The document provided is a Procurement Summary related to Request for Bids (RFB) 2024-019 for the construction of the Long Swamp Creek Recreation Area project in Cherokee County, Georgia. The project involves the development of a 24-acre park along the confluence of Long Swamp Creek and the Etowah River, featuring an open lawn, walking trails, primitive campsites, an archery range, and a canoe/kayak launch, along with supporting facilities such as parking, lighting, restrooms, signage, and utilities. The RFB was advertised for 30+ days, and four bids were received, with Magnum Contracting, LLC submitting the lowest evaluated bid of $2,058,294.00. The contract term is 270 days after the Notice to Proceed.

The procurement summary includes pricing details for the various bid items, such as demolition, civil works, hardscaping, lighting, site furniture, landscaping, and architecture. It also includes several allowance items for the removal and disposal of rock and unsuitable soil, as well as the hauling and placement of fill material and other aggregates. Two add alternates were included in the bids, while one deduct alternate was offered. The county is funding the project through a combination of a DNR grant, SPLOST VII funds, recreation impact fees, the tree fund, and a financial contribution from the City of Ball Ground.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROCUREMENT SUMMARY

RFB# 2024-019

Date Submitted: Procurement Process:

Submitted by: Length of Advertising:

Supplier Name: Source Selection Method:

Description: Fair Price Determination:

Agreement Type:

Contract Number:

Contract Category: Submissions Received: 4 Vendors Contacted: 344

Contract Term:

Contract Value: Weight

Contract Options/Renewals: 100%

Source of Funds:

Debarred/Suspended:

SAM Requirement:

BOC Meeting Prepared for:

100.00

Evaluation Criteria

Bid Price - Not Within 5% of Low Bid

N/A - Lowest Evaluated Price Awarded

Lowest Evaluated Bidder

Adequate Price Competition

RFP/RFQ Selection Criteria Used in Selection Process

Evaluated Price

2,612,179.92$

Place of Business

Jasper, GA

The county is utilizing a DNR grant of $600,000, as well as SPLOST VII, Recreation Impact Fees, the Tree Fund, and a financial contribution from the City of Ball Ground.

*Important Price Evaluation Notes Project was bid out, and we received four bids, with Magnum being the low bid, at $2,058,294.00. Construction term is to be 270 days after NTP.

Other Important Considerations

Triscapes, LLC

Astra Group, LLC

MAPP, LLC

Cumming, GA

Woodstock, GA

Atlanta, GA

Tye Beavers

3,170,060.00$

4,472,527.00$

July 16, 2024

Registration Not Required

No (screen-print on file)

Other - See Notes

None Cost of Item(s) and/or Services

Score

2,058,294.00$

Bidder/Proposing Business

2,058,294.00$

Construction Services

2024-019

Magnum Contracting, LLC

Other - See Notes

CSA - Standard Not Low Bid Award:

County Business:

Request for Bids (RFB)July 10, 2024

Construction of Long Swamp Rec Area

Magnum Contracting, LLC

GA Code for Construction (30+ days)

CHEROKEE COUNTY BOARD OF COMMISSIONERS

BID OPENING TAB

Solicitation Number: RFB 2024-019

Solicitation Name: Long Swamp Creek Recreation Area

Bid Due Date / Time: July 2, 2024, at 10:00 AM

Proposals Received (no particular order)

Required Forms:

X x

X x

X x

X x

X x x x

Notes:

Opening/Reading Attendance

Greg Anderson Cherokee County

Brian Davis (Zoom) Cherokee County

NAME COMPANY

Tye Beavers Cherokee County

App B - Non-Coll Affidavit App I - Bid Bond

App C - E-Verify Affidavit App J - Contractor's Qual. Statement

App D - References COI

App E - Contract Acceptance Form

App F - Sus/Debar Form

Pricing form

Other:

App G -Contractor License Cert. Other:

App A - Info/Add Form App H - Ability to provide performance, labor, & mat. Bond

Triscapes Alpharetta, Georgia $2,612,179.92 (Lump sum)

Magnum Contracting, LLC Jasper, Georgia $2,058,294.00 (Lump sum)

MAPP Built Atlanta, Georgia $4,472,527.00 (Lump sum)

NAME CITY/STATE Cost

Astra Group, LLC Woodstock, GA $3,170,060.00 (Lump sum)

Proposal Price Breakdown Astra Group LLC Magnum Contracting LLC MAPP Built Triscapes

Lump Sum 3,170,060.00 2,058,294.00 4,472,527.00 2,612,179.92 Total $ 3,170,060.00 $ 2,058,294.00 $ 4,472,527.00 $ 2,612,179.92

Add Alternate 3 Cost (Camping spots along the Etowah) $ 55,790.00 $ 39,836.00 $ 56,384.00 $ 56,779.30 Deduct Alternate 4 (Gravel parking spaces instead of asphalt) $ (10,000.00) $ (10,000.00) $ (17,953.00) $ (62,910.00)

Total + Options $ 3,215,850.00 $ 2,088,130.00 $ 4,510,958.00 $ 2,606,049.22 Notes

Vendor's Place of Business Woodstock, GA Jasper, Georgia Atlanta, Georgia Alpharetta, Georgia

Astra Group LLC Magnum Contracting LLC MAPP Built Triscapes

Appendix A X X Not signed X Appendix B X X X X Appendix C X X Used tax id instead of Everify # X Appendix D X X X X Appendix E X X X X Appendix F X X X X Appendix G X X X X Appendix H X X X X Appendix I X X X X Appendix J X X X X

COI X X Included a bonding letter instead X Pricing X X X X

Required Form Check

Astra Group, LLC MAPP Built Triscapes Magnum Contracting, LLC Item NoCode Description UOM Quantity Price Total Cost Price Total Cost Price Total Cost Price Total Cost

1 BLI Demolition Lump-Sum 1 $60,000.00 $60,000.00 $109,713.00 $109,713.00 $62,730.00 $62,730.00 $49,579.00 $49,579.00 2 BLI Civil Lump-Sum 1 $1,384,014.20 $1,384,014.20 $2,395,405.00 $2,395,405.00 $760,465.16 $760,465.16 $882,462.00 $882,462.00 3 BLI Hardscape Lump-Sum 1 $178,000.00 $178,000.00 $718,574.00 $718,574.00 $561,075.52 $561,075.52 $484,846.00 $484,846.00 4 BLI Lighting Lump-Sum 1 $188,000.00 $188,000.00 $106,483.00 $106,483.00 $354,600.00 $354,600.00 $147,774.00 $147,774.00 5 BLI Site Furniture Lump-Sum 1 $50,000.00 $50,000.00 $240,760.00 $240,760.00 $13,350.16 $13,350.16 $5,900.00 $5,900.00 6 BLI Landscape Elements Lump-Sum 1 $380,000.00 $380,000.00 $453,272.00 $453,272.00 $241,363.72 $241,363.72 $89,322.00 $89,322.00 7 BLI Architecture (Restroom and Pad Out) Lump-Sum 1 $210,000.00 $210,000.00 $214,460.00 $214,460.00 $313,703.48 $313,703.48 $203,253.00 $203,253.00 8 ALI Remove and dispose of mass rock off site. (Quantity Allowance Item)Cubic Yard 250 $272.85 $68,212.50 $62.00 $15,500.00 $12.00 $3,000.00 $75.00 $18,750.00 9 ALI Remove and dispose of trench rock off site. (Quantity Allowance Item)Cubic Yard 250 $348.44 $87,110.00 $96.00 $24,000.00 $12.00 $3,000.00 $125.00 $31,250.00

10 ALI Remove and dispose of unsuitable soil off site. (Quantity Allowance Item)Cubic Yard 750 $277.52 $208,140.00 $41.00 $30,750.00 $69.38 $52,035.00 $40.00 $30,000.00 11 ALI Haul in and place suitable fill Material from off site. (Quantity Allowance Item)Cubic Yard 750 $277.52 $208,140.00 $31.00 $23,250.00 $61.88 $46,410.00 $35.00 $26,250.00 12 ALI Haul in and place #4 stone (Quantity Allowance Item) Cubic Yard 30 $96.37 $2,891.10 $48.00 $1,440.00 $103.13 $3,093.90 $112.00 $3,360.00 13 ALI Haul in and place #57 stone (Quantity Allowance Item)Cubic Yard 30 $64.70 $1,941.00 $54.00 $1,620.00 $103.13 $3,093.90 $114.00 $3,420.00 14 ALI Haul in and place Rip Rap (Quantity Allowance Item) Cubic Yard 10 $87.02 $870.20 $42.00 $420.00 $121.88 $1,218.80 $162.00 $1,620.00 15 ALI Furnish and install Tensar BX 1100 Geogrid or approved equal (Quantity Allowance Item)Square Yard 200 $18.50 $3,700.00 $5.25 $1,050.00 $116.25 $23,250.00 $4.00 $800.00 16 ALI Furnish and install French Drain (Quantity Allowance Item)Linear Foot/Feet 150 $37.94 $5,691.00 $63.00 $9,450.00 $69.38 $10,407.00 $45.00 $6,750.00 17 AltBB Add Alternate #1 - include in Base Bid Lump-Sum 1 $98,500.00 $98,500.00 $126.00 $126.00 $120,347.08 $120,347.08 $53,001.00 $53,001.00 18 AltBB Add Alternate #2 - include in Base Bid Lump-Sum 1 $34,850.00 $34,850.00 $126,254.00 $126,254.00 $39,036.20 $39,036.20 $19,957.00 $19,957.00

Base Bid $3,170,060.00 $4,472,527.00 $2,612,179.92 $2,058,294.00

19 Alt Add Alternate #3 - exclude from Base Bid Lump-Sum 1 $55,790.00 $55,790.00 $56,384.00 $56,384.00 $56,779.30 $56,779.30 $39,836.00 $39,836.00 20 Alt Deduct Alternate #4 - exclude from Base Bid Lump-Sum 1 $10,000.00 $10,000.00 $17,953.00 $17,953.00 $62,910.00 $62,910.00 $10,000.00 $10,000.00

Total $3,235,850.00 $4,546,864.00 $2,731,869.22 $2,108,130.00