B-46194 Change Order Notice for P-19619 JPMC Spreader Repair Parts - Extend to 06.30.25.pdf
PDF 2 MB Posted
- Solicitation number
- 25-416CMS-BOSS4-B-46194
- Issued by
- Illinois
About this file
The provided file appears to be a standard Adobe Reader error message/placeholder page rather than actual contract documentation. The page displays the common "Please wait..." message that appears when a PDF viewer is unable to properly load or display a document. It includes instructions for upgrading Adobe Reader software and trademark information for Windows, Mac, and Linux operating systems.
Based on the file name provided in the metadata (B-46194 Change Order Notice for P-19619 JPMC Spreader Repair Parts - Extend to 06.30.25.pdf), this appears to be a change order notice related to spreader repair parts with an extension date to June 30, 2025, but the actual content of the change order is not visible in the provided file.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Change Order Notice Chief Procurement Office for General Services Change Order Notice V.23.2 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.
This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.
Detailed explanation for this change order:
11.0.0.20130303.1.892433.887364
| CurrentPage: |
| PageCount: |
| DropDownList1: CMS - Central Management Services |
| ProcurementTitle: JPMC Spreader Repair Parts - Monroe Comp |
| BBREFNO.: 25-416CMS-BOSS-B-46194 |
| thedetails: CMS is extending Joint Purchase Master Contract (JPMC) JPMC Spreader Repair Parts - Monroe Comp 21-416CMS-BOSS4-P-19619 (initial contract term 12/11/20 - 10/11/24, and extended to 02/28/25) until June 30, 2025. This contract was established to enable governmental units and qualified not-for-profit agencies to purchase Monroe brand spreader repair parts on an as needed basis. The extension will allow for the purchase of parts necessary to ensure that important weather treatment equipment is working properly during the winter weather. |
| CheckBox1: 1 |
| CheckBox2: 1 |
File details come from the government source that posted it. Updated .