This is a Sources Sought notice for MCM-1 Class ship mooring and service requirements issued by NAVSUP Fleet Logistics Center (FLC) Yokosuka Site Sasebo. The Government intends to issue a competitive solicitation to Master Ship Repair Agreement (MSRA) and Agreement for Boat Repair (ABR) holders located in Japan, with the award anticipated as a single contract. The MCM-1 Class ship is tentatively scheduled for September 2026 with a performance duration of approximately 20 days at a contractor facility on the western coast of Hokkaido. The NAICS code is 336611 and the Product Service Code is J999.
Eligibility requirements mandate that offerors must possess a current MSRA or ABR in Japan, be certified by NAVSUP FLC, and maintain active registration in System for Awards Management (SAM.gov). Interested companies must submit responses of five pages or less electronically to Contracting Specialist Ms. Taeko Karyu (taeko.karyu2.ln@us.navy.mil) and Contracting Officer Ms. Elsa Nakasone (elsa.k.nakasone.civ@us.navy.mil) with the subject line "Sources Sought - Hokkaido MCM Ship Repair and Maintenance" no later than July 7, 2026, 10:00 Japan Standard Time. A Work Item Index containing identified requirements is attached to the notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MCM-1 Class Mooring and Service Requirements.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1 CRACK IN OVHD DURING ZONE INSPECTION, S/F DISCOVERED CRACK IN 1-78-1-L OVERHEAD. S/F REQUEST OUTSIDE ACTIVITY TO REPAIR CRACK.
| PE NOTE: OVERHEAD INSPECTION CONDUCTED BY SEKI-SAN ON 21-MAY-2026, RECOMMENDED TO APPLY SEALANT. | ON WORK SPEC | Post 100% | SASN-004-26 | NAGATO, NORIAKI | 620-00 | A6A2 | 620-00-001 | REYNOLDS | USS WARRIOR | MCM 10 | PASSAGE 1-78-1-L | NONE | XCOMPARTMNT | 620001781L | 1-78-1-L | OUTSIDE SUPPLY DEPARTMENT OFFICE” TO “1-78-1-L | Conventional | |||||
| DEGRADED GAUGE LINE | S/F DISCOVERED THAT STBD MRG LUBE OIL STRAINER HIGH DIFFERENTIAL PRESSURE SWITCH GAUGE LINES (3X) ARE LEAKING OIL. | S/F REQUEST OUTSIDE ACTIVITY TO REPLACE THREE LEAKING GAUGE LINES AND CONDUCT OPERATIONAL TEST (AS REQUIRED). | ON WORK SPEC | 80% | SASN-004-26 | YOSHINAGA, TOMOHIRO | 241-11 | A6A2 | 241-11-001 | REYNOLDS | USS WARRIOR | MCM 10 | MAIN REDUCTION GEAR SHAFT NO. 1 | 2C105893 | 691050067 | 2411169001 | 3-63-0-E | PE NOTE: CONTACT PE, JOEY TALOB FOR SHIPCHECK. | Conventional | |||
| DEG EME SW VLV | S/F DISCOVERED DEGRADED VALVE WHILE ALIGNING EMERGENCY SEAWATER TO SYSTEM. | S/F TO PROCURE VALVE AND WILL REQUEST OUTSIDE ACTIVITY TO INSTALL DUE TO INRFERANCES DURING CMAV IN HAKODATE. | ON WORK SPEC | Post 100% | SASN-004-26 | TERASHITA, SHUUJI | 524-11 | A6A2 | 524-11-001 | REYNOLDS | USS WARRIOR | MCM 10 | SSDG 2 ASW EMERGENCY COV | 3-69-1 | 882053792 | 52411A7892 | 3-63-0-E | Conventional | ||||
| REPLACE GAUGE LINE | S/F DISCOVERED THAT NR 1B MPDE GAUGE LINE TO JACKET WATER HIGH TEMP SWITCH HAS A CRACK AND LEAKING FLUID. S/F APPLIED SOFT PATCH TO ISOLATE AS TEMP REPAIR. | S/F REQUEST OUTSIDE ACTIVITY TO REMOVE GAUGE LINE, FABRICATE NEW GAUGE LINE AS PER SAMPLE AND INSTALL NEW GAUGE LINE. | ON WORK SPEC | Post 100% | SASN-004-26 | HAMADA, AKIHITO | 233-12 | A6A2 | 476-11-001 | TALOB J. | USS WARRIOR | MCM 10 | PROPULSION DIESEL ENGINE NO. 2/1B | 3606-1036 | 668880032L | 3-63-0-E | Conventional | |||||
| DEGRADED FLEX HOSES 1A SSDG | DURING INSPECTION S/F DISCOVERED THAT FLEXIBLE HOSES CONNECTING TO 1-DGLO-V-32A, 1-DGLO-V-34A, 1-DGLO-V-33A, 1A-PDFS-V-16 ARE DEGRADED AND NEED TO BE REPLACED. | S/F REQUEST OUTSIDE ACTIVITY TO REMOVE, MANUFACTURE AND REPLACE FLEXIBLE HOSES CONNECTING TO 1-DGLO-V-32A, 1-DGLO-V-34A, 1-DGLO-V-33A, 1A-PDFS-V-16 | ON WORK SPEC | 80% | SASN-004-26 | YOSHINAGA, TOMOHIRO | 311-21 | A6A2 | 311-21-001 | REYNOLDS | USS WARRIOR | MCM 10 | GENERATOR SETS, SSDG NO. 1A | 5C105264 | 161510002 | 3112116161A | 3-41-0-E | Conventional | ||||
| DEGRADED S/W PIPE LINE | S/F DISCOVERED THAT MMGTG SEAWATER PIPING INLET TO THE COOLER HAS A CORRODED BOSS' THREAD WHERE THE GAUGE LINE IS CONNECTED. THIS PREVENT THE GAUGE LINE TO SECURELY CONNECT TO THE PIPE | S/F REQUEST OUTSIDE ACTIVITY TO REMOVE INTERFERENCE, REMOVE INLET TO THE COOLER PIPE, REPLACE OR REPAIR (DEPENDING ON THE PIPE CONDITION), AND INSTALL NEW PIPING. REQUEST OUTSIDE ACTIVITY TO REPLACE GAUGE LINE AND INSTALL. PLACE SYSTEM BACK TO OPERATIONAL CONDITION. | ON WORK SPEC | 80% | SASN-004-26 | YOSHINAGA, TOMOHIRO | 476-11 | A6A2 | 476-11-002 | NAKANO | USS WARRIOR | MCM 10 | GAS TURBINE ENGINE | 1011SD3 | 052020050 | 476110511A | 3-41-0-E | Conventional | ||||
| NR 1B SSDG LUBE OIL FLEX HOSE | NR 1B SSDG LUBE OIL RETURN FLEXIBLE HOSE FROM THE OIL PAN CONNECTING TO THE FILTREX HOUSING IS HAS INDICATIONS OF EXTERNAL LEAKS NOTED. | REPLACE NR 1B SSDG LUBE OIL FLEXIBLE HOSE (CONNECTION FROM THE FILTREX ASSEMBLY TO THE OIL PAN) IAW MRC E4TN (A-3+), ("HOSE COVER DAMAGED BY CUTS, ABRASIONS, CRACKING, OR CHAFING. IF INTERNAL WIRES OR FIBER REINFORCEMENT YARNS ARE EXPOSED, HOSE MUST BE REPLACED") AND GUIDANCE FROM S6430-AE-TED-010, CHAPTER 9. | ON WORK SPEC | 80% | SASN-004-26 | TERASHITA, SHUUJI | 311-22 | A6A2 | 311-22-002 | SANCHEZ | USS WARRIOR | MCM 10 | DIESEL ENGINE | 74501FMG01 | 668880044L | 3-41-0-E | Conventional | |||||
| NR 1B SSDG F/O INLET FLEX HOSE | NR 1B SSDG FUEL INLET FLEXIBLE HOSE CONNECTING TO THE FUEL FILTER DUPLEX HOUSING IS CRACKED AND DETERIORATED, NO SIGNS OF EXTERNAL LEAKS NOTED. | REPLACE 1B SSDG FUEL INLET FLEXIBLE HOSE (CONNECTION TO THE DUPLEX FUEL FILTER ASSEMBLY) IAW MRC E4TN (A-3+), ("HOSE COVER DAMAGED BY CUTS, ABRASIONS, CRACKING, OR CHAFING. IF INTERNAL WIRES OR FIBER REINFORCEMENT YARNS ARE EXPOSED, HOSE MUST BE REPLACED") AND GUIDANCE FROM S6430-AE-TED-010, CHAPTER 9. | ON WORK SPEC | 80% | SASN-004-26 | TERASHITA, SHUUJI | 311-22 | A6A2 | 311-22-003 | SANCHEZ | USS WARRIOR | MCM 10 | DIESEL ENGINE | 74501FMG01 | 668880044L | 3-41-0-E | Conventional | |||||
| NR 1B SSDG F/O OUT FLEX HOSE | NR 1B SSDG FUEL OUTLET FLEXIBLE HOSE CONNECTING TO THE FUEL FILTER DUPLEX HOUSING IS CRACKED AND DETERIORATED, NO SIGNS OF EXTERNAL LEAKS NOTED. | REPLACE NR 1B SSDG FUEL OUTLET FLEXIBLE HOSE (CONNECTION TO THE DUPLEX FUEL FILTER ASSEMBLY) IAW MRC E4TN (A-3+), ("HOSE COVER DAMAGED BY CUTS, ABRASIONS, CRACKING, OR CHAFING. IF INTERNAL WIRES OR FIBER REINFORCEMENT YARNS ARE EXPOSED, HOSE MUST BE REPLACED") AND GUIDANCE FROM S6430-AE-TED-010, CHAPTER 9. | ON WORK SPEC | 80% | SASN-004-26 | TERASHITA, SHUUJI | 311-22 | A6A2 | 311-22-001 | SANCHEZ | USS WARRIOR | MCM 10 | DIESEL ENGINE | 74501FMG01 | 668880044L | 3-41-0-E | Conventional | |||||
| BROKEN TELEFLEX | DURING DCMA S/F DISCOVERED THAT REMOTE OPERATOR MD-1-55-2 (FOR MD-V-5) TELEFLEX WAS BROKEN. | S/F REQUEST OUTSIDE ACTIVITY TO REMOVE INTERFERENCES, UNINSTALL TELEFLEX CABLE, PROCURE NEW TELEFLEX, INSTALL NEW TELEFLEX, REINSTALL INTEREFERENCES, AND COMPLETE OPTEST (IF REQUIRED). | ON WORK SPEC | 80% | SASN-004-26 | KATAOKA, YUUKI | 529-11 | A6A2 | 529-11-001 | ECKELBERG | USS WARRIOR | MCM 10 | BILGE SUCT HOSE CONN VLV | MD-V-4 | 882047633 | 52911C0031 | 3-41-0-E | Conventional | ||||
| DEGRADED HATCH | DURING PMS 1671/001 M-1 S/F DISCOVERED THAT AFT STEERING HATCH 1-108-2 NEEDS TO BE REPLACE/REFURBISHED WITH ALL PARTS REPLACED ON IT. DUE TO CRACK ON PANEL AND RAIN WATER LEAK IN TO COMPARTMENT. | S/F REQUEST OUTSIDE ACTIVITY TO REFURBISH AND REPLACE ALL PARTS FOR IT. |
| PE NOTE: DEFERRED FROM 5C1 SRA DUE TO MATERIAL RECEIPT TIMELINE. UPDATE: 17-JUN-2026, ALL MATERIAL VERIFIED ON-HAND. | ON WORK SPEC | Post 100% | SASN-004-26 | SASHI, NAOKI | 167-11 | A6A2 | 167-11-001 | ECKELBERG | USS WARRIOR | MCM 10 | RSD WT QA HATCH 1-108-2 | QAWTH 1-108-2 | XCONFIGITEM | 1671111082H | 1-108-2-WEA | Conventional | |||||
