B.08_Attachment_1_NORTH_SITES_AND_FREQUENCIES_final.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- W9127N22R0012
About this file
This document package includes a federal contract opportunity announcement and related file attachment. The federal contract opportunity W9127N22R0012 is a 100% Total Small Business set-aside released by the Department of the Army Corps of Engineers Engineering District Portland. The solicitation is for janitorial services to be performed at the North Willamette Valley Project locations in a manner that will maintain a satisfactory facility condition and present a clean, neat, and professional appearance. The contractor will be required to provide and replenish supplies in all restrooms, kitchens, and other areas. Interested vendors must review the Attachments and submit quotes by email to Carl.R.Schmurr@usace.army.mil no later than April 15, 2022 at 2:00PM PDT. Any questions shall also be emailed to this point of contact. The related file attachment provides location details, surface types, areas, and cleaning frequencies for sites within the Detroit, Green Peter, Big Cliff, and Foster projects.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENV&REC
| Appendix A - North Valley RECREATIOIN | |||||||
| CLIN | Location/Facility (attached drawing) | surface type | area sq ft/or total | Cleaning Frequency | Price | PRC LINE | FUNDING |
| Detroit Project (PWS Services 5.3.1 - 5.3.10) | |||||||
| 0002 | Top of Dam (see CLINS for dates) | 8&9 | DET REC TOP OF DAM | ||||
| Janitorial Services, May - Sept | daily | ||||||
| Janitorial Services, Oct - Apr | 4x weekly | ||||||
| CXT | concrete | 32 sqfsqf | |||||
| Trash Cans | aluminum/metal | 8 Each | |||||
| CLIN | Location/Facility (attached drawing) | surface type | area sq ft/or total | Cleaning Frequency | Price | PRC LINE | FUNDING |
| Green Peter Project (PWS Services 5.3.1 - 5.3.10) | |||||||
| 0007 | Billings Park and North Viewpoint (See CLINS for dates) | 10 | GPR REC BILLINGS & NORTH VIEWPOINT | ||||
| Janitorial Services, May - Sept | 3x weekly | ||||||
| Janitorial Services, Oct - Apr | 1x weekly | ||||||
| 2 CXTs 1 double, 1 single | concrete | 32 sqf | |||||
| Trash Can | aluminum | 1 | |||||
| 0008 | Two-Mile Boat-In Site (See CLINS for dates) | 11 | GPR REC TWO-MILE CAMPSITE | ||||
| Janitorial Services, May 15 - Sept 30 | 1x weekly | ||||||
| Fire Rings | steel | 5 | |||||
| 0009 | Quartzville Corridor - Dispersed Sites | 12 | GPR REC DISPERSED SITES | ||||
| Janitorial Services, May - Sept | 3x weekly | ||||||
| CXT, Whitcomb Bridge, | concrete | 32 sqf | |||||
| Litter pick-up | |||||||
| Janitorial Services, Oct - Apr | 1x weekly | ||||||
| CXTs, Whitcomb Bridge | concrete | 160sqf | |||||
| Litter pick-up | |||||||
| Remote access points, Dispersed Sites- year round | 2 x Monthly | ||||||
| CLIN | Location/Facility (attached drawing) | surface type | area sq ft/or total | Cleaning Frequency | Price | PRC LINE | FUNDING |
| Foster Project (PWS Services 5.3.1 - 5.3.10) | |||||||
| 0012 | Wiley Park (See CLINS for dates) | 13 | FOS REC WILEY PARK CXT | ||||
| Janitorial Services, Apr - Oct 15 | 3x weekly | ||||||
| Janitorial Services, Oct. 16 - Mar | 1x weekly | ||||||
| CXT, double | 64sqf | ||||||
| Grills | 20each | ||||||
| Picnic Tables | 20each | ||||||
| Trash Cans | 2each | ||||||
| 0013 | Janitorial Services - Remote Access Points | 2x monthly | 14 | FOS JT DISBURSED SITES |
PH_DAMS_OFFICE
| Appendix A - North Valley Powerhouse & Dams | |||||||
| CLIN | Location/Facility (attached drawing) | surface type | area sq ft/or total | Cleaning Frequency | Price | PRC LINE | FUNDING |
| Detroit Project | 1 | DET HY PH | |||||
| 0001 | Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Detroit Powerhouse (DET-1 & 4) | 1x weekly | |||||
| Generator Floor | concrete | 9512 | |||||
| Control Room | rubber tile | 1240 | |||||
| First Aid Room | terazzo tile | 81 | |||||
| Floor Maintenance | tile | 9512 | |||||
| Kitchen Cleaning | rubber tile | 266 | |||||
| Maintenance Shop | concrete | 1336 | |||||
| Restroom/Lockerroom, Employees x4 | tile | 836 | |||||
| Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Upstairs (DET-1 & 4) | |||||||
| Hallway | rubber tile | 210 | |||||
| Floor Maintenance | tile | 1366 | |||||
| Offices (3) | rubber tile | 300 | |||||
| Laundry Room | plastic tile | 210 | |||||
| Stair Case | quarry tile | 176 | |||||
| Restroom x2 | ceramic tile | 240 | |||||
| Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Turbine Floor (DET-2) | |||||||
| Governor Room | 711 | ||||||
| Stair Case | 108 | ||||||
| Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - El. 1201 (DET-6) | |||||||
| Floor Maintenance | concrete | 3100 | |||||
| Stair Cases x2 | 108 | ||||||
| Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - El. 1189 (DET-5) | |||||||
| Stair Cases x2 | concrete | 108 | |||||
| Unwatering Pump Stairs | concrete |
(Paragraph 5.2.2 of PWS) Windows Interior - Upstairs, May & Nov 231 1x yearly
| Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Turbine Floor | 1x monthly | ||||||
| Breaker Gallery | concrete | 2244 | |||||
| Floor Maintenance | concrete | 6480 | |||||
| Document Storage | concrete | 276 | |||||
| Heat Pump Room | concrete | 300 | |||||
| Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - EL 1189 | |||||||
| Floor Maintenance | concrete | 3400 | |||||
| Unwatering Pump Pit | concrete | 150 | |||||
| 0003 | Detroit Dam Overlook - Litter pick up | 2 | DET JT TOP OF DAM | ||||
| Janitorial Services, APR, SEP, DEC | Steep incline | 1050 | 3x Yearly | ||||
| CLIN | Location/Facility (attached drawing) | surface type | area sq ft/or total | Cleaning Frequency | Price | PRC LINE | FUNDING |
| Big Cliff Project | |||||||
| 0004 | Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Big Cliff Powerhouse (BC-1 & BC-02) | 1x monthly | 3 | BCL HY PH | |||
| Generator Floor | concrete | 4000 | |||||
| Generator floor stairs to Turbine Floor | concrete | 140 | |||||
| Turbine Floor | concrete | 2548 | |||||
| Water Treatment Room | concrete | 455 | |||||
| Turbine floor stairs to Water Treatment floor | concrete | 92 | |||||
| Storage | 130 |
| 0005 | Janitorial (Paragraph 5.3.1-5.3.2 of PWS) Services - General Reservoir, Jan 1 - Dec 31 (BC-3) | 4 | BCL JT GENERAL RESERVOIR | ||||
| Boat Ramp | gravel | 1x Monthly | |||||
| CLIN | Location/Facility (attached drawing) | surface type | area sq ft/or total | Cleaning Frequency | Price | PRC LINE | FUNDING |
| Green Peter Project | |||||||
| 0006 | Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Green Peter Powerhouse - (GP 13 & 14) | 1x weekly | 5 | GPR HY PH | |||
| Breakroom | carpet | 216 | |||||
| Carpet outside Breakroom | carpet | 63 | |||||
| Elevator Tower | concrete | 90 | |||||
| Janitor Closet | concrete | 60 | |||||
| Control Room | concrete | ||||||
| Restroom x2 | tile | 184 | |||||
| Floor Maintenance | concrete | 1440 | 1x monthly | ||||
| (Paragraph 5.2.3 of PWS) Strip-Seal Floor Finish, Apr & Oct | concrete | 368 | 1x yearly | ||||
| CLIN | Location/Facility (attached drawing) | surface type | area sq ft/or total | Cleaning Frequency | Price | PRC LINE | FUNDING |
| Foster Project | |||||||
| 0010 | Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Foster Project Office - (FS-4 & 5) | 2x weekly | 6 | FOS JT PROJECT OFFICE | |||
| Offices x3 | carpet | 1080 | |||||
| Kitchen Cleaning | tile | 276 | |||||
| Lobby | linoleum | 144 | |||||
| Warehouse | carpet | 338 | |||||
| Receiving Area | tile | 338 | |||||
| Restroom Cleaning | terrazo tile | 192 | |||||
| Second Floor - Offices x3 | linoleum | 1500 | |||||
| Second Floor - Office | carpet | 300 | |||||
| Service Building | concrete | 680 | |||||
| Training Room | concrete | 680 | |||||
| Windows - downstairs and upstairs | 511 | 402 | |||||
| 0011 | Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Foster Powerhouse - (FS-2 & 3) | 7 | FOS HY PH | ||||
| Balcony | concrete | 112 | |||||
| Control Room | carpet | 550 | |||||
| First Floor | 2034 | ||||||
| Maintenance Office | tile | 360 | |||||
| Receiving Area | tile | 756 | |||||
| Storage Room | concrete | 256 | |||||
| Windows | glass | 36 | |||||
| Second Floor - Assembly Area | concrete | 1764 | |||||
| Second Floor - First Aid Room | concrete | 264 |
| (Paragraph 5.2.2 of PWS) Window Cleaning, Jan-Apr-Jul-Oct | glass | 438 | 2x yearly |
| (Paragraph 5.2.3 of PWS) Strip-Seal Floor Finish, Downstairs and Upstairs, Apr & Oct | 5540 | 1x yearly | |
| Foster Project Office (downstairs and upstairs), Foster Powerhouse |
File details come from the government source that posted it. Updated .