B.08.02 100% Package.pdf

PDF 8 MB Posted

Attached to
Construct PBS Role II - Solicitation
Solicitation number
W5J9JE23R0016
Issued by

About this file

This document outlines the technical requirements for a federal construction contract to build a Role II medical facility in Syria. Key details include:

  • The project involves constructing a metal building system structure for a Role II medical facility, along with associated site work including utilities, road, and retaining walls. Required products and services include a generator and fuel system, storage cabinets, and furnishing and equipment.

  • Technical requirements cover site investigations, earthwork, potable water and wastewater systems, structural design standards, architectural elements, mechanical and electrical systems. Specific standards are provided for materials, construction methods, and testing and inspection.

  • The metal building system structure and foundations must be designed by a qualified manufacturer. Structural drawings and analysis must be submitted for approval. Concrete must meet compressive strength and slump requirements.

  • Upon completion, the contractor must submit as-built drawings and provide a one-year warranty on workmanship. The target period of performance is 240 days from notice to proceed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

Transatlantic Expeditionary District

CONSTRUCT PBS ROLE II,

SHADDADI,

SYRIA

2023-0070

2023-0070 Construct Role II

Construct PBS Role II 20230070

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 11 00.00 45 BID SCHEDULE

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 STATEMENT OF WORK (SOW)

01 10 15 TECHNICAL REQUIREMENTS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 16.00 21 SYRIA PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 33 00 SUBMITTAL PROCEDURES

01 35 13 SPECIAL PROJECT REQUIREMENTS

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 15 METRIC MEASUREMENTS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 78 00 CLOSEOUT SUBMITTALS

APPENDIX-A: Contract Drawings APPENDIX-B: Standard MBS Drawings

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 01 00.00

BID SCHEDULE

PART 1 GENERAL

1.1 BID SCHEDULE

1.1.1 Schedule No. 1

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

DOCUMENT 00 11 00.00 45 Page 1

SECTION 00 01 00.00

BID SCHEDULE

PART 1 GENERAL

1.1 BID SCHEDULE

1.1.1 Schedule No. 1

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

BASE WORK

0001 Mobilization/ Demobilization

1 JOB

0002 As-Built Drawings

1 JOB $___________

0003 Contractor Manpower

Reporting

1 JOB $___________

0004 Site Survey

1 JOB $___________

0005 Geotechnical Investigation

1 JOB

0006 Demolition 1 JOB

0007 Site Grading & Drainage

1 JOB

0008 Retaining Walls 1 JOB

0009 Access Road 1 JOB $___________

0010 Potable Water Supply

1 JOB

0011 Potable Water Service

1 JOB

0012 Wastewater Holding Tank

1 JOB

0013 Sewer Service 1 JOB

DOCUMENT 00 11 00.00 45 Page 2

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

0014 Generator & Fuel Pad

1 JOB

0015 Generator & Fuel Tanks, & MTS

1 JOB

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

0016 Power Service 1 JOB

0017 Role II Medical Facility

1 EA

0018 Tambour Storage Cabinets

23 EA

0019 Storage Cabinets 5 EA

TOTAL BASE WORK SCHEDULE COST

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

DOCUMENT 00 11 00.00 45 Page 3

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 10 00

STATEMENT OF WORK (SOW)

PART 1 GENERAL

1.1 SUMMARY OF WORK

1.2 PARTIAL NOTICE TO PROCEED (PNTP)

1.2.1 Post Award Conference

1.3 NOTICE TO PROCEED (NTP)

1.3.1 Preconstruction Conference

1.4 PERIOD OF PERFORMANCE (POP)

1.5 APPENDICES

1.6 PROJECT LOCATION, BOUNDARIES, AND WORK RESTRICTIONS

1.6.1 Contractor Access

1.6.2 Batch Plant

1.6.3 SITE ACCESS & COORDINATION WITH OTHERS

1.7 SECURITY

PART 2 GENERAL WORK ITEMS

2.1 MOBILIZATION AND DEMOBILIZATION

2.2 AS-BUILT DRAWINGS

2.3 CONTRACTOR MANPOWER REPORTING

PART 3 SITE INVESTIGATIONS

3.1 SITE SURVEY

3.2 GEOTECHNICAL INVESTIGATION

PART 4 SITE IMPROVEMENTS

4.1 DEMOLITION

4.2 SITE GRADING AND DRAINAGE

4.3 RETAINING WALLS

4.4 ACCESS ROAD

4.5 POTABLE WATER SUPPLY

4.6 POTABLE WATER SERVICE

4.7 WASTEWATER HOLDING TANK

4.8 SEWER SERVICE

4.9 GENERATOR AND FUEL PAD

4.10 GENERATORS, FUEL TANKS, & MTS

4.11 POWER SERVICE

PART 5 FACILITIES

5.1 ROLE II MEDICAL FACILITY

PART 6 FURNISHING, FURNITURE, & EQUIPMENT (FFE)

6.1 TAMBOUR STORAGE CABINETS

6.2 STORAGE CABINETS

SECTION 01 10 00 Page 1

SECTION 01 10 00 Page 2

SECTION 01 10 00

STATEMENT OF WORK (SOW)

PART 1 GENERAL

1.1 SUMMARY OF WORK

This project is located in northeastern Syria near the vicinity of Ash Shaddadi. Work consists of the construction of al Role II Medical Facility, and the respective potable water, wastewater/sewer, and power generation service for the new facility. Work shall include all labor, equipment, and materials to complete all work specified herein.

All requirements set forth in this Section, 01 10 01 (SOW), but not included in the TECHNICAL REQUIREMENTS, Section 01 10 15, shall be considered as set forth in both and vice versa.

1.2 PARTIAL NOTICE TO PROCEED (PNTP)

Within 7 days after contract award, the Contracting Officer will issue a Partial Notice to Proceed (PNTP) to complete the following PNTP submittals/requirements:

a. Construction Schedule - SECTION 01 32 16.00 21

b. Contractor Quality Control (CQC) Plan - SECTION 01 45 00.00 10

c. Accident Prevention Plan (APP) - SECTION 01 35 26

d. Activity Hazard Analysis (AHA) - SECTION 01 35 26

e. Site Survey - SECTION 01 10 15

f. Final Grading Plan - SECTION 01 10 15

g. Designer's Qualifications - SECTION 01 10 15

h. Structural Drawings and Analysis - SECTION 01 10 15

i. Roof and Wall Analysis - SECTION 01 10 15

j. Concrete mix design - SECTION 01 10 15

k. Any training required in the contract specifications.

