B.08 Attachment 5b Program Budgeted Proposal - The Dalles Project.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Management of Undesirable Plants on USACE Lands at The Dalles Project and John Day Project, Sherman County, Oregon
Opportunity number
W9127N2420005
Issued by

About this file

This document contains a proposed program budget and statement of work for a cooperative agreement between the U.S. Army Corps of Engineers and a state agency to manage undesirable plant species on federal lands at the John Day and Dalles Projects in Sherman County, Oregon. The five-year cooperative agreement, valued at $0 with costs to be determined annually, would be awarded pursuant to the Federal Noxious Weed Act of 1974 to facilitate interagency coordination on undesirable plant control. The state recipient must be responsible for administering or implementing state undesirable plants laws. The program budget template outlines estimated costs for coordination, planning, surveying, implementing treatments for rush skeletonweed, knapweed, puncturevine and flowering rush, and reporting across base and option years. Treatments would be conducted at Rufus Landing and any other new infestations identified within the agreement scope. The cooperative agreement is assigned to the Management of Undersirable Plants on Federal Lands program under CFDA #12.012, with the goal of coordinated management between state and federal agencies.

Program Budgeted Proposal - The Dalles Project

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposed Program Budget

Attachment 5b - Budget Proposal Worksheet - The Dalles Project
W9127N-24-2-0005
2024-2028* Undesirable Plant Mgmt on USACE lands in Sherman County at The Dalles** - Cooperative Agreement
INSTRUCTIONS: Fill in the anticipated costs for the given action. Formulas are built in and totals will populate vertically and laterally. Refer to the attached Statement of Work for more details of each Action Item.
BASE YEAROPTION YEAR 1OPTION YEAR 2OPTION YEAR 3OPTION YEAR 4
ITEMACTION DESCRIPTIONNumber of Personnel HoursHourly RateTotal Personnel Cost (Hours x Hourly Rate)Fringe Benefit RateTotal Fringe Benefits (Hours x Fringe Rate)TravelEquipmentSuppliesContractualOtherFY24-FY25 TOTAL for each specific actionNumber of Personnel HoursHourly RateTotal Personnel Cost (Hours x Hourly Rate)Fringe Benefit RateTotal Fringe Benefits (Hours x Fringe Rate)TravelEquipmentSuppliesContractualOtherESTIMATED FY25-FY26 TOTAL for each specific actionNumber of Personnel HoursHourly RateTotal Personnel Cost (Hours x Hourly Rate)Fringe Benefit RateTotal Fringe Benefits (Hours x Fringe Rate)TravelEquipmentSuppliesContractualOtherESTIMATED FY26-FY27 TOTAL for each specific actionNumber of Personnel HoursHourly RateTotal Personnel Cost (Hours x Hourly Rate)Fringe Benefit RateTotal Fringe Benefits (Hours x Fringe Rate)TravelEquipmentSuppliesContractualOtherESTIMATED FY27-FY28 TOTAL for each specific actionNumber of Personnel HoursHourly RateTotal Personnel Cost (Hours x Hourly Rate)Fringe Benefit Rate
0001Coordination$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0002Planning$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0003Surveying$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004Implementation
0004aRufus Landing (8 acres) - Rush skeletonweed, knapweed and puncturevine at Rufus Landing - investigate use of biocontrol agents$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004bFlowering Rush - should it be found along the shoreline of Lake Celilo in Sherman County, Oregon.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0004cAny other infestation identified by recipient, if within the scope of this agreement and funding is available.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
0005Reporting$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TOTALS0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
Grand Total of Base + 4 Option Years
* Note 1: All items under Implementation are expected to change from year to year. Revised annual SOWs will be developed prior to the bilateral exercising of Option Years. For the purposes of the initiation of the Cooperative Agreement, assume the specific actions under Implementation will remain the same and estimate associated costs in option years as well.
** Note 2: Please complete a separate Worksheet for both John Day and The Dalles. Then maintain separate lines for each location on the SF-424A as well.