B.08 Att15 - Price Schedule Phillip Mtywaku.docx

DOCX document 35 KB Posted

Attached to
IAF-24-0001 Phillip Mtywaku Secondary School Renovation
Solicitation number
W912GB24R0048
Issued by

About this file

This document is a Price Schedule for a design-build construction contract for the renovation and expansion of the Phillip Mtywaku Secondary School in Eastern Cape, South Africa.

The key details are: The U.S. Army Corps of Engineers (USACE) Europe District is soliciting proposals for a design-build project to construct a new 5-classroom building, renovate the existing kitchen, and convert the library into a science lab classroom at the Phillip Mtywaku Secondary School. The contract will be a Firm Fixed Price design-build with a period of performance of 450 calendar days. The estimated contract value is between $1,000,000 and $5,000,000. The solicitation will be open to full and open competition, with no small business set-asides. The price schedule includes a base bid with two items - the new 5-classroom facility and the kitchen renovation, as well as an option item to convert the science lab. Offerors are required to provide pricing for all base and option items. The solicitation is anticipated to be issued within 60 days.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

ZAF PHILLIP MTYWAKU SECONDARY SCHOOL

EASTERN CAPE, SOUTH AFRICA

19-January-2024

PRICE SCHEDULE

IMPROVE WATER SUPPLY FOR TSAGHKABER & ARVASHOGH COMMUNITIES

TSAGHKABER & ARVASHOGH, ARMENIA

29-NOV-22

Offerors shall provide pricing for all base and option items.

The following items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Statement of Work (SOW), Request for Proposal and Base Contract. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, and safety requirements. All work shall be performed in accordance with these documents. Refer to Specification Section 01 22 00 Price and Payment Procedures for additional description of the work associated with each of the items.

Period of Performance: Refer to clause COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10) in the Request for Proposal for the period of performance for all base and option items.

Liquidated Damages: Refer to clause LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12) in the for Proposal for the liquidated damages for all base and option items.

Option Items: The Government reserves the right to award the options up to 90 calendar days from contact award. See Section 01 22 00 for additional information regarding the award of options.

Item No.
Title
Quantity
Unit
Unit Price
Amount

BASE ITEMS

0001
New (5) Classroom Facility
1
Job
$
$
0002
Renovate Existing Kitchen Facility
1
Job
$
$
Total of Base Items 0001 - 0002
$

OPTION ITEMS

0003
Option 1, Convert Science Laboratory
1
Job
$
$
Total of Option Item 0003
$
Total of all Base and Option Items
$

EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

-- END OF PROPOSAL SCHEDULE --

File details come from the government source that posted it. Updated .