Award Information
193 KB Posted
- Solicitation number
- BL119-22
- Issued by
- Gwinnett County, Georgia
About this file
This Award Information document pertains to a Georgia state and local contract opportunity for the purchase and installation of rapid mixer and flocculator gearbox equipment at the Shoal Creek Filter Plant (SCFP). The project scope encompasses the procurement of replacement gearboxes, motors, couplings, and mounting bases for two (2) rapid mixers and nine (9) flocculators. The supplied equipment will be installed and connected to electrical and control equipment under a separate contract to be managed by others. This procurement represents a component of the facility's equipment replacement initiative at SCFP.
No additional details regarding pricing terms, set-asides, incumbents, funding sources, award amounts, contract term, response deadlines, or other salient contractual information are provided in this Award Information file excerpt.
Text of this file
BID TABULATION PAGE 1 of 1
BL119-22
Purchase and Installation of Rapid Mixer and Flocculator Gearbox and Motor Replacement Equipment Department of Water Resources
ITEM # DESCRIPTION UNIT
PRICE
TOTAL
PRICE
1 Rapid mixers
1.1 Replacement vertical gearbox drive assembly
without motor adaptor 2 ea $21,558.00 $43,116.00
1.2 Motor adaptor and coupling guard module 2 ea $634.00 $1,268.00
1.3 Flexible Coupling 2 ea $796.00 $1,592.00
1.4 Pedestal and fasteners (price includes plate and
anchor bolts) 2 ea $8,880.00 $17,760.00
1.5 Electric motor 2 ea $12,809.00 $25,618.00
1.6 Gear box shaft 2 ea $5,689.00 $11,378.00
1.7 Factory priming and coating of completed units
and motors 1 lot N/B $5,350.00
1.8 Tools and spare parts 1 lot N/B $10,530.00
2 Flocculators
2.1 Replacement vertical gearbox drive assembly without motor adaptor 9 ea $21,352.00 $192,168.00
2.2 Motor adaptor and coupling guard module 9 ea $473.00 $4,257.00
2.3 Flexible Coupling 9 ea $142.00 $1,278.00
2.4 Pedestal and fasteners 9 ea $8,130.00 $73,170.00
2.5 Electric motor 9 ea $2,710.00 $24,390.00
2.6 Gear box shaft 9 ea $5,665.00 $50,985.00
2.7 Factory priming and coating of completed units
and motors 1 lot N/B $24,075.00
2.8 Tools and spare parts 1 lot N/B $13,687.00
3 Support to Installation Contractor
3.1 Final installation inspection by factory
representative 4 days $1,500.00 $6,000.00
3.2 Cost for separate onsite day visit of 8 hours if
requested by owner 1 day $1,500.00 $1,500.00
3.3 Factory representative to provide onsite post start
up training to the owner's personnel 1 day $1,500.00 $1,500.00
3.4 Cost for separate one day training session if
requested by owner 1 day $1,500.00 $1,500.00
Recommended Vendor:
Carl Eric Johnson, Inc.
Attn: Kevin Eisert 1725 MacLeod Drive Lawrenceville, GA 30043 keisert@cejco.com customerservice@cejco.com
$459,243.00
Remove spare gears and spare bearings Replace custom paint color with Chemineer Standard Blue
Bid Total including deductions
Total $511,122.00
QTY
-$22,454.00 -$29,425.00
Optional Deductions
Carl Eric Johnson, Inc.
(L) km mailto:keisert@cejco.com mailto:customerservice@cejco.com
| BL119-22 Award Notice.pdf |
| BL119-22 Tab.pdf |
| Sheet1 |
Other files
| File | Type | Posted |
|---|---|---|
| Addendum #1 | — | |
| Invitation to Bid | — | |
| Addendum #2 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .