B.08 Attachment 1 Gilliam County 2024-2025 Statement of Work.pdf
PDF 371 KB Posted
- Attached to
- Management of Undesirable Plants on USACE Lands at John Day Project, Gilliam County, Oregon
- Opportunity number
- W9127N2420006
About this file
This document is a 2-page Statement of Work for a Cooperative Agreement between the U.S. Army Corps of Engineers (USACE) and a recipient to assist with the management of undesirable plants on federal lands managed by the Natural Resource Management section at the John Day-Willow Creek Project in Gilliam County, Oregon.
The key details are:
- The recipient will coordinate regional efforts, develop an annual work plan, conduct surveys and GIS mapping, and implement integrated treatment methods to manage undesirable plants such as flowering rush.
- USACE may provide vessels for survey and treatment activities. The recipient will submit reports on anticipated and actual pesticide use.
- This Cooperative Agreement is being awarded under the Federal Noxious Weed Act of 1974 and the USACE intends to enter into the agreement with a state agency responsible for administering undesirable plant laws.
- The federal grant program under which this opportunity is assigned is the Management of Undesirable Plants on Federal Lands (CFDA 12.012).
Attachment 1 Gilliam County 2024-2025 Statement of Work
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9127N-24-2-0006 Attachment 1 – Gilliam County 2024-2025 Statement of Work
2024-2025 Statement of Work Management of Undesirable Plants on USACE Lands
John Day – Willow Creek Project Gilliam County, Oregon
DESCRIPTION OF SERVICES:
Recipient will assist the U.S. Army Corps of Engineers (USACE) with the management of undesirable plants affecting federal lands and waters managed by the Natural Resource Management section at John Day-Willow Creek Project (Project) in Gilliam County, Oregon.
1. Coordination
Assist in coordination to manage undesirable plants from a strategic regional perspective.
Manage and coordinate the actions of this Cooperative Agreement with relevant County Weed Boards, Soil and Water Conservation Districts and other political subdivisions of the state.
2. Planning Assist in the development of a USACE-approved annual plan of work, identifying target species for inventory and management, prioritizing treatment based on regional plans, site location and level of infestation. Provide consultation to USACE on regional Best Management Practices including Early Detection and Rapid Response (EDRR) targets, quarantine initiatives, biological control releases, and updates to the State Noxious Weed List including new classifications, changes in classification of previously listed species, and delisting of species that have become a lower priority.
3. Surveying
Assist with the inventory, survey, monitoring, and/or GIS mapping of exotic, noxious, invasive, or undesirable native vegetation at the Project. Maps, location descriptions, data and/or GIS information will be provided to the USACE Project Natural Resource Section that will aid in the management of areas. USACE may provide a USACE-operated vessel for survey activities. Data and vessel access require coordination with the Grants Officer’s Representative (GOR).
In the Columbia River region, targets for early detection include, but are not limited to:
a. Flowering rush (Butomus umbellatus) is among the region’s highest priorities. Its presence is minimal on lands and waters managed by the Project, but vigilant surveying is required to detect and prevent further spread. It is among the region’s highest priorities for early detection because of its potential to devastate riparian habitat.
4. Implementation
Assist in the implementation of the appropriate integrated treatment method as prescribed or approved by USACE biologists, natural resource specialists, natural resource managers, and coordinated with the GOR. Implementation will be aligned with the Portland District Pesticide Discharge Management Plan (PDMP) (Attachment 7 – Pesticide Discharge Management Plan). Treatments may employ prevention, mechanical, cultural, biocontrol or herbicide methods. Where practicable, biocontrol methods and other effective non-herbicide methods are preferred. USACE may provide a USACE-operated vessel for treatment activities. Vessel access requires coordination with the GOR.
W9127N-24-2-0006 Attachment 1 – Gilliam County 2024-2025 Statement of Work
Specific targets at the Project include:
a. Philippi Park (20 acres maximum)
i. Total vegetation control on swim beach and perimeter of structures. Establish a three-foot control area along the perimeter of the restroom building, boat dock gangways and pump house.
ii. Spot treat vegetation in dry land areas and irrigated lawns, including Yellow star-thistle.
b. Lake Umatilla Shoreline
i. EDRR for any presence of Flowering rush. A cultural clearance must be performed by USACE before any substrate-disturbing activity.
5. Reporting
If chemical methods are planned during the Period of Performance, an “Anticipated Pesticide Use” report will be submitted by the recipient to the GOR, prior to implementation. An “Actual Pesticide Use” report will then be submitted by the recipient to the GOR by 15 December, outlining the actions completed each calendar year. Templates will be provided by USACE to ensure the required data outlined in the PDMP (Attachment 7) and Oregon State pesticide regulations are included.
SCHEDULE BREAKDOWN:
An initial meeting between the recipient and USACE will occur within four (4) weeks of the execution of this Cooperative Agreement. A schedule will be coordinated at that time. Additional ad hoc work within the scope of this Cooperative Agreement may be requested throughout the Period of Performance as needs arise and if funding is available. Additional work will be implemented by a bilateral modification.
File details come from the government source that posted it. Updated .