B.01.01.01 Section J Attachment -4- Daily Log Form.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Janitorial Services at the Missouri River Area Office, Napoleon, MO
Solicitation number
W912DQ24Q1059
Issued by

About this file

The document is a Daily Log Form for a janitorial services contract (Solicitation Number W912DQ24Q1059) at the Missouri River Area Office in Napoleon, MO. The U.S. Army Corps of Engineers Kansas City District has a requirement for janitorial services to maintain the Administration Building and Maintenance (Shop) Building in a clean and sanitary condition. The contractor shall perform various cleaning duties on a daily, weekly, monthly, and semi-annual basis, including vacuuming, sweeping, mopping, dusting, and restocking supplies. The contractor must comply with all federal, state, and local laws and regulations. The Performance Work Statement outlines the specific cleaning requirements and inspection methods. The contractor must document all completed duties and any deficiencies on the Daily Log Form.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract : WDQ912-
Contractor:
Daily Log
DutiesDailyWeeklyMonthlySemi AnnuallyInspection Method
FLOOR CLEANINGRequiredCompletedRequiredCompletedRequiredCompletedRequiredCompleted
CarpetVacuum and remove spotsXR
ShampooXR
Ceramic TileSweep, damp mop and/or buff to maintain a clean and well cared for appearance.XR
Resilient FlooringSweep, damp mop and/or buff to maintain a clean and well cared for appearance.XR
Clean and wax resilient floor tilesXR
Shop Building - Sweep, damp mop to maintain a clean and well cared for appearanceXR
Vinyl Plank FlooringSweep, damp mop to maintain a clean and well cared for appearance.XR
Concrete Floor – Front PorchSweepXR
FURNITUREFabric Chairs: Vacuum upholstery and dust exposed frameXR
Vinyl, Leather: Wash vinyl, leather upholstery with wet or damp cloth using cleaners and vinyl preservatives as may be appropriate. Wash exposed frame and apply wax or preservatives as may be appropriate for the type of frameXR
GLASS CLEANINGBoth sides of interior door glass, display cases, etc. and inside surface of exterior doors and windowsXR
Shop Building Include both sides of storm windows, interior and exterior surface of all windowsXR
Exterior windows and doorsXR
DOORS, DOOR FRAMES, WINDOW FRAMES, AND WALLSpot clean, wipe down, dust or vacuumXR
Spot clean, wash down with damp cloth or scrub brush and cleanser, vacuum and shampoo, etc. Apply wax, or other surface preservatives, as appropriate for the type of surfaceXR
LIGHT FIXTURESDust, wipe, etc. to remove dust and cobwebsXR
Take down grillwork, shades, etc. Wash, wipe, dust or vacuum to thoroughly cleanXR
SINKS, COUNTER TOPS AND APPLIANCESSinks and countertops shall be scrubbed clean and appliances wiped downXR
Shop Building Sinks and countertops shall be scrubbed clean and appliances wiped downXR
WASTE REMOVALWaste baskets shall be emptied and wiped clean and plastic liners replacedXR
Shop Building Waste baskets shall be emptied and wiped clean and plastic liners replacedXR
WATER FOUNTAINS AND RESTROOM FIXTURESWater fountains, lavatories, stools, urinals, partitions, mirrors, chrome fixtures, etc., shall be scrubbed clean, dried, and shiny surfaces buffed with a soft cloth to restore sheenXR
Shop Building Lavatories, stools, urinals, partitions, mirrors, chrome fixtures, etc., shall be scrubbed clean, dried, and shiny surfaces buffed with a soft cloth to restore sheenXR
CEILINGSCheck ceilings and clean as needed to remove spots, dust, and cobwebsXR
MISCELLANEOUSToilet tissue, paper towels, soap and deodorant blocks shall be replenished as needed. Clean restroom wallsXR
All refuse and debris collected during performance of services shall be deposited in a Government furnished trash receptacle.XR
Shop Building Toilet tissue, paper towels, soap and deodorant blocks shall be replenished as needed. Clean restroom walls, all recyling Bins emptied and all discarded cardboard, plastic, and paper material taken to recycling center
XR
All recyling Bins emptied and all discarded cardboard, plastic, and paper material taken to recycling centerXR
Keep Janitor’s room neat, clean, and orderly.X
Restock suppliesXR
Clean ventilating registers.XR
I have completed the duties defined above.Deficiency and Inspection Results

Date and Time Service Completed Deficiencies Corrective Actions

Signed

Definitions:DailyTwo times per week.
WeeklyOne time per week.
MonthlyOnce during the first week of each month.Contractor Signature and Date:
Semi AnnuallyOnce during the first weeks in April and October
%=100%, R=Random, V=Validated User/Customer ComplaintsCOR Signature and Date:

File details come from the government source that posted it. Updated .