MCM-1 Class Mooring and Service Requirement
Solicitation number
N6264926FTBD
Issued by

About this file

This is a Sources Sought notice for MCM-1 Class ship mooring and service requirements issued by NAVSUP Fleet Logistics Center (FLC) Yokosuka Site Sasebo. The Government intends to issue a competitive solicitation to Master Ship Repair Agreement (MSRA) and Agreement for Boat Repair (ABR) holders located in Japan, with the award anticipated as a single contract. The MCM-1 Class ship is tentatively scheduled for September 2026 with a performance duration of approximately 20 days at a contractor facility on the western coast of Hokkaido. The NAICS code is 336611 and the Product Service Code is J999.

Eligibility requirements mandate that offerors must possess a current MSRA or ABR in Japan, be certified by NAVSUP FLC, and maintain active registration in System for Awards Management (SAM.gov). Interested companies must submit responses of five pages or less electronically to Contracting Specialist Ms. Taeko Karyu (taeko.karyu2.ln@us.navy.mil) and Contracting Officer Ms. Elsa Nakasone (elsa.k.nakasone.civ@us.navy.mil) with the subject line "Sources Sought - Hokkaido MCM Ship Repair and Maintenance" no later than July 7, 2026, 10:00 Japan Standard Time. A Work Item Index containing identified requirements is attached to the notice.

View the file

Other files

File Type Posted
MCM-1 Class Mooring and Service Requirements.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1 CRACK IN OVHD DURING ZONE INSPECTION, S/F DISCOVERED CRACK IN 1-78-1-L OVERHEAD. S/F REQUEST OUTSIDE ACTIVITY TO REPAIR CRACK.

PE NOTE: OVERHEAD INSPECTION CONDUCTED BY SEKI-SAN ON 21-MAY-2026, RECOMMENDED TO APPLY SEALANT.ON WORK SPECPost 100%SASN-004-26NAGATO, NORIAKI620-00A6A2620-00-001REYNOLDSUSS WARRIORMCM 10PASSAGE 1-78-1-LNONEXCOMPARTMNT620001781L1-78-1-LOUTSIDE SUPPLY DEPARTMENT OFFICE” TO “1-78-1-LConventional
DEGRADED GAUGE LINES/F DISCOVERED THAT STBD MRG LUBE OIL STRAINER HIGH DIFFERENTIAL PRESSURE SWITCH GAUGE LINES (3X) ARE LEAKING OIL.S/F REQUEST OUTSIDE ACTIVITY TO REPLACE THREE LEAKING GAUGE LINES AND CONDUCT OPERATIONAL TEST (AS REQUIRED).ON WORK SPEC80%SASN-004-26YOSHINAGA, TOMOHIRO241-11A6A2241-11-001REYNOLDSUSS WARRIORMCM 10MAIN REDUCTION GEAR SHAFT NO. 12C10589369105006724111690013-63-0-EPE NOTE: CONTACT PE, JOEY TALOB FOR SHIPCHECK.Conventional
DEG EME SW VLVS/F DISCOVERED DEGRADED VALVE WHILE ALIGNING EMERGENCY SEAWATER TO SYSTEM.S/F TO PROCURE VALVE AND WILL REQUEST OUTSIDE ACTIVITY TO INSTALL DUE TO INRFERANCES DURING CMAV IN HAKODATE.ON WORK SPECPost 100%SASN-004-26TERASHITA, SHUUJI524-11A6A2524-11-001REYNOLDSUSS WARRIORMCM 10SSDG 2 ASW EMERGENCY COV3-69-188205379252411A78923-63-0-EConventional
REPLACE GAUGE LINES/F DISCOVERED THAT NR 1B MPDE GAUGE LINE TO JACKET WATER HIGH TEMP SWITCH HAS A CRACK AND LEAKING FLUID. S/F APPLIED SOFT PATCH TO ISOLATE AS TEMP REPAIR.S/F REQUEST OUTSIDE ACTIVITY TO REMOVE GAUGE LINE, FABRICATE NEW GAUGE LINE AS PER SAMPLE AND INSTALL NEW GAUGE LINE.ON WORK SPECPost 100%SASN-004-26HAMADA, AKIHITO233-12A6A2476-11-001TALOB J.USS WARRIORMCM 10PROPULSION DIESEL ENGINE NO. 2/1B3606-1036668880032L3-63-0-EConventional
DEGRADED FLEX HOSES 1A SSDGDURING INSPECTION S/F DISCOVERED THAT FLEXIBLE HOSES CONNECTING TO 1-DGLO-V-32A, 1-DGLO-V-34A, 1-DGLO-V-33A, 1A-PDFS-V-16 ARE DEGRADED AND NEED TO BE REPLACED.S/F REQUEST OUTSIDE ACTIVITY TO REMOVE, MANUFACTURE AND REPLACE FLEXIBLE HOSES CONNECTING TO 1-DGLO-V-32A, 1-DGLO-V-34A, 1-DGLO-V-33A, 1A-PDFS-V-16ON WORK SPEC80%SASN-004-26YOSHINAGA, TOMOHIRO311-21A6A2311-21-001REYNOLDSUSS WARRIORMCM 10GENERATOR SETS, SSDG NO. 1A5C1052641615100023112116161A3-41-0-EConventional
DEGRADED S/W PIPE LINES/F DISCOVERED THAT MMGTG SEAWATER PIPING INLET TO THE COOLER HAS A CORRODED BOSS' THREAD WHERE THE GAUGE LINE IS CONNECTED. THIS PREVENT THE GAUGE LINE TO SECURELY CONNECT TO THE PIPES/F REQUEST OUTSIDE ACTIVITY TO REMOVE INTERFERENCE, REMOVE INLET TO THE COOLER PIPE, REPLACE OR REPAIR (DEPENDING ON THE PIPE CONDITION), AND INSTALL NEW PIPING. REQUEST OUTSIDE ACTIVITY TO REPLACE GAUGE LINE AND INSTALL. PLACE SYSTEM BACK TO OPERATIONAL CONDITION.ON WORK SPEC80%SASN-004-26YOSHINAGA, TOMOHIRO476-11A6A2476-11-002NAKANOUSS WARRIORMCM 10GAS TURBINE ENGINE1011SD3052020050476110511A3-41-0-EConventional
NR 1B SSDG LUBE OIL FLEX HOSENR 1B SSDG LUBE OIL RETURN FLEXIBLE HOSE FROM THE OIL PAN CONNECTING TO THE FILTREX HOUSING IS HAS INDICATIONS OF EXTERNAL LEAKS NOTED.REPLACE NR 1B SSDG LUBE OIL FLEXIBLE HOSE (CONNECTION FROM THE FILTREX ASSEMBLY TO THE OIL PAN) IAW MRC E4TN (A-3+), ("HOSE COVER DAMAGED BY CUTS, ABRASIONS, CRACKING, OR CHAFING. IF INTERNAL WIRES OR FIBER REINFORCEMENT YARNS ARE EXPOSED, HOSE MUST BE REPLACED") AND GUIDANCE FROM S6430-AE-TED-010, CHAPTER 9.ON WORK SPEC80%SASN-004-26TERASHITA, SHUUJI311-22A6A2311-22-002SANCHEZUSS WARRIORMCM 10DIESEL ENGINE74501FMG01668880044L3-41-0-EConventional
NR 1B SSDG F/O INLET FLEX HOSENR 1B SSDG FUEL INLET FLEXIBLE HOSE CONNECTING TO THE FUEL FILTER DUPLEX HOUSING IS CRACKED AND DETERIORATED, NO SIGNS OF EXTERNAL LEAKS NOTED.REPLACE 1B SSDG FUEL INLET FLEXIBLE HOSE (CONNECTION TO THE DUPLEX FUEL FILTER ASSEMBLY) IAW MRC E4TN (A-3+), ("HOSE COVER DAMAGED BY CUTS, ABRASIONS, CRACKING, OR CHAFING. IF INTERNAL WIRES OR FIBER REINFORCEMENT YARNS ARE EXPOSED, HOSE MUST BE REPLACED") AND GUIDANCE FROM S6430-AE-TED-010, CHAPTER 9.ON WORK SPEC80%SASN-004-26TERASHITA, SHUUJI311-22A6A2311-22-003SANCHEZUSS WARRIORMCM 10DIESEL ENGINE74501FMG01668880044L3-41-0-EConventional
NR 1B SSDG F/O OUT FLEX HOSENR 1B SSDG FUEL OUTLET FLEXIBLE HOSE CONNECTING TO THE FUEL FILTER DUPLEX HOUSING IS CRACKED AND DETERIORATED, NO SIGNS OF EXTERNAL LEAKS NOTED.REPLACE NR 1B SSDG FUEL OUTLET FLEXIBLE HOSE (CONNECTION TO THE DUPLEX FUEL FILTER ASSEMBLY) IAW MRC E4TN (A-3+), ("HOSE COVER DAMAGED BY CUTS, ABRASIONS, CRACKING, OR CHAFING. IF INTERNAL WIRES OR FIBER REINFORCEMENT YARNS ARE EXPOSED, HOSE MUST BE REPLACED") AND GUIDANCE FROM S6430-AE-TED-010, CHAPTER 9.ON WORK SPEC80%SASN-004-26TERASHITA, SHUUJI311-22A6A2311-22-001SANCHEZUSS WARRIORMCM 10DIESEL ENGINE74501FMG01668880044L3-41-0-EConventional
BROKEN TELEFLEXDURING DCMA S/F DISCOVERED THAT REMOTE OPERATOR MD-1-55-2 (FOR MD-V-5) TELEFLEX WAS BROKEN.S/F REQUEST OUTSIDE ACTIVITY TO REMOVE INTERFERENCES, UNINSTALL TELEFLEX CABLE, PROCURE NEW TELEFLEX, INSTALL NEW TELEFLEX, REINSTALL INTEREFERENCES, AND COMPLETE OPTEST (IF REQUIRED).ON WORK SPEC80%SASN-004-26KATAOKA, YUUKI529-11A6A2529-11-001ECKELBERGUSS WARRIORMCM 10BILGE SUCT HOSE CONN VLVMD-V-488204763352911C00313-41-0-EConventional
DEGRADED HATCHDURING PMS 1671/001 M-1 S/F DISCOVERED THAT AFT STEERING HATCH 1-108-2 NEEDS TO BE REPLACE/REFURBISHED WITH ALL PARTS REPLACED ON IT. DUE TO CRACK ON PANEL AND RAIN WATER LEAK IN TO COMPARTMENT.S/F REQUEST OUTSIDE ACTIVITY TO REFURBISH AND REPLACE ALL PARTS FOR IT.
PE NOTE: DEFERRED FROM 5C1 SRA DUE TO MATERIAL RECEIPT TIMELINE. UPDATE: 17-JUN-2026, ALL MATERIAL VERIFIED ON-HAND.ON WORK SPECPost 100%SASN-004-26SASHI, NAOKI167-11A6A2167-11-001ECKELBERGUSS WARRIORMCM 10RSD WT QA HATCH 1-108-2QAWTH 1-108-2XCONFIGITEM1671111082H1-108-2-WEAConventional
SHIPWIDE LAGGING REQUIREDDURING ZONE INSPECTION, DISCOVERED LAGGING NEED TO BE REPLACED IN VARIOUS SPACES ONBOARD THE SHIP.S/F REQUEST OUSIDE ACTIVITY TO REMOVE OLD, DEGRADED AND DAMAGED LAGGING, INSTALL NEW LAGGING, PAINT AND STENCIL AS NEEDED. LAGGING JOB REQUEST LIST WILL BE SENT SEPCOR.ON WORK SPEC80%SASN-004-26YOSHINAGA, TOMOHIRO507-00A6A2508-11-001MCDANIELUSS WARRIORMCM 10MACHINERY AND PIPING DESIGNATION AND MARKINGNONEXSYSTEMITEM50700SY1261ASYSTEM-LEVELConventional
HAZARDOUS WASTE HANDLINGSERVICES FOR HANDLING AND DISPOSAL OF HAZARDOUS WASTE DURING THE AVAILABILITY ARE REQUIRED. REMOVE, HANDLE, STORE, TRANSPORT AND DISPOSE OF HAZARDOUS WASTE PRODUCED BY GOVERNMENT AND CONTRACTOR PERSONNEL IN
ACCORDANCE WITH NAVSEA STANDARD WORK TEMPLATE (SWT) 077-001.REQUEST SERVICES FOR HANDLING AND DISPOSAL OF HAZARDOUS WASTE DURING THE AVAILABILITY ARE REQUIRED. REMOVE, HANDLE, STORE, TRANSPORT AND DISPOSE OF HAZARDOUS WASTE PRODUCED BY GOVERNMENT AND CONTRACTOR PERSONNEL IN ACCORDANCE WITH NAVSEA STANDARD WORK TEMPLATE (SWT) 077-001.ON WORK SPEC80%SASN-004-26SAITO, KAZUYUKI865-90A6A2865-90-001TALOB J.USS WARRIORMCM 10OCCUPATIONAL SAFETY AND HEALTH (OSH)NONEXSERVICEITMSHIP-WIDEConventional
SF CRANE/RIGGING SVCE - PROVCRANE , RIGGING, FORKLIFT AND TRANSPORTATION SERVICES ARE REQUIRED TO SUPPORT SHIP'S FORCE AND PRODUCTION SHOP WORK DURING THE AVAILABILITY.PROVIDE CRANE, RIGGING, FORKLIFT AND TRANSPORTATION SERVICES IN SUPPORT OF SHIP'S FORCE AND PRODUCTION SHOP WORK TO LOAD/UNLOAD MATERIALS, EQUIPMENT AND SUPPLIES THROUGHOUT THE AVAILABILITY AUTHORIZED AS FOLLOWS: A. CRANE SERVICE (WITH OPERATOR AND RIGGERS) UP TO FIVE (5) TIMES PER DAY. B. FORKLIFT SERVICE (WITH OPERATOR) UP TO FIVE (5) TIMES PER DAY. C. TRANSPORTATION SERVICE (WITH OPERATOR) UP TO FIVE (5) TIMES PER DAY IN THE VICINITY OF THE SHIP. NOTE: USE SWT 993-015 FOR GUIDANCE IN DEVELOPING SPEC.ON WORK SPECPost 100%SASN-004-26OOKUBO, TAKASHI865-20A6A2865-20-001TALOB J.USS WARRIORMCM 10CRANES AND TRANSPORTATION SERVICES (PRORATED)NONEXSERVICEITMSHIP-WIDEConventional
BARGE SVCE- PROVBARGE SERVICES. THE CONTRACTOR SHALL PROVIDE FLOATING BARGE SERVICES FOR REMOVAL OF FUEL,

WATER, FUEL OIL AND OILY WASTE AS EQUIRED.DURING THE AVAILABILITY.

REQUEST BARGE SERVICES. THE CONTRACTOR SHALL PROVIDE FLOATING BARGE SERVICES FOR REMOVAL OF FUEL, WATER, FUEL OIL AND OILY WASTE AS REQUIRED. THE CONTRACTOR SHALL PROVIDE ONE (1) 100,000 GALLON CAPACITY OIL BARGE.

I. THE BARGE SHOULD HAVE A MINIMUM CAPACITY OF 100,000 GALLONS.

II. THE CONTRACTOR SHALTHE CONTRACTOR SHALL PROVIDE ONE (1) 100,000 GALLO

II. THE CONTRACTOR SHALL PROVIDE 2 RUBBER FENDERS LOCATED IN PORT OF THE CONTRACTOR.

III. THE CONTRACTOR SHALL MAINTAIN THE CAPABILITY TO SAFELY TRANSVERSE FROM THE BARGE TO THE PIER WHEN REQUIRED.

ON WORK SPECPost 100%SASN-004-26HAMABE, YUUKI863-51A6A2863-51-005TALOB J.USS WARRIORMCM 10TEMPORARY SHIP SYSTEMSNONEXSERVICEITMSHIP-WIDEConventional
TRASH & WASTE REMOVAL/SERVICESTRASH & NON-HAZARDOUS WASTE REMOVAL: THE CONTRACTOR TO PROVIDE REMOVAL OF ALL TRASH AND NON-HAZARDOUS WASTE AS REQUIRED. TRASH REMOVAL SERVICE IS THE COLLECTION AND DISPOSAL OF TRASH INCLUDING LIQUID, SEMI-LIQUID, OR SOLID GARBAGE. TRASH CONSISTS MAINLY OF TRASH FROM FOOD SERVICE OPERATIONS SUCH AS FOOD WASTE, PAPER AND PLASTIC PACKAGING, AND DOMESTIC WASTES GENERATED IN THE ACCOMMODATION SPACES AS A

RESULT OF THE ORDINARY DAY-BY-DAY ACTIVITIES ONBOARD THE SHIP. TRASH DOES NOT INCLUDE HAZARDOUS MATERIAL, BILGE WATER, AND GREYWATER, EXPLOSIVES AND INCENDIARY WASTE, OR WASTE CONTAMINATED BY MEDICAL AND

RADIOLOGICAL PROCESSES.REQUEST FOR CONTRACTOR TO PROVIDE REMOVAL/ COLLECTION OF ALL TRASH AND NON-HAZARDOUS WASTE. SERVICES INCLUDES TRASH BIN TO BE LOCATED IN THE VICINITY OF THE SHIP FOR THE DURATION OF VISIT (24AUG - 14SEP 2026).ON WORK SPEC80%SASN-004-26MAEDA, HIROKI863-51A6A2863-51-003TALOB J.USS WARRIORMCM 10TEMPORARY SHIP SYSTEMSNONEXSERVICEITMSHIP-WIDEConventional
TEMP OFFICES & SUPPORT SVCSOFFICE SPACE AND SUPPORT SVCS ARE REQUIRED DURING AVAILABILITY.

"PROVIDE AND MAINTAIN TEMPORARY OFFICE SPACE(S) TO BE USED BY THE MAINTENANCE AND OVERSIGHT TEAM (8-10 PERSONNEL) PIER SIDE WHILE THE SHIP IS IN MAINTENANCE AVAILABILITY FROM 01SEP – 09OCT 2026.

PROVIDE LIGHTING, WATER, AIR CONDITIONING, AND ELECTRICAL POWER.

PROVIDE JANITORIAL SERVICES, INCLUDING TRASH DISPOSAL.

NOTE: USE SWT 980-001 ""MAINTENANCE AND OVERSIGHT TEAM OFFICE SPACE; PROVIDE"" FOR GUIDANCE WHEN DEVELOPING AVAILABILITY SPEC.

REQUEST FOR CONTRACTOR TO PROVIDE AND MAINTAIN LOCKABLE TEMPORARY OFFICE SPACE(S) TO BE USED BY THE MAINTENANCE AND OVERSIGHT TEAM (8-10 PERSONNEL) PIER SIDE WHILE THE SHIP IS IN MAINTENANCE AVAILABILITY FROM 01SEP – 09OCT 2026.

PROVIDE LIGHTING, WATER, AIR CONDITIONING, AND ELECTRICAL POWER. PROVIDE JANITORIAL SERVICES, INCLUDING TRASH DISPOSAL.

NOTE: USE SWT 980-001""MAINTENANCE AND OVERSIGHT TEAM OFFICE SPACE; PROVIDE"" FOR GUIDANCE WHEN DEVELOPING AVAILABILITY SPEC

PROVIDE;

(2) UNIT HOUSES (E.G., W 4,550MM X D 2,300MM X H 2,603 MM) ENTRANCE DOORS WITH CANOPY, STEP FOR THE DOORS FOR EACH UNIT HOUSE, BLIND FOR ALL WINDOWS FOR EACH UNIT HOUSE.

(4) OFFICE DESKS (E.G., W 1,000 MM X D 600MM X H 700MM) PER EACH UNIT HOUSE

(1) ROLLING RECLINING CHAIR WITH ARM (ERGONOMICS) PER EACH DESK

(4) MOBILE PEDESTAL WITH 3 OR 4 LOCKABLE DRAWERS (E.G., W 400MM X D 480MM X H 600MM)

(2) DUPLEX OUTLETS WALL-MOUNTED (20 AMPS, 120V) PER EACH DESK

(4) EXTENSION OUTLETS WITH 4 SOCKETS.

(4) DESK LIGHT

(2) ROLLING RECLINING CHAIR WITH ARM (ERGONOMICS) PER EACH UNIT HOUSE.

(4) LOCKABLE LOCKERS (E.G., 1 LOCKER SIZE, W 230MM X D 450MM X H 830MM) PER EACH UNIT HOUSE

(1) SMALL TABLE (E.G., W 1000MM X D 500MM X H 700MM) PER EACH UNIT HOUSE

(1) MEDIUM MICROWAVE (E.G., W 480MM X D 340MM X H 300MM) FOR 1 UNIT HOUSE

(1) REFRIGERATOR WITH FREEZER, CAPACITY 200 LITERS (E.G., W 560MM X D 600MM X H 1600MM) FOR EACH UNIT HOUSE

(4) TRASH BOXES WITH TRASH SERVICE PER EACH UNIT HOUSE

(1) WATER/HOT WATER DISPENSER (KURIKURA OR EQUIVALENT) WITH DISPOSABLE CUPS, 5 GALLON PER WEEK FOR 1 UNIT HOUSE

ENOUGH PAPER TOWEL DAILY USE FOR 4 PERSONNEL FOR EACH UNIT HOUSE

JANITORIAL SERVICES 3 DAYS/WEEK PER EACH UNIT HOUSE.

(4) MALE AND (1) FEMALE TOILET WITH WATER BASIN (AVAILABLE HAND SOAP/SANITIZER) WITHIN 50 FT OF THE UNIT HOUSES WITH DAILY CLEAN

(20) BICYCLES WITH REPAIR SERVICES.

ON AVAILPost 100%SASN-004-26OHIRA, SHINICHI890-00A6A2TALOB J.USS WARRIORMCM 10CONTRACTUAL AND PRODUCTION SUPPORT SERVICENONEXSERVICEITMSHIP-WIDEConventional
TEMP OFFICE SPACES AND CONF RMOFFICE SPACES AND CONFERENCE ROOM ARE REQUIRED DURING AVAILABILITY.

"PROVIDE AND MAINTAIN TEMPORARY OFFICE SPACE(S) TO BE USED BY THE PROJECT TEAM AND GOV'T MAINTENANCE TEAM/REPRESENTATIVES WHILE THE SHIP IS IN MAINTENANCE AVAILABILITY FROM 01SEP – 09OCT 2026.

PROVIDE JANITORIAL SERVICES, INCLUDING TRASH DISPOSAL.

NOTE: USE SWT 980-001 “MAINTENANCE AND OVERSIGHT TEAM OFFICE SPACE; PROVIDE"" FOR GUIDANCE WHEN DEVELOPING AVAILABILITY SPEC. REQUEST FOR CONTRACTOR TO PROVIDE AND MAINTAIN OFFICE SPACES AND CONFERENCE ROOM TO BE USED BY THE PROJECT TEAM AND GOV'T MAINTENANCE TEAM/REPRESENTATIVES WHILE THE SHIP IS IN MAINTENANCE AVAILABILITY FROM 01SEP – 09OCT 2026. PROVIDE JANITORIAL SERVICES, INCLUDING TRASH DISPOSAL. NOTE: USE SWT 980-001 “MAINTENANCE AND OVERSIGHT TEAM OFFICE SPACE;

PROVIDE"" FOR GUIDANCE WHEN DEVELOPING AVAILABILITY SPEC

MAIN OFFICE (2 OFFICE SPACES):

PROVIDE,

(10) OFFICE DESKS (E.G., W 1,000 MM X D 600MM X H 700MM) PER OFFICE SPACE

(1) ROLLING RECLINING CHAIR WITH ARM (ERGONOMICS) PER EACH DESK

(10) MOBILE PEDESTAL WITH 3 OR 4 LOCKABLE DRAWERS (E.G., W 400MM X D 480MM X H 600MM) PER EACH OFFICE SPACE

(2) DUPLEX OUTLETS WALL-MOUNTED (20 AMPS, 120V) PER DESK

(10) EXTENSION OUTLET WITH 4 SOCKETS PER OFFICE SPACE

(10) DESK LIGHTS PER OFFICE SPACE

(10) LOCKABLE LOCKERS (E.G., 1 LOCKER SIZE, W 230MM X D 450MM X H 830MM) PER EACH OFFICE SPACE

(1) TABLE (E.G., W 1500MM X D 900MM X H 700MM) PER OFFICE SPACE

(1) MEDIUM MICROWAVE (E.G., W 480MM X D 340MM X H 300MM)

(1) REFRIGERATOR WITH FREEZER, CAPACITY 300 LITERS (E.G., W 560MM X D 600MM X H 1600MM)

(10) TRASH BOXES WITH TRASH SERVICE PER OFFICE SPACE

(1) WATER/HOT WATER DISPENSER (KURIKURA OR EQUIVALENT) WITH DISPOSABLE CUPS, 10 GALLON PER WEEK PER OFFICE SPACE

ENOUGH PAPER TOWEL DAILY USE FOR 10 PERSONNEL PER EACH OFFICE SPACE

JANITORIAL SERVICES 3 DAYS/WEEK PER OFFICE SPACE

(6) MALE AND (1) FEMALE TOILET WITH WATER BASIN (AVAILABLE HAND SOAP/SANITIZER)

CONFERENCE ROOM:

(2) CONFERENCE TABLE, MINIMUM 8 FEET LONG.

(20) ROLLING RECLINING CHAIR WITH ARM (ERGONOMICS)

(2) DISPLAY MONITORS, MINIMUM OF 65" WITH HDMI CONNECTION.

(6) WALL-MOUNTED OUTLETS (2) DUPLEX OUTLETS (20 AMPS, 120 VOLTS).

ON AVAILPost 100%SASN-004-26OHIRA, SHINICHI890-00A6A2TALOB J.USS WARRIORMCM 10CONTRACTUAL AND PRODUCTION SUPPORT SERVICENONEXSERVICEITMSHIP-WIDEConventional
SHORE AIR SERVICESSHORE AIR AND CONNECTION SERVICES: SHORE AIR AND CONNECTIONS REQUIRED DURING THE AVAILABILITY FROM 01SEP – 09OCT 2026. REQUEST FOR THE CONTRACTOR TO PROVIDE A PRESSURE AIR COMPRESSOR SERVICES AS REQUIRED.THE CONTRACTOR SHALL PROVIDE A LOW PRESSURE AIR TREES, CLEARLY MARKED FOR USE WITH PNEUMATIC TOOLS, AS REQUIRED ON THE SHIP FOR SHIPS FORCE PERSONNEL. SHORE AIR IS TO BE USED FOR AIR POWERED TOOLS NEEDED TO COMPLETE WORK BY THE CONTRACTOR AND SHIPS FORCE PERSONNEL. AT NO TIME SHALL CONTRACTOR EMPLOYEES CONNECT TO THE SHIPS PRESSURE AIR SYSTEM. CONTRACTOR SHALL ENSURE THAT PRESSURE AIR INTENDED FOR USE WITH PNEUMATIC TOOLS, IT SHOULD BE FILTERED FOR PARTICULATE, AND WATER SHOULD BE SEPARATED OUT. CONTRACTOR SHALL ENSURE THAT PRESSURE IS REGULATED TO A MAXIMUM OF 125 PSIG. PROVIDE REQUIRED ADAPTERS TO CONNECT TO SHIP'S FORCE ITEMS. PROVIDE SOME HOSES TO CONNECT SHIP'S FORCE ITEMS WITH KTR AIR MANIFOLD TO PROVIDE AIR FOR MMR AND AMR.ON WORK SPECPost 100%SASN-004-26MOROOKA, SATORU863-52A6A2863-52-001TALOB J.USS WARRIORMCM 10TEMPORARY UTILITIES AND SERVICES (PRORATABLE)NONEXSERVICEITMSHIP-WIDEConventional
MISSING VENT FAN COVERS/F DISCOVERED MISSING VENTILATION FAN COVER FOR SUPPLY SYSTEM 01-33-1. APPROX 3"X3".REQUEST OUTSIDE ACTIVITY FABRICATE AND INSTALL REPLACEMENT VENTILATION COVER. REQUEST CONTACT CSPE FOR PICS OR SHIPCHECK.ON WORK SPEC80%SASN-004-26YOSHINAGA, TOMOHIRO620-00A6A2620-00-005VAZQUEZUSS WARRIORMCM 10BOATSWAIN'S STOREROOMNONEXCOMPARTMNT62000100A1-0-0-AConventional
CRACKED OVERHEAD IN FWD P-WAYDURING ZONE INSPECTION OF FWD P-WAY S/F DISCOVERED CRACKS ON THE OVERHEAD IN FORWARD P-WAY OUTSIDE OF REPAIR 2.S/F REQUEST OUTSIDE ACTIVITY TO PERFORM DAMAGE SURVEY AND REPAIR CRACKED OVERHEAD IN FWD P-WAY OUTSIDE OF REPAIR 2.
PE NOTE: INSPECTION CONDUCTED BY SEKI-SAN ON 21-MAY-2026. RECOMMENDED APPLY SEALANT.ON WORK SPEC80%SASN-004-26MUTA, HITOSHI620-00A6A2620-00-002RIMMERUSS WARRIORMCM 10PASSAGEWAYNONEXCOMPARTMNT62000150L1-5-0-LConventional
REPLACE PRC SYSTEMS/F DISCOVERED DECK PRC CRACKING IN 15-MAN BERTHING HEAD IN FRONT OF THE SINK CAUSING WATER TO LEAK THROUGH THE OVERHEAD IN 40-MAN BERTHING PRESENTING A MAJOR HEALTH HAZARD AND CAUSING DAMAGE TO PERSONAL PROPERTY. 08-MAY-2026, WOOD ISEA MR. JOHN OATES AND MR. SEKI CONDUCTED SHIPCHECK AND FOUND PRC DELAMINATION CAUSING WATER TO LEAK DOWN TO 40-MAN BERTHING OVERHEAD.S/F REQUEST OUTSIDE ACTIVITY TO REMOVE 4 FEET X 6 FEET OF PRC SYSTEM, INSPECT GPC/WOOD FOR ANY DAMAGE, CONDUCT REPAIR, AND RE-APPLY PRC SYSTEM IN 15-MAN BERTHING HEAD/IN-FRONT OF THE SINK.ON WORK SPEC80%SASN-004-26SATO, TAKANORI620-00A6A2620-00-004RIMMERUSS WARRIORMCM 10CREW WR, WC & SHOWERNONEXCOMPARTMNT620001281L1-28-1-LConventional
40-MAN HEAD HPW PIPINGDURING ZONE INSPECTION S/F DISCOVERED THAT THE SINK HOT WATER PIPINGS ARE CORRODED CAUSING LEAK ON THE PIPINGS AND ON THE FAUCETS.
S/F REQUEST OUTSIDE ACTIVITY TO REPLACE HOT WATER PIPING AND SINK FAUCETS, AND REPLACE LAGGING ON PIPING THAT REQUIRED LAGGING.ON WORK SPECPost 100%SASN-004-26HAMADA, AKIHITO620-00A6A2620-00-003SAGASTUMEUSS WARRIORMCM 10CREW WR, WC & SHOWERNONEXCOMPARTMNT620001282L1-28-2-LConventional
CLEAN UCHS HYD FLUID COOLERSHIPS FORCE EXPERIENCED HIGH HYDRAULIC TEMPERATURES ON THE AN/SLQ-48 UCHS SYSTEM, IDENTIFYING THAT THE HYDRAULIC FLUID WAS NOT BEING COOLED SUFFICIENTLY.REQUEST OUTSIDE ACTIVITY REMOVE, ACID DIP, CLEAN, AND HYDRO TEST THE HYDRAULIC FLUID COOLER IN ORDER TO PREVENT SYSTEM OVERHEATING IN WARM WATERS.ON WORK SPECPost 100%SASN-004-26TOKUDA, YUUICHIRO476-21A6A2476-21-001MARTIN M.USS WARRIORMCM 10AN/SLQ-48 UCHS WINCH ASSEMBLY01300695C3302-86-0-EConventional

&"Times New Roman,Bold"Avail In Process WN List &"Times New Roman,Bold"&D-&T

File details come from the government source that posted it. Updated .