B.08 - Attachment 2 - W912HN22B4004 Gun Pad_Register.pdf
PDF 239 KB Posted
- Attached to
- W912HN22B4004 Gun Pad and Taxiway Repair Pope Army Airfield, NC Project Number FA-80005-21
- Solicitation number
- W912HN22B4004
About this file
This submittal register outlines the required submissions for the Pavement and Electrical Rehab for Gun Pad and Taxiway J project. The project involves rehabilitating an existing Gun Pad concrete pavement, reconstructing a taxiway, removing and installing new airfield lighting and signs, demolishing a wash rack and building, and other related work at Pope Army Airfield in Fort Bragg, North Carolina.
The submittal register lists over 100 submittal items required across multiple specifications. It identifies the paragraph where each item is discussed, classification, required action and approval dates, and other processing details. Key submittals include a project schedule, quality control plan, safety data sheets, mix designs, shop drawings, test reports, certificates of compliance, manufacturer instructions, as-built drawings, operation and maintenance manuals, and training documentation. The submittal register provides a comprehensive list of pre-construction, progress, and closeout submissions for the project.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 22 PAGES
Pavement and Electrical Rehab for Gun Pad and Taxiway J
01 11 00 SD-01 Preconstruction Submittals
1.5 G ROSalvage Plan
01 14 00 SD-01 Preconstruction Submittals
1.3.1.1List of Contact Personnel
01 30 00 SD-01 Preconstruction Submittals
1.3View Location Map
1.4Progress and Completion
Pictures
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 G ROSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.2 G ROPreliminary High Performance
and Sustainable Building Checklist
1.4.1 G ROSustainability Action Plan
1.5.3.2 G ROPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.5.3.2 GFinal High Performance and
Sustainable Building Checklist
1.5.3.2 G ROFinal Sustainability eNotebook
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 22 PAGES
01 33 29 1.5.3.2 G ROAmended Final Sustainability eNotebook
1.5.3.2 G ROAmended Final High
Performance and Sustainable
Building Checklist
01 35 13 SD-01 Preconstruction Submittals
3.1.4 G ROHeavy Equipment and Vehicle
List
3.1.3.2 G ROExisting Conditions Survey
3.1.2FAA Form 7460-1
3.1.2FAA Form 7460-2
3.1.3.1 G ROConstruction Operations Plan
01 35 26 SD-01 Preconstruction Submittals
1.7.1 G ROAPP - Construction
1.7 G ROAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 G ROAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.3.2 G ROStandard Lift Plan
1.7.3.3 G ROCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 22 PAGES
01 35 26 1.9.1Hot Work Permit
1.12.4Certificate of Compliance
1.14License Certificates
1.14.1 G RORadiography Operation Planning
Work Sheet
1.14.1 G ROPortable Gauge Operations
Planning Worksheet
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
01 50 00 SD-01 Preconstruction Submittals
1.3 G ROConstruction Site Plan
3.4.1 G ROTraffic Control Plan
2.2.1 G ROHaul Road Plan
1.6.1.4 G ROContractor Computer
Cybersecurity Compliance
Statements
1.6.6 G ROContractor Temporary Network
Cybersecurity Compliance
Statements
SD-06 Test Reports
3.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 22 PAGES
01 50 00 1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.6.1Preconstruction Survey
1.11 G ROSolid Waste Management Permit
1.6.2 G RORegulatory Notifications
1.7 G ROEnvironmental Protection Plan
1.7.9.1 G RODirt and Dust Control Plan
1.6.4 G ROEmployee Training Records
SD-06 Test Reports
1.11.1 G ROMonthly Solid Waste Disposal
Report
SD-07 Certificates
1.6.4 G ROEmployee Training Records
1.6.4Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.7.1 G ROWaste Determination
Documentation
3.7.3.4 G RODisposal Documentation for
Hazardous and Regulated Waste
1.6.4 G ROAssembled Employee Training
Records
1.11 G ROSolid Waste Management Permit
3.7.2.1 G ROProject Solid Waste Disposal
Documentation Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 22 PAGES
01 57 19 3.7.3.1 G ROHazardous Waste/Debris
Management
1.6.2 G RORegulatory Notifications
3.7.2.1 G ROSales Documentation
01 58 00 SD-02 Shop Drawings
1.3.1 G ROSign Legend Orders
01 74 19 SD-01 Preconstruction Submittals
1.6 G ROConstruction Waste Management
Plan
SD-06 Test Reports
1.8.3Annual Report
1.8.2Monthly Reports
SD-11 Closeout Submittals
1.9 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.8.1Warranty Management Plan
1.8.5Warranty Tags
1.6Spare Parts Data
SD-08 Manufacturer’s Instructions
1.8.1Instructions
SD-10 Operation and Maintenance
Data
3.7 G ROOperation and Maintenance
Manuals
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 22 PAGES
01 78 00 3.1 G ROAs-Built Drawings
3.3 G RORecord Drawings
1.8.1As-Built Record of Equipment and Materials
3.6As-Built Record of Equipment and Materials
3.4 G ROFinal Approved Shop Drawings
3.5 G ROConstruction Contract
Specifications
3.9.1 G ROInterim DD FORM 1354
3.9.2 G ROChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance
Data
1.3 G ROO&M Database
3.1.1 G ROTraining Plan
3.1.3 G ROTraining Outline
3.1.2 G ROTraining Content
SD-11 Closeout Submittals
3.1.4 G ROTraining Video Recording
3.1.6 G ROValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.2 G RODemolition Plan
1.11Existing Conditions
SD-07 Certificates
1.7 G RONotification
03 30 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 22 PAGES
03 30 00 1.6.3.1Concrete Curing Plan
1.6.6 G ROQuality Control Plan
1.6.7 G ROQuality Control Personnel
Certifications
1.6.7Quality Control Organizational
Chart
1.6.9 G ROLaboratory Accreditation
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.4Joint Sealants
2.4.3Joint Filler
2.1Formwork Materials
2.3.1Cementitious Materials
2.4.1Concrete Curing Materials
2.6Reinforcement
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
1.8.1Local/Regional Materials
2.2.2Biodegradable Form Release
Agent
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 G ROConcrete Mix Design
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 22 PAGES
03 30 00 1.6.1.1 G ROConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
3.10.3.3 G ROCompressive Strength Tests
3.10.3.4Air Content
3.10.3.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.9Welder Qualifications
1.6.3.2Safety Data Sheets
1.6.7.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.4Joint Sealants
2.4.1Curing Compound
03 42 13.00 10 SD-01 Preconstruction Submittals
1.3.2.2Quality Control Procedures
SD-02 Shop Drawings
2.1.1Standard Precast Units
2.1.2Custom-Made Precast Units
3.2.4.3Special Finishes
SD-03 Product Data
2.1.1Standard Precast Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 22 PAGES
03 42 13.00 10 2.1.3Proprietary Precast Units
3.1.3Embedded Items
2.2.4Accessories
SD-05 Design Data
2.1.2 G RODesign Calculations
2.1.5.1Concrete Mix Proportions
SD-06 Test Reports
1.3.2.4Test Reports
SD-07 Certificates
1.3.2.2Quality Control Procedures
25 05 11.01 SD-01 Preconstruction Submittals
3.3.2 GDevice Account Lock Exception
Request
1.9.1.6 GContractor Computer
Cybersecurity Compliance
Statements
1.9.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
1.8.1 GProposed STIG and SRG
Applicability Report
1.7.1 GQualifications
SD-02 Shop Drawings
1.8.4 GCybersecurity Riser Diagram
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 22 PAGES
25 05 11.01 1.8.6 GControl System Cybersecurity
Documentation
SD-06 Test Reports
3.10.1 GControl System Cybersecurity
Testing Procedures
3.10.3 GControl System Cybersecurity
Testing Report
SD-11 Closeout Submittals
3.4.4.3 GConfidential Password Report
3.3.7 GEnclosure Keys
1.8.3 GSoftware and Configuration
Backups
1.8.5 GSTIG, SRG and Vendor Guide
Compliance Result Report
1.8.2 GControl System Inventory Report
25 10 10 SD-02 Shop Drawings
3.2.1 GALCMS Contractor Design
Drawings
3.2.2 GDraft As-Built Drawings
3.2.2 GFinal As-Built Drawings
SD-03 Product Data
2.1.5 GProduct Data Sheets
2.5.1 GEnclosure Keys
SD-06 Test Reports
1.7 GPre-Construction QC Checklist
1.7 GPost-Construction QC Checklist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 22 PAGES
25 10 10 3.1 GExisting Conditions Report
3.4 GStart-Up and Start-Up Testing
Report
3.5.1 GPVT Phase I Procedures
3.5.2 GPVT Phase I Report
3.5.3 GPVT Phase II Report
SD-11 Closeout Submittals
1.7 GCloseout QC Checklist
26 56 20 SD-01 Preconstruction Submittals
1.5.4 G ROProtection plan
3.8.2 G ROTraining
SD-02 Shop Drawings
2.1 G ROLighting and visual navigation
aids
3.8.4 G ROPosted instructions
SD-03 Product Data
2.2 G ROAirfield lighting control and
monitoring system
2.8.1.6 G ROType L-823
2.3.1 G ROTaxiway edge lights
2.4.3 G ROGuidance signs
2.5 G ROLight bases
2.7 G ROEncapsulated isolation
transformers
2.8.2.2 G ROFrangible couplings
2.8.6 G ROType P-606
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 22 PAGES
26 56 20 2.8.6 G ROType P-606
3.1.4.1 G ROType P-606
1.5.2 G ROMaterials and equipment
SD-06 Test Reports
3.7 G ROVisual inspection
3.7.1 G ROVisual inspection
3.7.4 G ROProgress testing for series
lighting circuits
3.7.3 G ROCounterpoise system test and
inspection
3.7.2 G ROOperating test
3.7.5 G ROElectrical acceptance tests
3.7.6 G ROLow-voltage continuity tests
3.7.7 G ROHigh-voltage insulation resistance
tests
SD-07 Certificates
1.5.3 G ROQualifications of contractor
2.9.1 G ROSpecial tools
3.8.2 G ROSpecial tools
3.1.5 G RO4-Jack positioning jig
3.1.5.1 G ROElevated light level
3.2.3.2 G ROCrimping tool
3.2.3.3 G ROCable penciler
3.9.1 G ROList of parts
SD-08 Manufacturer’s Instructions
3.8.4 G ROPosted instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 22 PAGES
