About this file

This document summarizes an upcoming federal contract solicitation for construction and installation services related to anti-terrorism and force protection measures. The U.S. Army Corps of Engineers Europe District will solicit and award an indefinite-delivery, indefinite-quantity single award task order contract with a total value not to exceed $49.995 million over a five-year period. The contract will provide construction and installation services for physical security barriers, access control points, security systems and related infrastructure at U.S. facilities located in Germany, Belgium, Netherlands, Poland, Romania and Bulgaria. A pre-proposal conference will be held on March 4, 2020, with proposals due under a best value evaluation. The minimum task order value is $10,000 and maximum is $5.5 million. All task orders will be awarded and paid in Euros.

View the file

Other files

File Type Posted
ATTACH 8 - ATFP Unit Price Book (UPB) 2019 (AMDT 0003) FINAL.xlsx XLSX spreadsheet
W912GB20R0017-0003.pdf PDF
W912GB20R0017-0002.pdf PDF
B.08.02 ATTACH 9 ATFP Technical Exhibits 2019 (AMDT 0002).pdf PDF
B.08.02 ATTACH 8 - ATFP Unit Price Book (UPB) 2019 (AMDT 0002).xlsx XLSX spreadsheet
B.08.02 ATTACH 4 FY20 ATFP Pricing Schedule (AMDT 0002).xlsx XLSX spreadsheet
B.08.03 W912GB20R0017-0002 (AMDT 0002).docx DOCX document
PPC Sign In Sheet ATFP JOC (AMDT 0001).pdf PDF
B.08.03 W912GB20R0017-0001 (AMDT 0001).pdf PDF
ATFP JOC PPC Slides 2020.03.04 FINAL (AMDT 0001).pdf PDF
B.08.02 ATTACH 8 - ATFP Unit Price Book (UPB) 2019 (AMDT 0001).xlsx XLSX spreadsheet
B.08.02 ATTACH 4 FY20 ATFP Pricing Schedule (AMDT 0001).xlsx XLSX spreadsheet
B.08.02 ATTACH 2A ExperienceOverviewSheet FY20ATFP (AMDT 0001).DOCX DOCX document
B.08.02 ATTCH 1 01 78 00.pdf PDF
REGISTRATION PPC USACE FY20 ATFP JOC.xlsx XLSX spreadsheet
B.08.02 W912GB20R0017.pdf PDF
B.08.02 ATTCH 1 01 33 16.pdf PDF
B.08.02 ATTACH 4 FY20 ATFP Pricing Schedule.xlsx XLSX spreadsheet
Pre-Proposal Conference Wegbeschreibung-Map.pdf PDF
B.08.02 ATTACH 5 BLA Template.docx DOCX document
B.08.02 ATTACH 2A ExperienceOverviewSheet FY20ATFP.docx DOCX document
B.08.02 ATTACH 3 PPQ Form.docx DOCX document
B.08.02 ATTCH 1 00 74 10.pdf PDF
B.08.02 ATTACH 2B Experience InfoSheet FY20ATFP.docx DOCX document
B.08.02 ATTACH 8 - ATFP Unit Price Book (UPB) 2019.xlsx XLSX spreadsheet
B.08.02 ATTACH 10 UPB_Germany_Italy_Europe_2016-2005.pdf PDF
B.08.02 ATTCH 1 01 33 00.pdf PDF
B.08.02 ATTCH 1 00 74 01.pdf PDF
B.08.02 ATTCH 1 01 35 26.pdf PDF
B.08.02 ATTCH 1 00 74 18.pdf PDF
B.08.02 ATTACH 7 Letter of Commitment.docx DOCX document
B.08.02 ATTCH 1 01 45 00.pdf PDF
B.08.02 ATTCH 1 01 32 16.pdf PDF
B.08.02 ATTCH1 EP310-1-6a Construction Project Signs ENGLISH.pdf PDF
B.08.02 ATTCH 1 00 74 19.pdf PDF
B.08.02 ATTACH 9 ATFP Technical Exhibits 2019.pdf PDF
B.08.02 ATTCH 1 00 74 02.pdf PDF
B.08.02 ATTCH 1 01 45 06.pdf PDF
B.08.02 ATTCH 1 01 45 01.pdf PDF
B.08.02 ATTACH 11 DIN EU Standard.pdf PDF
B.08.02 ATTCH 1 EP310-1-6a Construction Project Signs GERMAN.pdf PDF
B.08.02 ATTCH 1 01 30 01.pdf PDF
B.08.02 ATTACH 6 BLG Template.docx DOCX document
B.08.02 ATTCH 1 01 78 23.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED//FOR OFFICIAL USE ONLY

DEPARTMENT OF THE ARMY

U.S. ARMY CORPS OF ENGINEERS

EUROPE DISTRICT

CMR 410, BOX 1

APO AE 09096-0001

UNCLASSIFIED//FOR OFFICIAL USE ONLY 1

CENAU-EC-E August 2019

ENGINEERING GUIDELINE 02/2019

SUBJECT:

UNITED STATES ARMY CORPS OF ENGINEERS EUROPE DISTRICT

(CENAU) ANTITERRORISM/ FORCE PROTECTION (ATFP) GUIDELINE

I. BACKGROUND INFORMATION:

This guideline provides a summary of the ATFP requirements for CENAU projects in the EUCOM Area of Responsibility (AOR). This guideline is intended to consolidate information from multiple requirements documents, and provide a clear path for determining which ATFP requirements apply to a given project.

The documents used to develop this guideline are:

FRAGORD 001 TO USEUCOM ANTITERRORISM OPERATIONS ORDER

18-11, Dated 14 Jul 2019. Herein referred to as (FRAGO).

UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings, Dated 12 Dec 2018

UFC 4-020-01 DoD Security Engineering Facilities Planning Manual, Dated 11 September 2008

See Table 1 for a summary of ATFP requirements for various project types.

II. GENERAL GUIDANCE:

1. EXEMPTIONS FROM ATFP REQUIREMENTS:

See Appendix 1 for a flowchart depicting the process for determining if the project is exempt from ATFP requirements.

Exceptions per UFC 4-010-01 Section 1-6:

Low Occupancy Buildings- Buildings or portions of buildings routinely occupied by less than 11 DoD personnel and with a population density of less than one person per 40 gross square meters.

Low Occupancy Family Housing- 12 units or fewer per building.

Fisher Houses- 24 units or fewer.

Town Centers Enhanced Use Leases

ENGINEERING GUIDELINE 02/2019‐ TABLE 1

Table Summarizing ATFP Requirements for Various Project Types

UFC 4‐020‐01

II. * *

III. 3. e No

* DBT Analysis Requirement and Mitigation is Dependent on Guidance From the Antiterrorism Officer (ATO) and Users, see Section II. Of Engineering Guideline 02/2019 ** UFC 4‐010‐01 Standards 6, 7 & 9 Apply to the Addition Only. These Standards do Not Apply to the Existing Building

UNCLASSIFIED//FOR OFFICIAL USE ONLY

New Facilities

NOT Exempt from ATFP Requirements Per UFC 4‐010‐01

Section 1‐6

Outside Air Intake or Associated Controls Modified Else

WITHOUT Major Investment or Change of Occupancy Level

Existing Building

All LOPs

Building Addition

Other Assets or Threats Indentified Else

Windows, Skylights, Glazing or Doors Replaced

All LOPs ATFP Requirements Apply to Addition

Only

Standoff to Site Perimeter Cannot be Defended

"Low" LOP or Higher for VBIEDs

WITH Major Investment or Change of Occupancy Level

"Very Low" LOP for VBIEDs "Low" LOP or Higher for VBIEDs

Addition and Existing Building

Addition and Existing Building

"Very Low" LOP for VBIEDs "Low" LOP or Higher for VBIEDs "Very Low" LOP for VBIEDs

Standoff to Site Perimeter Can be Defended

More Than 50% of the Gross Area of the Existing Building

Less Than 50% of the Gross Area of the Existing Building

Appendix B Appendix CStandard

Yes

Moving

VBIED

Stationary

VBIED

Glazing Per Section 3.b.8

See Appendix

DBT

Required?

Mitigation Strategies for DBT Elements

Standard 5, 8, 11, 13‐17, 19‐21

Standard 6, 7, 9

6 Yes

7 Yes

Yes

9 Yes **

8 Yes

11 Yes

10 Yes

UFC 4‐010‐01 Requirements

No

III. 3. e

Exempt from ATFP Requirements Per UFC 4‐010‐01 Section 1‐6

III. 2. b

III. 2. c

III. 3. a

III. 3. b

III. 3. c

III. 3. d

FRAGO Requirements Eng. Guideline

Section

II.

III. 1. a

III. 1. b

III. 2. a

Yes

13 Yes

CENAU-EC-E ENGINEERING GUIDELINE 02/2019

UNCLASSIFIED//FOR OFFICIAL USE ONLY 2

Transitional & Temporary Structures and Spaces-Less than 5 years.

Military Protective Construction Parking Structures

a) Project Exempt from ATFP Requirements per UFC 4-010-01:

If the project is exempt from ATFP requirements per UFC 4-010-01, the project must be discussed with a local Antiterrorism Officer (ATO) and users to determine if there any assets or aggressor tactics that need to be addressed during project design.

UFC 4-020-01 Table 3-8 includes potential assets. Table 3-27 includes potential aggressor tactics.

FRAGO Section 3.b.3.b requires the Design Basis Threat (DBT) for defense critical infrastructure facilities to include visual, acoustic, and electronic eavesdropping tactics and airborne/waterborne contamination tactics.

If assets or aggressor tactics are identified as needing to be addressed during project design, then a DBT Analysis must be performed in accordance with Section II. 2. of this document, and mitigation strategies developed in accordance with UFC 4-020-01.

If assets or aggressor tactics are not identified as needing to be addressed during project design, the project does not have ATFP requirements.

b) Project NOT Exempt from ATFP Requirements per UFC 4-010-01:

If the project is NOT exempt from ATFP requirements per UFC 4-010-01, proceed in this guideline to the appropriate section:

Section IV- New Facilities Section V- Additions Section VI- Existing Facilities

2. Design Basis Threat (DBT) Analysis

UFC 4-020-01 Chapter 3 provides the process for the facility DBT Analysis; a planning team creates a Design Criteria Summary Worksheet that documents the appropriate DBT and Level of Protection (LOP) for the design.

Additional or reinforced DBT guidance from FRAGO Section 3.b.3.d.:

Determining the facility DBT is an installation function.

Determining the facility DBT is the first step in planning ATFP requirements and shall be completed prior to the beginning of the design phase.

Every planning team will include engineers, installation Antiterrorism Officers (ATOs), facility users, intelligence officials, operations, logistics and resource managers.

UNCLASSIFIED//FOR OFFICIAL USE ONLY 3

Inhabited Facilities must provide occupants no less than a “Very Low”

LOP.

Inhabited buildings routinely occupied by 50 or more DoD personnel must provide occupants no less than a “Low” LOP.

See FRAGO Section 3.b.3.d.2. for the minimum threat vehicle.

See FRAGO Section 3.b.3.d.3. for the minimum Vehicle Borne Improvised

Explosive Devise (VBIED) explosive weights.

The approved local DBT shall be used to establish design criteria based upon UFC 4-020-01. (Note the local DBT is different than the facility DBT).

III. SPECIFIC GUIDANCE:

1. NEW FACILTIES ATFP REQUIREMENTS

See Appendix 2 for a flowchart depicting the process for determining ATFP requirement for new facilities.

Complete a DBT Analysis in accordance with Section III. Note that the DBT Analysis results will govern the design where they exceed the minimum requirements established below.

a) New Facility with “Very Low” LOP for VBIEDs. See Appendix 6 for the

ATFP Requirements for the project.

b) New Facility with “Low” LOP or Higher for VBIEDs. See Appendix 7 for the ATFP Requirements for the project.

2. BUILDING ADDITION ATFP REQUIREMENTS

See Appendix 3 for a flowchart depicting the process for determining ATFP requirement for building additions.

Complete a DBT Analysis in accordance with Section II. 2. Note that the DBT Analysis results will govern the design where they exceed the minimum requirements established below.

a) Building Addition Less Than 50% of the Gross Area of the Existing

Building. Only the building addition must comply with ATFP requirements (UFC 4-010-01 Section 1-5.3). See Appendix 8 for the ATFP Requirements for the project.

b) Building Addition More Than 50% of the Gross Area of the Existing

Building and “Very Low” LOP for VBIEDs. The existing building and the building addition must comply with ATFP requirements (UFC 4-010-01

UNCLASSIFIED//FOR OFFICIAL USE ONLY 4

Section 1-5.3). See Appendix 9 for the ATFP Requirements for the project.

c) Building Addition More Than 50% of the Gross Area of the Existing

Building and “Low” LOP or Higher for VBIEDs. The existing building and the building addition must comply with ATFP requirements (UFC 4- 010-01 Section 1-5.3). See Appendix 10 for the ATFP Requirements for the project.