| SHIPWIDE LAGGING REQUIRED | DURING ZONE INSPECTION, DISCOVERED LAGGING NEED TO BE REPLACED IN VARIOUS SPACES ONBOARD THE SHIP. | S/F REQUEST OUSIDE ACTIVITY TO REMOVE OLD, DEGRADED AND DAMAGED LAGGING, INSTALL NEW LAGGING, PAINT AND STENCIL AS NEEDED. LAGGING JOB REQUEST LIST WILL BE SENT SEPCOR. | ON WORK SPEC | 80% | SASN-004-26 | YOSHINAGA, TOMOHIRO | 507-00 | A6A2 | 508-11-001 | MCDANIEL | USS WARRIOR | MCM 10 | MACHINERY AND PIPING DESIGNATION AND MARKING | NONE | XSYSTEMITEM | 50700SY1261A | SYSTEM-LEVEL | Conventional | |||
| HAZARDOUS WASTE HANDLING | SERVICES FOR HANDLING AND DISPOSAL OF HAZARDOUS WASTE DURING THE AVAILABILITY ARE REQUIRED. REMOVE, HANDLE, STORE, TRANSPORT AND DISPOSE OF HAZARDOUS WASTE PRODUCED BY GOVERNMENT AND CONTRACTOR PERSONNEL IN | ||||||||||||||||||||
| ACCORDANCE WITH NAVSEA STANDARD WORK TEMPLATE (SWT) 077-001. | REQUEST SERVICES FOR HANDLING AND DISPOSAL OF HAZARDOUS WASTE DURING THE AVAILABILITY ARE REQUIRED. REMOVE, HANDLE, STORE, TRANSPORT AND DISPOSE OF HAZARDOUS WASTE PRODUCED BY GOVERNMENT AND CONTRACTOR PERSONNEL IN ACCORDANCE WITH NAVSEA STANDARD WORK TEMPLATE (SWT) 077-001. | ON WORK SPEC | 80% | SASN-004-26 | SAITO, KAZUYUKI | 865-90 | A6A2 | 865-90-001 | TALOB J. | USS WARRIOR | MCM 10 | OCCUPATIONAL SAFETY AND HEALTH (OSH) | NONE | XSERVICEITM | SHIP-WIDE | Conventional | |||||
| SF CRANE/RIGGING SVCE - PROV | CRANE , RIGGING, FORKLIFT AND TRANSPORTATION SERVICES ARE REQUIRED TO SUPPORT SHIP'S FORCE AND PRODUCTION SHOP WORK DURING THE AVAILABILITY. | PROVIDE CRANE, RIGGING, FORKLIFT AND TRANSPORTATION SERVICES IN SUPPORT OF SHIP'S FORCE AND PRODUCTION SHOP WORK TO LOAD/UNLOAD MATERIALS, EQUIPMENT AND SUPPLIES THROUGHOUT THE AVAILABILITY AUTHORIZED AS FOLLOWS: A. CRANE SERVICE (WITH OPERATOR AND RIGGERS) UP TO FIVE (5) TIMES PER DAY. B. FORKLIFT SERVICE (WITH OPERATOR) UP TO FIVE (5) TIMES PER DAY. C. TRANSPORTATION SERVICE (WITH OPERATOR) UP TO FIVE (5) TIMES PER DAY IN THE VICINITY OF THE SHIP. NOTE: USE SWT 993-015 FOR GUIDANCE IN DEVELOPING SPEC. | ON WORK SPEC | Post 100% | SASN-004-26 | OOKUBO, TAKASHI | 865-20 | A6A2 | 865-20-001 | TALOB J. | USS WARRIOR | MCM 10 | CRANES AND TRANSPORTATION SERVICES (PRORATED) | NONE | XSERVICEITM | SHIP-WIDE | Conventional | ||||
| BARGE SVCE- PROV | BARGE SERVICES. THE CONTRACTOR SHALL PROVIDE FLOATING BARGE SERVICES FOR REMOVAL OF FUEL, |
WATER, FUEL OIL AND OILY WASTE AS EQUIRED.DURING THE AVAILABILITY.
REQUEST BARGE SERVICES. THE CONTRACTOR SHALL PROVIDE FLOATING BARGE SERVICES FOR REMOVAL OF FUEL, WATER, FUEL OIL AND OILY WASTE AS REQUIRED. THE CONTRACTOR SHALL PROVIDE ONE (1) 100,000 GALLON CAPACITY OIL BARGE.
I. THE BARGE SHOULD HAVE A MINIMUM CAPACITY OF 100,000 GALLONS.
II. THE CONTRACTOR SHALTHE CONTRACTOR SHALL PROVIDE ONE (1) 100,000 GALLO
II. THE CONTRACTOR SHALL PROVIDE 2 RUBBER FENDERS LOCATED IN PORT OF THE CONTRACTOR.
III. THE CONTRACTOR SHALL MAINTAIN THE CAPABILITY TO SAFELY TRANSVERSE FROM THE BARGE TO THE PIER WHEN REQUIRED.
| ON WORK SPEC | Post 100% | SASN-004-26 | HAMABE, YUUKI | 863-51 | A6A2 | 863-51-005 | TALOB J. | USS WARRIOR | MCM 10 | TEMPORARY SHIP SYSTEMS | NONE | XSERVICEITM | SHIP-WIDE | Conventional |
| TRASH & WASTE REMOVAL/SERVICES | TRASH & NON-HAZARDOUS WASTE REMOVAL: THE CONTRACTOR TO PROVIDE REMOVAL OF ALL TRASH AND NON-HAZARDOUS WASTE AS REQUIRED. TRASH REMOVAL SERVICE IS THE COLLECTION AND DISPOSAL OF TRASH INCLUDING LIQUID, SEMI-LIQUID, OR SOLID GARBAGE. TRASH CONSISTS MAINLY OF TRASH FROM FOOD SERVICE OPERATIONS SUCH AS FOOD WASTE, PAPER AND PLASTIC PACKAGING, AND DOMESTIC WASTES GENERATED IN THE ACCOMMODATION SPACES AS A |
RESULT OF THE ORDINARY DAY-BY-DAY ACTIVITIES ONBOARD THE SHIP. TRASH DOES NOT INCLUDE HAZARDOUS MATERIAL, BILGE WATER, AND GREYWATER, EXPLOSIVES AND INCENDIARY WASTE, OR WASTE CONTAMINATED BY MEDICAL AND
| RADIOLOGICAL PROCESSES. | REQUEST FOR CONTRACTOR TO PROVIDE REMOVAL/ COLLECTION OF ALL TRASH AND NON-HAZARDOUS WASTE. SERVICES INCLUDES TRASH BIN TO BE LOCATED IN THE VICINITY OF THE SHIP FOR THE DURATION OF VISIT (24AUG - 14SEP 2026). | ON WORK SPEC | 80% | SASN-004-26 | MAEDA, HIROKI | 863-51 | A6A2 | 863-51-003 | TALOB J. | USS WARRIOR | MCM 10 | TEMPORARY SHIP SYSTEMS | NONE | XSERVICEITM | SHIP-WIDE | Conventional |
| TEMP OFFICES & SUPPORT SVCS | OFFICE SPACE AND SUPPORT SVCS ARE REQUIRED DURING AVAILABILITY. |
"PROVIDE AND MAINTAIN TEMPORARY OFFICE SPACE(S) TO BE USED BY THE MAINTENANCE AND OVERSIGHT TEAM (8-10 PERSONNEL) PIER SIDE WHILE THE SHIP IS IN MAINTENANCE AVAILABILITY FROM 01SEP – 09OCT 2026.
PROVIDE LIGHTING, WATER, AIR CONDITIONING, AND ELECTRICAL POWER.
PROVIDE JANITORIAL SERVICES, INCLUDING TRASH DISPOSAL.
NOTE: USE SWT 980-001 ""MAINTENANCE AND OVERSIGHT TEAM OFFICE SPACE; PROVIDE"" FOR GUIDANCE WHEN DEVELOPING AVAILABILITY SPEC.
REQUEST FOR CONTRACTOR TO PROVIDE AND MAINTAIN LOCKABLE TEMPORARY OFFICE SPACE(S) TO BE USED BY THE MAINTENANCE AND OVERSIGHT TEAM (8-10 PERSONNEL) PIER SIDE WHILE THE SHIP IS IN MAINTENANCE AVAILABILITY FROM 01SEP – 09OCT 2026.
PROVIDE LIGHTING, WATER, AIR CONDITIONING, AND ELECTRICAL POWER. PROVIDE JANITORIAL SERVICES, INCLUDING TRASH DISPOSAL.
NOTE: USE SWT 980-001""MAINTENANCE AND OVERSIGHT TEAM OFFICE SPACE; PROVIDE"" FOR GUIDANCE WHEN DEVELOPING AVAILABILITY SPEC
PROVIDE;
(2) UNIT HOUSES (E.G., W 4,550MM X D 2,300MM X H 2,603 MM) ENTRANCE DOORS WITH CANOPY, STEP FOR THE DOORS FOR EACH UNIT HOUSE, BLIND FOR ALL WINDOWS FOR EACH UNIT HOUSE.
(4) OFFICE DESKS (E.G., W 1,000 MM X D 600MM X H 700MM) PER EACH UNIT HOUSE
(1) ROLLING RECLINING CHAIR WITH ARM (ERGONOMICS) PER EACH DESK
(4) MOBILE PEDESTAL WITH 3 OR 4 LOCKABLE DRAWERS (E.G., W 400MM X D 480MM X H 600MM)
(2) DUPLEX OUTLETS WALL-MOUNTED (20 AMPS, 120V) PER EACH DESK
(4) EXTENSION OUTLETS WITH 4 SOCKETS.
