AWO - Fencing Stage II Rebid - Plans.pdf

PDF 14 MB Posted

Attached to
Perimeter Fencing Rehabilitation – Stage II Rebid
Solicitation number
146417
Issued by
Clark County, Nevada

About this file

This is a construction plans document for the Arlington Municipal Airport (AWO) Perimeter Fencing Rehabilitation – Stage II Rebid project located in Arlington, Washington. The project involves the comprehensive rehabilitation of the airport's perimeter fencing system and is associated with FAA project numbers 3-53-0002-043-2026 and 3-53-0002-044-2026, with City Project Numbers AP26.04, AP26.05, and AP26.06. The scope of work includes demolition of existing fencing, installation of new chain-link fencing, installation of automatic bi-fold gates with card reader systems, pedestrian gates, bollards, and associated civil site work including trench repairs and asphalt pavement. The project is organized into three phases with a total contract time of 85 working days if all bid additives are awarded. The plans include detailed construction drawings, phasing schedules, electrical and fiber optic communications layouts, survey control information, and specifications for foundation details, gate systems, and fence construction standards. The project encompasses multiple areas including Airport Boulevard, 48th Drive NE, 49th Drive NE, 50th Drive NE, and 51st Drive NE, with designated contractor staging areas and temporary fencing requirements during construction.

The plans document specifies general construction safety requirements, utility coordination procedures, and notation that contractors must call before digging to identify underground utilities. The project includes provisions for water supply for construction activities and delineates areas designated as critical to keep out (ILS critical areas and midfield takeoff prohibition zones). Temporary barricading and low-profile barricade systems are detailed for phased construction execution. The electrical and communications infrastructure plans indicate integration with existing power services and fiber optic systems, with specific tie-in details provided for each phase. The design was prepared by DOWL (contact: 425-869-2670 and SE 30th Place, Suite 200, Bellevue, Washington 98007) and emphasizes that users of the electronic design files assume all risk and liability, with no warranties expressed or implied regarding accuracy or functionality of the provided materials.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Co nc.

Pav ed

Pav ed

Pav ed

Pav ed

Pav ed

Pav ed

Pav ed

Pav ed

Pav ed

Pav ed

Pav ed

Pav ed

Pav ed

Co nc.

Co nc.

Pav ed

De ck

Pav ed

Pav ed

Pav ed

Po ol

C

Be aco n

RAMP

RAMP

ILS

C

RIT

IC

AL

A

REA

KE

EP

O

UT

ILS

C

RIT

IC

AL

A

REA

KE

EP

O

UT

E

E

E

E

E

E

E

X

X

X

X

X

X

EE

E

E

AW

AW

EAW

ARLINGTON MUNICIPAL AIRPORT (AWO)

VICINITY MAP

SHEET INDEX

CONTACTS / UTILITIES

VERTICAL AND HORIZONTAL CONTROL

C O

VE

R

S H

EE

T

C1

ARLINGTON, WASHINGTON

SEPTEMBER 2026

FAA NO. 3-53-0002-043-2026

FAA NO. 3-53-0002-044-2026

CITY PROJECT NO. AP26.04/ AP26.05/ AP26.06

MAYOR

AIRPORT DIRECTOR

AIRPORT OPERATIONS MANAGER

AIRPORT OPERATIONS COORDINATOR

RUNWAY 11-29

TAXIWAY C

SHEET

NO. SHEET TITLE

PROJECT

LOCATION

D2

C2

CITY COUNCIL

AIRPORT COMMISSION

PERIMETER FENCING

REHABILITATION - STAGE II

GENERAL NEW FENCING NOTES:

PERIMETER FENCING REHABILITATION

PROJECT - STAGE II REBID

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

C3 C1C4

D3

TAXIWAY D

AIRPORT BLVD

51ST AVE NE

43RD AVE NE

172ND ST NE/ S

R531

TAXIW

AY B

RUNW

AY 16-34

TAXIW

AY A

A4

A3

A2

A1

B4

B3

B2

TA

XI

W

AY

E

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

C2

N O

TE

S‚

A

BB

R

EV

IA

TI

O N

S‚ A

N D

L

EG

EN

D

ABBREVIATIONS

LEGEND

GENERAL SAFETY NOTES

WATER FOR CONSTRUCTION ACTIVITIES NOTES:

CONTRACTOR STAGING AREA NOTES:

GENERAL NEW FENCING NOTES:

PERMITTING NOTES:

De ck

E

E

E

E

E

E

E

E

E

EE

EAW

C3

BI

D

S C

H

ED

U

LE

B R

EA

KD

O W

N P

LA

N

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

LEGEND: BID SCHEDULE NOTES:

De ck

E

E

E

E

E

E

E

E

E

EAW

X

C4

SU

R

VE

Y

C O

N

TR

O L

PL

AN

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

SURVEY CONTROL POINTS

POINT # NORTHING EASTING ELEVATION DESCRIPTION

SURVEY NOTES:

SURVEY CONTROL:

LEGEND:

E E

E

E

E

E

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

E

E

E

E

E

E

E

E

E

AW

AW

AW

X

THE USER OF THESE FILES ASSUMES ALL RISK AND LIABILITY. T

HE ENGINEER

MAKES NO REPRESENTATION, W

ARRANTY OR GUARANTEE, E

XPRESSED OR

IM

PLIED, A

S TO THE ACCURACY, F

UNCTIONALITY, O

R RESULTS DERIVED FROM

THE USE OF ELECTRONIC DESIGN FILES PROVIDED BY THE ENGINEER.

ELEC

COMMCOMM

ELEC

COMMCOMM

ELEC

COMM

ELEC

COMM

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

COMM

COMM

ELEC

COMMCOMM

C O

N

ST

R U

C

TI

O N

S

AF

ET

Y

AN

D

PH

AS

IN

G

P

LA

N O

VE

R

VI

EW

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

C5

GENERAL PHASING NOTES: LEGEND:

X

X

TOTAL IF ALL ADDITIVES AWARDED: 85 WORKING DAYS

TOTAL CONTRACT TIME WILL BE DEPENDENT ON BID ADDITIVES AWARDED, AS FOLLOWS:

X

X

X

X

X

X

ELEC

COMMCOMM

ELEC

COMM

ELEC

COMM

ELEC

ELEC

ELEC

ELEC COMM

ELEC

C

SP

P

- P

H

AS

E

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

LEGEND:

X

X

C6

PHASE 1 NOTES:

E E

E

E

E

E

E

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

E

E

E

E

E

E

E

E

E

AW

AW

AW

X

THE USER OF THESE FILES ASSUMES ALL RISK AND LIABILITY. T

HE ENGINEER

MAKES NO REPRESENTATION, W

ARRANTY OR GUARANTEE, E

XPRESSED OR

IM

PLIED, A

S TO THE ACCURACY, F

UNCTIONALITY, O

R RESULTS DERIVED FROM

THE USE OF ELECTRONIC DESIGN FILES PROVIDED BY THE ENGINEER.

ELEC

COMMCOMM

ELEC

COMMCOMM

ELEC

COMM

ELEC

COMM

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

COMM

COMM

ELEC

COMMCOMM

C

SP

P

- P

H

AS

E

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

PHASE 2 NOTES: LEGEND:

X

C7

ELEC

COMMCOMM

ELEC

COMMCOMM

ELEC

COMM

ELEC

COMM

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

COMM

COMM

ELEC

COMMCOMM

C

SP

P

- P

H

AS

E

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

LEGEND:

X

X

C8

PHASE 3 NOTES:

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

C9

C

SP

P N

O

TE

S

D

ET

AI

LS

LOW PROFILE BARRICADE NOTES:

TEMPORARY CHAIN LINK FENCE DETAIL

LOW PROFILE BARRICADE DETAIL

TEMPORARY FENCING LAYOUT - PLAN VIEW

GENERAL NEW FENCING NOTES:

De ck

Be aco n

E

C2 11-29C3 11-29

D2 29-11

C 16-34

16-34

29-APCH

D E

D

E D

C4 11

E 11

D3 D

D3 29-11

D3 D

C1 11-29

WARNING

MIDFIELD TOKOFF

PROHIBITED

WARNING

MIDFIELD TOKOFF

PROHIBITED

WARNING

MIDFIELD TAKEOFF

PROHIBITED

WARNING

MIDFIELD TAKEOFF

PROHIBITED

E

E

E

E

E

E

E

E

E

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

E

E

E

E

E

E

E

E

E

AW

AW

AW

FRONT

FRONT

FRONT

FRONT

FRONT

FRONT

X

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

C10

D

EM

O

LI

TI

O

N A

N D

T

ES

C O

VE

R

VI

EW

Know what's below.

before you dig.Call

R

DEMOLITION KEY NOTES:

LEGEND

DEMOLITION GENERAL NOTES:

X XX X

C11

D

EM

O

LI

TI

O

N A

N D

T

ES

C P

LA

N

-A

IR

PO

R

T

BL

VD

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

M A

TC

H

L

IN

E

TO

P R

IG

H

T

M A

TC

H

L

IN

E B

O

TT

O M

L

EF

T M

A

TC

H L

IN

E

TO

P

LE

FT

S H

EE

T

C

LEGEND

DEMOLITION KEY NOTES:

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

C12

D

EM

O

LI

TI

O

N A

N D

T

ES

C P

LA

N

-G

AT

E

AR

EA

S

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

M A

TC

H

L

IN

E

TO

P R

IG

H

T

M A

TC

H

L

IN

E B

O

TT

O M

L

EF

T

M A

TC

H

L

IN

E B

O

TT

O M

R

IG

H T

SH

EE

T C

LEGEND

C13

EM

O

LI

TI

O

N A

N D

T

ES

C P

LA

N

TH

D

R N

E

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

LEGEND

C14

EM

O

LI

TI

O

N A

N D

T

ES

C P

LA

N

TH

D

R N

E

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

LEGEND

C15

EM

O

LI

TI

O

N A

N D

T

ES

C P

LA

N

TH

D

R N

E

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

LEGEND

C16

EM

O

LI

TI

O

N A

N D

T

ES

C P

LA

N

ST

D

R N

E

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

LEGEND

De ck

Be aco n

E

C2 11-29 C3 11-29

D2 29-11

C 16-34

16-34

29-APCH

C4 11

E 11

D3 D

D3 29-11

D

D

C1 11-29

WARNING

MIDFIELD TOKOFF

PROHIBITED

WARNING

MIDFIELD TOKOFF

PROHIBITED

WARNING

MIDFIELD TAKEOFF

PROHIBITED

WARNING

MIDFIELD TAKEOFF

PROHIBITED

E

E

E

E

E

E

E

E

E

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

E

E

E

E

E

E

E

E

E

AW

AW

AW

FRONT

FRONT

FRONT

FRONT

FRONT

FRONT

X

ELEC

COMMCOMM

ELEC

COMMCOMM

ELEC

COMM

ELEC

COMM

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

COMM

COMM

ELEC

COMMCOMM

Co nc.

De ck

Be aco n

E

C2 11-29 C3 11-29

D2 29-11

C 16-34

16-34

29-APCH

C4 11

E 11

D3 D

D3 29-11

D

D

C1 11-29

WARNING

MIDFIELD TOKOFF

PROHIBITED

WARNING

MIDFIELD TOKOFF

PROHIBITED

WARNING

MIDFIELD TAKEOFF

PROHIBITED

WARNING

MIDFIELD TAKEOFF

PROHIBITED

E

E

E

E

E

E

E

E

E

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

E

E

E

E

E

E

E

E

E

AW

AW

AW

FRONT

FRONT

FRONT

FRONT

FRONT

FRONT

X

C17

FE

N

C

IN

G A

N D

G

AT

E

LA

YO

U

T O

VE

R

VI

EW

GENERAL NOTES:

Know what's below.

before you dig.Call

R

PROJECT LAYOUT PLAN NOTES:

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

LEGENDFENCING AND GATE LAYOUT OVERVIEW:

X XX X

C18

FE

N

C

IN

G P

LA

N

AI

R

PO

R T

BL

VD

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

M A

TC

H

L

IN

E

TO

P R

IG

H

T

M A

TC

H

L

IN

E B

O

TT

O M

L

EF

T M

A

TC

H L

IN

E

TO

P

LE

FT

S H

EE

T

C

CONSTRUCTION NOTES

GENERAL NOTES:

ELEC

COMMCOMM

ELEC

COMMCOMM

ELEC

COMM

ELEC

COMM

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

COMM

COMM

ELEC

COMMCOMM

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

ELEC

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

C19

FE

N

C

IN

G P

LA

N

AI

R

PO

R T

BL

VD

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

M A

TC

H

L

IN

E

TO

P R

IG

H

T

M A

TC

H

L

IN

E B

O

TT

O M

L

EF

T

M A

TC

H

L

IN

E B

O

TT

O M

R

IG

H T

SH

EE

T C

CONSTRUCTION NOTES

C O

M M

ELEC

ELEC

C O

M M

C O

M M

C O

M M

C20

C

IV

IL

S

IT

E

PL

AN

TH

D

R N

E

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

CIVIL CONSTRUCTION KEY NOTES

O

M M

C O

M M

ELECC

O

M M

C O

M M

ELEC

ELEC

ELEC

C21

C

IV

IL

S

IT

E

PL

AN

TH

D

R N

E

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

CIVIL CONSTRUCTION KEY NOTES

O

M M

ELEC

ELEC

C O

M

MELEC

C22

C

IV

IL

S

IT

E

PL

AN

TH

D

R N

E

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

CIVIL CONSTRUCTION KEY NOTES

C23

C

IV

IL

S

IT

E

PL

AN

ST

D

R N

E

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

CIVIL CONSTRUCTION KEY NOTES

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

NOT TO SCALE

COLUMN PIER FOUNDATION DETAIL 2

C24

NOT TO SCALE

AUTOMATIC BI-FOLD GATE DETAIL 1

C24

BI

FO

LD

G

AT

E

AN

D

C

AR

D R

EA

D

ER

PE

D

ES

TA

L

D

ET

AI

LS

C24

A A

NOT TO SCALE

SECTION VIEW DETAIL 3

C24

SECTION A-A

AA

NOT TO SCALE

BIFOLD GATE POST ALT-SHALLOW FOUNDATION DETAIL 4

C24

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

C

AR

D R

EA

D

ER

IS

LA

N

D

C

AM

ER

A

PO

ST

D

ET

AI

LS

C25

NOT TO SCALE

EXTENDED CAMERA FENCE POST DETAIL 2

C25NOT TO SCALE

CARD READER PEDESTAL ISLAND DETAIL 1

C25

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

C H

AI

N

L

IN

K

FE

N C

E D

ET

AI

LS

CONCRETE POST SETTINGTYPICAL POST TOP

TYPICAL CORNER OR TERMINAL POSTTYPICAL PULL POSTTYPICAL FENCE SECTION

CHAINLINK FENCE NOTES:

C26

CHAINLINK FENCE DETAILS 1

C26

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

PE

D

G

AT

E, P

AV

EM

EN

T, A N

D B

O

LL

AR

D

D

ET

AI

LS

C27NOT TO SCALE

PEDESTRIAN GATE DETAIL 1

C27

NOT TO SCALE

BOLLARD DETAIL 3

C27

NOT TO SCALE

NEW ASPHALT PAVEMENT TYPICAL SECTION 2

C27

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

NOT TO SCALE

UNPAVED TRENCH REPAIR DETAIL 2

C28

TR

EN

C H

R

EP

AI

R

D

ET

AI

LS

C28

NOT TO SCALE

PAVED TRENCH REPAIR DETAIL 1

C28

TRENCH REPAIR GENERAL NOTES:

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

BI

FO

LD

G

AT

E

LA

YO

U T

PL

AN

C29

NOT TO SCALE

AUTOMATIC BI-FOLD GATE SYSTEM LAYOUT DETAIL 1

C29

8 8 8 8

E

E

E E

E 8E E E E E E E E E E E E E

E E E E E

ELEC

COMMCOMM

ELEC

COMMCOMM

ELEC

COMM

ELEC

COMM

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

ELEC

COMM

COMM

ELEC

E

COMMCOMM

E E E E E E

E1

EL

EC

TR

IC

AL

P

LA

N

O

VE

R

VI

EW

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

LEGEND

25-TA

ELECTRICAL GENERAL NOTES FIBER OPTIC/COMMUNICATIONS GENERAL NOTES

8 8 8 8 8 8 8

8 8 8 8 8

E E

E E

E E

E E

E E

E E E E E E

E E E E E E E E E E E

COMM

ELEC

ELEC

COMM

COMMCOMM

888888

E E E E E E E E E

E E E E

8 8 8 8 8 8

E

COMM

ELEC

ELEC

ELEC

COMM

ELEC

E E

E E

E E

E

E 8 8 8 8 8 8

E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

E2

EL

EC

TR

IC

AL

S

IT

E

PL

AN

(1 O

F 2)

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

1" = 10'

50TH DR NE ENHANCED VIEW 1

E2

1" = 10'

48TH DR NE ENHANCED VIEW 2

E2

LEGEND

ELEC

COMM

COMM

ELECTRICAL KEY NOTES FIBER/COMMUNICATIONS KEY NOTES

8 8 8

8 8 E

E E

E E

E E

E E

E

E E E E E E

E E E E E E E E E E E E E E E E E

E E

E E

ELEC

COMMCOMM

ELEC

COMMCOMM

ELECELEC

8 8 8 8 8 8

8 8

8 8 8 8

E E E E E8 8 8 8 8 8

ELECE E E E E E E E E E E E

E3

EL

EC

TR

IC

AL

S

IT

E

PL

AN

(2 O

F 2)

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

1" = 10'

51ST DR NE ENHANCED VIEW 2

E3

1" = 10'

49TH DR NE ENHANCED VIEW 1

E3

LEGEND

ELEC

COMM

COMM

ELECTRICAL KEY NOTES FIBER/COMMUNICATIONS KEY NOTES

E4

EX

IS

TI

N

G E

LE

C

TR

IC

AL

A

N D

F

IB

ER

T

IE

-IN

S

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

NTS

50TH DR NE EXISTING FIBER AT TIE-IN 3

E4 NTS

51ST DR NE EXISTING POWER SERVICE 4

E4

NTS

49TH DR NE EXISTING FIBER AT TIE-IN 2

E4NTS

48TH DR NE EXISTING FIBER SPLICT BOX 1

E4

NTS

EXISTING ELECTRICAL PANEL DETAIL 5

E4

E5

EL

EC

TR

IC

AL

D

ET

AI

LS

5-

9-

SE

0t h Pl ac e, S ui te

Be lle vu e, W as hi ng to n

W W

W .D

O W

L .C

O M

AR

LI

N G

TO

N

M U

N

IC

IP

AL

A

IR

PO

R

T (A

W O

PE

R

IM

ET

ER

F

EN

C

IN

G R

EH

AB

P R

O

JE

C T

- S

TA

G E

II

R

EB

ID

NTS

EQUIPMENT ENCLOSURE RACK DETAIL 1

E5

EQUIPMENT ENCLOSURE RACK GENERAL NOTES:

Sheets and Views
C1 COVER SHEET
C2 NOTES‚ ABBREVIATIONS‚ AND LEGEND
C3 BID SCHEDULE BREAKDOWN PLAN
C4 SURVEY CONTROL PLAN
C5 CONSTRUCTION SAFETY AND PHASING PLAN OVERVIEW
A1
C6 CSPP - PHASE 1
C7 CSPP - PHASE 2
C8 CSPP - PHASE 3
C9 CSPP NOTES & DETAILS
C10 DEMOLITION AND TESC OVERVIEW
C11 DEMOLITION AND TESC PLAN-AIRPORT BLVD
C12 DEMOLITION AND TESC PLAN-GATE AREAS
C13 DEMOLITION AND TESC PLAN - 48TH DR NE
C14 DEMOLITION AND TESC PLAN - 49TH DR NE
C15 DEMOLITION AND TESC PLAN - 50TH DR NE
C16 DEMOLITION AND TESC PLAN - 51ST DR NE
C17 FENCING AND GATE LAYOUT OVERVIEW
C18 FENCING PLAN - AIRPORT BLVD
C19 FENCING PLAN - AIRPORT BLVD
C20 CIVIL SITE PLAN - 48TH DR NE
C21 CIVIL SITE PLAN - 49TH DR NE
C22 CIVIL SITE PLAN - 50TH DR NE
C23 CIVIL SITE PLAN - 51ST DR NE
C24 BIFOLD GATE AND CARD READER PEDESTAL DETAILS
C25 CARD READER ISLAND & CAMERA POST DETAILS
C26 CHAIN LINK FENCE DETAILS
C27 PED GATE, PAVEMENT, AND BOLLARD DETAILS
C28 TRENCH REPAIR DETAILS
C29 BIFOLD GATE LAYOUT PLAN
E1 ELECTRICAL PLAN OVERVIEW
E2 ELECTRICAL SITE PLAN (1 OF 2)
E3 ELECTRICAL SITE PLAN (2 OF 2)
E4 EXISTING ELECTRICAL AND FIBER TIE-INS
E5 ELECTRICAL DETAILS

File details come from the government source that posted it. Updated .