B-4877 Plans Marine Stadium.pdf

PDF 4 MB Posted

Attached to
R-7292 Marine Stadium Electrical Infrastructure
Solicitation number
PW-27-805
Issued by
California

About this file

This Project Description document, prepared for the City of Long Beach, California, outlines electrical infrastructure improvements for marine facility structures located at 525 E. Polyway, Long Beach. The project involves the installation of electrical service extensions to existing utility service points and new electrical service infrastructure across three separate conduit areas: Facilities Building (LV Conduit 3), Lifeguard Museum and Restroom (LV Conduit 2), and Restroom and Pipeline (LV Conduit 1). The scope encompasses equipment pad construction, transformer installation, distribution systems, trench installation and repair, asphalt concrete pavement repair, and PCC (Portland Cement Concrete) pavement repair. The project includes detailed specifications for site conditions, structural design data, equipment sizing requirements, and construction details. Multiple conduit plans, site plans, equipment pad structural designs, and pavement repair details are provided throughout the technical documentation. The project adheres to the 2022 editions of the California Building Code, Electrical Code, Fire Code, Mechanical Code, and Plumbing Code, with contractor responsibilities clearly delineated from utility company obligations.

The project responsibilities are divided between the contractor and the utility provider, with the contractor responsible for trench work, conduit preparation, equipment pad construction, and pavement restoration, while the utility provides fixture wire connections and conducts final service activation. Site notes indicate that all new work must be performed within designated areas along Edgewater and Artisan Ways, with coordination required between contractor operations and public safety considerations. The document includes an Inspector Contact designation (ICE Inspector Contact: Mr. Sal T. at 310-885-4239) and a Notice of Final Local Action acknowledgment confirming project conditions of approval. Construction shall commence according to the architect's direction, with all work performed to meet applicable local and state codes. No specific contract term, renewal options, pricing information, or funding sources are detailed within this Project Description document.

View the file

Other files

File Type Posted
Seller Guidance v4.pdf PDF
R-7292 Bid Specs Marine Stadium.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .