Award Information

193 KB Posted

Attached to
Purch& Install of Rapid Mixer & Flocculator Gearbo
Solicitation number
BL119-22
Issued by
Gwinnett County, Georgia

About this file

This Award Information document pertains to a Georgia state and local contract opportunity for the purchase and installation of rapid mixer and flocculator gearbox equipment at the Shoal Creek Filter Plant (SCFP). The project scope encompasses the procurement of replacement gearboxes, motors, couplings, and mounting bases for two (2) rapid mixers and nine (9) flocculators. The supplied equipment will be installed and connected to electrical and control equipment under a separate contract to be managed by others. This procurement represents a component of the facility's equipment replacement initiative at SCFP.

No additional details regarding pricing terms, set-asides, incumbents, funding sources, award amounts, contract term, response deadlines, or other salient contractual information are provided in this Award Information file excerpt.

Text of this file

BID TABULATION PAGE 1 of 1

BL119-22

Purchase and Installation of Rapid Mixer and Flocculator Gearbox and Motor Replacement Equipment Department of Water Resources

ITEM # DESCRIPTION UNIT

PRICE

TOTAL

PRICE

1 Rapid mixers

1.1 Replacement vertical gearbox drive assembly

without motor adaptor 2 ea $21,558.00 $43,116.00

1.2 Motor adaptor and coupling guard module 2 ea $634.00 $1,268.00

1.3 Flexible Coupling 2 ea $796.00 $1,592.00

1.4 Pedestal and fasteners (price includes plate and

anchor bolts) 2 ea $8,880.00 $17,760.00

1.5 Electric motor 2 ea $12,809.00 $25,618.00

1.6 Gear box shaft 2 ea $5,689.00 $11,378.00

1.7 Factory priming and coating of completed units

and motors 1 lot N/B $5,350.00

1.8 Tools and spare parts 1 lot N/B $10,530.00

2 Flocculators

2.1 Replacement vertical gearbox drive assembly without motor adaptor 9 ea $21,352.00 $192,168.00

2.2 Motor adaptor and coupling guard module 9 ea $473.00 $4,257.00

2.3 Flexible Coupling 9 ea $142.00 $1,278.00

2.4 Pedestal and fasteners 9 ea $8,130.00 $73,170.00

2.5 Electric motor 9 ea $2,710.00 $24,390.00

2.6 Gear box shaft 9 ea $5,665.00 $50,985.00

2.7 Factory priming and coating of completed units

and motors 1 lot N/B $24,075.00

2.8 Tools and spare parts 1 lot N/B $13,687.00

3 Support to Installation Contractor

3.1 Final installation inspection by factory

representative 4 days $1,500.00 $6,000.00

3.2 Cost for separate onsite day visit of 8 hours if

requested by owner 1 day $1,500.00 $1,500.00

3.3 Factory representative to provide onsite post start

up training to the owner's personnel 1 day $1,500.00 $1,500.00

3.4 Cost for separate one day training session if

requested by owner 1 day $1,500.00 $1,500.00

Recommended Vendor:

Carl Eric Johnson, Inc.

Attn: Kevin Eisert 1725 MacLeod Drive Lawrenceville, GA 30043 keisert@cejco.com customerservice@cejco.com

$459,243.00

Remove spare gears and spare bearings Replace custom paint color with Chemineer Standard Blue

Bid Total including deductions

Total $511,122.00

QTY

-$22,454.00 -$29,425.00

Optional Deductions

Carl Eric Johnson, Inc.

(L) km mailto:keisert@cejco.com mailto:customerservice@cejco.com

BL119-22 Award Notice.pdf
BL119-22 Tab.pdf
Sheet1

Other files

File Type Posted
Addendum #1 —
Invitation to Bid —
Addendum #2 —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .