This document summarizes an upcoming federal contract solicitation for construction and installation services related to anti-terrorism and force protection measures. The U.S. Army Corps of Engineers Europe District will solicit and award an indefinite-delivery, indefinite-quantity single award task order contract with a total value not to exceed $49.995 million over a five-year period. The contract will provide construction and installation services for physical security barriers, access control points, security systems and related infrastructure at U.S. facilities located in Germany, Belgium, Netherlands, Poland, Romania and Bulgaria. A pre-proposal conference will be held on March 4, 2020, with proposals due under a best value evaluation. The minimum task order value is $10,000 and maximum is $5.5 million. All task orders will be awarded and paid in Euros.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED//FOR OFFICIAL USE ONLY
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS
EUROPE DISTRICT
CMR 410, BOX 1
APO AE 09096-0001
UNCLASSIFIED//FOR OFFICIAL USE ONLY 1
CENAU-EC-E August 2019
ENGINEERING GUIDELINE 02/2019
SUBJECT:
UNITED STATES ARMY CORPS OF ENGINEERS EUROPE DISTRICT
(CENAU) ANTITERRORISM/ FORCE PROTECTION (ATFP) GUIDELINE
I. BACKGROUND INFORMATION:
This guideline provides a summary of the ATFP requirements for CENAU projects in the EUCOM Area of Responsibility (AOR). This guideline is intended to consolidate information from multiple requirements documents, and provide a clear path for determining which ATFP requirements apply to a given project.
The documents used to develop this guideline are:
FRAGORD 001 TO USEUCOM ANTITERRORISM OPERATIONS ORDER
18-11, Dated 14 Jul 2019. Herein referred to as (FRAGO).
UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings, Dated 12 Dec 2018
UFC 4-020-01 DoD Security Engineering Facilities Planning Manual, Dated 11 September 2008
See Table 1 for a summary of ATFP requirements for various project types.
II. GENERAL GUIDANCE:
1. EXEMPTIONS FROM ATFP REQUIREMENTS:
See Appendix 1 for a flowchart depicting the process for determining if the project is exempt from ATFP requirements.
Exceptions per UFC 4-010-01 Section 1-6:
Low Occupancy Buildings- Buildings or portions of buildings routinely occupied by less than 11 DoD personnel and with a population density of less than one person per 40 gross square meters.
Low Occupancy Family Housing- 12 units or fewer per building.
Fisher Houses- 24 units or fewer.
Town Centers Enhanced Use Leases
ENGINEERING GUIDELINE 02/2019‐ TABLE 1
Table Summarizing ATFP Requirements for Various Project Types
UFC 4‐020‐01
II. * *
III. 3. e No
* DBT Analysis Requirement and Mitigation is Dependent on Guidance From the Antiterrorism Officer (ATO) and Users, see Section II. Of Engineering Guideline 02/2019 ** UFC 4‐010‐01 Standards 6, 7 & 9 Apply to the Addition Only. These Standards do Not Apply to the Existing Building
UNCLASSIFIED//FOR OFFICIAL USE ONLY
New Facilities
NOT Exempt from ATFP Requirements Per UFC 4‐010‐01
Section 1‐6
Outside Air Intake or Associated Controls Modified Else
WITHOUT Major Investment or Change of Occupancy Level
Existing Building
All LOPs
Building Addition
Other Assets or Threats Indentified Else
Windows, Skylights, Glazing or Doors Replaced
All LOPs ATFP Requirements Apply to Addition
Only
Standoff to Site Perimeter Cannot be Defended
"Low" LOP or Higher for VBIEDs
WITH Major Investment or Change of Occupancy Level
"Very Low" LOP for VBIEDs "Low" LOP or Higher for VBIEDs
Addition and Existing Building
Addition and Existing Building
"Very Low" LOP for VBIEDs "Low" LOP or Higher for VBIEDs "Very Low" LOP for VBIEDs
Standoff to Site Perimeter Can be Defended
More Than 50% of the Gross Area of the Existing Building
Less Than 50% of the Gross Area of the Existing Building
Appendix B Appendix CStandard
Yes
Moving
VBIED
Stationary
VBIED
Glazing Per Section 3.b.8
See Appendix
DBT
Required?
Mitigation Strategies for DBT Elements
Standard 5, 8, 11, 13‐17, 19‐21
Standard 6, 7, 9
6 Yes
7 Yes
Yes
9 Yes **
8 Yes
11 Yes
10 Yes
UFC 4‐010‐01 Requirements
No
III. 3. e
Exempt from ATFP Requirements Per UFC 4‐010‐01 Section 1‐6
III. 2. b
III. 2. c
III. 3. a
III. 3. b
III. 3. c
III. 3. d
FRAGO Requirements Eng. Guideline
Section
II.
III. 1. a
III. 1. b
III. 2. a
Yes
13 Yes
CENAU-EC-E ENGINEERING GUIDELINE 02/2019
UNCLASSIFIED//FOR OFFICIAL USE ONLY 2
Transitional & Temporary Structures and Spaces-Less than 5 years.
Military Protective Construction Parking Structures
a) Project Exempt from ATFP Requirements per UFC 4-010-01:
If the project is exempt from ATFP requirements per UFC 4-010-01, the project must be discussed with a local Antiterrorism Officer (ATO) and users to determine if there any assets or aggressor tactics that need to be addressed during project design.
UFC 4-020-01 Table 3-8 includes potential assets. Table 3-27 includes potential aggressor tactics.
FRAGO Section 3.b.3.b requires the Design Basis Threat (DBT) for defense critical infrastructure facilities to include visual, acoustic, and electronic eavesdropping tactics and airborne/waterborne contamination tactics.
If assets or aggressor tactics are identified as needing to be addressed during project design, then a DBT Analysis must be performed in accordance with Section II. 2. of this document, and mitigation strategies developed in accordance with UFC 4-020-01.
If assets or aggressor tactics are not identified as needing to be addressed during project design, the project does not have ATFP requirements.
b) Project NOT Exempt from ATFP Requirements per UFC 4-010-01:
If the project is NOT exempt from ATFP requirements per UFC 4-010-01, proceed in this guideline to the appropriate section:
Section IV- New Facilities Section V- Additions Section VI- Existing Facilities
2. Design Basis Threat (DBT) Analysis
UFC 4-020-01 Chapter 3 provides the process for the facility DBT Analysis; a planning team creates a Design Criteria Summary Worksheet that documents the appropriate DBT and Level of Protection (LOP) for the design.
Additional or reinforced DBT guidance from FRAGO Section 3.b.3.d.:
Determining the facility DBT is an installation function.
Determining the facility DBT is the first step in planning ATFP requirements and shall be completed prior to the beginning of the design phase.
Every planning team will include engineers, installation Antiterrorism Officers (ATOs), facility users, intelligence officials, operations, logistics and resource managers.
UNCLASSIFIED//FOR OFFICIAL USE ONLY 3
Inhabited Facilities must provide occupants no less than a “Very Low”
LOP.
Inhabited buildings routinely occupied by 50 or more DoD personnel must provide occupants no less than a “Low” LOP.
See FRAGO Section 3.b.3.d.2. for the minimum threat vehicle.
See FRAGO Section 3.b.3.d.3. for the minimum Vehicle Borne Improvised
Explosive Devise (VBIED) explosive weights.
The approved local DBT shall be used to establish design criteria based upon UFC 4-020-01. (Note the local DBT is different than the facility DBT).
III. SPECIFIC GUIDANCE:
1. NEW FACILTIES ATFP REQUIREMENTS
See Appendix 2 for a flowchart depicting the process for determining ATFP requirement for new facilities.
Complete a DBT Analysis in accordance with Section III. Note that the DBT Analysis results will govern the design where they exceed the minimum requirements established below.
a) New Facility with “Very Low” LOP for VBIEDs. See Appendix 6 for the
ATFP Requirements for the project.
b) New Facility with “Low” LOP or Higher for VBIEDs. See Appendix 7 for the ATFP Requirements for the project.
2. BUILDING ADDITION ATFP REQUIREMENTS
See Appendix 3 for a flowchart depicting the process for determining ATFP requirement for building additions.
Complete a DBT Analysis in accordance with Section II. 2. Note that the DBT Analysis results will govern the design where they exceed the minimum requirements established below.
a) Building Addition Less Than 50% of the Gross Area of the Existing
Building. Only the building addition must comply with ATFP requirements (UFC 4-010-01 Section 1-5.3). See Appendix 8 for the ATFP Requirements for the project.
b) Building Addition More Than 50% of the Gross Area of the Existing
Building and “Very Low” LOP for VBIEDs. The existing building and the building addition must comply with ATFP requirements (UFC 4-010-01
UNCLASSIFIED//FOR OFFICIAL USE ONLY 4
Section 1-5.3). See Appendix 9 for the ATFP Requirements for the project.
c) Building Addition More Than 50% of the Gross Area of the Existing
Building and “Low” LOP or Higher for VBIEDs. The existing building and the building addition must comply with ATFP requirements (UFC 4- 010-01 Section 1-5.3). See Appendix 10 for the ATFP Requirements for the project.
3. EXISTING BUILDING ATFP REQUIREMENTS
See Appendix 4 & 5 for a flowcharts depicting the process for determining ATFP requirement for building renovations, modifications, repairs, revitalizations and restorations of existing buildings.
a) Existing Building WITH Major Investment or Change of Occupancy
Level and a “Very Low” LOP.
This section applies during the following conditions:
The project cost exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, or when any building or portion of a building is converted from low occupancy to inhabited occupancy.
The DBT Analysis determines a “Very Low” LOP for VBIEDs.
Complete a DBT Analysis in accordance with Section II. 2. Note that the DBT Analysis results will govern the design where they exceed the minimum requirements established below.
See Appendix 11 for the ATFP Requirements for the project.
b) Existing Building WITH Major Investment or Change of Occupancy
Level, “Low” LOP or Higher for VBIEDs, and Standoff to the Site Perimeter to Defend Against VBIEDs CAN be Achieved.
This section applies during the following conditions:
The project cost exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, or when any building or portion of a building is converted from low occupancy to inhabited occupancy.
The DBT Analysis determines a “Low” LOP or Higher for VBIEDs.
Standoff to the site perimeter to defend against VBIEDs CAN be achieved in accordance with FRAGO Section 3.b.3.d.4.d.
UNCLASSIFIED//FOR OFFICIAL USE ONLY 5
See Appendix 12 for the ATFP Requirements for the project.
c) Existing Building WITH Major Investment or Change of Occupancy
Level, “Low” LOP or Higher, and Standoff to the Site Perimeter to defend against VBIEDs CANNOT be Achieved.
This section applies during the following conditions:
The project cost exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, or when any building or portion of a building is converted from low occupancy to inhabited occupancy.
The DBT Analysis determines a “Low” LOP or Higher for VBIEDs.
Standoff to the site perimeter to defend against VBIEDs cannot be achieved in accordance with FRAGO Section 3.b.3.d.4.d.
See Appendix 13 for the ATFP Requirements for the project.
d) Existing Building WITHOUT Major Investment or Change of
Occupancy Level and with Windows, Skylights, Glazing or Doors Replaced.
This section applies during the following conditions:
The project cost does not exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, and the building or portion of a building are not converted from low occupancy to inhabited occupancy.
Windows, skylights, glazing or doors are replaced.
See Appendix 14 for the ATFP Requirements for the project.
UNCLASSIFIED//FOR OFFICIAL USE ONLY 6
e) Existing Building WITHOUT Major Investment or Change of
Occupancy Level and with NO Windows, Skylights, Glazing or Doors Replaced.
This section applies during the following conditions:
The project cost does not exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, and the building or portion of a building are not converted from low occupancy to inhabited occupancy. (UFC 4-010-01 Section 1-
5.2.1 & 1-5.2.2.)
Windows, skylights, glazing or doors are not replaced. (UFC 4- 010-01 Section 1-5.2.3)
Whenever HVAC systems featuring outside air intakes or control system associated with HVAC systems including outside air intakes are being replaced or modified, apply provisions of UFC 4-010-01 Standard 18.
Else, No ATFP Requirements apply.
Point of Contact CENAU POC for this Engineering Guideline 02/2019 is:
Nathan Fox, Structural Engineer, Technical Engineering Section
ACHIM KNACKSTERDT
CHIEF, TECHNICAL ENGINEERING SECTION
ENGINEERING BRANCH
CENAU-EC-E
APPENDIX 1
FLOWCHART FOR EXEMPTIONS FROM ATFP REQUIREMENTS
APPENDIX 2
FLOWCHART FOR NEW FACILITY ATFP REQUIREMENTS
APPENDIX 3
FLOWCHART FOR BUILDING ADDITION ATFP REQUIREMENTS
APPENDIX 4
FLOWCHART FOR EXISTING BUILDING ATFP REQUIREMENTS
APPENDIX 5
FLOWCHART FOR EXISTING BUILDING WITH MAJOR RENOVATIONS OR
CHANGE OF OCCUPANCY ATFP REQUIREMENTS
EUROPE DISTRICT
ENGINEERING GUIDELINE 02/2019- APPENDIX 6
NEW FACILITY WITH A “VERY LOW” LEVEL OF PROTECTION (LOP),
ANTITERRORISM/FORCE PROTECTION (ATFP) REQUIREMENTS
This appendix applies during the following conditions:
New facility with a “Very Low” LOP Project is not exempt from ATFP Standards per UFC 4-010-01 Section 1-6
Note that the DBT Analysis results will govern the design where they exceed the
FRAGO Requirements
Facility must mitigate against a stationary VBIED threat (Section 3.b.3.d.3.)
Establish Standoff Distance and Unobstructed Space to perimeter, parking and roadways.
Facility must consider a moving VBIED threat by allowing for the possibility of future interim or permanent measures to mitigate against moving VBIED threats. (Section 3.b.3.d.3.)
New glazing must meet the requirements of Section 3.b.8. Glazing must be designed in accordance with the DBT Analysis results and Standoff Distance provided.
UFC 4-020-01 Requirements
Establish mitigation strategies for elements identified in the DBT Analysis.
UFC 4-010-01 Requirements Standard 5 Parking Beneath Buildings or on Rooftops Standard 6 Progressive Collapse Resistance Standard 7 Structural Isolation Standard 8 Building Overhangs and Breezeways Standard 9 Exterior Masonry Walls Standard 11 Building Entrance Layout Standard 13 Mail Rooms and Loading Docks Standard 14 Roof Access
APPENDIX 6
Standard 15 Overhead Mounted Architectural Features Standard 16 Air Intakes Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors
Appendix C- Mandatory because of FRAGO guidance o Representative standoff distances for conventional construction
EUROPE DISTRICT
ENGINEERING GUIDELINE 02/2019- APPENDIX 7
NEW FACILITY WITH A “LOW” LEVEL OF PROTECTION (LOP) OR
HIGHER, ANTITERRORISM/FORCE PROTECTION (ATFP)
REQUIREMENTS:
This Appendix applies during the following conditions:
New facility with a “Low” LOP or higher for VBIEDs.
FRAGO Requirements
Facility must mitigate against moving and stationary VBIED threats (Section 3.b.3.d.3.)
Facility must have a continuous perimeter of passive and/or active barriers at the moving vehicle standoff distance. (Section 3.b.3.d.4.e.)
See Section 3.b.3.d.4.e. for minimum barrier requirements.
New glazing must meet the requirements of Section 3.b.8. Glazing must be
Standard 6 Progressive Collapse Resistance Standard 7 Structural Isolation Standard 8 Building Overhangs and Breezeways Standard 9 Exterior Masonry Walls Standard 11 Building Entrance Layout
Standard 14 Roof Access
APPENDIX 7
Standard 16 Air Intakes Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors
EUROPE DISTRICT
ENGINEERING GUIDELINE 02/2019- APPENDIX 8
BUILDING ADDITION LESS THAN 50% OF THE GROSS AREA OF THE
EXISTING BUILDING, ANTITERRORISM FORCE PROTECTION (ATFP)
REQUIREMENTS
This appendix applies during the following conditions:
Building addition less than 50% of the gross area of the existing building
Only the building addition must comply with ATFP requirements (UFC 4-010-01 Section 1-5.3).
Note that the DBT Analysis results will govern the design where they exceed the minimum requirements established below.
FRAGO Requirements
Addition must mitigate against a stationary VBIED threat (Section 3.b.3.d.4.c.)
Establish Standoff Distance and Unobstructed Space to perimeter, parking and roadways.
New glazing must meet the requirements of Section 3.b.8. Glazing must be
Standard 6 Progressive Collapse Resistance Standard 7 Structural Isolation Standard 8 Building Overhangs and Breezeways Standard 9 Exterior Masonry Walls Standard 11 Building Entrance Layout
APPENDIX 8
Standard 14 Roof Access Standard 15 Overhead Mounted Architectural Features Standard 16 Air Intakes Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors
EUROPE DISTRICT
ENGINEERING GUIDELINE 02/2019- APPENDIX 9
BUILDING ADDITION WITH MORE THAN 50% OF THE GROSS AREA
OF THE EXISTING BUILDING AND “VERY LOW” LEVEL OF
PROTECTION (LOP), ANTITERRORISM/FORCE PROTECTION (ATFP)
REQUIREMENTS
This Appendix applies during the following conditions:
Building addition with more than 50% of the gross area of the existing building and “Very Low” LOP for VBIEDs
Project is not exempt from ATFP Standards per UFC 4-010-01 Section 1-6
The existing building and the building addition must comply with ATFP requirements (UFC 4-010-01 Section 1-5.3).
Note that the DBT Analysis results will govern the design where they exceed the minimum requirements established below.
FRAGO Requirements
Existing building and addition must mitigate against a stationary VBIED threat (Section 3.b.3.d.3.).
Establish Standoff Distance and Unobstructed Space to perimeter, parking and roadways.
New glazing for the existing building and addition must meet the requirements of Section 3.b.8. Glazing must be designed in accordance with the DBT Analysis results and Standoff Distance provided.
Standard 6 Progressive Collapse Resistance (At Addition Only) Standard 7 Structural Isolation (At Addition Only)
APPENDIX 9
Standard 8 Building Overhangs and Breezeways Standard 9 Exterior Masonry Walls (At Addition Only) Standard 11 Building Entrance Layout Standard 13 Mail Rooms and Loading Docks Standard 14 Roof Access Standard 15 Overhead Mounted Architectural Features Standard 16 Air Intakes Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors
EUROPE DISTRICT
ENGINEERING GUIDELINE 02/2019- APPENDIX 10
BUILDING ADDITION MORE THAN 50% OF THE GROSS AREA OF
THE EXISTING BUILDING AND “LOW” LEVEL OF PROTECTION (LOP)
OR HIGHER, ANTITERRORISE FORCE PROTECTION (ATFP)
REQUIREMENTS
This Appendix applies during the following conditions:
Building addition more than 50% of the gross area of the existing building and a “Low” LOP or higher for VBIEDs.
Project is not exempt from ATFP Standards per UFC 4-010-01 Section 1-6
The existing building and the building addition must comply with ATFP requirements (UFC 4-010-01 Section 1-5.3).
FRAGO Requirements
Existing building and addition must mitigate against a stationary and moving VBIED threat (Section 3.b.3.d.4.c.).
Facility must have a continuous perimeter of passive and/or active barriers at the moving vehicle standoff distance. (Section 3.b.3.d.4.e.)
See Section 3.b.3.d.4.e. for minimum barrier requirements.
New glazing for the existing building and addition must meet the requirements of Section 3.b.8. Glazing must be designed in accordance with the DBT Analysis results and Standoff Distance provided.
Standard 6 Progressive Collapse Resistance (At Addition Only)
APPENDIX 10
Standard 7 Structural Isolation (At Addition Only) Standard 8 Building Overhangs and Breezeways Standard 9 Exterior Masonry Walls (At Addition Only) Standard 11 Building Entrance Layout Standard 13 Mail Rooms and Loading Docks Standard 14 Roof Access Standard 15 Overhead Mounted Architectural Features Standard 16 Air Intakes Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors
EUROPE DISTRICT
ENGINEERING GUIDELINE 02/2019- APPENDIX 11
EXISTING BUILDING WITH MAJOR INVESTMENT OR CHANGE OF
OCCUPANCY LEVEL AND A “VERY LOW” LEVEL OF PROTECTION
(LOP) ANTITERRORISM/FORCE PROTECTION (ATFP)
REQUIREMENTS
This appendix applies during the following conditions:
The project cost exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, or when any building or portion of a building is converted from low occupancy to inhabited occupancy.
The DBT Analysis determines a “Very Low” LOP for VBIEDs.
Project is not exempt from ATFP Standards per UFC 4-010-01 Section 1-6
Note that the DBT Analysis results will govern the design where they exceed the minimum requirements established below.
FRAGO Requirements
Existing building must mitigate against a stationary VBIED threat (Section 3.b.3.d.4.c.)
Establish Standoff Distance and Unobstructed Space to perimeter, parking and roadways.
Existing building must have glazing that meets the requirements of Section 3.b.8. Glazing must be designed in accordance with the DBT Analysis results and Standoff Distance provided.
UFC 4-020-01 Requirements Establish mitigation strategies for elements identified in the DBT Analysis.
