B.08 - Attachment 2 - W912HN22B4004 Gun Pad_Register.pdf

PDF 239 KB Posted

Attached to
W912HN22B4004 Gun Pad and Taxiway Repair Pope Army Airfield, NC Project Number FA-80005-21
Solicitation number
W912HN22B4004
Issued by

About this file

This submittal register outlines the required submissions for the Pavement and Electrical Rehab for Gun Pad and Taxiway J project. The project involves rehabilitating an existing Gun Pad concrete pavement, reconstructing a taxiway, removing and installing new airfield lighting and signs, demolishing a wash rack and building, and other related work at Pope Army Airfield in Fort Bragg, North Carolina.

The submittal register lists over 100 submittal items required across multiple specifications. It identifies the paragraph where each item is discussed, classification, required action and approval dates, and other processing details. Key submittals include a project schedule, quality control plan, safety data sheets, mix designs, shop drawings, test reports, certificates of compliance, manufacturer instructions, as-built drawings, operation and maintenance manuals, and training documentation. The submittal register provides a comprehensive list of pre-construction, progress, and closeout submissions for the project.

View the file

Other files

File Type Posted
C.04 - W912HN22B4004 Bid Abstract (signed).pdf PDF
B.08 - Solicitation - W912HN22B4004 Amendment 0004 Conform FA-80005-21 PAAF Gun Pad Taxiway Repair.pdf PDF
B.08 - Attachment 1 W912HN-22-B-4004_SPECS 5AUG22.pdf PDF
B.08 - Solicitation - W912HN22B4004 Amendment 0004 FA-80005-21 PAAF Gun Pad Taxiway Repair.pdf PDF
B.08 - Solicitation - W912HN22B4004 Amendment 0003 Conform FA-80005-21 PAAF Gun Pad Taxiway Repair.pdf PDF
B.08 - Solicitation - W912HN22B4004 Amendment 0003 FA-80005-21 PAAF Gun Pad Taxiway Repair.pdf PDF
B.07 - W912HN22B4004 FA-80005-21 Gun Pad Taxiway J Site Visit Roster.pdf PDF
B.08 - Solicitation - W912HN22B4004 Amendment 0002 FA-80005-21 PAAF Gun Pad Taxiway Repair.pdf PDF
B.08 - Solicitation - W912HN22B4004 Amendment 0002 Conform FA-80005-21 PAAF Gun Pad Taxiway Repair.pdf PDF
B.08 - Attachment 2 W912HN-22-B-4004_DRAWINGS 20JUL2022.pdf PDF
B.08 - Attachment 1 W912HN-22-B-4004_SPECS 20JUL2022.pdf PDF
B.08 - Solicitation - W912HN22B4004 Amendment 0001 Conform FA-80005-21 PAAF Gun Pad Taxiway Repair.pdf PDF
B.08 - Solicitation - W912HN22B4004 Amendment 0001 FA-80005-21 PAAF Gun Pad Taxiway Repair.pdf PDF
B.08 - Solicitation - W912HN22B4004 FA-80005-21 Gun Pad and Taxiway Repair PAAF.pdf PDF
B.08 - Attachment 1 - W912HN22B4004 Gun Pad_Final Specs.pdf PDF
B.08 - Attachment 3 - W912HN22B4004 Final Plans Gun Pad.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 22 PAGES

Pavement and Electrical Rehab for Gun Pad and Taxiway J

01 11 00 SD-01 Preconstruction Submittals

1.5 G ROSalvage Plan

01 14 00 SD-01 Preconstruction Submittals

1.3.1.1List of Contact Personnel

01 30 00 SD-01 Preconstruction Submittals

1.3View Location Map

1.4Progress and Completion

Pictures

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 G ROSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.2 G ROPreliminary High Performance

and Sustainable Building Checklist

1.4.1 G ROSustainability Action Plan

1.5.3.2 G ROPreliminary Sustainability

eNotebook

SD-11 Closeout Submittals

1.5.3.2 GFinal High Performance and

Sustainable Building Checklist

1.5.3.2 G ROFinal Sustainability eNotebook

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 22 PAGES

01 33 29 1.5.3.2 G ROAmended Final Sustainability eNotebook

1.5.3.2 G ROAmended Final High

Performance and Sustainable

Building Checklist

01 35 13 SD-01 Preconstruction Submittals

3.1.4 G ROHeavy Equipment and Vehicle

List

3.1.3.2 G ROExisting Conditions Survey

3.1.2FAA Form 7460-1

3.1.2FAA Form 7460-2

3.1.3.1 G ROConstruction Operations Plan

01 35 26 SD-01 Preconstruction Submittals

1.7.1 G ROAPP - Construction

1.7 G ROAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.3.2 G ROStandard Lift Plan

1.7.3.3 G ROCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 22 PAGES

01 35 26 1.9.1Hot Work Permit

1.12.4Certificate of Compliance

1.14License Certificates

1.14.1 G RORadiography Operation Planning

Work Sheet

1.14.1 G ROPortable Gauge Operations

Planning Worksheet

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9.2Verification Statement

01 50 00 SD-01 Preconstruction Submittals

1.3 G ROConstruction Site Plan

3.4.1 G ROTraffic Control Plan

2.2.1 G ROHaul Road Plan

1.6.1.4 G ROContractor Computer

Cybersecurity Compliance

Statements

1.6.6 G ROContractor Temporary Network

Cybersecurity Compliance

Statements

SD-06 Test Reports

3.5Backflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 22 PAGES

01 50 00 1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.6.1Preconstruction Survey

1.11 G ROSolid Waste Management Permit

1.6.2 G RORegulatory Notifications

1.7 G ROEnvironmental Protection Plan

1.7.9.1 G RODirt and Dust Control Plan

1.6.4 G ROEmployee Training Records

SD-06 Test Reports

1.11.1 G ROMonthly Solid Waste Disposal

Report

SD-07 Certificates

1.6.4 G ROEmployee Training Records

1.6.4Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

3.7.1 G ROWaste Determination

Documentation

3.7.3.4 G RODisposal Documentation for

Hazardous and Regulated Waste

1.6.4 G ROAssembled Employee Training

Records

1.11 G ROSolid Waste Management Permit

3.7.2.1 G ROProject Solid Waste Disposal

Documentation Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 22 PAGES

01 57 19 3.7.3.1 G ROHazardous Waste/Debris

Management

1.6.2 G RORegulatory Notifications

3.7.2.1 G ROSales Documentation

01 58 00 SD-02 Shop Drawings

1.3.1 G ROSign Legend Orders

01 74 19 SD-01 Preconstruction Submittals

1.6 G ROConstruction Waste Management

Plan

SD-06 Test Reports

1.8.3Annual Report

1.8.2Monthly Reports

SD-11 Closeout Submittals

1.9 SFinal Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

1.8.1Warranty Management Plan

1.8.5Warranty Tags

1.6Spare Parts Data

SD-08 Manufacturer’s Instructions

1.8.1Instructions

SD-10 Operation and Maintenance

Data

3.7 G ROOperation and Maintenance

Manuals

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 22 PAGES

01 78 00 3.1 G ROAs-Built Drawings

3.3 G RORecord Drawings

1.8.1As-Built Record of Equipment and Materials

3.6As-Built Record of Equipment and Materials

3.4 G ROFinal Approved Shop Drawings

3.5 G ROConstruction Contract

Specifications

3.9.1 G ROInterim DD FORM 1354

3.9.2 G ROChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance

Data

1.3 G ROO&M Database

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.2 G RODemolition Plan

1.11Existing Conditions

SD-07 Certificates

1.7 G RONotification

03 30 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 22 PAGES

03 30 00 1.6.3.1Concrete Curing Plan

1.6.6 G ROQuality Control Plan

1.6.7 G ROQuality Control Personnel

Certifications

1.6.7Quality Control Organizational

Chart

1.6.9 G ROLaboratory Accreditation

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data

2.4.4Joint Sealants

2.4.3Joint Filler

2.1Formwork Materials

2.3.1Cementitious Materials

2.4.1Concrete Curing Materials

2.6Reinforcement

2.3.4Admixtures

2.6.2Mechanical Reinforcing Bar

Connectors

1.8.1Local/Regional Materials

2.2.2Biodegradable Form Release

Agent

2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.1 G ROConcrete Mix Design

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 22 PAGES

03 30 00 1.6.1.1 G ROConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.10.3.3 G ROCompressive Strength Tests

3.10.3.4Air Content

3.10.3.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.9Welder Qualifications

1.6.3.2Safety Data Sheets

1.6.7.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.4Joint Sealants

2.4.1Curing Compound

03 42 13.00 10 SD-01 Preconstruction Submittals

1.3.2.2Quality Control Procedures

SD-02 Shop Drawings

2.1.1Standard Precast Units

2.1.2Custom-Made Precast Units

3.2.4.3Special Finishes

SD-03 Product Data

2.1.1Standard Precast Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 22 PAGES

03 42 13.00 10 2.1.3Proprietary Precast Units

3.1.3Embedded Items

2.2.4Accessories

SD-05 Design Data

2.1.2 G RODesign Calculations

2.1.5.1Concrete Mix Proportions

SD-06 Test Reports

1.3.2.4Test Reports

SD-07 Certificates

1.3.2.2Quality Control Procedures

25 05 11.01 SD-01 Preconstruction Submittals

3.3.2 GDevice Account Lock Exception

Request

1.9.1.6 GContractor Computer

Cybersecurity Compliance

Statements

1.9.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

1.8.1 GProposed STIG and SRG

Applicability Report

1.7.1 GQualifications

SD-02 Shop Drawings

1.8.4 GCybersecurity Riser Diagram

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 22 PAGES

25 05 11.01 1.8.6 GControl System Cybersecurity

Documentation

SD-06 Test Reports

3.10.1 GControl System Cybersecurity

Testing Procedures

3.10.3 GControl System Cybersecurity

Testing Report

SD-11 Closeout Submittals

3.4.4.3 GConfidential Password Report

3.3.7 GEnclosure Keys

1.8.3 GSoftware and Configuration

Backups

1.8.5 GSTIG, SRG and Vendor Guide

Compliance Result Report

1.8.2 GControl System Inventory Report

25 10 10 SD-02 Shop Drawings

3.2.1 GALCMS Contractor Design

Drawings

3.2.2 GDraft As-Built Drawings

3.2.2 GFinal As-Built Drawings

SD-03 Product Data

2.1.5 GProduct Data Sheets

2.5.1 GEnclosure Keys

SD-06 Test Reports

1.7 GPre-Construction QC Checklist

1.7 GPost-Construction QC Checklist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 22 PAGES

25 10 10 3.1 GExisting Conditions Report

3.4 GStart-Up and Start-Up Testing

Report

3.5.1 GPVT Phase I Procedures

3.5.2 GPVT Phase I Report

3.5.3 GPVT Phase II Report

SD-11 Closeout Submittals

1.7 GCloseout QC Checklist

26 56 20 SD-01 Preconstruction Submittals

1.5.4 G ROProtection plan

3.8.2 G ROTraining

SD-02 Shop Drawings

2.1 G ROLighting and visual navigation

aids

3.8.4 G ROPosted instructions

SD-03 Product Data

2.2 G ROAirfield lighting control and

monitoring system

2.8.1.6 G ROType L-823

2.3.1 G ROTaxiway edge lights

2.4.3 G ROGuidance signs

2.5 G ROLight bases

2.7 G ROEncapsulated isolation

transformers

2.8.2.2 G ROFrangible couplings

2.8.6 G ROType P-606

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 22 PAGES

26 56 20 2.8.6 G ROType P-606

3.1.4.1 G ROType P-606

1.5.2 G ROMaterials and equipment

SD-06 Test Reports

3.7 G ROVisual inspection

3.7.1 G ROVisual inspection

3.7.4 G ROProgress testing for series

lighting circuits

3.7.3 G ROCounterpoise system test and

inspection

3.7.2 G ROOperating test

3.7.5 G ROElectrical acceptance tests

3.7.6 G ROLow-voltage continuity tests

3.7.7 G ROHigh-voltage insulation resistance

tests

SD-07 Certificates

1.5.3 G ROQualifications of contractor

2.9.1 G ROSpecial tools

3.8.2 G ROSpecial tools

3.1.5 G RO4-Jack positioning jig

3.1.5.1 G ROElevated light level

3.2.3.2 G ROCrimping tool

3.2.3.3 G ROCable penciler

3.9.1 G ROList of parts

SD-08 Manufacturer’s Instructions

3.8.4 G ROPosted instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 22 PAGES

26 56 20 SD-10 Operation and Maintenance

Data

3.9.2 G ROMaintenance and repair

instructions

3.9.3 G ROPosted operations and

maintenance instructions

SD-11 Closeout Submittals

3.8.3 G ROAs-built drawings

31 00 00 SD-01 Preconstruction Submittals

3.4 G ROShoring

3.2.4 G RODewatering Work Plan

SD-03 Product Data

3.8 G ROUtilization of Excavated Materials

SD-06 Test Reports

3.17Testing

2.1Borrow Site Testing

SD-07 Certificates

3.17Testing

31 11 00 SD-01 Preconstruction Submittals

3.1.1Herbicide Application Plan

SD-03 Product Data

1.3.2 G ROHerbicides

SD-07 Certificates

1.3.2 G ROQualifications

SD-11 Closeout Submittals

3.5.1Pest Management Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 22 PAGES

32 01 11.51 SD-01 Preconstruction Submittals

1.2 G ROSchedule of work

3.1 G ROPaint Removal Process Plan

3.4 G ROWaste Collection, Identification

and Disposal Plan

SD-03 Product Data

1.4Mechanical paint removal equipment

1.5Chemical paint removal equipment

2.1 G ROPaint Removal Detergents or

Chemicals

SD-06 Test Reports

1.6Test Section Results

32 01 16.71 SD-06 Test Reports

3.2.1 G ROMilled Grade Conformance

Report

32 01 19 SD-03 Product Data

2.1Manufacturer's

Recommendations

3.1Equipment

2.3 G ROBackup Material

2.1 G ROASTM D5893 Non-Sag Sealant

2.1 G ROASTM D6690 Hot Pour Sealant

SD-04 Samples

1.3.1 G ROMaterials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 22 PAGES

32 01 19 SD-06 Test Reports

1.3.1 G ROCertified Copies of the Test

Reports

32 11 23.00 SD-03 Product Data

1.4Plant, Equipment, and Tools

SD-06 Test Reports

2.3.1Initial Tests

3.12.1In-Place Tests

32 11 23.23 SD-03 Product Data

1.3.1Plants, Equipment, and Tools

SD-06 Test Reports

1.4.3.1Initial Tests

1.4.3.2In-Place Tests

3.6.7Test Section Construction Report

32 11 40.00 SD-03 Product Data

2.2.2 G ROFly Ash

2.2.1 G ROPortland Cement

SD-05 Design Data

2.1Mix design

SD-06 Test Reports

1.4.2Mix design review

2.2.3Aggregate tests

3.2.2Compressive strength tests

SD-07 Certificates

1.4.1Ready-mixed Concrete Plant

1.4.1Batch ticket information

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 22 PAGES

32 11 40.00 2.2.1 G ROPortland Cement

2.2.1 G ROPortland Cement

2.2.3Fine Aggregate

2.2.2Fly Ash

32 12 13 SD-03 Product Data

1.1.1Waybills and Delivery Tickets

SD-06 Test Reports

3.7Sampling and Testing

32 12 15.13 SD-01 Preconstruction Submittals

2.1.6 G RODiamond Grinding Plan

SD-02 Shop Drawings

2.1 G ROPlacement Plan

SD-03 Product Data

2.4 G ROMix Design

3.1 G ROROContractor Quality Control

SD-04 Samples

2.2Aggregates

2.3Asphalt Binder

SD-06 Test Reports

2.2 G ROAggregates

3.1.3.10QC Monitoring

SD-07 Certificates

2.3 G ROAsphalt Binder

3.1.2Testing Laboratory

1.5Airfield Asphalt Pavement QC

Manager

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 22 PAGES

32 12 15.13 1.5Airfield Asphalt Pavement

Inspector

1.5Airfield Asphalt Pavement

Technician

32 13 14.13 SD-03 Product Data

2.1.7 G RODiamond Grinding Plan

2.9.1 G RODowels

2.9.2 G RODowel Bar Assemblies

2.11Equipment

3.1.2 G ROProposed Techniques

2.14 G ROPartial Depth Spall Repair

Materials

SD-05 Design Data

2.13.2 G DOPreliminary Proposed

Proportioning

2.13.2 G DOProportioning Studies

SD-06 Test Reports

1.4.1 G ROBatch Plant Manufacturer's

Inspection Report

1.4.1 G ROSlipform Paver Manufacturer's

Inspection Report

2.1.4.1 G ROSampling and Testing

2.1.7 G RODiamond Grinding of PCC

Surfaces

2.11.2.3 G ROMixer Performance (Uniformity)

Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 22 PAGES

32 13 14.13 3.9.1 G RORepair Recommendations Plan

SD-07 Certificates

1.4.1 G ROContractor Quality Control Staff

1.4.3Laboratory Accreditation and

Validation

1.4.3.3 G ROCommercial Laboratory

2.11NRMCA Certificate of

Conformance

32 17 23 SD-03 Product Data

2.1.2 G ROApplication Equipment List

3.2Exterior Surface Preparation

1.3.1 G ROSafety Data Sheets

2.2.2.1 G ROReflective media for airfields

2.2.1 G ROWaterborne Paint

SD-06 Test Reports

2.2.2.1 G ROReflective Media for Airfields

2.2.1 G ROWaterborne Paint

SD-07 Certificates

1.3.2 G ROQualifications

2.2.2.1Reflective Media for Airfields

2.2.1Waterborne Paint

1.3.1 G ROVolatile Organic Compound

SD-08 Manufacturer’s Instructions

2.2.1 G ROWaterborne Paint

32 31 13 SD-02 Shop Drawings

2.1 G ROFence Assembly

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 22 PAGES

32 31 13 3.2.2.1 G ROLocation of Gate, Corner, End, and Pull Posts

Part 3 G ROErection/Installation Drawings

SD-03 Product Data

2.1 G ROFence Assembly

2.3.1 G ROZinc Coating

2.2.1 G ROFabric

2.2.6 G ROStretcher Bars

2.3.2 G ROConcrete

SD-04 Samples

2.2.1 G ROFabric

2.2.2 G ROPosts

2.2.3 G ROBraces

2.2.2.1.1 G ROLine Posts

2.2.5 G ROSleeves

2.2.3.1 G ROTop Rail

2.2.3.2 G ROBottom Rail

2.2.8 G ROTension Wire

2.2.6 G ROStretcher Bars

2.2.4 G ROWire Ties

SD-07 Certificates

1.3.1Certificates of Compliance

SD-08 Manufacturer’s Instructions

2.1Fence Assembly

2.1Hardware Assembly

2.1Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 22 PAGES

32 31 13 SD-11 Closeout Submittals

3.3 SRecycled Material Content

32 92 19 SD-03 Product Data

2.4.3 G ROWood Cellulose Fiber Mulch

2.3 G ROFertilizer

SD-06 Test Reports

2.2.3 G ROTopsoil Composition Tests

SD-07 Certificates

2.1 G ROSeed

SD-08 Manufacturer’s Instructions

2.6 G ROErosion Control Materials

32 92 23 SD-03 Product Data

2.4 G ROFertilizer

3.3.1 G ROWire Fencing and Stakes

SD-06 Test Reports

2.2.3 G ROTopsoil composition tests

SD-07 Certificates

2.1 G ROsods

33 40 00 SD-07 Certificates

2.4.1 G ROHydrostatic Test on Watertight

Joints

2.3.5 G ROFrame and Cover or Gratings

SD-08 Manufacturer’s Instructions

3.3 G ROPlacing Pipe

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 22 PAGES

33 40 00 3.7.2.1.2 G ROPost-Installation Inspection

Report

33 46 16 SD-03 Product Data

2.4.3.1Frames And Covers For Airfield

Facilities

2.1.1.1Pipe And Fittings

2.4.2Mortar Mix

SD-04 Samples

2.2Geotextile

2.1Pipe and Pipe Fittings

SD-07 Certificates

2.2Geotextile

2.1Pipe and Pipe Fittings

33 71 02 SD-03 Product Data

2.5.2 G ROBuried Warning And Identification

Tape

SD-06 Test Reports

3.9.1 G ROField Acceptance Checks and

Tests

34 73 13 SD-02 Shop Drawings

1.3 G ROAs-Built Drawings

SD-06 Test Reports

2.3 G ROConcrete

SD-07 Certificates

2.2Mooring Devices

2.4Reinforcing Steel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 22 PAGES

34 73 16 SD-02 Shop Drawings

1.3 G ROAs-Built Drawings

SD-06 Test Reports

3.2Tests

SD-07 Certificates

2.2Grounding Rods

2.3Copper Conductors

2.4Grounding Connectors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .