Award Information
232 KB Posted
- Attached to
- Safe and Equitable Multimodal Access Study
- Solicitation number
- RP009-23
- Issued by
- Gwinnett County, Georgia
About this file
This is an Award Information and Cost Tabulation document for the Gwinnett County Board of Commissioners' RP009-23 solicitation for a Safe and Equitable Multimodal Access Study under the Department of Community Services. The project encompasses five primary tasks: an existing plans and conditions assessment with technical analysis, public engagement activities, plan and technical analysis development for LCI Area 1, plan and technical analysis development for LCI Areas 2 and 3, and preparation of project deliverables. Gresham Smith was selected as the recommended vendor based on evaluation criteria including experience and expertise, key personnel availability, understanding and technical approach, outreach and public engagement capabilities, references, and Disadvantaged Business Enterprise participation.
The total contract cost is $247,949.00, with task-specific pricing ranging from $16,696.00 for deliverables preparation to $96,167.00 for public engagement activities. Gresham Smith scored 94.75 out of 100 possible points across the evaluation criteria, substantially outperforming the competing bidder Sizemore Group, LLC, which scored 76.75 points. Notably, Gresham Smith achieved perfect scores on both references and DBE participation categories, while demonstrating superior performance in experience, personnel, technical approach, and public engagement evaluation areas. The vendor's contact information is provided as Eric Lusher, located at 1132 Satellite Boulevard, Suite 200, Suwanee, Georgia 30024.
Text of this file
SCORE TABULATION Page 1 of 1
RP009-23
Provision of a Safe and Equitable Multimodal Access Study Department of Community Services
Gresham Smith (L)
Sizemore Group, LLC
(OC)
ITEM # CRITERIA POINTS ALLOCATED TOTAL POINTS TOTAL POINTS
1 Experience and Expertise 15 13.75 13.00 2 Key Personnel & Availability 20 18.50 14.50 3 Understanding and Technical Approach 25 23.50 22.00 4 Outreach and Public Engagement 20 19.00 17.25 5 References 10 10.00 10.00 6 Disadvantaged Business Enterprise (DBE) Participation 10 10.00 0.00
100 94.75 76.75 Recommended Vendor:
Gresham Smith Attn: Eric Lusher 1132 Satellite Boulevard, Suite 200 Suwanee, GA 30024 Phone: 678-268-4285 eric.lusher@greshamsmith.com
TOTAL
km mailto:eric.lusher@greshamsmith.com
COST TABULATION Page 1 of 1
RP009-23
Provision of a Safe and Equitable Multimodal Access Study Department of Community Services
Gresham Smith (L)
ITEM
Description TOTAL PRICE
1 TASK 1 – Existing Plans and Conditions Assessment & Technical Analysis $40,176.00
2 TASK 2 – Public Engagement $96,167.00
3 TASK 3 – LCI Area 1 – Plan and Technical Analysis Development $39,166.00
4 TASK 4 – LCI Areas 2 and 3 - Plan and Technical Analysis Development $55,744.00
5 TASK 5 - Prepare Project Deliverables $16,696.00
$247,949.00
TOTAL COST
km
| RP009-23 Award Notice.pdf |
| RP009-23 Score Tab.pdf |
| Sheet1 |
| RP009-23 Cost Tab.pdf |
| Sheet1 |
Other files
| File | Type | Posted |
|---|---|---|
| RP009-23 INV | — | |
| RP009-23 Addendum #1 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .