This document is a Price Schedule for the Renovation of Purcivems EMS Riga Latvia project. It includes a list of base and option items with corresponding quantities, unit prices, and total amounts. The base items consist of the building renovation and improvements. The option items include repairing the garage floor and interior trench drains, repairing the vehicle washing area and providing an oil water separator, replacing the garage interior lighting, replacing the main heating pipes, and replacing the vehicle entry door.
The related Federal Contract Opportunity is a pre-solicitation announcement for the IEU-24-0010 Purvciems EMS Garage Renovation project in Riga, Latvia. The U.S. Army Corps of Engineers, Europe District plans to solicit proposals for a design-build project with the intent to award a single construction contract. The project includes various repair and replacement work for the EMS garage facility. The anticipated contract value is between $500,000 and $1,000,000 (USD), and the performance period is estimated to be between one and two calendar years after contract award. The solicitation announcement is expected to be made in May 2024 with full and open competition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.08.02_Att8_Bank Letter of Assurance (BLA) Template_New.docx | DOCX document | |
| B.08.02 lt22_Att4_Dedication Plaque.pdf | ||
| B.08.02 lt22_Att1_Location Map.pdf | ||
| B.08.02 lt22_Att2_As-built Site-Utilities Plan.pdf | ||
| B.08.02_Att7_Full Spec Binder.pdf | ||
| B.08.02_Att6_01 22 00 Purcivems EMS.docx | DOCX document | |
| B.08.02_Att9_Past Performance Questionair PPQ.docx | DOCX document | |
| B.08.02 lt22_Att3_ConcArchDwgs.pdf | ||
| B.08.02_Att10_Site Visit Attendee Worksheet.xlsx | XLSX spreadsheet | |
| B.08.02 lt22_011010_GaragePurvciems SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
Renovation of Purcivems EMS Riga Latvia 13-Feb-24
PRICE SCHEDULE
Renovation of Purcivems EMS Riga Latvia 13-Feb-24
Offerors shall provide pricing for all base and option items.
The following items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Statement of Work (SOW), Request for Proposal and Base Contract. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, and safety requirements. All work shall be performed in accordance with these documents. Refer to Specification Section 01 22 00 Price and Payment Procedures for additional description of the work associated with each of the items.
Period of Performance: Refer to clause COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10) in the Request for Proposal for the period of performance for all base and option items.
Liquidated Damages: Refer to clause LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12) in the Request for Proposal for the liquidated damages for all base and option items.
Option Items: The Government reserves the right to award the options up to 180 calendar days from contact award. See Section 01 22 00 for additional information regarding the award of options.
| Item No. |
| Title |
| Quantity |
| Unit |
| Unit Price |
| Amount |
BASE ITEMS
| 0001 |
| Building Renovation and Improvements |
| 1 |
| Job |
| $ |
| $ |
| Total of Base Item 0001 |
| $ |
OPTION ITEMS
| 0002 |
| Repair garage floor and interior trench drains |
| 1 |
| Job |
| $ |
| $ |
| 0003 |
| Repair vehicle washing area and provide Oil Water Separator |
| 1 |
| Job |
| $ |
| $ |
| 0004 |
| Replace garage interior lighting |
| 1 |
| Job |
| $ |
| $ |
| 0005 |
| Replace main heating pipes |
| 1 |
| Job |
| $ |
| $ |
| 0006 |
| Replace vehicle entry door |
| 1 |
| Job |
| $ |
| $ |
| Total of Option Items 0002 thru 0006 |
| $ |
| Total of all Base and Option Items |
| $ |
EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
-- END OF PROPOSAL SCHEDULE --