(4) DESK LIGHT
(2) ROLLING RECLINING CHAIR WITH ARM (ERGONOMICS) PER EACH UNIT HOUSE.
(4) LOCKABLE LOCKERS (E.G., 1 LOCKER SIZE, W 230MM X D 450MM X H 830MM) PER EACH UNIT HOUSE
(1) SMALL TABLE (E.G., W 1000MM X D 500MM X H 700MM) PER EACH UNIT HOUSE
(1) MEDIUM MICROWAVE (E.G., W 480MM X D 340MM X H 300MM) FOR 1 UNIT HOUSE
(1) REFRIGERATOR WITH FREEZER, CAPACITY 200 LITERS (E.G., W 560MM X D 600MM X H 1600MM) FOR EACH UNIT HOUSE
(4) TRASH BOXES WITH TRASH SERVICE PER EACH UNIT HOUSE
(1) WATER/HOT WATER DISPENSER (KURIKURA OR EQUIVALENT) WITH DISPOSABLE CUPS, 5 GALLON PER WEEK FOR 1 UNIT HOUSE
ENOUGH PAPER TOWEL DAILY USE FOR 4 PERSONNEL FOR EACH UNIT HOUSE
JANITORIAL SERVICES 3 DAYS/WEEK PER EACH UNIT HOUSE.
(4) MALE AND (1) FEMALE TOILET WITH WATER BASIN (AVAILABLE HAND SOAP/SANITIZER) WITHIN 50 FT OF THE UNIT HOUSES WITH DAILY CLEAN
(20) BICYCLES WITH REPAIR SERVICES.
| ON AVAIL | Post 100% | SASN-004-26 | OHIRA, SHINICHI | 890-00 | A6A2 | TALOB J. | USS WARRIOR | MCM 10 | CONTRACTUAL AND PRODUCTION SUPPORT SERVICE | NONE | XSERVICEITM | SHIP-WIDE | Conventional |
| TEMP OFFICE SPACES AND CONF RM | OFFICE SPACES AND CONFERENCE ROOM ARE REQUIRED DURING AVAILABILITY. |
"PROVIDE AND MAINTAIN TEMPORARY OFFICE SPACE(S) TO BE USED BY THE PROJECT TEAM AND GOV'T MAINTENANCE TEAM/REPRESENTATIVES WHILE THE SHIP IS IN MAINTENANCE AVAILABILITY FROM 01SEP – 09OCT 2026.
PROVIDE JANITORIAL SERVICES, INCLUDING TRASH DISPOSAL.
NOTE: USE SWT 980-001 “MAINTENANCE AND OVERSIGHT TEAM OFFICE SPACE; PROVIDE"" FOR GUIDANCE WHEN DEVELOPING AVAILABILITY SPEC. REQUEST FOR CONTRACTOR TO PROVIDE AND MAINTAIN OFFICE SPACES AND CONFERENCE ROOM TO BE USED BY THE PROJECT TEAM AND GOV'T MAINTENANCE TEAM/REPRESENTATIVES WHILE THE SHIP IS IN MAINTENANCE AVAILABILITY FROM 01SEP – 09OCT 2026. PROVIDE JANITORIAL SERVICES, INCLUDING TRASH DISPOSAL. NOTE: USE SWT 980-001 “MAINTENANCE AND OVERSIGHT TEAM OFFICE SPACE;
PROVIDE"" FOR GUIDANCE WHEN DEVELOPING AVAILABILITY SPEC
MAIN OFFICE (2 OFFICE SPACES):
PROVIDE,
(10) OFFICE DESKS (E.G., W 1,000 MM X D 600MM X H 700MM) PER OFFICE SPACE
(1) ROLLING RECLINING CHAIR WITH ARM (ERGONOMICS) PER EACH DESK
(10) MOBILE PEDESTAL WITH 3 OR 4 LOCKABLE DRAWERS (E.G., W 400MM X D 480MM X H 600MM) PER EACH OFFICE SPACE
(2) DUPLEX OUTLETS WALL-MOUNTED (20 AMPS, 120V) PER DESK
(10) EXTENSION OUTLET WITH 4 SOCKETS PER OFFICE SPACE
(10) DESK LIGHTS PER OFFICE SPACE
(10) LOCKABLE LOCKERS (E.G., 1 LOCKER SIZE, W 230MM X D 450MM X H 830MM) PER EACH OFFICE SPACE
(1) TABLE (E.G., W 1500MM X D 900MM X H 700MM) PER OFFICE SPACE
(1) MEDIUM MICROWAVE (E.G., W 480MM X D 340MM X H 300MM)
(1) REFRIGERATOR WITH FREEZER, CAPACITY 300 LITERS (E.G., W 560MM X D 600MM X H 1600MM)
(10) TRASH BOXES WITH TRASH SERVICE PER OFFICE SPACE
(1) WATER/HOT WATER DISPENSER (KURIKURA OR EQUIVALENT) WITH DISPOSABLE CUPS, 10 GALLON PER WEEK PER OFFICE SPACE
ENOUGH PAPER TOWEL DAILY USE FOR 10 PERSONNEL PER EACH OFFICE SPACE
JANITORIAL SERVICES 3 DAYS/WEEK PER OFFICE SPACE
(6) MALE AND (1) FEMALE TOILET WITH WATER BASIN (AVAILABLE HAND SOAP/SANITIZER)
CONFERENCE ROOM:
(2) CONFERENCE TABLE, MINIMUM 8 FEET LONG.
(20) ROLLING RECLINING CHAIR WITH ARM (ERGONOMICS)
(2) DISPLAY MONITORS, MINIMUM OF 65" WITH HDMI CONNECTION.
(6) WALL-MOUNTED OUTLETS (2) DUPLEX OUTLETS (20 AMPS, 120 VOLTS).
| ON AVAIL | Post 100% | SASN-004-26 | OHIRA, SHINICHI | 890-00 | A6A2 | TALOB J. | USS WARRIOR | MCM 10 | CONTRACTUAL AND PRODUCTION SUPPORT SERVICE | NONE | XSERVICEITM | SHIP-WIDE | Conventional | |||||||
| SHORE AIR SERVICES | SHORE AIR AND CONNECTION SERVICES: SHORE AIR AND CONNECTIONS REQUIRED DURING THE AVAILABILITY FROM 01SEP – 09OCT 2026. REQUEST FOR THE CONTRACTOR TO PROVIDE A PRESSURE AIR COMPRESSOR SERVICES AS REQUIRED. | THE CONTRACTOR SHALL PROVIDE A LOW PRESSURE AIR TREES, CLEARLY MARKED FOR USE WITH PNEUMATIC TOOLS, AS REQUIRED ON THE SHIP FOR SHIPS FORCE PERSONNEL. SHORE AIR IS TO BE USED FOR AIR POWERED TOOLS NEEDED TO COMPLETE WORK BY THE CONTRACTOR AND SHIPS FORCE PERSONNEL. AT NO TIME SHALL CONTRACTOR EMPLOYEES CONNECT TO THE SHIPS PRESSURE AIR SYSTEM. CONTRACTOR SHALL ENSURE THAT PRESSURE AIR INTENDED FOR USE WITH PNEUMATIC TOOLS, IT SHOULD BE FILTERED FOR PARTICULATE, AND WATER SHOULD BE SEPARATED OUT. CONTRACTOR SHALL ENSURE THAT PRESSURE IS REGULATED TO A MAXIMUM OF 125 PSIG. PROVIDE REQUIRED ADAPTERS TO CONNECT TO SHIP'S FORCE ITEMS. PROVIDE SOME HOSES TO CONNECT SHIP'S FORCE ITEMS WITH KTR AIR MANIFOLD TO PROVIDE AIR FOR MMR AND AMR. | ON WORK SPEC | Post 100% | SASN-004-26 | MOROOKA, SATORU | 863-52 | A6A2 | 863-52-001 | TALOB J. | USS WARRIOR | MCM 10 | TEMPORARY UTILITIES AND SERVICES (PRORATABLE) | NONE | XSERVICEITM | SHIP-WIDE | Conventional | |||
| MISSING VENT FAN COVER | S/F DISCOVERED MISSING VENTILATION FAN COVER FOR SUPPLY SYSTEM 01-33-1. APPROX 3"X3". | REQUEST OUTSIDE ACTIVITY FABRICATE AND INSTALL REPLACEMENT VENTILATION COVER. REQUEST CONTACT CSPE FOR PICS OR SHIPCHECK. | ON WORK SPEC | 80% | SASN-004-26 | YOSHINAGA, TOMOHIRO | 620-00 | A6A2 | 620-00-005 | VAZQUEZ | USS WARRIOR | MCM 10 | BOATSWAIN'S STOREROOM | NONE | XCOMPARTMNT | 62000100A | 1-0-0-A | Conventional | ||
| CRACKED OVERHEAD IN FWD P-WAY | DURING ZONE INSPECTION OF FWD P-WAY S/F DISCOVERED CRACKS ON THE OVERHEAD IN FORWARD P-WAY OUTSIDE OF REPAIR 2. | S/F REQUEST OUTSIDE ACTIVITY TO PERFORM DAMAGE SURVEY AND REPAIR CRACKED OVERHEAD IN FWD P-WAY OUTSIDE OF REPAIR 2. |
| PE NOTE: INSPECTION CONDUCTED BY SEKI-SAN ON 21-MAY-2026. RECOMMENDED APPLY SEALANT. | ON WORK SPEC | 80% | SASN-004-26 | MUTA, HITOSHI | 620-00 | A6A2 | 620-00-002 | RIMMER | USS WARRIOR | MCM 10 | PASSAGEWAY | NONE | XCOMPARTMNT | 62000150L | 1-5-0-L | Conventional | |||||
| REPLACE PRC SYSTEM | S/F DISCOVERED DECK PRC CRACKING IN 15-MAN BERTHING HEAD IN FRONT OF THE SINK CAUSING WATER TO LEAK THROUGH THE OVERHEAD IN 40-MAN BERTHING PRESENTING A MAJOR HEALTH HAZARD AND CAUSING DAMAGE TO PERSONAL PROPERTY. 08-MAY-2026, WOOD ISEA MR. JOHN OATES AND MR. SEKI CONDUCTED SHIPCHECK AND FOUND PRC DELAMINATION CAUSING WATER TO LEAK DOWN TO 40-MAN BERTHING OVERHEAD. | S/F REQUEST OUTSIDE ACTIVITY TO REMOVE 4 FEET X 6 FEET OF PRC SYSTEM, INSPECT GPC/WOOD FOR ANY DAMAGE, CONDUCT REPAIR, AND RE-APPLY PRC SYSTEM IN 15-MAN BERTHING HEAD/IN-FRONT OF THE SINK. | ON WORK SPEC | 80% | SASN-004-26 | SATO, TAKANORI | 620-00 | A6A2 | 620-00-004 | RIMMER | USS WARRIOR | MCM 10 | CREW WR, WC & SHOWER | NONE | XCOMPARTMNT | 620001281L | 1-28-1-L | Conventional | |||
| 40-MAN HEAD HPW PIPING | DURING ZONE INSPECTION S/F DISCOVERED THAT THE SINK HOT WATER PIPINGS ARE CORRODED CAUSING LEAK ON THE PIPINGS AND ON THE FAUCETS. |
| S/F REQUEST OUTSIDE ACTIVITY TO REPLACE HOT WATER PIPING AND SINK FAUCETS, AND REPLACE LAGGING ON PIPING THAT REQUIRED LAGGING. | ON WORK SPEC | Post 100% | SASN-004-26 | HAMADA, AKIHITO | 620-00 | A6A2 | 620-00-003 | SAGASTUME | USS WARRIOR | MCM 10 | CREW WR, WC & SHOWER | NONE | XCOMPARTMNT | 620001282L | 1-28-2-L | Conventional | |||
| CLEAN UCHS HYD FLUID COOLER | SHIPS FORCE EXPERIENCED HIGH HYDRAULIC TEMPERATURES ON THE AN/SLQ-48 UCHS SYSTEM, IDENTIFYING THAT THE HYDRAULIC FLUID WAS NOT BEING COOLED SUFFICIENTLY. | REQUEST OUTSIDE ACTIVITY REMOVE, ACID DIP, CLEAN, AND HYDRO TEST THE HYDRAULIC FLUID COOLER IN ORDER TO PREVENT SYSTEM OVERHEATING IN WARM WATERS. | ON WORK SPEC | Post 100% | SASN-004-26 | TOKUDA, YUUICHIRO | 476-21 | A6A2 | 476-21-001 | MARTIN M. | USS WARRIOR | MCM 10 | AN/SLQ-48 UCHS WINCH ASSEMBLY | 013 | 00695C330 | 2-86-0-E | Conventional |