PNTP submittals/requirements shall be completed within 50 days of receipt of PNTP. All other submittals required in the contract specifications that are not stated above shall be completed after Notice to Proceed (NTP) specified herein.

1.2.1 Post Award Conference

Within 7 days of receipt of PNTP, the Contractor and any Subcontractors whose presence is necessary or requested, shall meet in conference with representatives of the Contracting Officer to discuss execution of this Contract, with special emphasis on PNTP submittal requirements and other aspects of this project that warrant clarification and understanding. The Contractor shall conduct additional conferences or meetings with the Government as determined necessary by the Contracting Officer.

1.3 NOTICE TO PROCEED (NTP)

The Contracting Officer will issue Notice to Proceed (NTP) once all PNTP submittals/requirements have been completed and approved by the Government to commence with all remaining and construction work. The maximum

SECTION 01 10 00 Page 3 duration(s) to complete construction work shall be in accordance with paragraph, PERIOD OF PERFORMANCE (POP).

1.3.1 Preconstruction Conference

Within 7 days of receipt of NTP, the Contractor and any Subcontractors whose presence is necessary or requested, shall meet in conference with representatives of the Contracting Officer to discuss execution of this Contract, with special emphasis on remaining submittal requirements and other aspects of this project that warrant clarification and understanding. The Contractor shall conduct additional conferences or meetings with the Government as determined necessary by the Contracting Officer.

1.4 PERIOD OF PERFORMANCE (POP)

Upon receipt of NTP, The Contractor shall have a Period of Performance (POP) of 240 days to complete construction for work specified herein.

1.5 APPENDICES

The following list of appendices are part of this solicitation:

APPENDIX A - Contract Drawings:

The drawings provided in this appendix are for construction of the project and are to be adhered to unless otherwise required in this Statement of Work.

APPENDIX B - Standard MBS Drawings:

The drawings provided in this appendix are the requirements for metal building systems (MBS) standard design and are to be adhered to unless otherwise required in this Statement of Work.

1.6 PROJECT LOCATION, BOUNDARIES, AND WORK RESTRICTIONS

The project is in northeastern Syria. The exact project location will be provided to the awarded Contractor. The exact boundaries limits the Contractor permitted to access will be provided by the COR during the pre-construction meeting. Work restrictions shall be as follows:

a. The Contractor, and/or Sub Contractors, will not be permitted to live within the garrison. The Contractor shall be responsible for providing any offsite living accommodations and/or transportation, if required, for all Contractor staff and workers.

b. Garrison authorities may notify the Contractor to stop work in the event of emergency operations and/or security situations at any time.

c. The Contractor staging and laydown and concrete batch plant areas shall be in accordance with SECTION 01 50 00, TEMPORARY CONSTRUCTION

FACILITIES AND CONTROLS.

1.6.1 Contractor Access

Access to the project site shall be through the garrison entry control point (ECP) and existing paved and unpaved roads on the garrison. The Contractor staging/laydown and batch plant areas shall be in accordance with SECTION 01 50 00, TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.

SECTION 01 10 00 Page 4

1.6.2 Batch Plant

Due to time constraints of processing concrete delivery onto the garrison, the Contractor shall install, and operate a concrete batch plant. The location for the batch plant will be at the provided staging/laydown and batch plant area(s) as stated in paragraph, Contractor Access. The concrete batch plant shall be sized to be capable of meeting all concrete demands of the project within the allowable time frames for concrete quality control. The Contractor shall responsible for providing all temporary power and water requirements for the batch plant. The Contractor may acquire use/concrete with any existing on base batch plant, by others, at the Contractor's own means.

1.6.3 SITE ACCESS & COORDINATION WITH OTHERS

Access to the project site shall be through the existing entry control points (ECP) of the garrison. The Contractor shall be fully responsible for coordinating and gaining any necessary permissions, badging, and/or documentation required by all garrison controlling entities and coordinating working hours, transportation of materials, applicable permits, and etc. Include all access requirements and access approvals in the "Area Use Plan" submittal required in SECTION 01 50 00, and reflect time required to obtain access in the "Construction Schedule" submittal required in SECTION 01 32 16.00 21.

1.7 SECURITY

Security shall be the responsibility of the Contractor including, but not limited to, the following:

a. Off-site Security : The Contractor must have an appropriate amount of security/protection to match the threat in the project area, outside of the base perimeter, and along the supply routes.

b. On-site Security : The Contractor shall be responsible for physical security of all materials, supplies, and equipment of every description, including property which may be Government-furnished or owned, for all areas occupied jointly by the Contractor and the Government, as well as for all work performed. Firearms and/or armed security guards will not be permitted within the base/garrison/airfield limits.

PART 2 GENERAL WORK ITEMS

2.1 MOBILIZATION AND DEMOBILIZATION

Mobilization and Demobilization shall consist of all labor, equipment, supplies, and temporary facilities required to stage all equipment and facilities needed for construction of this project. The Contractor's temporary facilities shall be in accordance with Section 01 50 00, TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.

2.2 AS-BUILT DRAWINGS

The Contractor shall provide the Government with complete as-built drawings at the conclusion of the project. The bid item "As-Built Drawings" shall consist of all labor, equipment, and all supplies needed to produce design records, documents, and drawings in accordance with the requirements specified in Section 01 78 00, CLOSEOUT SUBMITTALS.

SECTION 01 10 00 Page 5

2.3 CONTRACTOR MANPOWER REPORTING

The Contractor shall report annually by October 31 (or before end of contract if contract is solely within one fiscal year) for services performed under this contract during the preceding Government fiscal year (October 1-September 30). The information required shall be submitted via the internet at www.sam.gov. (See SAM User Guide). If the Contractor fails to submit the report in a timely manner, the contracting officer will exercise appropriate contractual remedies. In addition, the Contracting Officer will make the Contractor's failure to comply with the reporting requirements a part of the Contractor's performance information under FAR subpart 42.15. The Contractor shall report the following information:

1. Contract number and, as applicable, order number.

2. The total dollar amount invoiced for services performed during the previous Government fiscal year under the contract.

3. The number of Contractor direct labor hours expended on the services performed during the previous Government fiscal year.

4 Data reported by subcontractors. The Contractor shall require each first-tier subcontractor providing services under this contract, with subcontract(s) each valued at or above the thresholds set forth in 4.1703(a)(2), to provide the following detailed information to the Contractor in sufficient time to submit the report:

a. Subcontract number (including subcontractor name and unique entity identifier); and

b. The number of first-tier subcontractor direct-labor hours expended on the services performed during the previous Government fiscal year.

c. The Contractor shall advise the subcontractor that the information will be made available to the public as required by section 743 of Division C of the Consolidated Appropriations Act, PART 3 SITE INVESTIGATIONS

3.1 SITE SURVEY

The Contractor shall conduct topographic survey of the project area and any additional survey data required by MBS Manufacturer. The site survey shall be in accordance with the minimum requirements in Section 01 10 15, Technical Requirements.

3.2 GEOTECHNICAL INVESTIGATION

The Contractor shall conduct a geotechnical investigation for all on-site geotechnical data required by the Metal Building System (MBS) Manufacturer for the design of the new MBS facilities. The geotechnical investigation shall be in accordance with the minimum requirements in Section 01 10 15, Technical Requirements.

SECTION 01 10 00 Page 6

PART 4 SITE IMPROVEMENTS

4.1 DEMOLITION

The Contractor shall demolish approximately 40 linear meters of existing Hesco Barriers (Gabion baskets lined with geotextile fabric) and one (1) 6-M by 6-M by 3-M high overhead canopy sunshade. Material within the existing barriers shall be re-used for the new barriers as required in paragraph, RETAINING WALLS. All barriers and sunshade material shall be disposed of at an off-site Contractor provided disposal area.

4.2 SITE GRADING AND DRAINAGE

The Contractor shall grade the project site to provide positive drainage around the all new structures in accordance with the minimum requirements shown on the Contract Drawings and SECTION 01 10 15, TECHNICAL

REQUIREMENTS.

4.3 RETAINING WALLS

The Contractor shall construct retaining wall with Mil-1 Hesco (brand) geotextile-lined earth filled Gabion basket barriers (1.3-M high by 1.06-M wide). Barriers shall be filled with insitu material on-site. The retaining wall shall be placed between the helicopter landing zone (HLZ) and new Role-II Facility to provide additional space to accommodate the new facilities and retain material transitioned through the existing slope. The new retaining wall shall be in accordance with the minimum requirements shown on the Contract Drawings and SECTION 01 10 15, TECHNICAL REQUIREMENTS.

4.4 ACCESS ROAD

The Contractor shall construct a 3-meter wide aggregate paved access road, approximately 48 linear meters, identified as "Access Road" on the Contract Drawings. The Access road shall be in accordance with the Contract Drawings, SECTION 01 10 15 - TECHNICAL REQUIREMENTS.

4.5 POTABLE WATER SUPPLY

The Contractor shall construct a 7,000-liter capacity above ground PVC potable water storage tank(s), with water pumps, to service the Role II Medical Facility at the location shown on the Contract Drawings. The Contractor shall construct a 150-millimeter thick concrete pad sized to accommodate the dimensions of the water tank(s) and water pumps. Water storage tanks, pumps, and respective pad shall be in accordance with the Contract Drawings and SECTION 01 10 15, TECHNICAL REQUIREMENTS.

4.6 POTABLE WATER SERVICE

The Contractor shall construct underground water distribution system from the Water Supply to the Role II Medical Facility to provide water service. Water distribution shall be in accordance with the Contract Drawings and SECTION 01 10 15, TECHNICAL REQUIREMENTS.

4.7 WASTEWATER HOLDING TANK

The Contractor shall construct one (1) 24-cubic meter underground concrete (cast in place) wastewater holding tank, pump out fixtures, and manhole covers to service Role II Medical Facility. The wastewater holding tank

SECTION 01 10 00 Page 7 shall be in accordance with the Contract Drawings and SECTION 01 10 15, TECHNICAL REQUIREMENTS.

4.8 SEWER SERVICE

The Contractor shall construct a underground wastewater distribution system from the Role II Medical Facility to the Wastewater Holding Tank to provide wastewater service. Wastewater Distribution shall be in accordance with the Contract Drawings and SECTION 01 10 15, TECHNICAL REQUIREMENTS.

4.9 GENERATOR AND FUEL PAD

The Contractor shall construct one (1) concrete generator and fuel tank pad in accordance with the Contract Drawings and SECTION 01 10 15, TECHNICAL REQUIREMENTS. Provide bollards every 1.5-M around holding tank.

4.10 GENERATORS, FUEL TANKS, & MTS

The Contractor shall provide and install two (2) 75-KVA prime rated generators with a manual transfer switch (MTS). Provide and install fuel tanks that accommodate a minimum of three (3) days of fuel storage and fuel system. The generators, MTS, fuel tanks, and fuel system shall be in accordance with SECTION 01 10 15, TECHNICAL REQUIREMENTS.

4.11 POWER SERVICE

The Contractor shall construct an underground power distribution from the Generators to all respective facilities/equipment that requires power service as shown on the Contract Drawings. Power service shall include all electrical distribution and primary and secondary panels. Power distribution shall be in accordance with the Contract Drawings and SECTION

01 10 15, TECHNICAL REQUIREMENTS.

PART 5 FACILITIES

5.1 ROLE II MEDICAL FACILITY

The Contractor shall construct one (1) multi-span metal building system (MBS) one-story Role II Medical Structure at the location shown on the Contract Drawings provided in APPENDIX-A. All structural components, foundations, and roof/wall panels shall be designed and provided by an MBS Manufacturer. The MBS Role II Medical Facility shall be in accordance with the "ROLE II, STANDARD DESIGN ,MBS STRUCTURE)" drawings provided in APPENDIX-B and SECTION 01 10 15, TECHNICAL REQUIREMENTS.

a. Slab Dimensions : The grade slab shall be 200-mm thick concrete on top of a vapor barrier. The minimum dimensions for the slab shown on the drawings shall be adjusted to accommodate the actual full dimensions of the MBS structure. The slab shall have a 150-mm thick capillary barrier with a 150-mm scarified and compacted sub-base in accordance with Standard MBS Drawings and SECTION 01 10 15, TECHNICAL

REQUIREMENTS.

b. Interior Dimensions : Dimensions shall be in accordance with drawings. Columns shall be spaced as shown to provide the required space for each medical area. The minimum overhead clearance shall be 3-meters from the floor to ceiling.

c. Building Materials and Finishes : Materials, including structural

SECTION 01 10 00 Page 8 members and finishes shall be in accordance with the minimum requirements stated/shown in the Standard MBS Drawings and SECTION 01

10 15, TECHNICAL REQUIREMENTS.

d. Foundation/Footer : Foundations/footers for the MBS structure shall be designed by the MBS manufacturer in accordance with SECTION 01 10 15, TECHNICAL REQUIREMENTS. The Contractor shall be responsible for providing the MBS manufacturer with any geotechnical analysis and/or data requested by the MBS manufacturer.

e. HVAC: Provide a complete and functional HVAC system in accordance with the Standard MBS Drawings and SECTION 01 10 15, TECHNICAL

REQUIREMENTS.

f. Electrical Requirements and Fixtures : Provide a complete and functional electrical system for lighting, power, and HVAC in accordance with the Standard MBS Drawings and SECTION 01 10 15, TECHNICAL REQUIREMENTS.

g. Fire Protection : Provide and install three (3) wall mounted 5 kg fire extinguisher, Type A-B-C, and one (1) smoke detector per room.

h. Plumbing : Provide plumbing as shown on the drawings. Provide and install two (2) double bowl sinks with faucets in accordance with

SECTION 01 10 15, TECHNICAL REQUIREMENTS.

i. Wood Work :

a. Provide one (1) ADMIN desk top at the location and dimensions shown on the Contract Drawings.

b. Provide one (1) ADMIN counter top and shelves at the location and dimensions shown on the Contract Drawings.

c. Provide a desk with overhead cabinets and shelves for the Laboratory at the location and dimensions shown on the Contract Drawings.

d. Provide counter top and base cabinets at the Autoclave at the location and dimensions shown on the Contract Drawings.

j. Gutters & Downspouts : Provide gutters and down spouts in accordance with SECTION 01 10 15, TECHNICAL REQUIREMENTS.

PART 6 FURNISHING, FURNITURE, & EQUIPMENT (FFE)

6.1 TAMBOUR STORAGE CABINETS

Procure and install twenty-three (23) Tambour Storage Cabinets. Tambour Storage Cabinets shall be in accordance with SECTION 01 10 15, TECHNICAL

REQUIREMENTS.

6.2 STORAGE CABINETS

Procure and install five (5) Storage Cabinets. Storage Cabinets shall be in accordance with SECTION 01 10 15, TECHNICAL REQUIREMENTS.

-- End of Section --

SECTION 01 10 00 Page 9

SECTION 01 10 00 Page 10

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 10 15

TECHNICAL REQUIREMENTS

PART 1 GENERAL

1.1 COMPLIANCE

1.2 MINIMUM AND ALTERNATE REQUIREMENTS

1.3 SUBMITTALS

1.4 WARRANTY

1.5 MATERIALS AND STORAGE

1.5.1 Material Deliveries

1.5.2 Contractor Responsibility

1.5.3 Material Protection

1.5.4 Material Rejection

PART 2 SITE INVESTIGATIONS

2.1 SITE SURVEY

2.2 GEOTECHNICAL INVESTIGATION

PART 3 EARTHWORK/SITE WORK

3.1 SATISFACTORY FILL MATERIALS

3.2 DEGREE OF COMPACTION

3.3 SITE GRADING

3.4 AGGREGATE (GRAVEL) ROADS

3.4.1 General

3.4.2 Material

3.4.3 Gradation, Aggregate Base:

3.4.4 Gradation, Aggregate Surface Course:

PART 4 POTABLE WATER SERVICE

4.1 GENERAL POTABLE WATER REQUIREMENTS

4.1.1 WATER STORAGE TANK(S)

4.1.1.1 Potable Water

4.1.2 Potable Water Pumps

4.1.3 EXPANSION TANK

4.1.4 WATER DISTRIBUTION SYSTEM

4.1.4.1 Water mains and Branches

4.1.4.2 Water Service

4.1.4.3 Pipes

4.1.4.4 Fittings and Joints

4.1.4.5 Gate & Butterfly Valves

4.1.4.6 Vacuum and Air Release Valves

4.1.4.7 Blow-Off Valves

4.1.4.8 Thrust Blocking

4.1.5 Hydrostatic, Leakage, and Disinfection Tests

4.1.5.1 Time For Making(Hydrostatic/Pressure)Tests

SECTION 01 10 15 Page 1

4.1.5.2 Concurrent (Hydrostatic And Leakage) Tests

4.1.5.3 Hydrostatic (Pressure) Test

4.1.5.4 Leakage Test

4.1.6 Pipeline Disinfection Tests

4.1.6.1 Sampling

4.1.6.2 Acceptance Requirements

PART 5 WASTEWATER

5.1 WASTEWATER COLLECTION SYSTEM

5.1.1 Protection of Water Supplies

5.1.2 Gravity Sewer

5.1.3 Sewer Pipes

5.1.3.1 Sewer Pipe Fittings

5.1.3.2 Sewer Pipe Joints

5.1.3.3 Branch Connections

5.1.4 Building Connections and Services

5.1.4.1 Cleanouts

5.1.5 Field Tests and Inspections

5.2 BLACK WATER HOLDING TANK

PART 6 STRUCTURAL

6.1 GENERAL

6.1.1 METAL BUILDING SYSTEM MANUFACTURER DESIGN

6.2 MATERIAL STRENGTHS AND STANDARDS

6.2.1 STRUCTURAL CONCRETE

6.2.1.1 CONCRETE

6.2.1.2 Reinforcement Bars

6.2.1.3 Non-Shrink Grout

6.2.2 STRUCTURAL STEEL

6.2.2.1 MINIMUM THICKNESSES

6.2.3 COLD-FORMED STEEL

6.3 STRUCTURAL DRAWINGS AND STRUCTURAL ANALYSIS

6.3.1 STRUCTURAL DRAWINGS

6.3.2 STRUCTURAL ANALYSIS

6.4 STRUCTURAL DESIGN REQUIREMENTS FOR METAL BUILDING STRUCTURE

6.4.1 Codes

6.4.2 Dead Loads

6.4.3 LIVE LOADS

6.4.4 Roof Live Loads

6.4.5 Roof Snow Loads

6.4.6 Wind Loads

6.4.7 Seismic Loads

6.4.8 Collateral Loads

6.4.9 Deflection

6.4.10 Foundations

6.4.11 Floor Slab on Grade

6.4.12 Vapor Barrier

6.5 MBS WALLS AND ROOF MATERIALS

6.5.1 PANELS

6.5.1.1 Zinc-Coated Steel Sheet

6.5.1.2 Aluminum/Zinc-Coated Steel Sheet

6.6 CONCRETE INSTALLATION

6.7 ROOFS

6.7.1 Roof Trusses

6.7.2 Steel Roof Joists

6.7.3 Steel Decks

6.8 WELDING

SECTION 01 10 15 Page 2

6.8.1 Weld Procedure Specification

PART 7 ARCHITECTURAL

7.1 EXTERIOR WALLS

7.2 ROOF

7.2.1 ROOF PANELS

7.2.1.1 Roof Fasteners

7.2.2 RIDGE CAP/VENT

7.3 GUTTERS & DOWN SPOUTS

7.4 FLASHING AND TRIM

7.5 INSULATION

7.6 INTERIOR WALLS

7.7 CEILING

7.8 FLOOR FINISH

7.9 DOORS

7.9.1 Door Hardware

7.10 WOOD WORK

7.10.1 Counter Tops

7.10.2 Desk

7.10.3 Base Cabinets

7.10.4 Overhead Cabinets

PART 8 MECHANICAL

8.1 HVAC

8.2 AIR CONDITIONING

8.3 WALL PENETRATIONS

8.4 OPERATION AND MAINTENANCE MANUALS

PART 9 PLUMBING

9.1 GENERAL

9.2 ELECTRIC WATER HEATER

9.3 DOUBLE COMPONENT SINK

9.4 FLOOR DRAIN

9.5 PIPING

9.6 SANITARY WASTE AND VENT DISTRIBUTION

9.7 FUEL STORAGE & DISTRIBUTION

9.7.1 Fuel Storage Tanks

9.7.2 Generator Fuel System

9.8 TESTING & COMMISSIONING

PART 10 ELECTRICAL & POWER SERVICE

10.1 GENERAL

10.2 GENERATORS

10.3 MANUAL TRANSFER SWITCH

10.4 ELECTRICAL DISTRIBUTION

10.4.1 Miscellaneous Electrical Equipment

10.5 INTERIOR POWER DISTRIBUTION SYSTEM

10.6 EXTERIOR POWER DISTRIBUTION SYSTEM

10.7 TRENCHING

10.8 LIGHTING

10.8.1 Interior Lighting

10.8.2 Exterior Lighting

10.9 LIGHT SWITCH

10.10 RECEPTACLES

10.11 EXIT SIGN and EMERGENCY LIGHTING

SECTION 01 10 15 Page 3

10.12 SMOKE AND HEAT DETECTORS

10.13 GROUNDING AND BONDING

10.14 ENCLOSURES

10.15 IDENTIFICATION NAMEPLATES

10.16 SCHEDULES

10.17 SINGLE LINE DIAGRAM

10.18 ACCEPTANCE TESTING

PART 11 FURNISHING, FURNITURE, & EQUIPMENT (FFE)

11.1 6.1 TAMBOUR STORAGE CABINETS

11.2 6.2 STORAGE CABINETS

SECTION 01 10 15 Page 4

SECTION 01 10 15

TECHNICAL REQUIREMENTS

PART 1 GENERAL

1.1 COMPLIANCE

The Contractor's design and construction shall comply with all design requirements contained herein for all features of work. The Contractor shall provide design (where required) and construction using the best blend of cost, construction efficiency, system durability, ease of maintenance and environmental compatibility. The contractor shall utilize the requirements contained herein to complete the design and produce final construction documents. The requirements contained within this section are applicable to the extent the specific scope of work listed below is directly, or indirectly, required under the SCOPE OF WORK, or otherwise necessary to result in a complete and fully functional final project.

1.2 MINIMUM AND ALTERNATE REQUIREMENTS

The product requirements stated in these documents are minimum requirements. Exceeding the minimum requirements as improvements to the design stated herein is highly encouraged, at no additional cost, and as approved by the government. Any deviation from the technical requirements shall be approved by the Contracting Officer (KO). Request for deviations shall be submitted for approval. The Contractor is encouraged to propose alternate design or products (equipment and material) that are more commonly used in the region; but these variations shall be equal in performance from a technical standpoint, as well as more cost effective or allow for more timely completion. Variations shall furnish the same system safety, durability, ease of maintenance and environmental compatibility.

All variations of approved designs must be approved by the Contracting Officer (KO).

1.3 SUBMITTALS

The Contractor shall be required to submit all submittals listed below.

Appendix B provides a submittal register and the required submittal transmittal forms. Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Schedule and provide submittals requiring Government approval before acquiring the material or equipment covered thereby. The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

SD-01 Preconstruction Submittals

Designer's Qualifications; G Weld Procedure Specification; G concrete mix design; G

SECTION 01 10 15 Page 5

SD-02 Shop Drawings

Final Grading Plan; G Potable Water Supply & Distribution; G Wastewater Collection System & Storage; G MBS Structure Drawings; G Floor Slab; G Interior Wall Plan; G Suspended Ceiling; G Plumbing; G Generator Fuel System; G Electrical; G Single Line Diagram; G

SD-03 Product Data

Exterior Wall Panels; G Roof Panels; G Gutter & Down Spouts; G Flashing & Trim; G Insulation; G Floor Finish; G Door; G Door Hardware; G Countertop; G Desk; G Base Cabinets; G Overhead Cabinets; G Air Conditioners; G Water Heater; G Sink and Faucets; G Floor Drain; G Fuel Tanks; G Generator; G

MTS; G

Interior Electrical Cables; G Direct Buried Electrical Cables; G Lighting; G Light Switch; G Receptacles; G Exit Sign and Emergency Lighting; G Smoke & Heat Detectors; G Enclosures; G Tambour Storage Cabinets; G Storage Cabinets; G

SD-04 Certificates

Aggregate Gradation; G

SD-05 Design Data

Structural Drawings And Analysis; G Roof and Wall Analysis; G concrete mix design; G

SECTION 01 10 15 Page 6

1.4 WARRANTY

The Contractor shall provide a one (1) year warranty on all work and labor performed for this project. Contractor shall secure the full manufactures warranty on all materials and components purchased.

1.5 MATERIALS AND STORAGE

1.5.1 Material Deliveries

The Contractor shall provide a minimum of 4 day notice before bringing any material deliveries on the work site. The Contractor may be required to offload materials at a site approved by the USG for search purposes. Once the material has been cleared, the Contractor shall reload the material and proceed to the job site. Stockpiling of material shall be allowed at the staging/laydown area if properly coordinated through the COR. The USG reserves the right to refuse access of vehicles not having prior coordination.

1.5.2 Contractor Responsibility

The Contractor is responsible for the receipt, unloading, security and handling of all equipment and materials required for the completion of this work.

1.5.3 Material Protection

The Contractor shall protect all stored material from weather and negligence. If, for any reason, materials are damaged the contractor shall replace the materials prior to use at the contractor's expense.

Contractor shall protect all materials from contaminants such as grease, oil, and dirt. Contractor shall ensure materials can be accurately identified after bundles are broken and tags removed. The contractor shall exercise extreme care in handling, placing, and installing required items and tasks. The contractor shall follow all manufacturer warranties.

1.5.4 Material Rejection

Materials deemed unfit for use by the COR for reasons such as contamination, rusting, sun damage, water damage, wind damage, general poor condition or quality or abuse will be replaced as directed by the KO and at the contractor's expense for all work, cost and material required to make the correction.

PART 2 SITE INVESTIGATIONS

2.1 SITE SURVEY

At a minimum, the site survey shall include the following:

Topography: Survey the topography around the the proposed structure(s). Survey shall extend out to the project limit shown on the Contract Drawings. The Contractor shall provide the Metal Building System (MBS) Manufacturer with any additional survey data requested by the MBS Manufacturer for the fabrication/design of the MBS structure(s).

The survey shall be completed by a professional surveyor, accredited by

SECTION 01 10 15 Page 7 the local government, with a minimum of 5 years experience. All survey data provided for the MBS Manufacturer shall be included with the MBS shop drawings required in PART 5, STRUCTURAL.

2.2 GEOTECHNICAL INVESTIGATION

The Contractor shall be responsible for providing all geotechnical data/testing required by the MBS Manufacturer. The Contractor shall acquire services from a professional geotechnical engineering firm accredited by the local government to perform all geotechnical investigations. The geotechnical engineering firm shall be overseen by an senior geotechnical engineer with a minimum of 10 years experience. All completed geotechnical tests/data, and the geotechnical engineering firm information, shall be included with the structural analysis submittal of the MBS metal canopy and catwalk required in PART 5, STRUCTURAL.

PART 3 EARTHWORK/SITE WORK

3.1 SATISFACTORY FILL MATERIALS

In-situ materials from excavation work free of debris, roots, wood, scrap material, vegetation, refuse, soft unsound particles, or objectionable materials. Unless specified otherwise, the maximum particle diameter shall be one-half the lift thickness at the intended location.

3.2 DEGREE OF COMPACTION

Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D1557 abbreviated as a percent of laboratory maximum density. Since ASTM D1557 applies only to soils that have 30 percent or less by weight of their particles retained on the 19.0 mm sieve, express the degree of compaction for material having more than 30 percent by weight of their particles retained on the 19.0 mm sieve as a percentage of the maximum density in accordance with AASHTO T 180 and corrected with AASHTO T 224 .

3.3 SITE GRADING

The minimum requirements for site grading shall be as follows:

a. All building floor elevations shall be a minimum 150 mm above grade.

b. Provide a 3% to 4% slope away from the proposed structure,on all sides, for a minimum of 1-meter to 1.5-meters.

c. Provide swales between the access road nad retaining wall to provide positive drainage.

d. Provide all utility trenching backfill with a smooth finish matching the surrounding grades.

e. Site grading shall provide positive drainage within the shown project limits.

Once the Contractor completes the site survey, develop a Final Grading Plan, including the retention pond and ditches, and submit shop drawings of the final proposed plan for Government approval.

SECTION 01 10 15 Page 8

3.4 AGGREGATE (GRAVEL) ROADS

3.4.1 General

All roads shall be aggregate paved with a minimum aggregate base 100-mm thick and minimum surface course of 50-mm thick. Roads shall have a compacted sub-grade to 95% compaction. Roads shall be crowned with a minimum slope of 1% to 2% crown slopes. Aggregate surfacing shall be compacted to 95% compaction.

3.4.2 Material

Aggregate paved roads shall meet the following minimum requirements:

a. Aggregates shall consist of clean, sound, durable particles of natural crushed stone processed and blended. Aggregates shall be free from lumps and balls of clay, organic matter, objectionable coatings, and other foreign materials.

b. Aggregate gradation shall be made in conformance with ASTM C117, ASTM C136/C136M, and ASTM D422. Sieves shall conform to ASTM E11.

c. Aggregate material shall be well graded, durable, uniformly moistened, and mechanically stabilized by compaction. All aggregate placed shall be compacted to 95% maximum density. Degree of compaction shall be expressed as a percentage of the maximum density obtained by the test procedure in ASTM D 1557.

3.4.3 Gradation, Aggregate Base:

Sieve Size Percent Passing by Weight 50-mm 100 37.5-mm 97-100 19-mm 25-50 2-mm 25-50 250-um 13-35 75-um 7-15

3.4.4 Gradation, Aggregate Surface Course:

Sieve Size Percent Passing by Weight 19-mm 100 4.76-mm 50-78 2-mm 37-67 250-um 13-35 75-um 4-15

Submit the Aggregate Gradation plots and certificates for each aggregate gradation from the quarry supplier.

PART 4 POTABLE WATER SERVICE

4.1 GENERAL POTABLE WATER REQUIREMENTS

General potable water system requirements as follows:

a. Effective population : 10

SECTION 01 10 15 Page 9

b. Average Daily Demand (ADD) : 150 liters/capita/day.

c. Capacity factor (CF) : 1.5.

d. Average Daily Flow (ADF) : Use 2,400 liters per day.

e. Potable water storage capacity (~3 days) : Storage for 7,000 liters.

Refer to Sheet U-01 in the contract drawings for the standard water supply system.

The Contractor shall submit final fabrication of the Potable Water Supply & Distribution to include shop drawings for the installation and distribution layout, pipe material, water storage tanks and piping, and water pump system for Government approval. Provide manufacturers product data for pumps, pipes, and pipe components.

4.1.1 WATER STORAGE TANK(S)

Water storage tank(s) shall consist of one or multiple above ground PVC water storage tanks placed on a concrete slab as shown on Sheet U-100 in the Contract Drawings. Water tanks shall:

a. Have overflow outlets on top with screw on/off caps.

b. Have vents with insect screens.

c. Have fittings to connect pipes for filling.

d. Have fittings to connect pipes to supply water to pumps.

e. Be rated for potable water use.

f. Be new, used water tanks will not be permitted.

g. Tanks shall be fully factory assembled, field fabricated or modification will not be permitted.

Submit manufacturer's product data for Government approval.

4.1.1.1 Potable Water

Upon completion of the water system, including disifection and testing, the Contractor shall provide 7,000 liters of potable water stored in the water for each latrine/shower water storage tanks for ready use.

4.1.2 Potable Water Pumps

Provide water pumps for a water system designed to operate between 345-414 kPa. Minimum pressures of 207 kPa will be allowed at peak domestic flow conditions. Pumps operations shall be as follows:

a. Lead water Pumps Sequence of Operations :

1. The controller monitors feedback signals from a pressure transducer mounted on discharge header. The input signal provided by the pressure transducer is then compared to the selected set point pressure. The system pump speed will change based on this deviation.

SECTION 01 10 15 Page 10

2. When the system pressure falls below set point, the lead pump’s proof timer will begin counting. Once the timer expires, the lead pump will start. the lead pump’s VDF will ramp up and down based on the variance from set point.

3. When the lead pump reaches its user specified maximum speed, the lag pump’s proof timer will begin counting. Once its timer expires, the lag pump will then start. The lag pump will then ramp to match the speed of the lead pump. both pumps will then operate in parallel to maintain the desired set point pressure.

b. Lag Pump Shutdown Sequence : As the demand decreases, the pump(s) shall ramp down. Once the pump speed falls below the specified minimum speed and remains at or below this speed for 10 second (adjustable), the lag pump shall shut down. The lead pump will then ramp up to compensate to maintain set point pressure.

c. Lead Pump Shutdown Sequence : The lead pump shall continue to operate as long as a demand exists. As the system demand decreases, the pump speed shall decrease. Once the pump speed decreases to minimum run speed and remains at or below this speed for 10 second (adjustable) the controller shall begin to look for a no flow shutdown indication. The lead pump will shutdown only after no demand shut down is indicated and pressure set point is met.

d. No Demand Shutdown Control: Shall test the system demand and then shut off the lead pump if no demand is proven. The controller shall also include the feature of dynamic set-point adjustment, which automatically reset the system discharge pressure by adjusting the pump speed as the system demand changes. The controls shall start lag pump on lead pump’s failure. The controls shall include pump minimum run time and pump maximum run time adjustable set points.

4.1.3 EXPANSION TANK

The Contractor shall provide horizontally mounted and insulated above ground surge hydro-pneumatic tank(s) containing water and compressed air located adjacent to the water pumps to maintain pressure during surges. A compressor is required to charge the tank with air, or a pre-charged bladder type tank may be used. Volume is to be sized and pressure regulated such that it maintains the pressure range provided in the technical requirements based on a rate equal to the ADF. At low level the water remaining in the tank(s) shall be at least ten percent of the capacity of the tank. The tank(s) size shall be determined such that the pump cycles not less than 4 times per hour or more than 10 times per hour.

4.1.4 WATER DISTRIBUTION SYSTEM

The Contractor shall provide water distribution mains, branches, and service connections to include all pipe, valves, bends, thrust blocking, fittings, and appurtenances. Exterior water line construction shall include service to all buildings as described in the Scope of Work. The water distribution system shall adhere to the following:

a. The water system shall be designed to operate between 345-414 kPa.

Minimum pressures of 207 kPa will be allowed at peak domestic flow conditions.

SECTION 01 10 15 Page 11

b. The distribution network shall be laid out in a combination grid and looped pattern with dead ends not exceeding 30 meters.

c. Use similar piping materials for all buildings and pipe runs in the distribution system for efficiency of future maintenance activities.

d. Dead end sections shall not be less than 150 mm diameter and shall either have blow off valves (flushing valves) installed for periodic flushing of the line.

e. Water supply distribution shall connect to a building service at a point approximately 1.5 m outside the building or structure to which the service is required.

f. Piping segments where velocities less than 0.15 m/sec are anticipated shall be noted and brought to the attention of the COR.

g. If pressures greater than 690 kPa cannot be avoided, pressure-reducing valves shall be used.

h. A system pressure below 207 kPa shall be considered a deviation in the technical requirements requiring Contracting Officer approval

i. Water lines that cross under roads shall have steel sleeve (carrier pipe), with a minimum pipe thickness 12 mm, around the water pipe extending out to 1 m from each road edge.

j. Adequate cover must be provided for frost protection. A minimum cover of 800 mm is required to protect the water distribution system against freezing.

k. A minimum of three (3) shut off valves shall be installed on the main water distribution for maintenance of the system.

4.1.4.1 Water mains and Branches

Water main diameter shall be based on the installation fixture unit flow or two times the ADF. Pipe material for water mains and branches shall be in accordance with paragraph, Pipes.

4.1.4.2 Water Service

Water service line diameter based on fixture units of the building serviced or per contract. Building service lines will be sized according to the following guidance. Water service connections from the mains to the buildings shall vary from 19mm, 25mm, 38mm, 75mm, to 100mm as calculated, depending on the maximum flow velocity and minimum pressure requirements as determined by hydraulic analysis of fixture flows. Pipe service connections from the distribution main to the building shall be either Polyvinyl Chloride (PVC) plastic Schedule 80 ASTM D 1785 or copper tubing conforming to ASTM B 88M, Type K, annealed. PVC pipe couplings and fittings shall be manufactured of material conforming to ASTM D 1784, Class 12454B. Contractor shall not use HDPE for any of the water pipes

Provide a minimum of one (1) outside water hydrant (hose spigot) for all buildings with water service. Every hose spigot shall have a lockable valve on its water line located inside an adjacent building or in a valve box.

SECTION 01 10 15 Page 12

4.1.4.3 Pipes

Pipes shall be Schedule 80 Polyvinyl Chloride (PVC) pipe and conform to ASTM D 1785. Pipes shall adhere to the following:

a. All piping, and joints, shall be capable of at least 1.03 MPa leakage testing and 1.38 MPa hydrostatic pressure test, unless otherwise specified.

b. Pipe diameters shall be adequate to carry the maximum flow of water at velocities less than 1.5m/sec.

c. Contractor shall not use HDPE pipe and fittings, regardless if existing project water distribution system had this pipe material.

4.1.4.4 Fittings and Joints

Fittings and joints shall adhere to the following:

a. All joints shall be capable of at least 1.03 MPa leakage testing and 1.38 MPa hydrostatic pressure test, unless otherwise specified.

b. Plastic pipe couplings and fittings shall be manufactured of material conforming to ASTM D 1784, Class 12454B.

c. PVC screw joint shall be in accordance with ASTM D 1785, Schedules 40, 80 and 120.

d. PVCu pipe couplings and fittings shall be manufactured of material conforming to ASTM D 1784, Class 12454B.

e. Pipe less than 80mm (3 inch), screw joint, shall conform to dimensional requirements of ASTM D schedule 80.

f. Elastomeric gasket-joint, shall conform to dimensional requirements of ASTM D 1785 Schedule 40, PVCu (or uPVC) pipe and fittings shall have SDR that provide equal or superior strength properties to ASTM 1785 SCH 40 or SCH 80 pipe and fittings.

4.1.4.5 Gate & Butterfly Valves

Valves (Gate valves w/box) shall be placed at all pipe network tees and cross intersections, and the number of valves shall be one less than the number of lines leading into and away from the intersection. For isolation purposes valves shall be spaced not to exceed 3600 mm (12 feet). Gate valves shall be in accordance with AWWA C 500 and/or C509. Butterfly valves (rubber seated) shall be in accordance with C504 et al. The valves and valve boxes shall be constructed to allow a normal valve key to be readily used to open or close the valve. Provide traffic-rated valve boxes. Provide concrete pad, 1 m square, for all valve boxes.

4.1.4.6 Vacuum and Air Release Valves

Air release valves are required to evacuate air from the main high points in the line when it is filled with water, and to allow the discharge of air accumulated under pressure. Vacuum relief valves are needed to permit air to enter a line when it is being emptied of water or subjected to vacuum. Contractor shall submit manufacturer's data for properly sized combination air and vacuum release valves and determine their locations on

SECTION 01 10 15 Page 13 the distribution system subject to review and approval of the Contracting Officer.

4.1.4.7 Blow-Off Valves

The Contractor shall provide 40-50 mm blow-off valves at ends of dead end mains. Valves should be installed at low points in the mains where the flushing water can be readily discharged to natural or manmade drainage ditches, swales or other.

4.1.4.8 Thrust Blocking

Contractor shall provide concrete thrust blocking at any point where the layout of the system changes the direction of the flow, increases the velocity, or decreases or stops the flow. At these points, the pipes and fittings must be anchored and kept from moving or pulling apart by the use of thrust blocks installed against undisturbed earth.

4.1.5 Hydrostatic, Leakage, and Disinfection Tests

The Contracting Officer will be notified not less than 48 hours in advance of any water piping test and will be given full access for monitoring testing procedures and results. Where any section of water line is provided with concrete thrust blocking for fittings or hydrants, tests shall not be made until at least 5 days after installation of concrete thrust blocking, unless otherwise approved.

4.1.5.1 Time For Making(Hydrostatic/Pressure)Tests

Except for joint material setting or where concrete thrust blocks necessitate a 5-day delay, pipeline jointed with rubber gaskets, mechanical or push-on joints, or couplings may be subjected to hydrostatic pressure, inspected, and tested for leakage at any time after partial completion of backfill.

4.1.5.2 Concurrent (Hydrostatic And Leakage) Tests

The Contractor may elect to conduct the hydrostatic tests using either or both of the following procedures. Regardless of the sequence of tests employed, the results of pressure tests, leakage tests, and disinfection shall be recorded for submission and approval. Replacement, repair or retesting required shall be accomplished by the Contractor at no additional cost to the Government. Pressure and leakage testing may be conducted concurrently. Hydrostatic tests and disinfection may be conducted concurrently using water treated for disinfection to accomplish the hydrostatic tests. If water is lost when treated for disinfection and air is admitted to the unit being tested, or if any repair procedure results in contamination of the unit, disinfection shall be re-accomplished

4.1.5.3 Hydrostatic (Pressure) Test

After the pipe is laid, the joints completed, and the trench partially backfilled leaving the joints exposed for examination, the newly laid piping or any valved section of piping shall, unless otherwise specified, be subjected for 1 hour to a hydrostatic pressure test of 1.38 MPa. Each valve shall be opened and closed several times during the test. Exposed pipe, joints, fittings, hydrants and valves shall be carefully examined during the partially opened trench test. Joints showing visible leakage shall be replaced or remade as necessary. Cracked or defective pipe, SECTION 01 10 15 Page 14 joints, fittings, hydrants and valves discovered following this pressure test shall be removed and replaced and retested until the test results are satisfactory.

4.1.5.4 Leakage Test

Leakage tests shall be conducted after all pressure tests have been satisfactorily completed. The duration of each leakage test shall be at least 2 hours, and, during the test, water lines shall be subjected to not less than 1.01 MPa. Leakage is defined as the quantity of water to be supplied into the newly laid pipe, or any valved or approved section, necessary to maintain pressure to within 34.5 kPa of the specified leakage test pressure after the pipe has been filled with water and all air expelled. Pipe installation will not be accepted if leakage exceeds the allowable leakage, as determined by the following formula:

Metric Units:

L = 0.00042454*N*D*P^1/2 where:

L = Allowable leakage in liters per hour.

N = Number of joints in the length of pipeline tested.

D = Nominal diameter of the pipe in mm.

P = Average test pressure during the leakage test, in MPa gauge.

US Units L = 0.0001351*N*D*P^1/2 where:

L = Allowable leakage in gallons per hour.

N = Number of joints in the length of pipeline tested.

D = Nominal diameter of the pipe in inches.

P = Average test pressure during the leakage test, in psi gauge.

Should any test of pipe disclose leakage greater than that calculated by the above formula, the defective joints shall be located and repaired until the leakage is within the specified allowance, without additional cost to the government.

4.1.6 Pipeline Disinfection Tests

Before acceptance of potable water operation, each unit of completed waterline shall be…