This document is a Contractor Past Experience Information Sheet related to a federal contract opportunity W912GB24R0049 for the design and construction of two primary schools in Eswatini.

The key details are:

  • The project involves design-build construction of a new multi-classroom school building and renovation of an existing kitchen facility at two school locations in the Shiselweni Region of Eswatini.
  • The anticipated contract duration is 480 calendar days after award, with an estimated value between $1,000,000 and $5,000,000.
  • The contract will be a Design-Build, Firm Fixed Price construction contract subject to full and open competition. No small business set-asides or socioeconomic preferences will be granted.
  • The Contractor Past Experience Information Sheet requires details on the contractor's previous project experience, including the project name, location, completion date, final cost, scope of work, and whether the contractor was the prime, subcontractor, joint venture, or key subcontractor.

View the file

Other files

File Type Posted
B.01 Solicitation Amendment W912GB24R00490001_IAF-24-0010 Eswatini (Conform Copy).pdf PDF
B.01 Solicitation AmendmentW912GB24R00490001_IAF-24-0010 Eswatini.pdf PDF
B.08 Etjedze_Att#4 Preparation of Structural Calculations.pdf PDF
B.08_Att15 - Price Schedule Eswatini.docx DOCX document
B.08_Att17 - Commitment Letters.docx DOCX document
B.08_Att14 - Past Performance Questionaire PPQ.docx DOCX document
B.08 Ejubukweni_Att#7_Existing Kitchen Building Photos.pdf PDF
B.08 Etjedze_Att#2_Conceptual Site Plan.pdf PDF
B.08 Ejubukweni_Att#2_Conceptual Site Plan.pdf PDF
B.08 Etjedze_Att#6_Rainwater Tank Example.pdf PDF
B.08 Solicitation # W912GB24R0049_IAF-24-0010 Eswatini Etjd&Ejubu Primary Schools _ Final.pdf PDF
B.08 Ejubukweni_Att#6_Rainwater Tank Example.pdf PDF
B.08 Ejubukweni_Att#5_ Dedication Plaque.pdf PDF
B.08_Att11 - Bank Letter of Guarantee (BLG) Template_IAF-24-0010.docx DOCX document
B.08 Ejubukweni_Att#3_Conceptual Drawings.pdf PDF
B.08_Att13 - Past Performance Overview Sheet_Rev 19 Jan 2023.xlsx XLSX spreadsheet
B.08 Etjedze_Att#3_Conceptual Drawings.pdf PDF
B.08_Att9 - Specs Binder V 02-23.pdf PDF
B.08 Etjedze_Att#7_SCOPE FOR INDEPENDENT STRUCTURAL PROOFING.pdf PDF
B.08_Att10 - Bank Letter of Assurance (BLA) Template_IAF-24-0010.docx DOCX document
B.08_Att16 - Site Visit Attendee Worksheet.xlsx XLSX spreadsheet
B.08 Etjedze_Att#1_Project Location Map.pdf PDF
B.08 Etjedze_Att#5_ Dedication Plaque.pdf PDF
B.08 Ejubukweni_Att#4 Preparation of Structural Calculations.pdf PDF
B.08 Ejubukweni_Att#1_Project Location Map.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 12 (amended 13 FEB2023) W912GB24R0049_IAF-24-0010_Ejubukweni Community Primary School, and Etjedze Primary School, Eswatini.

CONTRACTOR PAST EXPERIENCE INFORMATION SHEET

PROJECT NO IAF-24-0010 Eswatini Ejubukweni Community Primary School, and Etjedze Primary School, Page 1

Project Name, Contract number, and Location:

Past Performance:

1. The day, month, and year work was completed: _______________

2. Is this project more than 90% complete? ____ Yes ____ No If “No” explain current percentage of completion, if yes and between 75-99% complete please explain how the percentage was calculated and what work remains.

3. The final cost of this project €_________________________

4. Do not provide a listing of existing or previous contracts, but rather provide detailed information of work for this project:

o Design- Build or Design-Bid-Build o Scope of the project, to include purpose/use of facility.

o Size of the project, differentiate square footage of new construction versus renovation if project includes both.

o Type and percentage of work that was self-performed.

o Whether the project involved new construction, renovation, or both. Clearly delineate square meters for construction and renovation.

o Whether the project was completed for the United States DoD.

(Continue typing if required to provide more information)

ATTACHMENT 2 – CONTRACTOR PAST EXPERIENCE INFORMATION SHEET

PROJECT NO. IAF-24-0010 Eswatini Ejubukweni Community Primary School, and Etjedze Primary School, Page 2

Offeror: A contractor and/or company submitting a proposal for this solicitation.

Prime Contractor: A contractor that performed at least 15% of the work, and managed all other work for the project.

Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.

Joint Venture: More than one contractor with a legal binding agreement to work together.

Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror may take credit for the Key Subcontractor’s past performance if it was meaningful to this procurement. Ensure you the letter of commitment is signed by both the Offeror and the Key Subcontractor.

5. Mark one of these selections:

Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor

a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.

b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.

c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:

d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals: