B-22837 JPMC Snow Plows and Ice Handling Equip Q and A-1 dated 112222.docx

DOCX document 38 KB Posted

Attached to
JPMC Snow Plows and Ice Handling Equip.
Solicitation number
21-416CMS-BOSS4-B-22837
Issued by
Illinois

About this file

This document contains questions and answers related to the Illinois Department of Central Management Services' solicitation for JPMC Snowplows and Ice Handling Equipment, Bid No. 21-416CMS-BOSS-B-22837. The solicitation is seeking bids for snowplows and ice handling equipment, with a bid opening date of December 12, 2022. The contract will be awarded to the overall low bidder meeting the specifications and terms and conditions, with the State reserving the right to award by individual line item or category. The contract term is for up to five years, with no option to renew, and a maximum total term of ten years per state procurement code.

Regarding pricing, bidders must quote a single percentage discount from their most current MSRP list, with no items considered "exclusive" or "excluded" from the contract. The solicitation also provides details on economic price adjustments, bid firm time, and bid submission requirements. The State is removing IDOT and Tollway snowplows from this solicitation and will include them in the next Dump Truck solicitation.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JPMC Snowplows and Ice Handling Equipment, 21-416CMS-BOSS-B-22837, Questions and Answers #1

Illinois Department of Central Management Services JPMC Snowplows and Ice Handling Equipment

21-416CMS-BOSS-B-22837

Questions and Answers #1 November 22, 2022

Q1
I would also like to see when we can work on DOT specs and IL DOT specs, for snow and ice equipment.
A1
We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.
Q2
When will be the last day to turn in bid?
A2
The BidBuy Bis Opening is Monday 12/12/2022 01:30:00 PM. All bids shall be submitted into BidBuy any time before the Bid Opening.

Documents shall be submitted in an electronic format that is accessible and readable using Microsoft Office suite software or Adobe Reader. Corrupted files shall not be considered. It is the Offeror’s responsibility to check that files are accessible and legible after uploading. File size may impact the uploading and downloading speed and may lead to browser time-outs resulting in failed upload/download attempts. Please consider this dependency when attaching very large documents.

Q3
Is the Illinois DOT trucks out to bid yet?
A3
We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.
Q4
Are the Illinois Tollway trucks out to bid yet?
A4
We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.
Q5
What is the award criteria for this solicitation? Is it a multiple award?
A5
Please reference the new B-22837 JPMC Snow Plows and Ice Handling Equipment IFB 221121; State of Illinois IFB Section 1. Part A. Instructions and General Information, A.22.1.18.

The State of Illinois intends to award this solicitation to the responsive and responsible overall low bidder meeting the specifications and terms and conditions of the bid. The State reserves the right to award by individual Line Item or Category.

Q6
Do we have to bid all items OR can we bid certain items and No Bid others?
A6
Please reference the new B-22837 JPMC Snow Plows and Ice Handling Equipment IFB 221121; State of Illinois IFB Section 1. Part A. Instructions and General Information, A.22.1.17.

Bidders may bid on all line items or may bid on only those individual line item(s) they choose to submit a bid.

Q7
Are the volumes shown a 5-year estimate or an annual estimate?
A7
Please reference the new B-22837 JPMC Snow Plows and Ice Handling Equipment IFB 221121; State of Illinois IFB Section 1. Part A. Instructions and General Information, A.22.3.

The quantities indicated under the Items Tab in BidBuy are for evaluation purposes only and are no guarantee of actual usage. Pricing submitted will be used in the resulting contract.

Please reference the new B-22837 JPMC Snow Plows and Ice Handling Equipment IFB 221121; State of Illinois IFB Contract: Description of Supplies and Services, 1.5.5. There is no guarantee of quantities for actual orders or usage. Vendor shall furnish all requirements for the Contract period.

Q8
Snow Plows on an as needed basis for an initial term of 5 years. Bid Firm Time: Vendor’s Bid must remain firm for 180 days from opening. Contract Section 2.5 SAYS ONE‐YEAR BEFORE ADJUSTMENT. Which is it?
A8
The quote submitted with the bid, must be firm for 180 days from the opening date.

Economic Adjustment-MSRP: The prices in this Contract must remain firm for the first year after the execution date of the Contract. Thereafter, one upward price adjustment may be applied no more frequently than once during any given six (6) month period.

Economic Adjustment-Non-MSRP: The Non-MSRP prices in this Contract must remain firm for the first year after the execution date of the Contract. Thereafter, one upward price adjustment may be applied no more frequently than once during any given six (6) month period. The PPI that was in the contract is what should be used to request an increase.

Q9
The resulting contract with the awarded Bidder shall have a term of up to five (5) years with no option to renew. In no event will the total term of the contract, including the initial term, any renewal terms, and any extensions exceed ten (10) years. 30 ILCS 500/20‐60. Please explain.
A9
Per the Procurement Code, 30 ILCS 500/20-60, in no event will the total term of the contract, including the initial term, any renewal terms, and any extensions exceed ten (10) years.
Q10
For Lines 19‐24, bidder shall quote their price as a single percentage discount from the most current submitted MSRP list. The MSRP list shall be a published price list. If you do not have a published pricelist, you must enter 0%. Bidder shall enter only a single “Percent Discount” in the “Discount %” field of every Line Item in BidBuy. Successful vendor shall supply all items listed within the approved MSRP list at the contract discount(s). No items shall be considered "exclusive" or "excluded" and therefore not covered by the contract.

· Line 19 needs chassis make, model, year, and exact equipment per chassis information in order to quote properly. It also mentions accessory equipment and components. Please provide more detail on this request.

· Line 21 needs to be more specific on the spreader(s) being requested. Tailgate, chassis mount slide‐in, size, etc. It also mentions accessory equipment and components. Please provide more detail on this request.

· Line 24 needs to be more specific in general.

· Lines 19, 21 & 24 are items that are specialty items specific to an application (chassis, equipment, etc.) and cannot be dialed in to a general price or component. If being used a replacement part, specifics are needed on that item in order to replace. If being used on a new install, specifics are needed on chassis & equipment

A10
Reference Revised Exhibit H and Exhibit I.
Q11
Item 1‐7 (Exhibit A‐G) seem straightforward, but specs do not seem to meet product previously supplied. Do these need to be updated?
A11
We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.
Q12
PLOW SPECIFICATION EXHIBIT “A” MPP36R11‐ISCT‐IL 1.2.11.2 Moldboard radii shall include the deflector shield and a 12” deflector of rubber belting bolted through a continuous 3/16" x 1‐1/2" flat with extended tabs at each bolt hole held by the top structural angle. The rubber deflector shall be a minimum 3/8” thick and 12” in width the full length of the moldboard. How long and wide should the extended tabs be? More Detail needed.
A12
We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.
Q13
1.2.11.4 Both upper leading ends shall include mailbox trims of 12” x 12” Is this a new feature?
A13
We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.
Q14
1.2.11.6 The moldboard shall include two orange LED lighted markers (6) mounted at the forward outermost corners of the snow plow. The markers shall be a minimum 30" to maximum 36” tall x 3/4" diameter. Wiring shall be continuous, outer fiber or plastic sheathing for protection and securely fastened to the moldboard. Allowing for full trip of the moldboard, wiring shall terminate at plow hitch with Weather pack type connection including female portion for installation on truck at later time. Is this a “NEW” feature?
A14
We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.

Q15

A15

1.4.2 The frame shall be connected to the four reinforced vertical ribs (six ribs on the12’ plow) This needs to be revised, 1.2.11.5 says to attach to six ribs.

We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.

Q16

A16

Q17

A17

Q18

A18

EXHIBIT “B” MPR39‐39‐57‐12‐ISCT‐IL

1.2.9.2. How long and wide should the extended tabs be? More detail needed

1.2.10 LED lighted markers with wire harness Is this a “NEW” feature?

We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.

EXHIBIT “C” MPP41R11-ISCT-IL

1.2.11.2 How long and wide should the extended tabs be? More details needed

1.2.12 LED lighted markers with wire harness Is this a new feature?

1.11 All plows shall be equipped to provide for field installation of casters later without modification. How are we addressing this on our Illinois push frame?

We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.

EXHIBIT “D” MPP41R12-ISCT-IL

1.2.11.2 How long and wide should the extended tabs be? More detail needed

1.2.11.6 LED lighted markers with wire harness Is this a new feature?

1.11 All plows shall be equipped to provide for field installation of casters later without modification. How are we addressing this on our Illinois push frame?

We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.

Q19

A19

Q20

A20

Q21

A21

Q22

A22

Q23

A23

Q24

A24

Q25

A25

Q26

A26

Q27

A27

Q28

A28

Q29

A29

Q30

A30

Q31

A31

Q32

A32

Q33

A33

Q34

A34

Q35

A35

Q36

A36

Q37

A37

Q38

A38

EXHIBIT “E” (MPFA30-60-12-ISCT)? ILL bottom angle

1.2.4 Requires 10-gauge Grade 50

1.2.9.2 How long and wide should the extended tabs be? More detail needed

1.2.9.6 LED lighted markers with wire harness Is this a new feature?

1.4.7 The push frame shall hydraulically adjust the plowing angle of moldboard 35* right to 35* left and hold the plowing position without the use of a mechanical device. Need to delete this 1.4.7?

We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.

EXHIBIT “F” (MP40-58-12-ISCT-EXP/316)? ILL bottom angle

1.2.9.2 How long and wide should the extended tabs be? More detail needed

1.2.9.7 LED lighted markers with wire harness Is this a new feature?

We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.

EXHIBIT “G” (MP41R11-ISCT-ME2)? ILL bottom angle

1.2.10.2 How long and wide should the extended tabs be? More detail needed

1.2.10.6 LED lighted markers with wire harness Is this a new feature?

We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.

EXHIBIT “H” BOSS 9-1/2-foot plow?

Snow plow must have a plastic hopper, so as to help alleviate the corrosion issue in the beds and providing longevity on the plow. More information needed on this as we don’t understand what is being asked

Reference Revised Exhibit H and Exhibit I. we are seeking a snow plow and have provided details on the dump truck.

EXHIBIT “J” (MP45R10-ISILTW,316)

EXHIBIT “K” (MP45R11-ISILTW,316)

We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.

EXHIBIT “L” “M” & “N” (MP45R12-ISILTW,316)

Specifications for L, M & N seems to be the same?

We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.

EXHIBIT O 8’ mid-mount JR wing for single axle – Tollway EXHIBIT P 8’ mid-mount JR wind for tandem axle – Tollway EXHIBIT Q 11’ benching wing (40”) for tandem axle – Tollway EXHIBIT R 30’ extended wing (Para-Glide) for tandem axle – Tollway Specifications for O – R need to be updated per previous history and conversations. Need to know chassis, make, model year, right hand or left-hand application.

We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.

Why are the wings listed as a Commodity?

We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.

Do they have a specific order to upload forms into BidBuy?

There is not a specific order to upload the forms.

In BidBuy how are the dollar amounts came up with?

They are just an estimation based on current market analysis.

Are we able to submit the questions to Anita Harris?

Per the IFB document, A.5. Information Contact: The individual listed in the “Info Contact:” on the Bulletin posting shall be the single point of contact for this solicitation. ALL questions are to be submitted to Anita Harris as the solicitation contact.

If a box is not checked on Forms A or Forms B, is there a grace period?

Bidders can submit Forms B only if they have an active Illinois Procurement Gateway (IPG) registration. If a bidder does not have an active IPG registration, the bidder is required to submit Forms A.

What are the specifications for the Tollway Wings?

We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation

Are the IDOT wings to be submitted?

We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation

Could we add the specifications for trucks as these Snow Plows and Ice Handling Equipment are custom made?

Bidders shall submit their bids based on the specifications of the solicitation.

Are you seeking a custom versus a generic pricelist?

We are seeking the manufacturer MSPR pricelist (over-the-counter) the bidder chooses to submit.

Please clarify how to give a percentage off on a custom pricelist. Our standard is typically 10% off the over-the-counter MSRP products.

We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation. For Line Items 3 to 8, we are seeking a percentage off the manufacturer MSPR pricelist (over-the-counter) the bidder chooses to submit.

Are prices to be entered in BidBuy or is an uploaded quote sufficient?

All prices shall be entered in BidBuy. Pricing received as an attachment will be deemed non-responsive.

There are 8 different wings on the master contract for Trucks (P-8607), are there amended specifications?

We are removing IDOT and Tollway Snow Plows from this solicitation. They will both be included in the next Dump Truck solicitation.

How is the percentage for the BEP Goal generated?

BEP Goal is based on the NIGP codes used in the solicitation and the number of BEP firms certified in the NIGP Codes. BEP firms certified in the NIGP Codes contact information is provided on the BEP vendor listing attached to the solicitation in BidBuy.

image1.emf

File details come from the government source that posted it. Updated .