3. EXISTING BUILDING ATFP REQUIREMENTS

See Appendix 4 & 5 for a flowcharts depicting the process for determining ATFP requirement for building renovations, modifications, repairs, revitalizations and restorations of existing buildings.

a) Existing Building WITH Major Investment or Change of Occupancy

Level and a “Very Low” LOP.

This section applies during the following conditions:

The project cost exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, or when any building or portion of a building is converted from low occupancy to inhabited occupancy.

The DBT Analysis determines a “Very Low” LOP for VBIEDs.

Complete a DBT Analysis in accordance with Section II. 2. Note that the DBT Analysis results will govern the design where they exceed the minimum requirements established below.

See Appendix 11 for the ATFP Requirements for the project.

b) Existing Building WITH Major Investment or Change of Occupancy

Level, “Low” LOP or Higher for VBIEDs, and Standoff to the Site Perimeter to Defend Against VBIEDs CAN be Achieved.

This section applies during the following conditions:

The project cost exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, or when any building or portion of a building is converted from low occupancy to inhabited occupancy.

The DBT Analysis determines a “Low” LOP or Higher for VBIEDs.

Standoff to the site perimeter to defend against VBIEDs CAN be achieved in accordance with FRAGO Section 3.b.3.d.4.d.

UNCLASSIFIED//FOR OFFICIAL USE ONLY 5

See Appendix 12 for the ATFP Requirements for the project.

c) Existing Building WITH Major Investment or Change of Occupancy

Level, “Low” LOP or Higher, and Standoff to the Site Perimeter to defend against VBIEDs CANNOT be Achieved.

This section applies during the following conditions:

The project cost exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, or when any building or portion of a building is converted from low occupancy to inhabited occupancy.

The DBT Analysis determines a “Low” LOP or Higher for VBIEDs.

Standoff to the site perimeter to defend against VBIEDs cannot be achieved in accordance with FRAGO Section 3.b.3.d.4.d.

See Appendix 13 for the ATFP Requirements for the project.

d) Existing Building WITHOUT Major Investment or Change of

Occupancy Level and with Windows, Skylights, Glazing or Doors Replaced.

This section applies during the following conditions:

The project cost does not exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, and the building or portion of a building are not converted from low occupancy to inhabited occupancy.

Windows, skylights, glazing or doors are replaced.

See Appendix 14 for the ATFP Requirements for the project.

UNCLASSIFIED//FOR OFFICIAL USE ONLY 6

e) Existing Building WITHOUT Major Investment or Change of

Occupancy Level and with NO Windows, Skylights, Glazing or Doors Replaced.

This section applies during the following conditions:

The project cost does not exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, and the building or portion of a building are not converted from low occupancy to inhabited occupancy. (UFC 4-010-01 Section 1-

5.2.1 & 1-5.2.2.)

Windows, skylights, glazing or doors are not replaced. (UFC 4- 010-01 Section 1-5.2.3)

Whenever HVAC systems featuring outside air intakes or control system associated with HVAC systems including outside air intakes are being replaced or modified, apply provisions of UFC 4-010-01 Standard 18.

Else, No ATFP Requirements apply.

Point of Contact CENAU POC for this Engineering Guideline 02/2019 is:

Nathan Fox, Structural Engineer, Technical Engineering Section

ACHIM KNACKSTERDT

CHIEF, TECHNICAL ENGINEERING SECTION

ENGINEERING BRANCH

CENAU-EC-E

APPENDIX 1

FLOWCHART FOR EXEMPTIONS FROM ATFP REQUIREMENTS

APPENDIX 2

FLOWCHART FOR NEW FACILITY ATFP REQUIREMENTS

APPENDIX 3

FLOWCHART FOR BUILDING ADDITION ATFP REQUIREMENTS

APPENDIX 4

FLOWCHART FOR EXISTING BUILDING ATFP REQUIREMENTS

APPENDIX 5

FLOWCHART FOR EXISTING BUILDING WITH MAJOR RENOVATIONS OR

CHANGE OF OCCUPANCY ATFP REQUIREMENTS

EUROPE DISTRICT

ENGINEERING GUIDELINE 02/2019- APPENDIX 6

NEW FACILITY WITH A “VERY LOW” LEVEL OF PROTECTION (LOP),

ANTITERRORISM/FORCE PROTECTION (ATFP) REQUIREMENTS

This appendix applies during the following conditions:

New facility with a “Very Low” LOP Project is not exempt from ATFP Standards per UFC 4-010-01 Section 1-6

Note that the DBT Analysis results will govern the design where they exceed the

FRAGO Requirements

Facility must mitigate against a stationary VBIED threat (Section 3.b.3.d.3.)

Establish Standoff Distance and Unobstructed Space to perimeter, parking and roadways.

Facility must consider a moving VBIED threat by allowing for the possibility of future interim or permanent measures to mitigate against moving VBIED threats. (Section 3.b.3.d.3.)

New glazing must meet the requirements of Section 3.b.8. Glazing must be designed in accordance with the DBT Analysis results and Standoff Distance provided.

UFC 4-020-01 Requirements

Establish mitigation strategies for elements identified in the DBT Analysis.

UFC 4-010-01 Requirements Standard 5 Parking Beneath Buildings or on Rooftops Standard 6 Progressive Collapse Resistance Standard 7 Structural Isolation Standard 8 Building Overhangs and Breezeways Standard 9 Exterior Masonry Walls Standard 11 Building Entrance Layout Standard 13 Mail Rooms and Loading Docks Standard 14 Roof Access

APPENDIX 6

Standard 15 Overhead Mounted Architectural Features Standard 16 Air Intakes Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors

Appendix C- Mandatory because of FRAGO guidance o Representative standoff distances for conventional construction

EUROPE DISTRICT

ENGINEERING GUIDELINE 02/2019- APPENDIX 7

NEW FACILITY WITH A “LOW” LEVEL OF PROTECTION (LOP) OR

HIGHER, ANTITERRORISM/FORCE PROTECTION (ATFP)

REQUIREMENTS:

This Appendix applies during the following conditions:

New facility with a “Low” LOP or higher for VBIEDs.

FRAGO Requirements

Facility must mitigate against moving and stationary VBIED threats (Section 3.b.3.d.3.)

Facility must have a continuous perimeter of passive and/or active barriers at the moving vehicle standoff distance. (Section 3.b.3.d.4.e.)

See Section 3.b.3.d.4.e. for minimum barrier requirements.

New glazing must meet the requirements of Section 3.b.8. Glazing must be

Standard 6 Progressive Collapse Resistance Standard 7 Structural Isolation Standard 8 Building Overhangs and Breezeways Standard 9 Exterior Masonry Walls Standard 11 Building Entrance Layout

Standard 14 Roof Access

APPENDIX 7

Standard 16 Air Intakes Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors

EUROPE DISTRICT

ENGINEERING GUIDELINE 02/2019- APPENDIX 8

BUILDING ADDITION LESS THAN 50% OF THE GROSS AREA OF THE

EXISTING BUILDING, ANTITERRORISM FORCE PROTECTION (ATFP)

REQUIREMENTS

This appendix applies during the following conditions:

Building addition less than 50% of the gross area of the existing building

Only the building addition must comply with ATFP requirements (UFC 4-010-01 Section 1-5.3).

Note that the DBT Analysis results will govern the design where they exceed the minimum requirements established below.

FRAGO Requirements

Addition must mitigate against a stationary VBIED threat (Section 3.b.3.d.4.c.)

Establish Standoff Distance and Unobstructed Space to perimeter, parking and roadways.

New glazing must meet the requirements of Section 3.b.8. Glazing must be

Standard 6 Progressive Collapse Resistance Standard 7 Structural Isolation Standard 8 Building Overhangs and Breezeways Standard 9 Exterior Masonry Walls Standard 11 Building Entrance Layout

APPENDIX 8

Standard 14 Roof Access Standard 15 Overhead Mounted Architectural Features Standard 16 Air Intakes Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors

EUROPE DISTRICT

ENGINEERING GUIDELINE 02/2019- APPENDIX 9

BUILDING ADDITION WITH MORE THAN 50% OF THE GROSS AREA

OF THE EXISTING BUILDING AND “VERY LOW” LEVEL OF

PROTECTION (LOP), ANTITERRORISM/FORCE PROTECTION (ATFP)

REQUIREMENTS

This Appendix applies during the following conditions:

Building addition with more than 50% of the gross area of the existing building and “Very Low” LOP for VBIEDs

Project is not exempt from ATFP Standards per UFC 4-010-01 Section 1-6

The existing building and the building addition must comply with ATFP requirements (UFC 4-010-01 Section 1-5.3).

Note that the DBT Analysis results will govern the design where they exceed the minimum requirements established below.

FRAGO Requirements

Existing building and addition must mitigate against a stationary VBIED threat (Section 3.b.3.d.3.).

Establish Standoff Distance and Unobstructed Space to perimeter, parking and roadways.

New glazing for the existing building and addition must meet the requirements of Section 3.b.8. Glazing must be designed in accordance with the DBT Analysis results and Standoff Distance provided.

Standard 6 Progressive Collapse Resistance (At Addition Only) Standard 7 Structural Isolation (At Addition Only)

APPENDIX 9

Standard 8 Building Overhangs and Breezeways Standard 9 Exterior Masonry Walls (At Addition Only) Standard 11 Building Entrance Layout Standard 13 Mail Rooms and Loading Docks Standard 14 Roof Access Standard 15 Overhead Mounted Architectural Features Standard 16 Air Intakes Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors

EUROPE DISTRICT

ENGINEERING GUIDELINE 02/2019- APPENDIX 10

BUILDING ADDITION MORE THAN 50% OF THE GROSS AREA OF

THE EXISTING BUILDING AND “LOW” LEVEL OF PROTECTION (LOP)

OR HIGHER, ANTITERRORISE FORCE PROTECTION (ATFP)

REQUIREMENTS

This Appendix applies during the following conditions:

Building addition more than 50% of the gross area of the existing building and a “Low” LOP or higher for VBIEDs.

Project is not exempt from ATFP Standards per UFC 4-010-01 Section 1-6

The existing building and the building addition must comply with ATFP requirements (UFC 4-010-01 Section 1-5.3).

FRAGO Requirements

Existing building and addition must mitigate against a stationary and moving VBIED threat (Section 3.b.3.d.4.c.).

Facility must have a continuous perimeter of passive and/or active barriers at the moving vehicle standoff distance. (Section 3.b.3.d.4.e.)

See Section 3.b.3.d.4.e. for minimum barrier requirements.

New glazing for the existing building and addition must meet the requirements of Section 3.b.8. Glazing must be designed in accordance with the DBT Analysis results and Standoff Distance provided.

Standard 6 Progressive Collapse Resistance (At Addition Only)

APPENDIX 10

Standard 7 Structural Isolation (At Addition Only) Standard 8 Building Overhangs and Breezeways Standard 9 Exterior Masonry Walls (At Addition Only) Standard 11 Building Entrance Layout Standard 13 Mail Rooms and Loading Docks Standard 14 Roof Access Standard 15 Overhead Mounted Architectural Features Standard 16 Air Intakes Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors

EUROPE DISTRICT

ENGINEERING GUIDELINE 02/2019- APPENDIX 11

EXISTING BUILDING WITH MAJOR INVESTMENT OR CHANGE OF

OCCUPANCY LEVEL AND A “VERY LOW” LEVEL OF PROTECTION

(LOP) ANTITERRORISM/FORCE PROTECTION (ATFP)

REQUIREMENTS

This appendix applies during the following conditions:

The project cost exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, or when any building or portion of a building is converted from low occupancy to inhabited occupancy.

The DBT Analysis determines a “Very Low” LOP for VBIEDs.

Project is not exempt from ATFP Standards per UFC 4-010-01 Section 1-6

Note that the DBT Analysis results will govern the design where they exceed the minimum requirements established below.

FRAGO Requirements

Existing building must mitigate against a stationary VBIED threat (Section 3.b.3.d.4.c.)

Establish Standoff Distance and Unobstructed Space to perimeter, parking and roadways.

Existing building must have glazing that meets the requirements of Section 3.b.8. Glazing must be designed in accordance with the DBT Analysis results and Standoff Distance provided.

