This document outlines a statement of work for a cooperative agreement between the U.S. Army Corps of Engineers and a state agency in Oregon. The recipient will assist the Corps with managing undesirable plant species on federal lands within the John Day and Willow Creek Projects in Sherman County, Oregon. Services will include coordination, planning, surveying, and implementation of integrated treatment methods to control target species such as knapweed, puncturevine, and flowering rush. Specific work locations and maximum treatment areas are delineated. The recipient will submit pesticide use reports to the Corps' Grant Officer's Representative. The period of performance is 2024-2025. Funding is provided through the Corps' Management of Undesirable Plants on Federal Lands program authorized by the Federal Noxious Weed Act of 1974, with an assigned CFDA number of 12.012.

Sherman County John Day 2024-2025 Statement of Work

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9127N2420005

2024-2025 Statement of Work Management of Undesirable Plants on USACE Lands

John Day – Willow Creek Project Sherman County, Oregon

DESCRIPTION OF SERVICES:

Recipient will assist the U.S. Army Corps of Engineers (USACE) with the management of undesirable plants affecting federal lands and waters managed by the Natural Resource Management section at John Day-Willow Creek Project (JDWC Project) in Sherman County, Oregon.

1. Coordination

Assist in coordination to manage undesirable plants from a strategic regional perspective. Manage and coordinate the actions of this Cooperative Agreement with relevant County Weed Boards, Soil and Water Conservation Districts and other political subdivisions of the state.

2. Planning Assist in the development of a USACE-approved annual plan of work, identifying target species for inventory and management, prioritizing treatment based on regional plans, site location and level of infestation. Provide consultation to USACE on regional Best Management Practices including Early Detection and Rapid Response (EDRR) targets, quarantine initiatives, biological control releases, and updates to the State Noxious Weed List including new classifications, changes in classification of previously listed species, and delisting of species that have become a lower priority.

3. Surveying Assist with the inventory, survey, monitoring, and/or GIS mapping of exotic, noxious, invasive, or undesirable native vegetation at the JDWC Project. Maps, location descriptions, data and/or GIS information will be provided to the USACE Project Natural Resource Section that will aid in the management of areas. USACE may provide a USACE-operated vessel for survey activities.

Data and vessel access require coordination with the Grants Officer’s Representative (GOR).

In the Columbia River region, targets for early detection include, but are not limited to:

a. Flowering rush (Butomus umbellatus) is among the region’s highest priorities. Its presence is minimal on lands and waters managed by the JDWC Project, but vigilant surveying is required to detect and prevent further spread. It is among the region’s highest priorities for early detection because of its potential to devastate riparian habitat.

4. Implementation

Assist in the implementation of the appropriate integrated treatment method as prescribed or approved by USACE biologists, natural resource specialists, natural resource managers, and coordinated with the GOR. Implementation will be aligned with the Portland District Pesticide Discharge Management Plan (PDMP, Attachment 6). Treatments may employ prevention, mechanical, cultural, biocontrol or herbicide methods. Where practicable, biocontrol methods and other effective non-herbicide methods are preferred. Recipient and USACE will cooperate to identify nursery and release sites for high priority agents. USACE may provide a USACE-operated vessel for treatment activities. Vessel access requires coordination with the GOR.

Specific targets at the JDWC Project include:

a. John Day Project South Shore Operations Area (13 acres maximum)

W9127N2420005

i. Spot treat knapweed and puncturevine in operations and maintenance areas.

b. Giles French Park (65 acres maximum)

i. Total vegetation control along entrance road and adjoining paved parking areas and islands.

Establish a five-foot control area along perimeter of both sides of the road.

ii. Spot treat dry land areas for noxious weeds and Himalayan blackberry.

c. LePage Park (14 acres maximum)

i. Pre-emergent treatment for total vegetation control on gate attendant sites, swim beach, paved road shoulders, and camp sites including power pedestal and water spigot. Establish a three-foot control area along perimeter of roadways. Work must be completed prior to park opening on April 15, 2024.

ii. Spot treat vegetation in dry land areas and irrigated lawns.

iii. Mid-summer spot treatment of vegetation including Sandbur and Puncturevine in campground and swim beach.

d. Lake Umatilla Shoreline

i. EDRR for any presence of Flowering rush. A cultural clearance must be performed by USACE before any substrate-disturbing activity.

5. Reporting

If chemical methods are planned during the Period of Performance, an “Anticipated Pesticide Use” report will be submitted by the recipient to the GOR, prior to implementation. An “Actual Pesticide Use” report will then be submitted by the recipient to the GOR by 15 December, outlining the actions completed each year. Templates will be provided by USACE to ensure the required data outlined in the PDMP (Attachment 6) and Oregon State pesticide regulations are included.

SCHEDULE:

An initial meeting between the recipient and USACE will occur within four (4) weeks of the execution of this Cooperative Agreement. A schedule will be coordinated at that time. Additional ad hoc work within the scope of this Cooperative Agreement may be requested throughout the Period of Performance as needs arise and if funding is available. Additional work will be implemented by a bilateral modification.