B.08_Attachment_1_NORTH_SITES_AND_FREQUENCIES_final.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
North Willamette Valley Project Janitorial Services
Solicitation number
W9127N22R0012
Issued by

About this file

This document package includes a federal contract opportunity announcement and related file attachment. The federal contract opportunity W9127N22R0012 is a 100% Total Small Business set-aside released by the Department of the Army Corps of Engineers Engineering District Portland. The solicitation is for janitorial services to be performed at the North Willamette Valley Project locations in a manner that will maintain a satisfactory facility condition and present a clean, neat, and professional appearance. The contractor will be required to provide and replenish supplies in all restrooms, kitchens, and other areas. Interested vendors must review the Attachments and submit quotes by email to Carl.R.Schmurr@usace.army.mil no later than April 15, 2022 at 2:00PM PDT. Any questions shall also be emailed to this point of contact. The related file attachment provides location details, surface types, areas, and cleaning frequencies for sites within the Detroit, Green Peter, Big Cliff, and Foster projects.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENV&REC

Appendix A - North Valley RECREATIOIN
CLINLocation/Facility (attached drawing)surface typearea sq ft/or totalCleaning FrequencyPricePRC LINEFUNDING
Detroit Project (PWS Services 5.3.1 - 5.3.10)
0002Top of Dam (see CLINS for dates)8&9DET REC TOP OF DAM
Janitorial Services, May - Septdaily
Janitorial Services, Oct - Apr4x weekly
CXTconcrete32 sqfsqf
Trash Cansaluminum/metal8 Each
CLINLocation/Facility (attached drawing)surface typearea sq ft/or totalCleaning FrequencyPricePRC LINEFUNDING
Green Peter Project (PWS Services 5.3.1 - 5.3.10)
0007Billings Park and North Viewpoint (See CLINS for dates)10GPR REC BILLINGS & NORTH VIEWPOINT
Janitorial Services, May - Sept3x weekly
Janitorial Services, Oct - Apr1x weekly
2 CXTs 1 double, 1 singleconcrete32 sqf
Trash Canaluminum1
0008Two-Mile Boat-In Site (See CLINS for dates)11GPR REC TWO-MILE CAMPSITE
Janitorial Services, May 15 - Sept 301x weekly
Fire Ringssteel5
0009Quartzville Corridor - Dispersed Sites12GPR REC DISPERSED SITES
Janitorial Services, May - Sept3x weekly
CXT, Whitcomb Bridge,concrete32 sqf
Litter pick-up
Janitorial Services, Oct - Apr1x weekly
CXTs, Whitcomb Bridgeconcrete160sqf
Litter pick-up
Remote access points, Dispersed Sites- year round2 x Monthly
CLINLocation/Facility (attached drawing)surface typearea sq ft/or totalCleaning FrequencyPricePRC LINEFUNDING
Foster Project (PWS Services 5.3.1 - 5.3.10)
0012Wiley Park (See CLINS for dates)13FOS REC WILEY PARK CXT
Janitorial Services, Apr - Oct 153x weekly
Janitorial Services, Oct. 16 - Mar1x weekly
CXT, double64sqf
Grills20each
Picnic Tables20each
Trash Cans2each
0013Janitorial Services - Remote Access Points2x monthly14FOS JT DISBURSED SITES

PH_DAMS_OFFICE

Appendix A - North Valley Powerhouse & Dams
CLINLocation/Facility (attached drawing)surface typearea sq ft/or totalCleaning FrequencyPricePRC LINEFUNDING
Detroit Project1DET HY PH
0001Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Detroit Powerhouse (DET-1 & 4)1x weekly
Generator Floorconcrete9512
Control Roomrubber tile1240
First Aid Roomterazzo tile81
Floor Maintenancetile9512
Kitchen Cleaningrubber tile266
Maintenance Shopconcrete1336
Restroom/Lockerroom, Employees x4tile836
Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Upstairs (DET-1 & 4)
Hallwayrubber tile210
Floor Maintenancetile1366
Offices (3)rubber tile300
Laundry Roomplastic tile210
Stair Casequarry tile176
Restroom x2ceramic tile240
Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Turbine Floor (DET-2)
Governor Room711
Stair Case108
Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - El. 1201 (DET-6)
Floor Maintenanceconcrete3100
Stair Cases x2108
Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - El. 1189 (DET-5)
Stair Cases x2concrete108
Unwatering Pump Stairsconcrete

(Paragraph 5.2.2 of PWS) Windows Interior - Upstairs, May & Nov 231 1x yearly

Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Turbine Floor1x monthly
Breaker Galleryconcrete2244
Floor Maintenanceconcrete6480
Document Storageconcrete276
Heat Pump Roomconcrete300
Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - EL 1189
Floor Maintenanceconcrete3400
Unwatering Pump Pitconcrete150
0003Detroit Dam Overlook - Litter pick up2DET JT TOP OF DAM
Janitorial Services, APR, SEP, DECSteep incline10503x Yearly
CLINLocation/Facility (attached drawing)surface typearea sq ft/or totalCleaning FrequencyPricePRC LINEFUNDING
Big Cliff Project
0004Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Big Cliff Powerhouse (BC-1 & BC-02)1x monthly3BCL HY PH
Generator Floorconcrete4000
Generator floor stairs to Turbine Floorconcrete140
Turbine Floorconcrete2548
Water Treatment Roomconcrete455
Turbine floor stairs to Water Treatment floorconcrete92
Storage130
0005Janitorial (Paragraph 5.3.1-5.3.2 of PWS) Services - General Reservoir, Jan 1 - Dec 31 (BC-3)4BCL JT GENERAL RESERVOIR
Boat Rampgravel1x Monthly
CLINLocation/Facility (attached drawing)surface typearea sq ft/or totalCleaning FrequencyPricePRC LINEFUNDING
Green Peter Project
0006Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Green Peter Powerhouse - (GP 13 & 14)1x weekly5GPR HY PH
Breakroomcarpet216
Carpet outside Breakroomcarpet63
Elevator Towerconcrete90
Janitor Closetconcrete60
Control Roomconcrete
Restroom x2tile184
Floor Maintenanceconcrete14401x monthly
(Paragraph 5.2.3 of PWS) Strip-Seal Floor Finish, Apr & Octconcrete3681x yearly
CLINLocation/Facility (attached drawing)surface typearea sq ft/or totalCleaning FrequencyPricePRC LINEFUNDING
Foster Project
0010Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Foster Project Office - (FS-4 & 5)2x weekly6FOS JT PROJECT OFFICE
Offices x3carpet1080
Kitchen Cleaningtile276
Lobbylinoleum144
Warehousecarpet338
Receiving Areatile338
Restroom Cleaningterrazo tile192
Second Floor - Offices x3linoleum1500
Second Floor - Officecarpet300
Service Buildingconcrete680
Training Roomconcrete680
Windows - downstairs and upstairs511402
0011Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Foster Powerhouse - (FS-2 & 3)7FOS HY PH
Balconyconcrete112
Control Roomcarpet550
First Floor2034
Maintenance Officetile360
Receiving Areatile756
Storage Roomconcrete256
Windowsglass36
Second Floor - Assembly Areaconcrete1764
Second Floor - First Aid Roomconcrete264
(Paragraph 5.2.2 of PWS) Window Cleaning, Jan-Apr-Jul-Octglass4382x yearly
(Paragraph 5.2.3 of PWS) Strip-Seal Floor Finish, Downstairs and Upstairs, Apr & Oct55401x yearly
Foster Project Office (downstairs and upstairs), Foster Powerhouse