26 56 20 SD-10 Operation and Maintenance
Data
3.9.2 G ROMaintenance and repair
instructions
3.9.3 G ROPosted operations and
maintenance instructions
SD-11 Closeout Submittals
3.8.3 G ROAs-built drawings
31 00 00 SD-01 Preconstruction Submittals
3.4 G ROShoring
3.2.4 G RODewatering Work Plan
SD-03 Product Data
3.8 G ROUtilization of Excavated Materials
SD-06 Test Reports
3.17Testing
2.1Borrow Site Testing
SD-07 Certificates
3.17Testing
31 11 00 SD-01 Preconstruction Submittals
3.1.1Herbicide Application Plan
SD-03 Product Data
1.3.2 G ROHerbicides
SD-07 Certificates
1.3.2 G ROQualifications
SD-11 Closeout Submittals
3.5.1Pest Management Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 22 PAGES
32 01 11.51 SD-01 Preconstruction Submittals
1.2 G ROSchedule of work
3.1 G ROPaint Removal Process Plan
3.4 G ROWaste Collection, Identification
and Disposal Plan
SD-03 Product Data
1.4Mechanical paint removal equipment
1.5Chemical paint removal equipment
2.1 G ROPaint Removal Detergents or
Chemicals
SD-06 Test Reports
1.6Test Section Results
32 01 16.71 SD-06 Test Reports
3.2.1 G ROMilled Grade Conformance
Report
32 01 19 SD-03 Product Data
2.1Manufacturer's
Recommendations
3.1Equipment
2.3 G ROBackup Material
2.1 G ROASTM D5893 Non-Sag Sealant
2.1 G ROASTM D6690 Hot Pour Sealant
SD-04 Samples
1.3.1 G ROMaterials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 22 PAGES
32 01 19 SD-06 Test Reports
1.3.1 G ROCertified Copies of the Test
Reports
32 11 23.00 SD-03 Product Data
1.4Plant, Equipment, and Tools
SD-06 Test Reports
2.3.1Initial Tests
3.12.1In-Place Tests
32 11 23.23 SD-03 Product Data
1.3.1Plants, Equipment, and Tools
SD-06 Test Reports
1.4.3.1Initial Tests
1.4.3.2In-Place Tests
3.6.7Test Section Construction Report
32 11 40.00 SD-03 Product Data
2.2.2 G ROFly Ash
2.2.1 G ROPortland Cement
SD-05 Design Data
2.1Mix design
SD-06 Test Reports
1.4.2Mix design review
2.2.3Aggregate tests
3.2.2Compressive strength tests
SD-07 Certificates
1.4.1Ready-mixed Concrete Plant
1.4.1Batch ticket information
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 22 PAGES
32 11 40.00 2.2.1 G ROPortland Cement
2.2.1 G ROPortland Cement
2.2.3Fine Aggregate
2.2.2Fly Ash
32 12 13 SD-03 Product Data
1.1.1Waybills and Delivery Tickets
SD-06 Test Reports
3.7Sampling and Testing
32 12 15.13 SD-01 Preconstruction Submittals
2.1.6 G RODiamond Grinding Plan
SD-02 Shop Drawings
2.1 G ROPlacement Plan
SD-03 Product Data
2.4 G ROMix Design
3.1 G ROROContractor Quality Control
SD-04 Samples
2.2Aggregates
2.3Asphalt Binder
SD-06 Test Reports
2.2 G ROAggregates
3.1.3.10QC Monitoring
SD-07 Certificates
2.3 G ROAsphalt Binder
3.1.2Testing Laboratory
1.5Airfield Asphalt Pavement QC
Manager
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 22 PAGES
32 12 15.13 1.5Airfield Asphalt Pavement
Inspector
1.5Airfield Asphalt Pavement
Technician
32 13 14.13 SD-03 Product Data
2.1.7 G RODiamond Grinding Plan
2.9.1 G RODowels
2.9.2 G RODowel Bar Assemblies
2.11Equipment
3.1.2 G ROProposed Techniques
2.14 G ROPartial Depth Spall Repair
Materials
SD-05 Design Data
2.13.2 G DOPreliminary Proposed
Proportioning
2.13.2 G DOProportioning Studies
SD-06 Test Reports
1.4.1 G ROBatch Plant Manufacturer's
Inspection Report
1.4.1 G ROSlipform Paver Manufacturer's
Inspection Report
2.1.4.1 G ROSampling and Testing
2.1.7 G RODiamond Grinding of PCC
Surfaces
2.11.2.3 G ROMixer Performance (Uniformity)
Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 22 PAGES
32 13 14.13 3.9.1 G RORepair Recommendations Plan
SD-07 Certificates
1.4.1 G ROContractor Quality Control Staff
1.4.3Laboratory Accreditation and
Validation
1.4.3.3 G ROCommercial Laboratory
2.11NRMCA Certificate of
Conformance
32 17 23 SD-03 Product Data
2.1.2 G ROApplication Equipment List
3.2Exterior Surface Preparation
1.3.1 G ROSafety Data Sheets
2.2.2.1 G ROReflective media for airfields
2.2.1 G ROWaterborne Paint
SD-06 Test Reports
2.2.2.1 G ROReflective Media for Airfields
2.2.1 G ROWaterborne Paint
SD-07 Certificates
1.3.2 G ROQualifications
2.2.2.1Reflective Media for Airfields
2.2.1Waterborne Paint
1.3.1 G ROVolatile Organic Compound
SD-08 Manufacturer’s Instructions
2.2.1 G ROWaterborne Paint
32 31 13 SD-02 Shop Drawings
2.1 G ROFence Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 22 PAGES
32 31 13 3.2.2.1 G ROLocation of Gate, Corner, End, and Pull Posts
Part 3 G ROErection/Installation Drawings
SD-03 Product Data
2.1 G ROFence Assembly
2.3.1 G ROZinc Coating
2.2.1 G ROFabric
2.2.6 G ROStretcher Bars
2.3.2 G ROConcrete
SD-04 Samples
2.2.1 G ROFabric
2.2.2 G ROPosts
2.2.3 G ROBraces
2.2.2.1.1 G ROLine Posts
2.2.5 G ROSleeves
2.2.3.1 G ROTop Rail
2.2.3.2 G ROBottom Rail
2.2.8 G ROTension Wire
2.2.6 G ROStretcher Bars
2.2.4 G ROWire Ties
SD-07 Certificates
1.3.1Certificates of Compliance
SD-08 Manufacturer’s Instructions
2.1Fence Assembly
2.1Hardware Assembly
2.1Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 22 PAGES
32 31 13 SD-11 Closeout Submittals
3.3 SRecycled Material Content
32 92 19 SD-03 Product Data
2.4.3 G ROWood Cellulose Fiber Mulch
2.3 G ROFertilizer
SD-06 Test Reports
2.2.3 G ROTopsoil Composition Tests
SD-07 Certificates
2.1 G ROSeed
SD-08 Manufacturer’s Instructions
2.6 G ROErosion Control Materials
32 92 23 SD-03 Product Data
2.4 G ROFertilizer
3.3.1 G ROWire Fencing and Stakes
SD-06 Test Reports
2.2.3 G ROTopsoil composition tests
SD-07 Certificates
2.1 G ROsods
33 40 00 SD-07 Certificates
2.4.1 G ROHydrostatic Test on Watertight
Joints
2.3.5 G ROFrame and Cover or Gratings
SD-08 Manufacturer’s Instructions
3.3 G ROPlacing Pipe
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 22 PAGES
33 40 00 3.7.2.1.2 G ROPost-Installation Inspection
Report
33 46 16 SD-03 Product Data
2.4.3.1Frames And Covers For Airfield
Facilities
2.1.1.1Pipe And Fittings
2.4.2Mortar Mix
SD-04 Samples
2.2Geotextile
2.1Pipe and Pipe Fittings
SD-07 Certificates
2.2Geotextile
2.1Pipe and Pipe Fittings
33 71 02 SD-03 Product Data
2.5.2 G ROBuried Warning And Identification
Tape
SD-06 Test Reports
3.9.1 G ROField Acceptance Checks and
Tests
34 73 13 SD-02 Shop Drawings
1.3 G ROAs-Built Drawings
SD-06 Test Reports
2.3 G ROConcrete
SD-07 Certificates
2.2Mooring Devices
2.4Reinforcing Steel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 22 PAGES
34 73 16 SD-02 Shop Drawings
1.3 G ROAs-Built Drawings
SD-06 Test Reports
3.2Tests
SD-07 Certificates
2.2Grounding Rods
2.3Copper Conductors
2.4Grounding Connectors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .