About this file
AU UH Animation Lab Project Summary
This document set comprises 100% Construction Document (CD) drawings and specifications for the AU-SC UH Animation Lab project at Augusta University's Summerville Campus, located at 2500 Walton Way, Augusta, Georgia 30904. The project involves the conversion of existing classroom space (Room 249) totaling 956 square feet into an animation laboratory within University Hall. The scope of work encompasses architectural finishes, mechanical, electrical, plumbing, and fire protection modifications to accommodate the new laboratory design. The project is classified as Business Occupancy (Type B) with a calculated occupant load of 7 persons and is designed as a Type IB, fully sprinklered building. Key specifications include the installation of new gypsum drywall partitions (PT-1A1 and PT-2 types), acoustical ceiling tiles and grid, updated HVAC terminal units with digital controls, fire suppression system rework, and comprehensive electrical modifications including new lighting fixtures, data/voice outlets, fire alarm components, and access control systems. Construction documents are dated April 10, 2026, with final approval from the State Fire Marshal dated May 7, 2024.
The project requires compliance with the 2024 International Building Code, 2024 International Fire Code, 2023 National Electrical Code, 2024 NFPA 101 Life Safety Code, NFPA 13 Sprinkler Standards, and Georgia State Fire Marshal requirements as of February 19, 2026. The contractor must maintain negative static pressure throughout demolition and construction activities in the laboratory space, with ICRA air calculation requirements specifying 1,530 to 1,721 CFM depending on ceiling configuration, or alternatively provision of HEPA air scrubbers. Fire protection specifications require white concealed quick-response extended coverage sprinklers rated for intermediate temperature activation. HVAC work includes installation of VAV terminal units (Trane VCWF-08 models) with hydronic heating coils and electronic controls integrated with the existing Johnson Controls Metasys system. Testing, adjusting, and balancing must be performed by AABC or NEBB certified contractors, with all data and communications wiring requiring Enhanced Category 6E certification testing per TIA/EIA 568-C.2-1 standards. The contractor shall obtain all necessary permits and inspections, provide as-built drawings, and furnish three sets of maintenance and operating instructions prior to final project acceptance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AU_SC UH Animation Lab 95_ Spec.pdf | ||
| DBB_SampleContract_25_117_UH.pdf | ||
| DBB_Contract_Bid_Forms_25_117_UH.pdf | ||
| DBB_General_Conditions_Oct_2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION:
UNIVERSITY HALL
PLAN NORTH
AREA OF WORK:
956 SF
O
T R
I
EG
S
STA
TE
H
DE AR RE C
CT
ETI
A O
ROBERT L. MAULDIN
GF E
I
RG
oI NC EAT .I
RE
T C
F
KM
ARCHITECTS, INC.
DATE
DRAWING NO.
PR
IN
TE
D
KEY PLAN:
529 GREENE ST. AUGUSTA, GA. 30901
(706) 736 3333 - FAX (706) 736 7100
This document is property of 2KM Architects, Inc. The unauthorized reproduction, copying, or otherwise use of this document is strictly prohibited and any infringement thereupon may be subject to legal action
Copyright © 2026, 2KM Architects, Inc.
DRAWN BY
PROJECT NO.
PAPER
ISSUE
24"x36"
FOR
DRAWING TITLE
04/10/2026
4/
/2
9:
:0
A M
Z
A ct iv e_
Pr oj ec ts
\2
Pr oj ec ts \2
5-
A U
-S C \2
5-
.0
A U
-S C U
H A ni m at io n La b\ D
R A W
IN
G
S \0
0% C
D s\
-1
1.
0% .r vt
AU-SC UH
ANIMATION LAB.
AUGUSTA
UNIVERSITY
04/10/2026
G0.1DA
25-11.03
2500 WALTON WAY, AUGUSTA, GA 30904
INDEX
100% CD
INDEX OF DRAWINGS
X WINDOW TYPE
INTERIOR
EXTERIOR
ELEVATION SYMBOL
ELEVATION SYMBOL
SECTION SYMBOL
T.O. SLAB
DOOR NUMBER
ROOM NAME
ROOM NUMBER
DETAIL NUMBER
DETAIL NUMBER
CROSS REFERENCE SHT #
DETAIL NUMBER
CROSS REFERENCE SHT #
DETAIL NUMBER
STORAGE
2104A
CROSS REFERENCE SHT #
CROSS REFERENCE SHT #
DETAIL
SYMBOL
A1.1
DRAWING TITLE
A1.1
SCALE:
A1.1
A1.1
A1.1
0'-0"
ELEVATION MARK
ELEVATION HEIGHT
GENERAL LEGEND
AU-SC UH ANIMATION LAB.
AUGUSTA UNIVERSITY
2500 WALTON WAY, AUGUSTA, GA 30904
SITE PLAN
INDEX
G0.1 INDEX
G0.2 EGRESS PLAN AND CODE ANALYSIS
ARCHITECTURAL
A0.1 DEMOLITION AND CONSTRUCTION SAFEGUARDING
PLAN
A1.1 FLOOR PLAN AND ELEVATIONS
A1.2 REFLECTED CEILING PLAN
A1.3 EQUIPMENT AND FURNITURE PLAN
FIRE PROTECTION
FP1.1 FIRE PROTECTION
MECHANICAL
M0.1 HVAC PLANS
M1.1 HVAC SCHEDULES, FMS SUMMARY, DETAILS,
NOTES AND LEGEND
M2.1 HVAC SPECIFICATIONS
ELECTRICAL
E1.0 LEGEND, NOTES, DETAILS, SCHEDULE AND SPECS
E1.1 ELECTRICAL SPECIFICATIONS
E2.1 ELECTRICAL DEMOLITION AND LIGHTING PLAN
E3.1 ELECTRICAL POWER PLAN
E4.1 MECHANICAL POWER AND SYSTEMS PLAN
E5.1 ELECTRICAL DETAILS
A AMPERAGE
ACM ASBESTOS CONTAINING MATERIAL
A/C AIR CONDITIONER
A.F.F. ABOVE FINISH FLOOR
ALT. ALTERNATE
AL. ALUMINUM
@ AT
ATC ACOUSTICAL TILE CEILING
AWG. AVERAGE WIRE GAUGE
BD. BOARD
BOT, B/ BOTTOM
BRG. BEARING
BTUH BRITISH THERMAL UNIT/ HOUR
B.W. BOTH WAYS
CARP. CARPET
CFM CUBIC FEET PER MINUTE
CJ. CONSTRUCTION JOINT
CENTER LINE
CL CLEARANCE
CONT. CONTINUOUS
C.T. CERAMIC TILE
DIA. DIAMETER
DN DOWN
DTL. DETAIL
E.C. ELECTRICAL CONDUIT
EF. EXHAUST FAN
EPT. ENAMEL PAINT
E.W. EACH WAY
E.S. EACH SIDE
EWC ELECTRICAL WATER COOLER
EXP. EXPANSION
EXT. EXTERIOR
F.D. FLOOR DRAIN
F.E. FIRE EXTINGUISHER
FEC. FIRE EXTINGUISHER CABINET
F.F.L. FINISH FLOOR LEVEL
ABBREVIATIONS
FIN. FINISH
FLR. FLOOR
FT. FOOT
F.V. FIELD VERIFY
G. GROUND
GA. GAUGE
G.C. GENERAL CONTRACTOR
GPDW GYPSUM DRYWALL
GPM GALLONS PER MINUTE
H/C HANDICAP
H.M. HOLLOW METAL
H.P. HORSE POWER
HVAC HEAT'G, VENT'G & AIR COND.
I.D. INSIDE DIAMETER
INSUL. INSULATION
INT. INTERIOR
IN.W.C. INCHES OF WATER COLUMN
JT. JOINT
LGMF LIGHT GAUGE METAL FRAMING
MDF MEDIUM DENSITY FIBER BOARD
M.O. MASONRY OPENING
M/R MOISTURE RESISTANT
MTL METAL
N/A NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
N.I.C. NOT IN CONTRACT
O.A. OUTSIDE AIR
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.H. OVERHEAD
P POLE
PB PARTICLE BOARD
PCPL PORTLAND CEMENT PLASTER
PL. PLATE
PLAM PLASTIC LAMINATE
PLYWD. PLYWOOD
P.T. PRESSURE TREATED
PVC. POLYVINYL CHLORIDE
Q.T. QUARRY TILE
R. RADIUS
R.C.P. REINFORCED CONCRETE PIPE
R.D. ROOF DRAIN
RDL. ROOF DRAIN LINE
REF. REFERENCE
REINF. REINFORCING
RPM. REVOLUTIONS PER MINUTE
SAT. SUSPENDED ACOUSTICAL TILE
S.C. SOLID CORE
S.H. SPRINKLER HEAD
SHT. SHEET
SIM. SIMILAR
S.P. STATIC PRESSURE
S.S. STAINLESS STEEL
STD. STANDARD
STL. STEEL
STR. STRUCTURAL
TEMP. TEMPERED
T/ TOP
T/F TOP OF FOOTING
THOLD. THRESHOLD
T/J TOP OF JOIST
TRANSL. TRANSLUCENT
TYP. TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
W/ WITH
W/O WITHOUT
WD. WOOD
WM WATER METER
W/P WATERPROOF
WV WATER VALVE
W.W.F. WELDED WIRE FABRIC
CL
PLAN NORTH
1. CONTRACTOR SHALL VISIT THE PROJECT SITE
PRIOR TO BIDDING TO REVIEW EXISTING
CONDITIONS. BID SHALL REFLECT ALL COSTS
AFFECTING THE SCOPE OF WORK AND
EXISTING CONDITIONS.
2. DO NOT SCALE DRAWINGS TO LOCATE WALLS,
DOORS, CEILING GRID, EQUIPMENT, ETC.
GENERAL NOTE
25154
ELECTRICAL DESIGN
C O N S U L T A N T S
AUGUSTA OFFICE -
ELECTRICAL ENGINEERS
PROJECT #:
edc1973.com
MECHANICAL: MARTIN FORD, P.E.
J. BRIAN MESSER, P.E.
PLUMBING: JOE POWELL, P.E.
PFA ENGINEERING, INC.
1201 BROAD STREET, SUITE 3A, AUGUSTA, GA 30901
PHONE: (706) 722-3959 FAX: (706) 724-5127
www.pfaengineering.com
#25-117-UHAU PROJECT NUMBER
- SUMMERVILLE CAMPUS
KM
ARCHITECTS, INC.
ARCHITECT:
2KM ARCHITECTS, INC.
529 GREENE ST.
PH. 706.736.3333
FX. 706.736.7100
EMAIL: mail@2kmarchitects.com
ROBERT L. MAULDIN NCARB, AIA
REVISIONS
# DATE DESCRIPTION
APPROVED
STATE FIRE MARSHAL
SUBJECT TO FINAL FIELD INSPECTION
Final approval subject to noted comments and field inspection based on NFPA Standards and
Georgia Accessibility Code.
05/07/2024
BY:
DATE:
Mi-Jung Kim
May 14, 2026
A COMPLETE SET OF APPROVED PLANS AND
SPECIFICATIONS SHALL BE MAINTAINED
ON THE CONSTRUCTION SITE AT ALL TIMES.
VIOLATORS SUBJECT TO CIVIL PENALTIES.
THIS OFFICE SHALL BE NOTIFIED IN WRITING
AT LEAST 21 DAYS PRIOR TO 80% AND 100%
COMPLETION FOR INSPECTIONS
FIRE STOPPING REQUIREMENT
Penetrations thru rated walls and floors shall be sealed with a material capable of preventing the passage of flames and hot gasses when subjected to the requirements of the Test Standard specific for Fire Stops ASTM-E-814.
SPRINKLER CONTRACTOR SHALL HAVE
CERTIFICATE OF COMPETENCY FROM
GEORGIA FIRE MARSHAL'S OFFICE.
SPRINKLER SHOP DRAWINGS SHALL
BE SUBMITTED TO GEORGIA FIRE
MARSHAL'S OFFICE FOR REVIEW
AND APPROVAL PRIOR TO INSTALLATION.
SUBJECT TO CIVIL PENALTIES.
A COMPLETE SET OF APPROVED PLANS AND
SPECIFICATIONS SHALL BE MAINTAINED
ON THE CONSTRUCTION SITE AT ALL TIMES.
VIOLATORS SUBJECT TO CIVIL PENALTIES.
ELEV NO. 1
LEGEND:
EXISTING WALL / PARTITION
F.E.C. EXISTING FIRE
EXTINGUISHER CABINET
EXISTING 2-HR FIRE / SMOKE BARRIER
AREA OF WORK
EGRESS ROUTE
NEW WALL / PARTITION
PLAN NORTH
AREA OF WORK:
956 SF
CLASSROOM
CORRIDOR
STAIR#2
STAIR#1
MAX DIST.136'-9"
NETWORK
ELECTRICAL
STAIR#3
STAIR#4
F.
E.
C
F.E.C.F.E.C.
E.
F.
C
O
T R
I
EG
S
STA
TE
H
DE AR RE C
CT
ETI
A O
ROBERT L. MAULDIN
GF E
I
RG
oI NC EAT .I
RE
T C
F
KM
ARCHITECTS, INC.
DATE
DRAWING NO.
PR
IN
TE
D
KEY PLAN:
529 GREENE ST. AUGUSTA, GA. 30901
(706) 736 3333 - FAX (706) 736 7100
This document is property of 2KM Architects, Inc. The unauthorized reproduction, copying, or otherwise use of this document is strictly prohibited and any infringement thereupon may be subject to legal action
Copyright © 2026, 2KM Architects, Inc.
DRAWN BY
PROJECT NO.
PAPER
ISSUE
24"x36"
FOR
DRAWING TITLE
04/10/2026
4/
/2
:5 0:
A
M Z
A ct iv e_
Pr oj ec ts
\2
Pr oj ec ts \2
5-
A U
-S C \2
5-
.0
A U
-S C U
H A ni m at io n La b\ D
R A W
IN
G
S \0
0% C
D s
(C
LO
S
ED
-1 1.
0%
.r vt
AU-SC UH
ANIMATION LAB.
AUGUSTA
UNIVERSITY
04/10/2026
G0.2DA
25-11.03
2500 WALTON WAY, AUGUSTA, GA 30904
EGRESS PLAN AND
CODE ANALYSIS
100% CD
PLAN NORTH
OCCUPANCY LOAD FACTOR
OCCUPANCY
SF/ PERSON - GA (NFPA 101 2024)
ABBREV. TYPE
B BUSINESS 150
OCCUPANCY LOAD (BY AREA)
ROOM NO. NAME OCCUPANCY OCCUPANCY TYPE AREA OCCUPANCY LOAD NUMBER
(GA) CALCULATED OCCUPANCY (GA)
249 ANIMATION
LAB. B BUSINESS 956 SF 150 7
A. PROJECT SCOPE SUMMARY:
1. THE PURPOSE OF THIS PROJECT IS TO CONVERT EXISTING CLASSROOM SPACE INTO AN ANIMATION LAB.
2. SCOPE OF WORK INCLUDES ARCHITECTURAL FINISHES, CHANGES TO MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION TO ACCOMMODATE NEW DESIGN.
3. MEANS OF EGRESS ARE NOT AFFECTED BY THIS PROJECT.
B. GROSS RENOVATION AREA:
1. AREA AFFECTED
C. OCCUPANCY (NFPA 101-2024)
1. CLASSIFICATION (6.1.5)
2. OCCUPANT LOAD (AFFECTED AREA)
(TABLE 7.3.1.2)
D. BUILDING CONSTRUCTION (IBC 2024)
1. NUMBER OF FLOORS
2. TYPE OF CONSTRUCTION
E. MEANS OF EGRESS (NFPA 101-2024)
1. CLEAR CORRIDOR WIDTH (38.2.3.4) = 44"
2. DOORS IN THE MEANS OF EGRESS (38.2.2.2)
3. DEAD END CORRIDOR LIMIT (38.2.5.2.1) = 50'
4. TRAVEL DISTANCE TO EXITS (38.2.6.3)
(300'-0" MAX, FULLY SPRINKLERED)
F. SPRINKLERS (NFPA 101-2024)
G. DETECTION, ALARM, AND COMMUNICATIONS
SYSTEMS (NFPA 101-2024)
H. PORTABLE FIRE EXTINGUISHERS (NFPA 101-2024)
J. HAZARD OF CONTENTS (NFPA 101-2024)
K. INTERIOR FINISH (NFPA 101- 2024) (TBL A10.2.2)
1. EXITS - CLASS A OR B
2. ACCESS TO EXITS - CLASS A OR B
3. OTHER SPACES - CLASS A OR B
4. FLOOR FINISH - CLASS I OR II
B.1. 956 S.F.
C.1. EXISTING BUSINESS
C.2. BY USE = 21 OCCUPANTS
BY AREA = 7 OCCUPANTS
D.1. THREE (EXISTING)
D.2. TYPE IB, FULLY SPRINKLERED
E.1. COMPLIANT (EXISTING)
E.2. COMPLIANT
E.3. NONE CREATED
E.4. 136'-9" FROM MOST REMOTE POINT IN
A ROOM TO AN EXIT
F1. FULLY SPRINKLERED FACILITY
G.1. EXISTING
H.1. PROVIDED
J.1. EXISTING BUSINESS /
ORDINARY HAZARD (6.2.2.3)
K.1. NOT AFFECTED
K.2. PROVIDED
K.3. PROVIDED
K.4. PROVIDED
CODE ANALYSIS
APPLICABLE CODE W/ GEORGIA AMENDMENTS
SPECIAL NOTES:
1. FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE BARRIERS AND SMOKE PARTITIONS, OR ANY OTHER WALLS REQUIRED TO HAVE PROTECTED OPENINGS OR PENETRATIONS, SHALL BE EFFECTIVELY AND PERMANENTLY IDENTIFIED WITH SIGNS OR STENCILING IN CONCEALED SPACES. LETTERING TO BE 3" IN HEIGHT (MIN.); 3/8" IN WIDTH/ STROKE (MIN.); IN CONTRASTING COLOR; WITHIN 15 FEET OF THE END OF EACH WALL; AND AT INTERVALS NOT EXCEEDING 30 FEET (HORIZONTAL). WORDING TO IDENTIFY THE APPROPRIATE RATING (I.E. "1-HR FIRE", "1-HR FIRE/SMOKE", ETC.) FOLLOWED BY "PROTECT ALL OPENINGS". THE
ABOVE IS AN OVERVIEW. SEE CURRENT IBC, SECTION 703.7 FOR FULL DESCRIPTION.
SCALE: 1/16"= 1'-0"
32'8'0 16'
120-3-3 STATE MINIMUM FIRE SAFETY STANDARDS (EFFECTIVE 02/19/2026)
120-3-20 2015 RULES AND REGULATION OF THE STATE OF GEORGIA - ACCESS TO AND USE OF PUBLIC FACILITIES BY
HANDICAPPED PERSONS
ADA 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
IBC 2024 INTERNATIONAL BUILDING CODE (W/ GA AMENDMENTS 2026)
IFC 2024 INTERNATIONAL FIRE CODE
IMC 2024 INTERNATIONAL MECHANICAL CODE (W/ GA AMENDMENTS 2026)
IFGC 2024 INTERNATIONAL FUEL GAS CODE (W/ GA AMENDMENTS 2026)
IEBC 2018 INTERNATIONAL EXISTING BUILDING CODE (W/ GA AMENDMENTS 2021)
IECC 2015 INTERNATIONAL ENERGY CONSERVATION CODE (W/ GA AMENDMENTS 2020, 2022, 2023)
NFPA 10 2022 STANDARD FOR PORTABLE FIRE EXTINGUISHERS (PER 120-3-3)
NFPA 13 2022 STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS (PER 120-3-3)
NFPA 25 2023 STANDARD FOR THE INSPECTION, TESTING AND MAINTENANCE OF WATER-BASED FIRE PROTECTION SYSTEMS
(PER 120-3-3)
NFPA 70 2023 NATIONAL ELECTRICAL CODE (NEC) (W/ GA AMENDMENTS 2026)
NFPA 72 2022 NATIONAL FIRE ALARM CODE(PER 120-3-3)
NFPA 90A 2024 STANDARD FOR THE INSTALLATION OF AIR CONDITIONING & VENTILATING SYSTEMS (PER 120-3-3)
NFPA 101 2024 LIFE SAFETY CODE (PER 120-3-3)
NFPA 241 2022 STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, & DEMOLITION OPERATIONS (PER 120-3-3)
O.C.G.A. 50-8-18 ENERGY EFFICIENCY AND SUSTAINABLE CONSTRUCTION ACT 2008
SCALE: 1/16" = 1'-0"
2 EGRESS PLAN AND CODE ANALYSIS - LEVEL 2
REVISIONS
# DATE DESCRIPTION
A COMPLETE SET OF APPROVED PLANS AND
SPECIFICATIONS SHALL BE MAINTAINED
EXISTING CONSTRUCTION
KEY:
TO BE DEMOLISHED
FIRE RETARDANT BARRIER
PLAN NORTH
AREA OF WORK:
956 SF
CONTRACTOR SHALL EITHER:
A. EXHAUST AIR DIRECTLY TO OUTDOORS TO MAINTAIN A NEGATIVE 0.01 INCH W.C. PRESSURE DIFFERENTIAL
B. PROVIDE A COMBINATION OF EXHAUST AND HEPA FILTER AIR SCRUBBERS
7,648 CUBIC FEET (W/ CEILING)
9'-0" AVG HEIGHT (W/O CEILING)
956 SQUARE FOOTAGE
8'-0" AVG HEIGHT (W/ CEILING)
8,664 CUBIC FEET (W/O CEILING)
ICRA AIR CALCULATION
AIR EXCHANGE REQUIREMENTS
12 REQUIRED AIR CHANGES
0.01 PRESSURE DIFFERENTIAL IN W.C.
1,721 CFM REQUIRED (W/O CEILING)
1,530 CFM REQUIRED (W/ CEILING)
HEPA AIR SCRUBBER REQUIREMENTS
2500 AIR SCRUBBER CFM
1 REQUIRED AIR SCRUBBERS (W/O CEILING)
1 REQUIRED AIR SCRUBBER (W/ CEILING)
2.9500 2.9610
2.2300 2.2600
ANIMATION
LAB.
2.9100
O
T R
I
EG
S
STA
TE
H
DE AR RE C
CT
ETI
A O
ROBERT L. MAULDIN
GF E
I
RG
oI NC EAT .I
RE
T C
F
KM
ARCHITECTS, INC.
DATE
DRAWING NO.
PR
IN
TE
D
KEY PLAN:
529 GREENE ST. AUGUSTA, GA. 30901
(706) 736 3333 - FAX (706) 736 7100
This document is property of 2KM Architects, Inc. The unauthorized reproduction, copying, or otherwise use of this document is strictly prohibited and any infringement thereupon may be subject to legal action
Copyright © 2026, 2KM Architects, Inc.
DRAWN BY
PROJECT NO.
PAPER
ISSUE
24"x36"
FOR
DRAWING TITLE
04/10/2026
4/
/2
9:
:0
A M
Z
A ct iv e_
Pr oj ec ts
\2
Pr oj ec ts \2
5-
A U
-S C \2
5-
.0
A U
-S C U
H A ni m at io n La b\ D
R A W
IN
G
S \0
0% C
D s\
-1
1.
0% .r vt
AU-SC UH
ANIMATION LAB.
AUGUSTA
UNIVERSITY
04/10/2026
A0.1TR/DA
25-11.03
2500 WALTON WAY, AUGUSTA, GA 30904
DEMOLITION AND
CONSTRUCTION
SAFEGUARDING
PLAN
100% CD
1. CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL MATERIALS WHICH ARE NOT SPECIFICALLY NOTED
TO BE EITHER RE-USED OR TURNED OVER TO THE OWNER.
2. SEE MECHANICAL, FIRE PROTECTION AND ELECTRICAL DRAWINGS FOR ADDITIONAL NOTES.
3. ALL SLAB PENETRATIONS TO EITHER BE FILLED SOLID WITH CONCRETE, OR IF RE-USED, SEALED WITH A
FIRE SEALANT SYSTEM PER SPECIFICATIONS.
4. SEE A1.1 FOR FUTURE LOCATIONS OF DOORS, FRAMES, PARTITIONS, OPENINGS, ETC. VERIFY ALL FUTURE
WORK PRIOR TO DEMOLITION ACTIVITIES.
5. CONTRACTOR TO FOLLOW ALL OSHA SAFETY STANDARDS FOR REMOVAL AND DISPOSAL OF MATERIALS.
6. DO NOT SCALE DRAWINGS TO LOCATE WALLS, DOORS, CEILING GRID, EQUIPMENT, ETC.
GENERAL NOTES
DEMOLITION NOTES
DIVISION 9 - FINISHES DEMO
2.9100 REMOVE SHEET ROCK AND INSULATION WITHIN ROOM AND DISPOSE.
2.9500 REMOVE EXISTING 2' X 2' ACOUSTICAL CEILING TILE AND GRID AND
DISPOSE.
2.9610 REMOVE EXISTING FLOORING AND BASE AND DISPOSE. PREP FOR NEW
FLOORING.
DIVISION 23 - HVAC DEMO
2.2300 SEE MECHANICAL DRAWINGS FOR DEMOLITION WORK.
DIVISION 26 - ELECTRICAL DEMO
2.2600 SEE ELECTRICAL DRAWINGS FOR DEMOLITION WORK.
XX.XXXX
1. FIRE-RETARDANT DUST BARRIER TO BE TRI-SYNERGY FLEXIBLE FILM DURA SKRIM 2 FR SURFACE COVER (1-800-446-6076) OR APPROVED EQUAL, WHERE APPROPRIATE. CONFIRM WITH OWNER FOR LOCATIONS OF
GPDW BARRIERS FOR PROJECT.
2. FIRE RETARDANT DUST BARRIER TO BE MOUNTED ON ZIP WALL EXPANDABLE POLES (1-800-446-6076) OR
APPROVED EQUAL OF LGMF.
3. FIRE RETARDANT DUST BARRIER TO BE SEALED/ TAPED CONTINUOUSLY FROM FLOOR TO CEILING. IF CEILING TILE IS REMOVED, SEAL/TAPE TO DECK. TAPE TO BE POLIKEN #225 (1-800-446-6076) OR APPROVED EQUAL.
4. CONTRACTOR TO USE TRI-SYNERGY STICKY MATS (1-800-446-6076) OR APPROVED EQUAL FOR DUST CONTROL AT A MINIMUM. CONTRACTOR SHALL CREATE AN ANTE-ROOM BETWEEN THE CONSTRUCTION AREA AND THE ADJACENT OPERATIONAL AREA. STICKY MATS, OR APPROVED EQUAL, SHALL BE LOCATED AND CLEANED DAILY;
CARPET MAY BE SUBSTITUTED ON THE CONSTRUCTION AREA SIDE. THERE WILL BE NO EXCEPTIONS WITHIN THE
ANTE-ROOM.
5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN CONSTRUCTION SAFEGUARDS AT ALL TIMES. THE OWNER MAY STOP THE WORK AT ANY TIME IF SAFEGUARDS ARE NOT MAINTAINED. THIS WILL BE AT NO COST TO
THE OWNER.
6. ALL CONSTRUCTION MUST FOLLOW THE OWNER'S ESTABLISHED INTERIM LIFE SAFETY POLICIES.
7. THE AREA OF WORK MUST MAINTAIN NEGATIVE STATIC PRESSURE AND MUST BE MAINTAINED DURING ALL
DEMOLITION/CONSTRUCTION ACTIVITIES.
8. ALL DUCT WORK AND PIPING ENTERING THE BUILDING MUST BE CLEANED INSIDE AND OUT PRIOR TO ENTERING THE BUILDING. ANY DUCT OR PIPING STORED IN AN EXPOSED LOCATION MUST HAVE ENDS CAPPED.
9. CAP ALL DUCTS THAT ARE OPENED IN DEMO WITH PLASTIC AND DUCT TAPE TO PREVENT TRANSFER TO OTHER
AREAS.
10. UNPROTECTED OPENINGS TO THE OUTSIDE ARE STRICTLY FORBIDDEN.
11. CONTRACTOR TO PROPOSE BARRIER LOCATIONS FOR OWNER APPROVAL. SOME BARRIERS HAVE BEEN
SUGGESTED FOR CLARITY.
CONSTRUCTION SAFEGUARDING GENERAL NOTES:
SCALE: 1/4" = 1'-0"
01 DEMOLITION AND CONSTRUCTION SAFEGUARDING PLAN
SCALE: 1/4"= 1'-0"
8'0 4'1'
PLAN NORTH
SPECIAL NOTES:
A. CONTRACTOR TO CONFIRM DURATION OF TEMPORARY BARRIERS.
B. ADJACENT DEPARTMENTS WILL REMAIN OPERATIONAL DURING DEMOLITION/CONSTRUCTION ACTIVITIES.
CONTRACTOR SHALL CLEAN ALL DEBRIS AND DUST FROM CORRIDORS AT THE END OF WORKING HOURS.
REVISIONS
# DATE DESCRIPTION
A COMPLETE SET OF APPROVED PLANS AND
SPECIFICATIONS SHALL BE MAINTAINED
1. SEE MECHANICAL, FIRE PROTECTION, AND ELECTRICAL DRAWINGS FOR ADDITIONAL NOTES.
2. DOORS TO BE +/- 6" FROM ADJACENT WALL UNLESS NOTED OTHERWISE.
3. DO NOT SCALE DRAWINGS TO LOCATE WALLS, DOORS, CEILING GRID, EQUIPMENT, ETC.
EXISTING CONSTRUCTION
KEY:
NEW CONSTRUCTION
SCALE: 1/8"= 1'-0"
16'4'0 8'
PT-1A1 - 3 5/8" PARTITION.
- GPDW ONE SIDE ONLY.
- SOUND ATTENUATED GPDW.
- EXTEND NEW CONSTRUCTION TO
DECK OR COMPLETELY FILL.
EXISTING OPENING.
- EXTEND ACOUSTICAL INSULATION TO
4" ABOVE HIGHEST CEILING.
- SEAL BOTTOM WITH NON-HARDENING,
PERMANENT, RESILIENT ACOUSTICAL
SEALANT.
SEE
PLAN
SEE
PLAN
PT-2
NEW GPDW
NEW
INSULATION
EXISTING
LGMF
EXISTING
GPDW
NEW 31/2"
INSULATION
5/8" GPDW
3 5/8" LGMF, 20 GA.
- EXISTING WALL.
- GPDW ONE SIDE ONLY.
- SOUND ATTENUATED GPDW.
- EXTEND NEW CONSTRUCTION TO
DECK OR COMPLETELY FILL
EXISTING OPENING.
- EXTEND ACOUSTICAL INSULATION TO
4" ABOVE HIGHEST CEILING.
- SEAL BOTTOM WITH NON-HARDENING,
PERMANENT, RESILIENT ACOUSTICAL
SEALANT.
PLAN NORTH
AREA OF WORK:
956 SF
8.720
9.510
9.512 9.910
23.000
ANIMATION
LAB.
A1.1
A1.1
A1.1
A1.1
26.0009.514
PT-1A1PT-2
PT-2 PT-2
PT-2
PT-2
249 249A
28.150
PT-2
SN1
SN2
28.150
8.720
F.V.
26'-6"
F.V.
23'-3"
249 249A
F.V.
16'-3"
F.V.
15'-5"
26'-6" (F.V.)
DISPLAY DISPLAYGLASS
BOARD
CLEQ. EQ.
4" 4"
O
T R
I
EG
S
STA
TE
H
DE AR RE C
CT
ETI
A O
ROBERT L. MAULDIN
GF E
I
RG
oI NC EAT .I
RE
T C
F
KM
ARCHITECTS, INC.
DATE
DRAWING NO.
PR
IN
TE
D
KEY PLAN:
529 GREENE ST. AUGUSTA, GA. 30901
(706) 736 3333 - FAX (706) 736 7100
This document is property of 2KM Architects, Inc. The unauthorized reproduction, copying, or otherwise use of this document is strictly prohibited and any infringement thereupon may be subject to legal action
Copyright © 2026, 2KM Architects, Inc.
DRAWN BY
PROJECT NO.
PAPER
ISSUE
24"x36"
FOR
DRAWING TITLE
04/10/2026
4/
/2
9:
:0
A M
Z
A ct iv e_
Pr oj ec ts
\2
Pr oj ec ts \2
5-
A U
-S C \2
5-
.0
A U
-S C U
H A ni m at io n La b\ D
R A W
IN
G
S \0
0% C
D s\
-1
1.
0% .r vt
AU-SC UH
ANIMATION LAB.
AUGUSTA
UNIVERSITY
04/10/2026
A1.1TR/DA
25-11.03
2500 WALTON WAY, AUGUSTA, GA 30904
FLOOR PLAN AND
ELEVATIONS
100% CD
FINISH NOTES
SPECIAL NOTES (SN#)
GENERAL NOTES
PLAN NORTH
FINISH SCHEDULE
R
EV
IS
IO
N
ROOM NO. SPACE
FL
O
O R
B A
S E
W A
LL
S
C
EI
LI
N
G
CLG.
HT. NOTES
249 ANIMATION LAB. 1 A 1 A * * MATCH EXISTING
FLOORING WALLS
1 1 PAINT GPDW (EGGSHELL)
BASE CEILINGS
A 4" RUBBER 2'X2' ATC "A"- HIGH NRC
MATERIAL SCHEDULE
A
FNA. PROVIDE ADA COMPLIANT TRANSITION STRIP AT INTERSECTION OF DISSIMILAR FLOORING.
FNB. ALL CEILING HEIGHTS TO MATCH EXISTING UNLESS NOTED OTHERWISE.
FNC. PAINT WALL AFFECTED BY MINOR PATCHING TO MATCH EXISTING WHERE NOTED. PAINT TO NEAREST INSIDE
OR OUTSIDE CORNER.
SN1 PATCH, REPAIR, AND LEVEL CONCRETE SUBFLOOR.
SN2 ALL FINISHES TO BE SELECTED BY OWNER (PDC)
PARTITION NOTES
1. ALL DIMENSIONS SHOWN FROM FACE OF FRAMING.
2. AT PARTITIONS WHICH DO NO EXTEND TO STRUCTURE, PROVIDE METAL STUD KICKERS, STAGGERED IN
ALTERNATING DIRECTIONS, AT 48" O.C. KICKERS ALSO REQUIRED AT EACH DOOR JAMB.
3. SEAL SOUND ATTENUATED PARTITIONS AT INTERSECTIONS WITH OTHER NEW MATERIALS (FLOORS, DECKS, PARTITIONS, PIPES, CONDUITS, ETC. THIS IS TO INCLUDE AT TOP AND SIDES. SEE SPECIFICATIONS FOR
SEALANTS INCLUDING THOSE FOR BOTH FIRE-RATED AND ACOUSTICAL ASSEMBLIES.
4. PROVIDE SLIP TRACKS AT HEAD OF PARTITIONS WHICH EXTEND TO UNDERSIDE OF ROOF DECK.
5. GPDW PARTITIONS TO RECEIVE LEVEL 4 FINISH WITH USG FIRST COAT PRIMER.
CONSTRUCTION NOTES
DIVISION 8 - OPENINGS
8.720 CLEAN EXISTING DOOR AND FRAME SURFACES. PRIME AND PAINT FRAME.
DIVISION 9 - FINISHES
9.510 INSTALL NEW FLOORING AND WALL BASE AS SCHEDULED.
9.512 INSTALL NEW 2' X2' ATC AND GRID AS SCHEDULED.
9.514 INSTALL SOUND-ATTENUATING GPDW AND INSULATION. PENETRATIONS AND ELECTRICAL DEVICES
TO BE SEALED. INSTALL SOUND SEALANT AT JOINTS.
9.910 PREP, PRIME, AND PAINT ALL GPDW WALLS.
DIVISION 23 - HVAC
23.000 SEE MECHANICAL DRAWINGS FOR ADDITIONAL WORK.
DIVISION 26 - ELECTRICAL
26.000 SEE ELECTRICAL DRAWINGS FOR ADDITIONAL WORK.
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28.150 INSTALL NEW CARD READER TO EXISTING DOOR.
XX.XXX
PARTITION TYPES
SCALE: 1/4" = 1'-0"
1 FLOOR PLAN
CARPET TILES
DOOR SCHEDULE
R
EV
IS
IO
N
DOOR NO.
DOOR GLASS FRAME FRAME DETAILS
LABEL SET REMARKS
WIDTH HEIGHT THICK TYPE FINISH SIZE G. TYPE F. TYPE MATERIAL HEAD JAMB SILL
249 3'-0" 7'-0" 1 3/4" EXIST - - - - - - - - - 1 CLOSER, ACCESS CONTROLS
249A 3'-0" 7'-0" 1 3/4" EXIST - - - - - - - - - 1 CLOSER, ACCESS CONTROLS
SCALE: 1/4" = 1'-0"A1.1
2 ELEVATION LOOKING EAST
SCALE: 1/4" = 1'-0"A1.1
3 ELEVATION LOOKING NORTH
SCALE: 1/4" = 1'-0"A1.1
4 ELEVATION LOOKING SOUTH
SCALE: 1/4" = 1'-0"A1.1
5 ELEVATION LOOKING WEST
ACOUSTICAL PANEL NOTES:
1. ACOUSTICAL PANELS TO BE MOUNTED ON "Z" CLIPS PER SPECIFICATIONS.
2. ACOUSTICAL PANELS TO BE FIELD CUT BY MANUFACTURE'S APPROVED INSTALLER, CUT EDGES TO BE FABRIC
WRAPED. OPENINGS TO BE CUT FOR RECEPTACLES, WALL MOUNTS , ETC. ELECTRICAL INSTALLATION TO BE
COORDINATED WITH PANEL INSTALLATION AND EQUIPMENT REQUIREMENTS.
3. FINISHES TO BE SELECTED BY OWNER (PDC).
SEE ACOUSTICAL PANEL NOTESSEE ACOUSTICAL PANEL NOTES
SEE ACOUSTICAL PANEL NOTES SEE ACOUSTICAL PANEL NOTES
REVISIONS
# DATE DESCRIPTION
A COMPLETE SET OF APPROVED PLANS AND
SPECIFICATIONS SHALL BE MAINTAINED
RCP LEGEND:
NEW 2X2 ACOUSTICAL CEILING TILE
AND SUSPENDED GRID
GPDW CEILING/BULKHEAD
2 X 4 LIGHT FIXTURE; SEE ELECTRICAL
NEW CEILING OUTLINE
HVAC SUPPLY; SEE MECHANICAL
HVAC RETURN; SEE MECHANICAL
EXIT LIGHT; SEE ELECTRICAL
SPRINKLER HEAD; SEE FIRE PROTECTION DRAWINGS
EXISTING CEILING OUTLINE
EXISTING WALL OUTLINE
PLAN NORTH
AREA OF WORK:
956 SF
EXISTING BULKHEAD
ANIMATION
LAB.
10'-1"
SN2
10'-1"
SN2
SN1
SN1
O
T R
I
EG
S
STA
TE
H
DE AR RE C
CT
ETI
A O
ROBERT L. MAULDIN
GF E
I
RG
oI NC EAT .I
RE
T C
F
KM
ARCHITECTS, INC.
DATE
DRAWING NO.
PR
IN
TE
D
KEY PLAN:
529 GREENE ST. AUGUSTA, GA. 30901
(706) 736 3333 - FAX (706) 736 7100
This document is property of 2KM Architects, Inc. The unauthorized reproduction, copying, or otherwise use of this document is strictly prohibited and any infringement thereupon may be subject to legal action
Copyright © 2026, 2KM Architects, Inc.
DRAWN BY
PROJECT NO.
PAPER
ISSUE
24"x36"
FOR
DRAWING TITLE
04/10/2026
4/
/2
9:
:0
A M
Z
A ct iv e_
Pr oj ec ts
\2
Pr oj ec ts \2
5-
A U
-S C \2
5-
.0
A U
-S C U
H A ni m at io n La b\ D
R A W
IN
G
S \0
0% C
D s\
-1
1.
0% .r vt
AU-SC UH
ANIMATION LAB.
AUGUSTA
UNIVERSITY
04/10/2026
A1.2TR/DA
25-11.03
2500 WALTON WAY, AUGUSTA, GA 30904
REFLECTED CEILING
PLAN
100% CD
PLAN NORTH
SN1 USE 2'X4' A.T.C. AND CUT TO FIT WHERE NEEDED.
SN2 MATCH EXISTING CEILING HEIGHT.
SPECIAL NOTES (SN #'S)
SCALE: 1/4" = 1'-0"
1 REFLECTED CEILING PLAN
SCALE: 1/4"= 1'-0"
8'0 4'1'
REVISIONS
# DATE DESCRIPTION
A COMPLETE SET OF APPROVED PLANS AND
SPECIFICATIONS SHALL BE MAINTAINED
PLAN NORTH
AREA OF WORK:
956 SF
M1
D1
M1
C1 C1C1 C1C1 C1
C1
C1
C1C1
C1
C1C1C1C1C1C1C1C1
P1
ANIMATION
LAB.
W1
W1
C1
/2
TA1
TA1
CH1CH1
DK1
DK1
CH1CH1CH1
CH1 CH1 CH1 CH1 CH1 CH1
CH1
CH1
CH1
CH1
CH1
CH1
CH1CH1CH1
CH1
CH1
CH1CH1CH1CH1
CH1CH1CH1CH1
DK1
DK1DK1
DK1 DK1 DK1
DK1
CH1 CH1 CH1 CH1 CH1
DK1
ANIMATION
LAB.
O
T R
I
EG
S
STA
TE
H
DE AR RE C
CT
ETI
A O
ROBERT L. MAULDIN
GF E
I
RG
oI NC EAT .I
RE
T C
F
KM
ARCHITECTS, INC.
DATE
DRAWING NO.
PR
IN
TE
D
KEY PLAN:
529 GREENE ST. AUGUSTA, GA. 30901
(706) 736 3333 - FAX (706) 736 7100
This document is property of 2KM Architects, Inc. The unauthorized reproduction, copying, or otherwise use of this document is strictly prohibited and any infringement thereupon may be subject to legal action
Copyright © 2026, 2KM Architects, Inc.
DRAWN BY
PROJECT NO.
PAPER
ISSUE
24"x36"
FOR
DRAWING TITLE
04/10/2026
4/
/2
9:
:0
A M
Z
A ct iv e_
Pr oj ec ts
\2
Pr oj ec ts \2
5-
A U
-S C \2
5-
.0
A U
-S C U
H A ni m at io n La b\ D
R A W
IN
G
S \0
0% C
D s\
-1
1.
0% .r vt
AU-SC UH
ANIMATION LAB.
AUGUSTA
UNIVERSITY
04/10/2026
A1.3TR/DA
25-11.03
2500 WALTON WAY, AUGUSTA, GA 30904
EQUIPMENT AND
FURNITURE PLAN
100% CD
PLAN NORTH
EQUIPMENT SCHEDULE
R
EV
IS
IO
N
ITEM
NO. ITEM DESCRIPTION MANUFACTURER MODEL NO.
DIMENSIONS
DATA POWER E.
POWER NOTES
W
ID
TH
D
EP
TH
H
EI
G H
T
C1 DESKTOP COMPUTER X X C
D1 GLASS BOARD
M1 MONITOR SHARP PN-M652 4'-9 1/2" 2'-6" 1'-8" X X
P1 PODIUM SPECTRUM INDUSTRIES INC.
HONORS LECTERN
3'-2" 2'-6" 2'-10" X X
W1 WALL MOUNT CHIEF LEGRAND 3'-6" 1 3/4" 1'-8"
A. ALL EQUIPMENT SUPPLIED AND INSTALLED BY OWNER UNLESS NOTED.
B. CONTRACTOR TO PROVIDE ALL BLOCKING/SUPPORT FOR WALL AND/OR CEILING MOUNTED ITEMS LISTED.
CONTRACTOR TO REVIEW ALL SUPPORTS WITH OWNER AND ARCHITECT (IN FIELD) PRIOR TO INSTALLATION OF
GPDW.
C. CPU INCLUDES TOWER, MONITORS, MOUSE, KEYBOARD, TABLET, ETC.
NOTES:
SCALE: 1/4" = 1'-0"
1 EQUIPMENT PLAN
SCALE: 1/4" = 1'-0"
2 FURNITURE PLAN
SCALE: 1/4"= 1'-0"
8'0 4'1'
SCALE: 1/4"= 1'-0"
8'0 4'1'
PLAN NORTH
FURNITURE SCHEDULE
R
EV
IS
IO
N
ITEM
NO. ITEM DESCRIPTION MANUFACTURER
MODEL #
DIMENSIONS
DATA POWER NOTES
W
ID
TH
D
EP
TH
H
EI
G H
T
CH1 CHAIR, TASK
DK1 DESK, ANIMATION
TA1 TABLE, CONFERENCE
A. ALL FURNITURE SUPPLIED AND INSTALLED BY OWNER UNLESS NOTED.
REVISIONS
# DATE DESCRIPTION
A COMPLETE SET OF APPROVED PLANS AND
SPECIFICATIONS SHALL BE MAINTAINED
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT APPLY TO THIS SECTION.
1.2 SUMMARY
A. PROVIDE COMPLETE, OPERATIONAL FIRE SPRINKLER SYSTEM. INCLUDE FIRE-SUPPRESSION PIPING AND
EQUIPMENT FOR THE FOLLOWING SYSTEM TYPES:
1. WET-PIPE, FIRE-SUPPRESSION SPRINKLERS, INCLUDING PIPING, VALVES, SPECIALTIES, AND
AUTOMATIC SPRINKLERS.
1.3 SYSTEM PERFORMANCE REQUIREMENTS
A. DESIGN SPRINKLERS AND OBTAIN APPROVAL FROM AUTHORITIES HAVING JURISDICTION.
B. DESIGN SPRINKLER PIPING FOR LIGHT HAZARD.
C. COMPONENTS AND INSTALLATION: CAPABLE OF PRODUCING PIPING SYSTEMS WITH 175-PSIG
MINIMUM WORKING-PRESSURE RATING, UNLESS OTHERWISE INDICATED.
1.4 SUBMITTALS
A. PRODUCT DATA: FOR THE FOLLOWING:
1. PIPE AND FITTING MATERIALS AND METHODS OF JOINING FOR SPRINKLER PIPING.
2. PIPE HANGERS AND SUPPORTS.
3. SPRINKLERS, ESCUTCHEONS, AND GUARDS. INCLUDE SPRINKLER FLOW CHARACTERISTICS,
MOUNTING, FINISH, AND OTHER PERTINENT DATA.
B. SPRINKLER PIPING DRAWINGS: SUBMIT WORKING PLANS AND EQUIPMENT INFORMATION, PREPARED
ACCORDING TO NFPA 13, TO AUTHORITIES HAVING JURISDICTION FOR REVIEW. INCLUDE HYDRAULIC
CALCULATIONS, IF APPLICABLE.
C. REVIEW OF SUBMITTALS DOES NOT RELIEVE THE CONTRACTOR OF ANY OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. FAILURE BY THE ENGINEER TO DOCUMENT ERRORS AND OMISSIONS IN THE CONTRACTOR'S SUBMITTALS DURING THE ENGINEER'S SUBMITTAL REVIEW DOES NOT CONSTITUTE A
WAIVER OF ANY OF THE REQUIREMENTS OF THE ORIGINAL CONTRACT DOCUMENTS.
D. FIELD TEST REPORTS AND CERTIFICATES: INDICATE AND INTERPRET TEST RESULTS FOR COMPLIANCE
WITH PERFORMANCE REQUIREMENTS AND AS DESCRIBED IN NFPA 13. INCLUDE CONTRACTOR'S
MATERIAL AND TEST CERTIFICATE FOR ABOVEGROUND PIPING.
E. MAINTENANCE DATA: FOR EACH TYPE OF SPRINKLER SPECIALTY TO INCLUDE IN MAINTENANCE
MANUAL.
1.5 QUALITY ASSURANCE
A. INSTALLER QUALIFICATIONS: AN EXPERIENCED INSTALLER WHO HAS DESIGNED AND INSTALLED
FIRE-SUPPRESSION PIPING SIMILAR TO THAT INDICATED FOR THIS PROJECT AND OBTAINED DESIGN
APPROVAL AND INSPECTION APPROVAL FROM AUTHORITIES HAVING JURISDICTION.
B. MANUFACTURER QUALIFICATIONS: FIRMS WHOSE EQUIPMENT, SPECIALTIES, AND ACCESSORIES ARE LISTED BY PRODUCT NAME AND MANUFACTURER IN UL'S "FIRE PROTECTION EQUIPMENT DIRECTORY" AND FM'S "FIRE PROTECTION APPROVAL GUIDE" AND THAT COMPLY WITH OTHER REQUIREMENTS
INDICATED.
C. SPRINKLER COMPONENTS: LISTING/APPROVAL STAMP, LABEL, OR OTHER MARKING BY A TESTING
AGENCY ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION.
D. NFPA STANDARDS: EQUIPMENT, SPECIALTIES, ACCESSORIES, INSTALLATION, AND TESTING COMPLYING
WITH NFPA 13.
1.6 LAYOUT AND COORDINATION
A. LAYOUT BASIS:
1. THE EQUIPMENT LISTED ON THE DRAWINGS AND IN THE SPECIFICATIONS HAS BEEN USED FOR THE
PHYSICAL ARRANGEMENT OF THE FIRE SPRINKLER SYSTEMS. WHEN EQUIPMENT LISTED AS
ACCEPTABLE, EQUAL OR EQUIPMENT WHICH HAS RECEIVED "PRIOR APPROVAL" IS USED, IT SHALL
BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE STRUCTURAL, ELECTRICAL, SERVICE
CLEARANCES, OR OTHER CHANGES REQUIRED TO ACCOMMODATE THE SUBSTITUTED EQUIPMENT.
CHANGES SHALL BE MADE AT NO ADDITIONAL COST TO THE OWNER. SUBMIT A LIST OF REQUIRED
CHANGES ALONG WITH ALL PRIOR APPROVAL REQUESTS AND SHOP DRAWING SUBMITTALS.
2. THE CONTRACT DRAWINGS ARE INTENDED TO SHOW THE GENERAL ARRANGEMENT OF ALL FIRE SPRINKLER WORK. THEY DO NOT SHOW IN DETAIL ALL OFFSETS, FITTINGS AND TRANSITIONS.
EXAMINE DRAWINGS, INVESTIGATE SITE CONDITIONS TO BE ENCOUNTERED AND ARRANGE WORK
ACCORDINGLY. FURNISH ALL OFFSETS AND TRANSITIONS REQUIRED.
3. CHECK SPACE LIMITATIONS AND VERIFY ELECTRICAL REQUIREMENTS BEFORE ORDERING ANY FIRE SPRINKLER EQUIPMENT OR MATERIALS. PLACE LARGE EQUIPMENT INSIDE THE BUILDING PRIOR TO
THE ERECTION OF EXTERIOR WALLS WHERE EQUIPMENT CANNOT ENTER FINISHED BUILDING
OPENINGS.
B. COORDINATION: FIRE SPRINKLER WORK SHALL BE COORDINATED WITH THAT OF OTHER TRADES TO AVOID CONFLICT. THE CONTRACTOR SHALL STUDY ALL PLANS AND SPECIFICATIONS FOR THIS PROJECT AND SHALL NOTIFY THE DESIGN PROFESSIONAL OF ANY CONFLICT BETWEEN WORK UNDER DIVISION 21 AND WORK UNDER OTHER DIVISIONS OF THE PROJECT. PARTICULAR ATTENTION SHALL BE GIVEN TO INTERFERENCE BETWEEN PIPING, ELECTRICAL INSTALLATIONS, STRUCTURAL SYSTEMS, BUILDING
OPENINGS AND DUCTWORK.
C. OPERATION AND MAINTENANCE INSTRUCTIONS:
1. PROVIDE AN ELECTRONIC (PDF FORMAT) DOCUMENT CONTAINING ALL OF THE OPERATION AND
MAINTENANCE MANUALS FOR FIRE SPRINKLER EQUIPMENT UTILIZED AND FIRE SPRINKLER TESTS PERFOMED ON THE PROJECT AS SPECIFIED IN THIS AND OTHER SECTIONS OF THE SPECIFICATIONS.
2. THE O&M DOCUMENT SHALL INCLUDE A COVER PAGE INDICATING THE PROJECT NAME, PROJECT
NUMBER, LEAD DESIGN PROFESSIONAL, MECHANICAL DESIGN PROFESSIONAL, AND PROJECT
OWNER.
3. THE DOCUMENT SHALL INCLUDE A TABLE OF CONTENTS WITH ELECTRONIC TABS THAT LINK TO
EACH OF THE EQUIPMENT SECTIONS IN THE DOCUMENT.
4. PROJECT-SPECIFIC MODEL AND SERIAL NUMBER INFORMATION SHALL BE SHOWN ON THE LEAD
PAGE OF EACH EQUIPMENT SECTION IN THE MANUAL.
5. THE MANUAL SHALL INCLUDE DOCUMENTATION CONFIRMING REGISTRATION OF EXTENDED
WARRANTIES WITH THE EQUIPMENT MANUFACTURER. THIS DOCUMENTATION SHALL INCLUDE
EQUIPMENT SERIAL NUMBERS AND DATES OF WARRANTY START.
6. THE DOCUMENT SHALL BE SUBMITTED TO THE OWNER AND THE DESIGN TEAM AT LEAST 15 DAYS
PRIOR TO THE SCHEDULED SYSTEMS/EQUIPMENT MAINTENANCE TRAINING.
1.7 PERMITS
A. OBTAIN ALL NECESSARY PERMITS AND INSPECTIONS REQUIRED FOR THE INSTALLATION OF THIS WORK
AND PAY ALL CHARGES INCIDENT THERETO. DELIVER TO THE DESIGN PROFESSIONAL ALL CERTIFICATES
OF INSPECTION ISSUED BY AUTHORITIES HAVING JURISDICTION.
B. FIRE MARSHAL SUBMITTAL FEES AND ALL OTHER CHARGES FOR WORK UNDER THIS DIVISION SHALL BE
PAID BY THE CONTRACTOR.
1.8 SEQUENCING AND SCHEDULING
A. COORDINATE MECHANICAL EQUIPMENT INSTALLATION WITH OTHER BUILDING COMPONENTS.
B. ARRANGE FOR CHASES, SLOTS, AND OPENINGS IN BUILDING STRUCTURE DURING PROGRESS OF
CONSTRUCTION TO ALLOW FOR MECHANICAL INSTALLATIONS.
C. COORDINATE THE INSTALLATION OF REQUIRED SUPPORTING DEVICES AND SET SLEEVES IN
POURED-IN-PLACE CONCRETE AND OTHER STRUCTURAL COMPONENTS AS THEY ARE CONSTRUCTED.
D. SEQUENCE, COORDINATE, AND INTEGRATE INSTALLATIONS OF MECHANICAL MATERIALS AND
EQUIPMENT FOR EFFICIENT FLOW OF THE WORK. COORDINATE INSTALLATION OF LARGE EQUIPMENT
REQUIRING POSITIONING PRIOR TO CLOSING IN THE BUILDING.
E. COORDINATE CONNECTION OF ELECTRICAL SERVICES.
F. COORDINATE CONNECTION OF MECHANICAL SYSTEMS WITH EXTERIOR UNDERGROUND AND
OVERHEAD UTILITIES AND SERVICES. COMPLY WITH REQUIREMENTS OF GOVERNING REGULATIONS, FRANCHISED SERVICE COMPANIES, AND CONTROLLING AGENCIES.
1.9 INTERRUPTION OF EXISTING SERVICES
A. EXERCISE CARE SO AS NOT TO CUT ANY EXISTING UTILITIES OR SERVICES. WHERE AN EXISTING UTILITY
LINE OR SERVICE LINE IS CUT IT SHALL BE REPAIRED TO "LIKE-NEW" CONDITION. INTERRUPTION OF
SERVICE SHALL NOT BE MADE WITHOUT PRIOR WRITTEN PERMISSION OF THE OWNER.
B. FIRE SUPPRESSION SYSTEM MUST REMAIN IN SERVICE DURING CONSTRUCTION. ARRANGE WITH THE
OWNER WELL IN ADVANCE OF SHUTDOWNS REQUIRED FOR TIE-INS. SHUTDOWNS SHALL BE MADE
AFTER NORMAL OCCUPANCY HOURS IF SO DIRECTED BY THE OWNER. NO ADDITIONAL MONIES WILL BE
PAID FOR AFTER-HOURS SHUTDOWNS.
1.10 EXTRA MATERIALS
A. FURNISH SPRINKLER CABINETS: FINISHED, WALL-MOUNTING STEEL CABINET AND HINGED COVER, WITH
SPACE FOR A MINIMUM OF SIX SPARE SPRINKLERS PLUS SPRINKLER WRENCH. INCLUDE THE NUMBER OF SPRINKLERS REQUIRED BY NFPA 13 AND WRENCH FOR SPRINKLERS. INCLUDE SEPARATE CABINET
WITH SPRINKLERS AND WRENCH FOR EACH TYPE OF SPRINKLER ON PROJECT.
1.11 CODES AND STANDARDS
A. MECHANICAL INSTALLATIONS SHALL CONFORM TO THE CURRENT EDITION (RECOGNIZED BY THE STATE)
OF THE FOLLOWING, IN ADDITION TO ANY PREVIOUSLY MENTIONED CODES AND STANDARDS.
7. THE INTERNATIONAL BUILDING CODE.
8. THE INTERNATIONAL FIRE PROTECTION CODE.
9. NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS.
10. NFPA 25 STANDARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF WATER-BASED FIRE
PROTECTION SYSTEMS.
PART 2 - PRODUCTS
2.1 PIPES AND TUBES
A. STANDARD-WEIGHT STEEL PIPE: ASTM A 53, ASTM A 135, OR ASTM A 795; SCHEDULE 40 IN NPS 2 AND
SMALLER.
B. SCHEDULE 10 STEEL PIPE: ASTM A 135 OR ASTM A 795, SCHEDULE 10 IN NPS 2-1/2 AND LARGER.
2.2 PIPE AND TUBE FITTINGS
A. CAST-IRON FITTINGS AND FLANGES: ASME B16.1.
B. MALLEABLE-IRON THREADED FITTINGS: ASME B16.3.
C. STEEL, THREADED COUPLINGS: ASTM A 865.
D. STEEL WELDING FITTINGS: ASTM A 234/A 234M, ASME B16.9, OR ASME B16.11.
E. STEEL FLANGES AND FLANGED FITTINGS: ASME B16.5.
F. STEEL, GROOVED-END FITTINGS: UL-LISTED AND FM-APPROVED, ASTM A 47 (ASTM A 47M), MALLEABLE
IRON OR ASTM A 536, DUCTILE IRON; WITH DIMENSIONS MATCHING STEEL PIPE AND ENDS FACTORY
GROOVED ACCORDING TO AWWA C606.
2.3 JOINING MATERIALS
A. STEEL, KEYED COUPLINGS: UL 213 AND AWWA C606, FOR STEEL-PIPE DIMENSIONS. INCLUDE ASTM A
536, DUCTILE-IRON HOUSING, RUBBER GASKETS, AND STEEL BOLTS AND NUTS.
2.4 SPRINKLERS
A. AUTOMATIC SPRINKLERS: WITH INTERMEDIATE TEMPERATURE CLASSIFICATION RATED ELEMENT
COMPLYING WITH UL199.
B. SPRINKLER TYPES, FEATURES, AND OPTIONS INCLUDE THE FOLLOWING:
1. CONCEALED CEILING SPRINKLERS, INCLUDING COVER PLATE.
PART 3 - EXECUTION
3.1 DEMOLITION
A. WHERE PIPE OR EQUIPMENT TO REMAIN IS DAMAGED OR DISTURBED, REMOVE DAMAGED PORTIONS
AND INSTALL NEW PRODUCTS OF EQUAL CAPACITY AND QUALITY.
B. ABANDONED WORK: CUT AND REMOVE PIPE ABANDONED IN PLACE, 2 INCHES BEYOND THE FACE OF
ADJACENT CONSTRUCTION. CAP PIPING AND PATCH SURFACE TO MATCH EXISTING FINISH.
C. REMOVAL: REMOVE INDICATED EQUIPMENT AND PIPING FROM THE PROJECT SITE UNLESS NOTED
OTHERWISE.
D. TEMPORARY DISCONNECTION: REMOVE, STORE, CLEAN, REINSTALL, RECONNECT, AND MAKE
OPERATIONAL EQUIPMENT INDICATED FOR RELOCATION.
E. REMOVE ALL HANGERS, SUPPORTS AND ANCHORS ASSOCIATED WITH FIRE SPRINKLER ITEMS. PATCH
SURFACES TO MATCH ADJACENT FINISHES.
3.3 ERECTION OF METAL SUPPORTS AND ANCHORAGE
A. CUT, FIT, AND PLACE MISCELLANEOUS METAL SUPPORTS ACCURATELY IN LOCATION, ALIGNMENT, AND
ELEVATION TO SUPPORT AND ANCHOR MECHANICAL MATERIALS AND EQUIPMENT.
3.4 PIPING APPLICATIONS
A. WET-PIPE SPRINKLERS: USE THE FOLLOWING:
1. NPS 1-1/4 AND LARGER: SCHEDULE 10 STEEL PIPE WITH PLAIN ENDS, STEEL WELDING FITTINGS, AND WELDED JOINTS.
2. NPS 2 AND SMALLER: STANDARD-WEIGHT STEEL PIPE WITH THREADED ENDS, CAST- OR
MALLEABLE-IRON THREADED FITTINGS, AND THREADED JOINTS.
3. NPS 1-1/4 AND LARGER: SCHEDULE 10 STEEL PIPE WITH ROLL-GROOVED ENDS; STEEL,
GROOVED-END FITTINGS; AND GROOVED JOINTS.
3.5 JOINT CONSTRUCTION
A. STEEL-PIPING, GROOVED JOINTS: USE SCHEDULE 40 STEEL PIPE WITH CUT OR ROLL-GROOVED ENDS
AND SCHEDULE 30 OR THINNER STEEL PIPE WITH ROLL-GROOVED ENDS; STEEL, GROOVED-END
FITTINGS; AND STEEL, KEYED COUPLINGS. ASSEMBLE JOINTS WITH COUPLINGS, GASKETS, LUBRICANT, AND BOLTS ACCORDING TO COUPLING MANUFACTURER'S WRITTEN INSTRUCTIONS.
B. DISSIMILAR-PIPING-MATERIAL JOINTS: CONSTRUCT JOINTS USING ADAPTERS OR COUPLINGS
COMPATIBLE WITH BOTH PIPING MATERIALS.
3.6 WATER-SUPPLY CONNECTION
A. CONNECT SPRINKLER PIPING TO EXISTING SPRINKLER SUPPLY PIPING.
3.7 PIPING INSTALLATION
A. USE APPROVED FITTINGS TO MAKE CHANGES IN DIRECTION, BRANCH TAKEOFFS FROM MAINS, AND
REDUCTIONS IN PIPE SIZES.
B. HANGERS AND SUPPORTS: COMPLY WITH NFPA 13 FOR HANGER MATERIALS. INSTALL ACCORDING TO
NFPA 13 FOR SPRINKLER PIPING.
C. INSTALL PIPING WITH GROOVED JOINTS ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS.
CONSTRUCT RIGID PIPING JOINTS, UNLESS OTHERWISE INDICATED.
D. FIRE BARRIER PENETRATIONS: MAINTAIN INDICATED FIRE RATING OF WALLS, PARTITIONS, CEILINGS, AND FLOORS AT PIPE PENETRATIONS. SEAL PIPE PENETRATIONS WITH U.L. LISTED FIRESTOPPING
SEALANT SYSTEM.
3.8 SPECIALTY SPRINKLER FITTING INSTALLATION
A. INSTALL SPECIALTY SPRINKLER FITTINGS ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS.
3.9 SPRINKLER APPLICATIONS
A. GENERAL: Q.R. CONCEALED SPRINKLERS.
3.10 SPRINKLER INSTALLATION
A. INSTALL SPRINKLERS IN SUSPENDED CEILINGS IN CENTER OF ACOUSTICAL PANELS AND TILES.
3.11HANGER AND SUPPORT INSTALLATION
A. GENERAL: COMPLY WITH NFPA 13, NFPA 14, MSS SP-69 AND SP-89. INSTALL HANGERS, SUPPORTS, CLAMPS, AND ATTACHMENTS AS REQUIRED TO PROPERLY SUPPORT PIPING FROM BUILDING
STRUCTURE
3.12 CONNECTIONS
A. CONNECT WATER SUPPLIES TO SPRINKLERS
3.13ERECTION OF METAL SUPPORTS AND ANCHORAGE
A. CUT, FIT, AND PLACE MISCELLANEOUS METAL SUPPORTS ACCURATELY IN LOCATION, ALIGNMENT, AND
ELEVATION TO SUPPORT AND ANCHOR MECHANICAL MATERIALS AND EQUIPMENT.
B. FIELD WELDING: COMPLY WITH AWS D1.1 "STRUCTURAL WELDING CODE--STEEL."
3.14 FIELD QUALITY CONTROL
A. FLUSH, TEST, AND INSPECT SPRINKLER PIPING ACCORDING TO NFPA 13.
B. REPORT TEST RESULTS PROMPTLY AND IN WRITING TO THE DESIGN PROFESSIONAL AND AUTHORITIES
HAVING JURISDICTION.
3.15 PROTECTION
A. PROTECT SPRINKLERS FROM DAMAGE UNTIL MATERIAL COMPLETION.
3.16 COMMISSIONNG
A. VERIFY THAT SPECIFIED TESTS OF PIPING ARE COMPLETE.
B. VERIFY THAT DAMAGED SPRINKLERS AND SPRINKLERS WITH PAINT OR COATING NOT SPECIFIED ARE
REPLACED WITH NEW, CORRECT TYPE.
C. VERIFY THAT SPRINKLERS ARE CORRECT TYPES, HAVE CORRECT FINISHES AND TEMPERATURE RATINGS, AND HAVE GUARDS AS REQUIRED FOR EACH APPLICATION.
D. FILL WET-PIPE SPRINKLER PIPING WITH WATER.
KM
ARCHITECTS, INC.
DATE
DRAWING NO.
KEY PLAN:
529 GREENE ST. AUGUSTA, GA. 30901
(706) 736 3333 - FAX (706) 736 7100
This document is property of 2KM Architects, Inc. The unauthorized reproduction, copying, or otherwise use of this document is strictly prohibited and any infringement thereupon may be subject to legal action
Copyright © 2026, 2KM Architects, Inc.
DRAWN BY
PROJECT NO.
PAPER
ISSUE
24"x36"
FOR
DRAWING TITLE
AU-SC UH
ANIMATION LAB.
AUGUSTA
UNIVERSITY
04/10/2026 25-11.03
2500 WALTON WAY, AUGUSTA, GA 30904
100% CD
REVISIONS
# DATE DESCRIPTION
FP1.1
FIRE PROTECTION
PLOT DATE:
FILENAME:
PLOT SCALE:
AU
G
U
ST
A, G
A
(7
) 7
-3
CO
PY
RI
G
HT
PF
A
EN
G
IN
EE
RI
N G
, I N
C.
04/09/26
25096FP1
1 = 96
JCP
JCP
FP1.1
FIRE PROTECTION DEMOLITION PLAN
SCALE: 1/8" = 1'-0"
FP1.1
FIRE PROTECTION NEW WORK PLAN
SCALE: 1/8" = 1'-0"
FIRE PROTECTION NOTES
EXISTING CLASSROOM BUILDING IS PROTECTED BY A WET PIPE
SPRINKLER SYSTEM.
REWORK SPRINKLER SYSTEM IN RENOVATED SPACES IN
ACCORDANCE WITH THE FOLLOWING:
· 2022 EDITION NFPA 13
· 2026 EDITION GEORGIA FIRE CODE 120-3-3
IN NEW CEILINGS, INSTALL WHITE CONCEALED QUICK
RESPONSE EXTENDED COVERAGE SPRINKLERS RATED FOR
INTERMEDIATE TEMPERATURE ACTIVATION.
REFER TO NFPA 25 REGARDING PRE-PLANNED SYSTEM
IMPAIRMENTS FOR CORRECTIONS, ALTERATIONS OR
IMPROVEMENTS.
PROVIDE SHOP DRAWINGS AND EQUIPMENT SUBMITTALS FOR
REVIEW BY ENGINEER, AHJ AND OWNER.
EXACT LOCATION, ARRANGEMENT, AND SIZES SHALL BE
VERIFIED ON THE JOB BEFORE PROCEEDING WITH ANY NEW
WORK. EXACT LOCATIONS AND ROUGHING REQUIREMENTS
FOR ALL FIXTURES AND EQUIPMENT SHALL BE DETERMINED
FROM APPROVED MANUFACTURER'S SHOP DRAWINGS.
PARTICULAR ATTENTION SHALL BE DIRECTED TO FIXTURES OR
EQUIPMENT FURNISHED UNDER OTHER DIVISIONS.
PROVIDE SLEEVES FOR PIPES PASSING THRU FLOORS,
MASONRY WALLS AND FIRE OR SMOKE PARTITIONS. PACK
ANNULAR SPACE BETWEEN PIPE WITH MATERIAL APPROVED
IN U.L. BUILDING DIRECTORY.
GENERAL
ALL AREAS ARE LIGHT HAZARD UNLESS NOTED OTHERWISE
ORDINARY HAZARD - GROUP 1
HAZARD CLASSIFICATION
REWORK EXISTING
SPRINKLER SYSTEM TO
CONFORM TO NEW
CEILING, LIGHTING
AND DUCTWORK
CONFIGURATIONS
REWORK EXISTING
SPRINKLER SYSTEM TO
CONFORM TO NEW
CEILING, LIGHTING
AND DUCTWORK
CONFIGURATIONS
PLAN NORTH
EXISTING 02/26/2025 FIRE PUMP TEST
APPROX LOCATION OF
EXISTING EXT
COVERAGE SPRINKLER
(TYPICAL) ANIMATION LAB
(C0MPUTER LAB)
C0MPUTER LAB
AREA OF WORK
A COMPLETE SET OF APPROVED PLANS AND
SPECIFICATIONS SHALL BE MAINTAINED
KM
ARCHITECTS, INC.
DATE
DRAWING NO.
KEY PLAN:
529 GREENE ST. AUGUSTA, GA. 30901
(706) 736 3333 - FAX (706) 736 7100
This document is property of 2KM Architects, Inc. The unauthorized reproduction, copying, or otherwise use of this document is strictly prohibited and any infringement thereupon may be subject to legal action
Copyright © 2026, 2KM Architects, Inc.
DRAWN BY
PROJECT NO.
PAPER
ISSUE
24"x36"
FOR
DRAWING TITLE
AU-SC UH
ANIMATION LAB.
AUGUSTA
UNIVERSITY
04/10/2026 25-11.03
2500 WALTON WAY, AUGUSTA, GA 30904
100% CD
REVISIONS
# DATE DESCRIPTION
ANIMATION
LAB.
ANIMATION
LAB.
PLAN NORTH
M101
HVAC DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
M101
HVAC NEW WORK PLAN
SCALE: 1/4" = 1'-0"
M0.1WDP
HVAC PLANS
18X14
12X12
X1
T 4-41
EXIST. 18X14
EXIST. 12X12
EX
IS
T.
6X
PLOT DATE:
FILENAME:
PLOT SCALE:
AU
G
U
ST
A, G
A
(7
) 7
-3
CO
PY
RI
G
HT
PF
A
EN
G
IN
EE
RI
N G
, I N
C.
04/09/26 25096M1 1 = 48
JBM/WDP
DEMOLITION NOTES
(THIS SHEET ONLY):
REMOVE AIR DEVICE AND ASSOCIATED RUNOUT TO THE
EXTENTS NECESSARY FOR THE INSTALLATION OF NEW
AS SHOWN ON NEW WORK PLAN.
REMOVE RETURN GRILLE. REPLACE WITH NEW AS
SHOWN ON NEW WORK PLAN.
REMOVE TERMINAL UNIT AND ASSOCIATED
THERMOSTAT. REMOVE HOT WATER COIL PIPING TRIM.
KEY NOTES (THIS SHEET ONLY):
FURNISH TRANSITION IF REQUIRED TO CONNECT NEW
RUNOUT TO EXISTING DUCTWORK.
INSTALL NEW GRILLE IN EXISTING RETURN PLENUM.
FURNISH CLEANING AND REPAINTING OF INTERIOR OF
EXISTING PLENUM IF REQUIRED.
CONNECT NEW COIL TRIM FOR REPLACEMENT
TERMINAL UNIT TO EXISTING HOT WATER RUNOUTS.
EX
IS
T.
8X
EX
IS
T.
2X
34X24 F/O 40X24 F/O
TU4-40
TU4-42
EX
IS
T.
6X
EX
IS
T.
4X
TU4-56
D
14X14
X1 c A
N E c A
N E c A c A c A
N
E
N E
N E
N E
D c A c A c A c A
T 4-56
T 4-41
N
E TU4-41
34X24 F/O 40X24 F/O
TU4-40
TU4-42
EX
IS
T.
6X
EX
IS
T.
4X
TU4-413
A COMPLETE SET OF APPROVED PLANS AND
SPECIFICATIONS SHALL BE MAINTAINED
KM
DATE
DRAWING NO.
KEY PLAN:
529 GREENE ST. AUGUSTA, GA. 30901
(706) 736 3333 - FAX (706) 736 7100
This document is property of 2KM Architects, Inc. The unauthorized reproduction, copying, or otherwise use of this document is strictly prohibited and any infringement thereupon may be subject to legal action
Copyright © 2026, 2KM Architects, Inc.
DRAWN BY
PROJECT NO.
PAPER
ISSUE
24"x36"
FOR
DRAWING TITLE
AU-SC UH
ANIMATION LAB.
AUGUSTA
UNIVERSITY
04/10/2026 25-11.03
2500 WALTON WAY, AUGUSTA, GA 30904
100% CD
REVISIONS
# DATE DESCRIPTION
M1.1
HVAC SCHEDULES,
FMS SUMMARY,
DETAILS, NOTES
AND LEGEND
PLOT DATE:
FILENAME:
PLOT SCALE:
AU
G
U
ST
A, G
A
(7
) 7
-3
CO
PY
RI
G
HT
PF
A
EN
G
IN
EE
RI
N G
, I N
C.
04/09/26 25096M1 1 = 48
JBM/WDP
NOT TO SCALE
FLEXIBLE ROUND DUCT CONNECTION DETAIL
APPLY DUCT INSULATION TO ELBOW
48" (MAXIMUM)
3" MIN. (TYP.)
ROUND NECK EXTENSION
OR SQUARE TO ROUND
ADAPTER WITH ROUND
NECK EXTENSION.
CEILING
INSULATED FLEXIBLE DUCT
SHEET METAL DUCT
M1.1
THROAT OF DIFFUSER
MASTIC JOINT AROUND
GLASSFAB AND
SHEET METAL 90° ELBOW.
SEAL CONNECTION PER DUCT
MANUFACTURER'S INSTALLATION
INSTRUCTIONS (TYPICAL)
FACTORY-INSTALLED, MOLDED,
INSULATED BACKPAN WITH FOIL SKRIM
VAPOR BARRIER
SEAL FLEX TO INSULATION
IN ACCORDANCE WITH
SPECIFICATIONS. (TYP.)
NYLON STRAP APPLIED
TO INNER FLEX LINER
WITH TENSIONING TOOL.
NOT TO SCALE
SUPPLY DUCT TAKE-OFF FITTING DETAIL
RECTANGULAR DUCT
1" STAND-OFF BRACKET
FOR INSULATION
MANUAL VOLUME DAMPER
CROWN NO. 306 ADJUSTABLE
TAKE-OFF FITTING (RECTANGULAR
TO ROUND). CROWN NO. 305 FOR
ROUND TO ROUND.
CLINCH LOCK (TYPICAL)
AI
R
FL
O
W
M1.1
SEE DETAILS FOR
LOW PRESSURE
DUCT CONSTRUCTION.
TO TERMINAL BOX.
CONICAL TAKEOFF
TRUNK DUCT WITH
MEDIUM PRESSURE
DUCT SIZE SHOWN ON PLANS
PROVIDE TRANSITION TO
LOW
PRESSURE
DUCT
MVD
CROWN 306 TAKEOFF
TO GRILLE
MANUAL VOLUME
DAMPER
PRE-INSULATED
FLEXIBLE DUCT
SUPPORT UNIT FROM STRUCTURE
ABOVE WITH THREADED ROD OR
STEEL STRAP.
(MAX 48" LENGTH)
VAV TERMINAL BOX DETAIL
NOT TO SCALE
M1.1
CFMCFM
5.0
WPD (FT. WG)
MODEL NO.
TRANE
VCWF-08
CONN.
NECK
VALVE
AIR
8"ø
HYDRONIC HEAT
GPM
0.87.8
MBH(1)
0.2
APD
MIN.DESIGN
PRIMARY AIR VALVE
TU4-41
ITEM
-- VAV TERMINAL UNIT SCHEDULE --
(3)
(1) MAX. IN. WG @ DESIGN CFM.
(2) COOLING ONLY.
(3) DUCT RUNOUTS SHALL BE NECK SIZE UNLESS INDICATED OTHERWISE.
REMARKS
(IN.)
-- AIR DISTRIBUTION SCHEDULE --
A
MARK TYPE FINISH OBDNECK
CONNECTION
(1) NO.
UNLESS NOTED
REMARKS (2)
D
CEILING
DIFFUSER 8"ø NO 24 X 24 PANEL
22" X 22" NORETURN/EXHAUST
CEILING
PRICE
SCD-4C
80MANUFACTURER'S
STANDARD FINISH
MANUFACTURER'S
STANDARD FINISH
WITH BORDER FRAME
24 X 24 PANEL
(1) DUCT RUNOUT SIZE SAME AS NECK CONNECTION SIZE, UNLESS NOTED OTHERWISE.
(2) PROVIDE LAY-IN TYPE FOR T-BAR CEILINGS AND SURFACE TYPE FOR ALL OTHER CEILINGS. REFER TO
ARCHITECTURAL FINISH SCHEDULE FOR CEILING TYPES.
(3) PROVIDE WITH REMOVABLE CORE (RC) AND MOLDED, INSULATED BACKPAN WITH FOIL SKRIM VAPOR
BARRIER.
ROOM OFFSET
ROOM TEMPERATURE
XDAMPER
TYPICAL TERMINAL UNIT
SUMMARY
INPUT/OUTPUT
FMS
ALARM ENERGY MGMT.DDCANALOGBINARYANALOGBINARY
SOFTWAREINPUTSOUTPUTS
N O
TE
S
FA
N
S
YN
CH
RO
N
IZ
AT
IO
N
EC
O N
O M
IZ
ER
RE
SE
T O
PT
IM
IZ
AT
IO
N
DE
M
AN
D
LI
M
IT
/C
YC
LE
DA
Y/
N
IG
HT
S
ET
BA
CK
O
PT
IM
U M
S
TA
RT
/S
TO
P
TI
M
E
SC
HE
DU
LE
S
/S
PR
O
P.
IN
TE
G
RA
L
PR
O
PO
RT
IO
N
AL
RU
N
T
IM
E
TO
TA
LI
ZA
TI
O N
HI
/L
O L
IM
IT
ST
AT
U S/
IN
TE
RL
O
CK
VO
LU
M
E (C
FM
PR
ES
SU
RE
RE
LA
TI
VE
H U
M
ID
IT
Y
TE
M
PE
RA
TU
RE
PU
LS
E
CO
N
TA
CT
AL
AR
M
C O
N
TA
CT
AU
X.
C
O N
TA
CT
DI
FF
. P
RE
SS
U
RE
S
W
IT
CH
DD
C
CO
N
TR
O
L
SE
TP
O
IN
T
AD
JU
ST
O
PE
N /C
LO
SE
EN
AB
LE
/D
IS
AB
LE
ST
AR
T/
ST
O
P
X X X
AIRFLOW X
DISCHARGE AIR TEMPERATURE X
NOT TO SCALE
EXHAUST/RETURN GRILLE CONNECTION DETAILS
6" HIGH FROM
TOP OF "T-BAR"
SIZES.
SEE DRAWINGS FOR
SHEET METAL DUCT.
GRILLE
LAY-IN
GRILLE
SURFACE MOUNTED
SQUARE ELBOW WITH TURNING VANES
CAN FULL SIZE OF LAY-IN
EXH./RETURN GRILLE.
CONST. OF 22 GA. SHEET
METAL & PAINT INSIDE
FLAT BLACK
ATTACH CAN TO "T-BAR"
SCREWS (2 EACH SIDE)
CEILING
CEILING
WITH SHEET METAL
M1.1
PAINT INSIDE OF TRANSITION,
DUCT AND VISIBLE PORTION OF
ELBOW FLAT BLACK.
TRANSITION FROM
DUCT TO GRILLE
WITH SHEET METAL
DUCTWORK.
HVAC NOTES:
NOT ALL EXISTING WORK IS SHOWN, AND THAT SHOWN IS IN ITS APPROXIMATE LOCATION AND ARRANGEMENT. EXACT LOCATION, ARRANGEMENT, AND SIZES SHALL BE VERIFIED ON THE JOB BEFORE
STARTING ANY NEW WORK.
COORDINATE THE INSTALLATION OF WORK UNDER THIS DIVISION WITH THAT OF OTHER TRADES TO
PROVIDE THE BEST ARRANGEMENT OF PIPING, DUCTWORK, AND EQUIPMENT.
PIPING, DUCTWORK, AND EQUIPMENT IS SHOWN IN ITS GENERAL LOCATION UNLESS DIMENSIONED.
ARRANGE PIPING AND DUCTWORK TO CLEAR STRUCTURAL MEMBERS, PIPING AND LIGHT FIXTURES.
EXACT LOCATION OF GRILLES AND CEILING OUTLETS SHALL BE DETERMINED ON THE JOBSITE.
COORDINATE WITH LIGHTS, SPRINKLER HEADS, AND OTHER CEILING APPURTENANCES TO PROVIDE A UNIFORM AND SYMMETRICAL APPEARANCE. REFER TO ARCHITECTURAL AND ELECTRICAL DRAWINGS AND
DETAILS.
PROVIDE FLEXIBLE DUCT CONNECTIONS TO ALL AIR HANDLING EQUIPMENT.
HVAC LEGEND
SYMBOL DESCRIPTION
T THERMOSTAT 4'-0" A.F.
c CUBIC FEET PER MINUTEor CFM
M-1 SHEET NO.
DETAIL NO 1/M-1
SUPPLY DIFFUSER
RETURN OR EXHAUST GRILLE
MANUAL VOLUME DAMPERor MVD
AIR DEVICE
NECK CONNECTION SIZE
A
N
E NEW TO EXISTING CONNECTION
SQUARE ELL WITH SINGLE THICK TURNING VANES
WDP
BALANCING VALVE
SEE PLANS FOR SIZES.
MAV
COIL
45 DEGREE
ELBOW (TYP.)
STRAINER WITH
BLOW-OFF VALVE.
2-WAY CONTROL VALVE.
TEMPERATURE/PRESSURE
TEST FITTINGS
PIPE WATER COILS FOR COUNTER-FLOW.
(ENTERING WATER CONTACTS LEAVING AIR.)
UNION OR FLANGE (TYP.)
SHUTOFF VALVE
(TYP.)
DRAIN VALVE WITH
THREADED CAP OR PLUG.
WATER COIL CONN. DETAIL (2-WAY VALVE)
SCHEMATIC
FURNISH FULL SIZED
HEADER FOR COILS WITH
MULTIPLE CONNECTIONS.
X
XXX
LOCATE UNIONS OR FLANGES
TO ALLOW FOR COIL
REMOVAL. (TYP.)
(TYP. FOR TU4-41)
EXIST. HWS&R MAINS,
N E
-- VCCF-1212"ø ----0.0501400TU4-56 (2)
REHEAT CONTROL VALVE X X (1)
(1) TU4-41 ONLY
A COMPLETE SET OF APPROVED PLANS AND
SPECIFICATIONS SHALL BE MAINTAINED
H.V.A.C. SPECIFICATIONS KM
DATE
DRAWING NO.
KEY PLAN:
529 GREENE ST. AUGUSTA, GA. 30901
(706) 736 3333 - FAX (706) 736 7100
This document is property of 2KM Architects, Inc. The unauthorized reproduction, copying, or otherwise use of this document is strictly prohibited and any infringement thereupon may be subject to legal action
Copyright © 2026, 2KM Architects, Inc.
DRAWN BY
PROJECT NO.
PAPER
ISSUE
24"x36"
FOR
DRAWING TITLE
AU-SC UH
ANIMATION LAB.
AUGUSTA
UNIVERSITY
04/10/2026 25-11.03
2500 WALTON WAY, AUGUSTA, GA 30904
100% CD
REVISIONS
# DATE DESCRIPTION
M2.1
HVAC
SPECIFICATIONS
PLOT DATE:
FILENAME:
PLOT SCALE:
AU
G
U
ST
A, G
A
(7
) 7
-3
CO
PY
RI
G
HT
PF
A
EN
G
IN
EE
RI
N G
, I N
C.
04/09/26 25096M1 1 = 48
JBM/WDP
WDP
GENERAL PROVISIONS
1. THE GENERAL REQUIREMENTS OF THIS CONTRACT ARE PROVIDED IN THE ARCHITECTURAL SPECIFICATIONS
IN ADDITION TO THE REQUIREMENTS OF THIS DOCUMENT.
2. MECHANICAL INSTALLATIONS SHALL CONFORM TO THE CURRENT EDITION OF THE FOLLOWING, INCLUDING
ANY STATE AMENDMENTS WHERE APPLICABLE:
a. THE INTERNATIONAL BUILDING CODE.
b. THE INTERNATIONAL MECHANICAL CODE.
c. THE INTERNATIONAL PLUMBING CODE.
d. THE INTERNATIONAL FIRE PROTECTION CODE.
e. THE STATE ENERGY CODE.
f. NFPA STANDARD 70, NATIONAL ELECTRIC CODE.
g. NFPA STANDARD 90A, INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS.
h. NFPA STANDARD 101, CODE FOR SAFETY TO LIFE FOR FIRE IN BUILDINGS AND STRUCTURES.
3. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND INSPECTIONS REQUIRED FOR THE
INSTALLATION OF THIS WORK AND PAY ALL CHARGES INCIDENT THERETO.
4. SUBMITTALS: PROVIDE SUBMITTALS PER THE REQUIREMENTS OF THIS CONTRACT FOR MATERIALS, EQUIPMENT AND SERVICES SPECIFIED HEREIN.
a. ELECTRICAL COORDINATION: IN ADDITION TO SUBMITTAL REQUIREMENTS INCLUDED IN THIS CONTRACT, SUBMIT A DOCUMENT APPROVED BY THE PROJECT ELECTRICAL CONTRACTOR CERTIFYING THAT ALL MECHANICAL EQUIPMENT BEING FURNISHED MECHANICAL COMPLIES WITH THE ELECTRICAL
CHARACTERISTICS OF THE SOURCE POWER WHICH WILL BE FURNISHED UNDER ELECTRICAL.
b. MODEL NUMBERS LISTED ON THE MECHANICAL CONTRACT DOCUMENTS SHALL NOT BE CONSTRUED
TO INDICATE ELECTRICAL CHARACTERISTICS. ELECTRICAL CHARACTERISTICS OF MECHANICAL
EQUIPMENT SHALL BE AS INDICATED ON THE ELECTRICAL CONTRACT DOCUMENTS.
c. REVIEW OF SUBMITTALS DOES NOT RELIEVE THE CONTRACTOR OF ANY OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. FAILURE BY THE ENGINEER TO DOCUMENT ERRORS AND OMISSIONS IN
THE CONTRACTOR'S SUBMITTALS DURING THE ENGINEER'S SUBMITTAL REVIEW DOES NOT
CONSTITUTE A WAIVER OF ANY OF THE REQUIREMENTS OF THE ORIGINAL CONTRACT DOCUMENTS.
5. CONTRACTOR QUALIFICATIONS: HVAC SUBCONTRACTOR SHALL HAVE A CURRENT CLASS II CONDITIONED AIR CONTRACTORS LICENSE FOR THE STATE IN WHICH THE PROJECT IS BEING CONSTRUCTED. THE SUBCONTRACTOR SHALL HAVE AS PART OF THE FIRM A SERVICE DEPARTMENT QUALIFIED TO SERVICE ALL SYSTEMS INSTALLED IN THE PROJECT OR HAVE A WRITTEN AGREEMENT WITH A SERVICE AGENCY QUALIFIED TO PROVIDE SUCH SERVICE. THE SERVICE DEPARTMENT OR AGENCY SHALL BE ON CALL AT ALL HOURS. THE SUBCONTRACTOR SHALL HAVE INSTALLED AT LEAST (WITHIN THE LAST FIVE YEARS) THREE (3)
HYDRONIC WATER SYSTEMS OF AT LEAST 150-TONS IN SIZE.
6. SUBSTITUTION PROCEDURES/PRIOR APPROVAL REQUESTS: REQUESTS FOR THE USE OF MATERIALS OR EQUIPMENT MANUFACTURERS NOT LISTED SHALL BE PER THE REQUIREMENTS OF THIS CONTRACT.
7. LAYOUT AND COORDINATION:
a. THE EQUIPMENT LISTED ON THE DRAWINGS AND IN THE SPECIFICATIONS HAS BEEN USED FOR THE
PHYSICAL ARRANGEMENT OF THE MECHANICAL SYSTEMS. WHEN EQUIPMENT LISTED AS ACCEPTABLE, EQUAL OR EQUIPMENT WHICH HAS RECEIVED "PRIOR APPROVAL" IS USED, IT…