UFC 4-010-01 Requirements Standard 5 Parking Beneath Buildings or on Rooftops Standard 8 Building Overhangs and Breezeways Standard 11 Building Entrance Layout Standard 13 Mail Rooms and Loading Docks Standard 14 Roof Access
Standard 16 Air Intakes
APPENDIX 11
Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors
EUROPE DISTRICT
ENGINEERING GUIDELINE 02/2019- APPENDIX 12
EXISTING BUILDING WITH MAJOR INVESTMENT OR CHANGE OF
OCCUPANCY LEVEL, “LOW” LEVEL OF PROTECTION (LOP) OR
HIGHER, AND STANDOFF TO THE SITE PERIMETER TO DEFEND
AGAINST VBIEDs CAN BE ACHIEVED, ANTITERRORISM/ FORCE
PROTECTION (ATFP) REQUIREMENTS
This appendix applies during the following conditions:
The project cost exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, or when any building or portion of a building is converted from low occupancy to inhabited occupancy.
The DBT Analysis determines a “Low” LOP or Higher for VBIEDs.
Standoff to the site perimeter to defend against VBIEDs CAN be achieved in accordance with FRAGO Section 3.b.3.d.4.d.
Existing building must mitigate against a stationary and moving VBIED threat (Section 3.b.3.d.4.d.)
Implement a continuous perimeter of passive and active barriers around the entire existing building (Section 3.b.3.d.4.d.).
See Section 3.b.3.d.4.e. for minimum barrier requirements.
Existing building must have glazing that meets the requirements of Section
3.b.8. Glazing must be designed in accordance with the DBT Analysis results and Standoff Distance provided.
APPENDIX 12
Standard 8 Building Overhangs and Breezeways Standard 11 Building Entrance Layout Standard 13 Mail Rooms and Loading Docks Standard 14 Roof Access Standard 15 Overhead Mounted Architectural Features Standard 16 Air Intakes Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors
EUROPE DISTRICT
ENGINEERING GUIDELINE 02/2019- APPENDIX 13
EXISTING BUILDING WITH MAJOR INVESTMENT OR CHANGE OF
OCCUPANCY LEVEL, “LOW” LEVEL OF PROTECTION (LOP) OR
HIGHER, AND STANDOFF TO THE SITE PERIMETER TO DEFEND
AGAINST VBIEDS CANNOT BE ACHIEVED; ANTITERRORISM/ FORCE
PROTECTION (ATFP) REQUIREMENTS
This section applies during the following conditions:
The project cost exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, or when any building or portion of a building is converted from low occupancy to inhabited occupancy.
The DBT Analysis determines a “Low” LOP or Higher for VBIEDs.
Standoff to the site perimeter to defend against VBIEDs cannot be achieved in accordance with FRAGO Section 3.b.3.d.4.d.
Existing building must mitigate against a stationary VBIED threat (Section 3.b.3.d.4.d.)
Establish Standoff Distance and Unobstructed Space to perimeter and parking.
Existing building must have glazing that meets the requirements of Section
APPENDIX 13
Standard 8 Building Overhangs and Breezeways Standard 11 Building Entrance Layout Standard 13 Mail Rooms and Loading Docks Standard 14 Roof Access Standard 15 Overhead Mounted Architectural Features Standard 16 Air Intakes Standard 17 Mail Room and Loading Dock Ventilation Standard 18 Emergency Air Distribution Shutoff Standard 19 Equipment Bracing Standard 20 Under Building Access Standard 21 Mass Notification Appendix B- Mandatory because of FRAGO guidance o B-2.1 Standoff Distances o B-2.2 Unobstructed Space o B-2.3 Drive-up/Drop-Off Areas o B-2.4 Access Roads o B-2.5 Parking Beneath Buildings or on Rooftops o B-3.1 Windows and Skylights o B-3.2 Exterior Doors
EUROPE DISTRICT
ENGINEERING GUIDELINE 02/2019- APPENDIX 14
EXISTING BUILDING WITHOUT MAJOR INVESTMENT OR CHANGE OF
OCCUPANCY LEVEL AND WITH WINDOWS, SKYLIGHTS, GLAZING
OR DOORS REPLACED; ANTITERRORISM/ FORCE PROTECTION
(ATFP) REQUIREMENTS
This section applies during the following conditions:
The project cost does not exceeds 50% of the replacement cost of the existing building in accordance with UFC 3-701-01, and the building or portion of a building are not converted from low occupancy to inhabited occupancy.
Windows, skylights, glazing or doors are replaced.
Project is not exempt from ATFP Standards per UFC 4-010-01 Section 1-6.
FRAGO Requirements
Existing building must have glazing that meets the requirements of Section
Standard 18 Emergency Air Distribution Shutoff (If triggered by outside air intakes or associated control systems being modified)