UFC 4-020-01 Requirements Establish mitigation strategies for elements identified in the DBT Analysis.

UFC 4-010-01 Requirements Standard 5 Parking Beneath Buildings or on Rooftops Standard 8 Building Overhangs and Breezeways Standard 11 Building Entrance Layout Standard 13 Mail Rooms and Loading Docks Standard 14 Roof Access

Standard 16 Air Intakes

APPENDIX 11

Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors

EUROPE DISTRICT

ENGINEERING GUIDELINE 02/2019- APPENDIX 12

EXISTING BUILDING WITH MAJOR INVESTMENT OR CHANGE OF

OCCUPANCY LEVEL, “LOW” LEVEL OF PROTECTION (LOP) OR

HIGHER, AND STANDOFF TO THE SITE PERIMETER TO DEFEND

AGAINST VBIEDs CAN BE ACHIEVED, ANTITERRORISM/ FORCE

PROTECTION (ATFP) REQUIREMENTS

This appendix applies during the following conditions:

The project cost exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, or when any building or portion of a building is converted from low occupancy to inhabited occupancy.

The DBT Analysis determines a “Low” LOP or Higher for VBIEDs.

Standoff to the site perimeter to defend against VBIEDs CAN be achieved in accordance with FRAGO Section 3.b.3.d.4.d.

Existing building must mitigate against a stationary and moving VBIED threat (Section 3.b.3.d.4.d.)

Implement a continuous perimeter of passive and active barriers around the entire existing building (Section 3.b.3.d.4.d.).

See Section 3.b.3.d.4.e. for minimum barrier requirements.

Existing building must have glazing that meets the requirements of Section

3.b.8. Glazing must be designed in accordance with the DBT Analysis results and Standoff Distance provided.

APPENDIX 12

Standard 8 Building Overhangs and Breezeways Standard 11 Building Entrance Layout Standard 13 Mail Rooms and Loading Docks Standard 14 Roof Access Standard 15 Overhead Mounted Architectural Features Standard 16 Air Intakes Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors

EUROPE DISTRICT

ENGINEERING GUIDELINE 02/2019- APPENDIX 13

EXISTING BUILDING WITH MAJOR INVESTMENT OR CHANGE OF

OCCUPANCY LEVEL, “LOW” LEVEL OF PROTECTION (LOP) OR

HIGHER, AND STANDOFF TO THE SITE PERIMETER TO DEFEND

AGAINST VBIEDS CANNOT BE ACHIEVED; ANTITERRORISM/ FORCE

PROTECTION (ATFP) REQUIREMENTS

This section applies during the following conditions:

The project cost exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, or when any building or portion of a building is converted from low occupancy to inhabited occupancy.

The DBT Analysis determines a “Low” LOP or Higher for VBIEDs.

Standoff to the site perimeter to defend against VBIEDs cannot be achieved in accordance with FRAGO Section 3.b.3.d.4.d.

Existing building must mitigate against a stationary VBIED threat (Section 3.b.3.d.4.d.)

Establish Standoff Distance and Unobstructed Space to perimeter and parking.

Existing building must have glazing that meets the requirements of Section

APPENDIX 13

Standard 8 Building Overhangs and Breezeways Standard 11 Building Entrance Layout Standard 13 Mail Rooms and Loading Docks Standard 14 Roof Access Standard 15 Overhead Mounted Architectural Features Standard 16 Air Intakes Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors

EUROPE DISTRICT

ENGINEERING GUIDELINE 02/2019- APPENDIX 14

EXISTING BUILDING WITHOUT MAJOR INVESTMENT OR CHANGE OF

OCCUPANCY LEVEL AND WITH WINDOWS, SKYLIGHTS, GLAZING

OR DOORS REPLACED; ANTITERRORISM/ FORCE PROTECTION

(ATFP) REQUIREMENTS

This section applies during the following conditions:

The project cost does not exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, and the building or portion of a building are not converted from low occupancy to inhabited occupancy.

Windows, skylights, glazing or doors are replaced.

Project is not exempt from ATFP Standards per UFC 4-010-01 Section 1-6.

FRAGO Requirements

Existing building must have glazing that meets the requirements of Section

Standard 18 Emergency Air Distribution Shutoff (If triggered by outside air intakes or associated control systems being modified)

Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors