This is a bid document for the Au Gres-Sims School District's Football Bleachers and HVAC Replacement Design-Build Project located in Au Gres, Michigan. The project consists of two primary bid categories: Bid Category 1 involves installing new football bleachers for home and away sides, including a 10-row home bleacher with 693 seats (plus 8 ADA seats) and a 3-row visitor side bleacher with 80 seats. Bid Category 2 involves replacing the Innovation Lab unit and kitchen make-up air unit and exhaust fans, which includes removing existing units and installing new Captive Aire and Rheem equipment. Bids are scheduled to be received on Monday, October 27th, 2025 at 4:00 p.m. local time, with proposals to be submitted in duplicate to the Superintendent at 310 S. Court Street, Au Gres, MI 48703.
The bid documents specify that this is a design-build project requiring contractors to provide engineered, stamped drawings submitted through Arenac County's Plan Review. Contractors must include all trades work, permits, and necessary inspections. The project requires a bid bond of 5% for bids exceeding $50,000, and bidders are encouraged to use local and minority subcontractors. The contract includes a 12-month warranty period, and contractors must provide comprehensive insurance coverage, including workers' compensation, commercial general liability, and automobile liability insurance with specified minimum coverage amounts. The maximum markup for extra work is limited to 10%, which includes overhead, profit, and other associated expenses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00 1000 - Advertisement for Bid.pdf | ||
| Addendum #2.pdf | ||
| Addendum No. 01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AU GRES-SIMS SCHOOL DISTRICT
FOOTBALL BLEACHERS AND HVAC REPLACEMENT
DESIGN-BUILD PROJECT
AU GRES, MICHIGAN
Au Gres-Sims School District Football Bleachers and HVAC Replacement 00 0100 - Project Directory
SECTION 00 0100
PROJECT DIRECTORY
PROJECT: Au Gres-Sims School District Football Bleachers and HVAC Replacement Design-Build Project
PROJECT LOCATION: Au Gres-Sims School District 310 S. Court Street Au Gres, MI 48703
END OF SECTION 00 0100
Football Bleachers and HVAC Replacement 00 0110 - Table of Contents
SECTION 00 0110
TABLE OF CONTENTS
DIVISION 0 BIDDING AND CONTRACT REQUIREMENTS
00 0100 Project Directory 00 0110 Table of Contents 00 1000 Advertisement for Bid 00 2000 Instructions to Bidders 00 2200 Bid Category General Notes 00 2400 Bid Category Descriptions 00 4000 Bid Form 00 4100 Familial Disclosure Statement 00 7300 Supplementary Conditions
END OF SECTION 00 0110
Football Bleachers and HVAC Replacement 00 1000 - Advertisement for Bid
SECTION 00 1000
ADVERTISEMENT FOR BID
Notice is hereby given that Au Gres-Sims School District is receiving Design-Build proposals from contractors for the following project:
FOOTBALL BLEACHERS AND HVAC REPLACEMENT DESIGN-BUILD PROJECT
Complete proposals will be received for the following work categories in accordance with the RFP.
BID CATEGORY 1: NEW FOOTBALL BLEACHERS - HOME / AWAY
BID CATEGORY 2: REPLACE INNOVATION LAB UNIT AND KITCHEN MAKE-UP AIR UNIT AND
EXHAUST FANS
Bids will be received at the Office of the Superintendent on Monday, October 27th, 2025 at 4:00 p.m.
local time at which time the bids will be publicly opened.
Proposals should be submitted in DUPLICATE and be addressed to:
Chris Ming - Superintendent
The Owner reserves the right to reject any, part of any or all bids and to waive all informalities in the bidding procedures. The Owner reserves the right to reject any bid when Bidder fails to submit data required by the Bidding Documents, or if the bid is submitted incomplete or irregular. No telephonic, telegraphic, email, fax bids or modification to a submitted bid will be received or considered by the Owner.
Bids may not be withdrawn for a period of sixty (60) days after the bid date.
BID BONDS
Each bid that exceeds Fifty Thousand Dollars ($50,000) must be submitted with an attached certified check or bid bond from a surety company approved to do business in the State of Michigan, payable to the Owner in an amount not less than five percent (5%) of the base bid.
THIS IS NOT A PREVAILING WAGE PROJECT.
PRE-BID CONFERENCE
None scheduled.
SCHEDULE
Please submit a start and completion date on your company letterhead with your Design-Build proposal.
QUESTIONS / RFIs All questions regarding the plans and specifications are to be emailed to Chris Ming at mingc@ags-schools.org.
END OF SECTION 00 1000
Football Bleachers and HVAC Replacement 00 2000 - Instruction to Bidders
SECTION 00 2000
INSTRUCTIONS TO BIDDERS
1. DEFINITIONS
Definitions set forth in the General Conditions of the Contract Construction, AIA Document A232
- Current Edition, and in other contract documents are applicable to the Bidding Documents.
Bidding Documents: Bidding Documents include the Drawings, Specifications, Addenda prepared by the Architects, Engineers, Consultants and Construction Manager and anything referenced within those documents.
Addenda: Addenda are written or graphic instruments issued prior to the execution of the Contract which modify or interpret the Bidding Documents by additions, deletions, clarifications or corrections.
Bid: A bid is a complete and properly signed proposal to do the work for a stipulated sum, submitted in accordance with the Bidding Documents.
Base Bid: The sum stated in the Bid Form for which the Bidder offers to perform the work described in the Bidding Documents as the Base Bid.
Alternate: An alternate is an amount stated in the Bid to be added or deducted from the Base Bid if the corresponding change in the work, as described in the Bidding Documents, is accepted.
Unit Price: An amount stated as a price per unit of measurements for materials or services described in the Bidding Documents.
Bidder: A person or entity who submits a bid.
Furnish: This term is used to mean supply and deliver to the Project site, ready for unloading, unpacking, assembly, installation and similar operations.
Install: The term is used to describe operations at the Project site including the actual unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations.
Provide: To furnish and install, complete and ready for the intended use.
2. BIDDING PROCEDURE
Bidders shall include all work noted in the Bid Category Description as well as General Bid Category Notes which apply to ALL Categories.
Each Bidder by submitting this Bid to the Owner represents that they have read and understand the Bidding Documents. Each bidder also represents that they have made a site inspection, familiarized themselves with the local conditions under which the work is to be performed, and have correlated observations with requirements of the Bidding Documents.
Bids shall be submitted in DUPLICATE. (1) One Original and (1) One Copy of the Bid Form are required. Fill in ALL blanks on the bid form. Information must be typed or in ink. Express sums in both words and figures. The amount in words will govern in case of a discrepancy. The signer of the bid must initial all interlineations, alterations and erasures.
Enclose the bid and other documents required in a sealed envelope. If the Bid is sent by mail, enclose the sealed envelope in a separate mailing envelope with “Sealed Bid Enclosed” printed on the envelope.
Address the envelope to the party receiving the bids and state project name, the bidder’s name and address, and the designated Bid Category # for which the bid is submitted on the outside of the envelope. If you are bidding on more than one Bid Category, each bid must be in its own clearly marked envelope.
Bids will be PUBLICLY opened after the deadline to submit bids. Only properly identified bids received on time will be opened.
3. COMBINED BIDS
If you intend on offering a discount as part of a Combined Bid, you MUST submit a base bid in each category and each category MUST be in a separate envelope. The Combined Bid must be entered on at least one Bid Form submitted by the bidder.
4. ALTERNATES
Alternates are listed on the Bid Form and are described in further detail in the Architectural Specification. Each bidder should review all Alternates and determine if what is described in the Specification and shown on the Drawings causes and addition or deduction to their Base Bid.
Bidders shall indicate on the Bid Form if the Alternate is an ADD or DEDUCT to the Base Bid and indicate the costs associated. If the Alternate does not affect your scope of work, enter “No Change” in the space provided. The Owner will have the right to accept Alternates in any order or combination and to determine the low bidder on the basis of the sum of the base bid and the accepted Alternate.
5. VOLUNTARY ALTERNATES
The bidder may submit voluntary alternates with their bid. Voluntary Alternates are changes in scope or a specification. Voluntary alternates shall be listed in the appropriate space on the Bid Form. If additional pages are necessary, attach them to the end of the Bid Form on your company letterhead. Voluntary alternates will be reviewed after the award of a contract and the Owner reserves the right to accept or reject any Voluntary Alternate.
6. QUESTIONS AND DISCREPENCIES
Notify the Owner at least five (5) days prior to bid of ambiguities, inconsistencies, or error discovered upon examination of the Bidding Documents, site or local conditions. Submit requests for clarification or interpretation of the Bidding Documents in writing. Interpretation, correction, or change of the Bidding Documents will be made by Addendum, all other forms will be non-binding. Questions should be EMAILED to the Owner.
7. SUBSTITUTIONS
The materials, products, and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance and quality. Pre-Bid substitution requests must be submitted in writing and received by the CM at least ten (10) days prior to bid date.
The burden of proof of the merit of the proposed substitute is upon the proposer. The Owner’s decision of acceptance or rejection of a proposed substitution will be final.
Requests for substitutions shall include:
1. The name of the material or equipment for which it is to be substituted and a complete description of the proposed substitute including drawings, cut-sheets, performance, test data and other information necessary for an evaluation.
2. A statement setting forth any changes in other materials, equipment, other work that incorporation of the substitute would require, shall be included.
8. MODIFICATION OR WITHDRAWAL OF A BID
A bid may not be modified or withdrawn following the time and date designated for the receipt of bids. Prior to the time and date designated for receipt of bids, a submitted bid may be withdrawn by notice to the party receiving bids at the place designated for receipt of bids.
Notice shall be in writing over the signature of the bidder or in person. Withdrawal notice shall be submitted by mail, telegram, or fax postmarked on or before the date and time for receipt of bids. Withdrawn bids may be resubmitted up to the time designated for the receipt of bids.
9. OWNER’S RESERVATION OF RIGHTS
The Owner reserves the right to reject any, part of any or all bids and to waive all informalities in the bidding procedures. The Owner reserves the right to reject any bid when Bidder fails to submit data required by the Bidding Documents, or if the bid is submitted incomplete or irregular. No telephonic, telegraphic, email, fax bids or modification to a submitted bid will be received or considered by the Owner.
The Owner will have the right to accept Alternates in any order or combination and to determine the low bidder on the basis of the sum of the base bid and the accepted Alternate.
It is the Owner’s intent to award a contract to the lowest responsible and competent bidder provided the bid has been submitted in accordance with the requirements of the bidding documents and does not exceed the funds available for construction.
The Owner reserves the right to cancel the project and contract at any point. The contractor will be reimbursed for work performed up to cancellation based upon the amount of work completed.
10. SUBSURFACE MATERIALS AND SOIL BORINGS (N/A)
Contractors may review test-boring data if it is available. Soil Boring data will be available either as a part of the specification or will be available as a separate file in the Electronic Plan Room.
The Owner, CM, or Architect as part of Contract Drawings or Specification does not guarantee its accuracy or completeness. Contractor shall assume all responsibility in excavating for this project and shall not rely on subsurface information obtained for CM. Bidders shall make their own investigation of existing subsurface conditions; neither Owner, CM, nor Architect will be responsible in any way for additional compensation for excavation work performed under the contract due to Contractor’s assumptions based on subsoil data prepared solely for Owner’s and Architect’s use.
11. BONDS
Bid Bond Each bid which exceeds $50,000 must be submitted with an attached certified check, money order, or a bid bond from a surety company approved to do business in the State of Michigan, payable to the Owner in an amount not less than 5% of the base bid sum of the work.
Performance Bond & Labor and Material Payment Bond Prior to the execution of the contract, furnish bonds covering the faithful performance of the contract and the payment of all obligations arising there under. Include cost of bonds in the base bid. The bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix thereto a certified and current copy of their power of attorney.
12. POST BID INFORMATION
The Bidder shall within seven (7) days of notification of selection for the award of the Contract for the work, submit the following information.
A. Designation of the Work to be performed by the Bidder with his own forces.
B. Proprietary names and the suppliers of principal items or systems of materials and equipment proposed for the Work.
C. List of names of the subcontractors or other persons or entities (including those who are to furnish materials or equipment fabricated to the special design) proposed for the principal portions of the Work.
D. A list of proposed job site staff and home office staff directly involved with this Project. Indicate the qualifications, pay rates, titles, responsibilities, and duties of each person.
E. Certificates evidencing insurance coverage in the amounts and types specified.
F. An interim construction schedule in a bar graph format.
G. A completed Schedule of Values in the format provided by the Owner.
The Bidder will be required to establish to the satisfaction of the Owner, the reliability and responsibility of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents.
Prior to the award of the Contract, the Bidder will be notified in writing. If the Owner has reasonable objection to any proposed person or entity, the Bidder may at his option, (1) withdraw his bid or (2) submit an acceptable substitute person or entity with an adjustment in cost occasioned by such substitution. The Owner may at his discretion, accept the adjusted bid price or disqualify the Bidder.
The Owner reserves the right to request financial statements from the bidder before the award of a contract.
13. TAXES
Each bidder shall include in their proposal, and agree to pay, all fees and taxes including Sales and Use which they may be required to pay in connection with the performance of the contract.
Also, the bidder includes and agrees to pay for all contributions to unemployment compensation, health and welfare, appropriate benefits, or other purposes now or hereafter during the term of the contract and the Owner shall not be liable for any additional charges.
14. INDEMNIFICATION AND GENERAL LIABILITY INSURANCE
Each trade contractor shall agree to indemnify and hold harmless the Owner from and against any and all general liability claims whatsoever arising out of or occurring during and occasioned directly or indirectly by its negligence or fault. Prior to entering into a contract, each trade contractor shall provide evidence satisfactory to the Owner of adequate general liability insurance coverage which names the Owner as additional insured. Each trade contractor shall also provide evidence of Worker’s Compensation Insurance in the amounts required by the State of Michigan.
15. LOCAL PRODUCTS
All prime bidders, subcontractors and suppliers shall utilize products that are local to the region or State whenever possible where price, quality and performance are equal to or better than non-local products.
16. MINORITY SUBCONTRACTORS
Bidders are encouraged to use the services of minority subcontractors if possible in the pursuance of this project.
17. NON-COLLUSION CLAUSE
By submitting and signing the proposal form, the bidder declares that neither the bidding firm nor agents of the bidding firm or any other members of the proposed team have entered into any collusion or agreement concerning any aspect of the proposal.
18. CONSTRUCTION DOCUMENT RESPONSIBILITIES
This is a Design-Build project and shall include All Trades work.
19. WARRANTY
All work shall be guaranteed for a period of twelve (12) months from the date of substantial completion of the entire Bid Package unless more specifically stated in the contract documents.
All service during this 12-month period shall be rendered without charge to the Owner. This 12-month warranty does not replace any longer warranties required by the specification.
20. SUBMITTALS
Submittals of product data, shop drawings, color charts and samples are required for this project. When submitting information electronically all contractors shall use the Portable Document Format (.pdf) for all email attachments. Forms and requests that are submitted in a different format may be rejected resulting in delays to the schedule and payments.
21. ADDITIONAL SETS OF DRAWINGS AND SPECS
The Owner will not furnish additional sets to the successful bidder(s). Contractors will need to purchase or reproduce additional sets of plans and specifications at their own expense.
22. PERMITS AND INSPECTIONS
The Contractor shall submit and pay for all applicable permits required for their work.
Contractors shall also schedule timely inspections and provide inspection reports to the Owner.
The Design-Build Contractor shall secure and pay for the Building Permit as well with Arenac County.
23. EXTRA WORK
The maximum amount of markup for extra work is 10% and that shall include overhead, profit, estimating expense, other office expense, insurance and bonds.
24. CLEANUP
All contractors shall provide daily and weekly cleanup including dust control. If contractors are not cleaning up, they shall be notified by the Owner and if there is not a response, the Owner will hire a cleaning company and backcharge the contractor(s).
25. LAYOUT
All contractors are responsible for their own layout and field dimensions.
26. TEMPORARY ENCLOSURES AND WEATHER PROTECTION
All temporary enclosures shall be weather-tight and secure at the end of every work day.
Contractors shall be responsible for any damage due to enclosures not being weather-tight or not secure.
27. SWORN STATEMENTS AND WAIVERS
Sworn statements and waivers are required with every payment request. Final payment will not be issued without full unconditional waivers from all suppliers.
28. PROJECT CLOSEOUT
Closeout documents must be submitted in both paper and electronic (PDF) formats.
END OF SECTION 00 2000
Football Bleachers and HVAC Replacement 00 2200 - Bid Category General Notes
SECTION 00 2200
BID CATEGORY GENERAL NOTES
The following are General Notes that apply to all bid categories.
1. All bid categories are to include all sections in Division 0 and Division 1 in their entirety.
2. Full compliance with all the safety regulations and requirements of Federal OSHA, MIOSHA, State
Authorities, and Local Authorities. Failure to do so will cause this contractor to be removed from the site. (Hard Hats and Work Boots must be worn at all times.)
3. Recycling of demolished materials by the Contractor and Subcontractor is encouraged provided that the materials are not marked on the drawings or in the specification to be salvaged and returned to the Owner. Any expected recycling earnings by the Contractor or Subcontractor should be reflected in their bid pricing. Recycled materials are not to be stockpiled and must be removed at least weekly from the site. Individual recycling (“dumpster diving”) of demolished materials is not permitted on site.
4. Smoking and use of Drugs or Alcohol on School property is strictly prohibited!
5. The maximum allowable markup on Changes in the Work shall be ten percent (10%) which includes overhead, profit, estimating expenses, other office expense, and insurance costs.
6. Each Contractor shall furnish and maintain a trash receptacle, clearly marked with their company name in the vicinity of every work area for their daily use.
7. Contractor and Employee name shall be placed on all hard hats.
8. Drinking water is the responsibility of contractors for their crews.
9. Contractors are required to perform daily and weekly cleanup as defined in Specification Section 017100. This to include proper dust control as generated by their construction activities.
Dumpsters provided by owner. No concrete, wood pallets, cardboard, or masonry.
10. Contact “Miss Dig” three days prior to any excavations.
11. All contractors are to cooperate with testing agencies hired by the Contractor. This to include advance notification to the construction manager of activities requiring testing. (Compaction, soil bearing, concrete, steel, etc.) Additional costs associated with failed tests will be passed on to the contractor whose work did not pass.
12. This project will require permits and inspections from Arenac County. Fire inspection will be required by Arenac County. Contractors shall pull permits and schedule inspections as required by the governing authority.
13. Each contractor is responsible for all layout and field dimensions associated with their work.
Football Bleachers and HVAC Replacement 00 2200 - Bid Category General Notes
14. Contractors shall remove mud and debris from streets and walks as a result of their work activities and deliveries.
15. Fill out and turn in a Daily Report form every day as well as a weekly “tool box talk.”
16. Contractors are to put forth their best effort to protect existing finishes and newly installed products from damage.
17. Provide all lifting, hoisting, scaffolding, etc. as required for the full installation of your work.
Schedule deliveries during normal working hours.
18. All contractors are to participate in keeping the site secure at the end of each workday.
Contractors are to shut windows/doors and lock gates at the end of each workday.
19. Contractors shall provide snow and ice removal as required for their work.
20. All openings made by contractors shall be covered and maintained by the contractor creating the opening until permanent finishes are installed.
21. Firestopping of openings in walls shall be done by the contractor who created the opening.
22. The Design-Build Contractor shall obtain and pay for a building permit.
END OF SECTION 00 2200
Football Bleachers and HVAC Replacement 00 2400 - Bid Category Descriptions
SECTION 00 2400
BID CATEGORY #1
NEW FOOTBALL BLEACHERS - HOME / AWAY
The work scope for this Bid Category includes, but is not limited to the work as specified in the RFP.
Provide all labor, materials and equipment to satisfy the following Specification Sections and Notes unless otherwise noted.
Division 0 Bidding and Contract Requirements
BID CATEGORY NOTES (INCLUDING, BUT NOT LIMITED TO):
1. All permits by this contractor including design drawings, engineer stamped and submitted locally through Plan Review with Arenac County.
2. Existing bleachers and foundations will be removed by others.
3. Any site work not mentioned is by others.
4. Concrete pad under Home and Away bleachers is by others.
5. Existing Press Box on the Home side shall remain.
6. New Home bleachers will be immediately in front of the existing Press Box with no entry to Press
Box from the new bleachers.
7. Top guard rail in Home side bleachers shall not impede viewing from the Press Box.
SCOPE OF WORK (FURNISH AND ASSEMBLE NEW HOME BLEACHERS)
1. (1) unit @ 10 row x 121’6” bleacher with 36” elevation
2. Net seating capacity 693 + 8 ADA seats per unit
3. Aluminum angle understructure with 8” Rise / 24” Run
4. 36 inch elevation, 63 inch clear front walkway
5. 2 x 10 anodized aluminum seat plank with poly end caps
6. Double 2 x 10 mill finish aluminum foot plank with aluminum end caps
7. 1 x 6 riser rows 1 - 9 and (2) 1 x 6 top row risers mill finish
8. (3) 4’-6” wide vertical aisle with mid aisle handrail
9. 2 sets of entry stairs
10. Chain link guardrail system
11. (1) L-shaped ADA accessibility ramp + 8 wheelchair spaces
12. Concrete wedge anchors
13. Drawing 36A-1012106CL08
14. Galvanized hardware
15. Submittals required
SCOPE OF WORK (FURNISH AND ASSEMBLE NEW VISITOR SIDE BLEACHERS)
1. (1) unit @ 3 row x 24’ preferred tiered bleacher
2. Net seating 80
3. #TA-0324PRF
4. Aluminum angle understructure
5. 2 x 10 anodized aluminum seat plan
6. Double mill finish aluminum foot plank
7. Tiered for dual field viewing
BID CATEGORY #2
REPLACE INNOVATION LAB UNIT AND KITCHEN MAKE-UP AIR UNIT AND EXHAUST FANS
The work scope for this Bid Category includes, but is not limited to the work as specified in the RFP.
Provide all labor, materials and equipment to satisfy the following Specification Sections and Notes unless otherwise noted.
Division 0 Bidding and Contract Requirements
BID CATEGORY NOTES (INCLUDING, BUT NOT LIMITED TO):
1. All trades wok shall be included.
2. Engineered stamped drawings shall be by this contractor and submitted locally through Plan
Review with Arenac County.
SCOPE OF WORK:
1. Remove existing kitchen make-up air unit. Furnish and install (1) Captive Aire DOAS Heating / Cooling unit with curb.
2. Remove (2) kitchen exhaust fans. Furnish and install (2) Captive Aire exhaust fans with curb adapters.
3. Remove existing Innovation Lab unit and furnish and install (1) new Rheem package unit with economizer and new curb.
4. Furnish and install (1) concentric duct kit for the new unit in the Innovation Lab.
5. Reconnect existing gas line to both rooftop units.
6. Provide new wiring to both new rooftop units and reconnect electrical to the new kitchen exhaust fans and reusing existing Ansul system.
7. Seal all new ductwork per code.
8. Include all permits.
9. Test and place into operation.
10. Clean up debris.
END OF SECTION 00 2400
Football Bleachers and HVAC Replacement 00 4000 - Bid Form
SECTION 00 4000
BID FORM
TO: Chris Ming - Superintendent
RE: Au Gres-Sims School District Football Bleachers and HVAC Replacement Design-Build Project
Having carefully reviewed the bidding documents described in Section 00 1000 and understanding the scope of work involved in the proposed Bid Category and those that interface with it, we hereby propose to furnish labor, materials, tools, equipment, supervision, insurance and services required for the completion of all work required for the Bid Category indicated in accordance with the RFP.
BID CATEGORY #: DESCRIPTION:
BIDDERS NAME:
BASE BID:
Total Base Sum of
Dollars $
(OPTIONAL) COMBINED BID FOR CATEGORIES :
Total Combined Sum of
Dollars $
ADDENDA:
And having received and examined the following Addenda: (include date for acknowledgement)
Addendum Number , dated , 2025
ALTERNATES:
Bidders shall indicate on the Bid Form if the Alternate is an ADD or DEDUCT to the Base Bid and indicate the costs associated. If the Alternate does not affect your base bid you must circle NO CHANGE.
ADD $ DEDUCT $ NO CHANGE
UNIT PRICES:
Unit prices shall include all necessary material plus costs for delivery, installation, insurance, bonds, applicable taxes, overhead and profit.
VOLUNTARY ALTERNATES / SUBSTITUTIONS:
Bidder is cautioned to bid on the “Standards” specified. The following substitutions from the “Standards” specified are listed herein for consideration, and if accepted, the contract sum may be adjusted in accordance with the following:
Add / Deduct $
Add / Deduct $
WORK TIME:
The undersigned hereby agrees to complete the entire work per the Milestone Schedule.
EXPERIENCE MODIFICATION RATE (EMR):
List the EMR for your firm as described by your insurance carrier for the past three (3) years.
2024 2023 2022
TIME AND MATERIAL RATES: (REQUIRED)
Labor rates listed below include the following: Cost of labor including Michigan Single Business Tax, Social Security and Medicare, Federal and State Unemployment tax, and Fringe Benefits Under Collective Bargaining Agreements, and Worker’s Compensation Insurance. The rates listed below do not include overhead and/or profit. These rates are only for additions and/or deletions to the contract that could not have been anticipated at the time of the bid.
Trade Straight Time Shift Time 1 ½ Time Double Time
CONTRACT:
The undersigned agrees that the above Base Bid Prices shall hold for 60 days and Alternate Prices for 120 days after receipt of proposals, to accept provisions of “Instructions to Bidders.”
SUBMITTED BY:
Firm Name:
Address:
City/St/Zip:
Email Address:
Signed: Title:
Typed Name: Date:
Phone: Fax:
If Bidder is a Corporation, indicate State of Incorporation:
If a Partnership, give full names of all Partners:
Please submit (2) copies and retain (1) copy for your records.
END OF SECTION 00 4000
Football Bleachers and HVAC Replacement 00 4100 - Familial Disclosure Statement
SECTION 00 4100
FAMILIAL DISCLOSURE STATEMENT
All bidders must complete the following familial disclosure form in compliance with MCL 380.1267 (Public Act 232 of 2004) and attach this information to the bid.
By the attached sworn and notarized statement we are disclosing the following familial relationship(s) that exists between the owner or any employee of the bidder and any member of the board, intermediate school board, or board of directors or the superintendent of the school district, intermediate superintendent of the intermediate school district, or chief executive officer of the public school academy.
The Owner shall not accept a bid that does not include this sworn and notarized disclosure statement.
Disclose any familial relationship and complete the form below in its entirety:
The following are familial relationships as described above (provide employee name, family contact name, family contact position, and familial relationship or NONE.)
Signature(s): Title:
Name of firm:
STATE OF MICHIGAN )
) SS
COUNTY OF )
On this day of , 20 , before me a Notary Public in and for said county, personally appeared , agent of the said firm and who acknowledged the same to be his free act and deed as such agent.
Notary Public
END OF SECTION 00 4100
Football Bleachers and HVAC Replacement 00 7300 - Supplementary Conditions
SECTION 00 7300
SUPPLEMENTARY CONDITIONS
GENERAL CONDITIONS
ARTICLE 2 - OWNER
ARTICLE 3 - CONTRACTOR
1. Add Section 3.4.2.1 to Section 3.4.2:
3.4.2.1 After the Contract has been executed, the Owner will consider requests for the substitution of products in place of those specified only under the conditions set forth in the General Requirements (Division 1 of the Specifications).
By making requests for substitutions, the Contractor:
.1 represents that it has personally investigated the proposed substitute product and determined that it is equal or superior in all respects to that specified;
.2 represents that it will provide the same warranty for the substitution as it would have provided for the product specified;
.3 certifies that the cost data presented is complete and includes all related costs for the substituted product and for Work that must be changed as a result of the substitution, except for the Architect’s redesign costs, and waives all claims for additional costs related to the substitution that subsequently become apparent; and
.4 shall coordinate the installation of the accepted substitute, making such changes as may be required for the Work to be complete in all respects.
2. Delete subparagraph 3.4.3 and substitute:
3.4.3 The Contractor shall at all times enforce strict discipline and good order among the Contractor’s employees and any subcontractor employed by the contractor and shall not employ on the work any unfit person or anyone not skilled in the task assigned to them.
3. Add subparagraph 3.7.6
3.7.6 Regarding OSHA fines: The Contractor for any fines incurred as a result of the Contractor shall reimburse the Owner for similar fines against the Owner.
4. Add subparagraph 3.9.4
3.9.4 The Construction Manager reserves the right to cause the replacement of the superintendent, assistant superintendent or employee of the contractor who is not qualified, in the opinion of the Construction Manager to do the work.
ARTICLE 5 - SUBCONTRACTORS
ARTICLE 7 - CHANGES IN THE WORK
1. Add Subparagraph 7.1.4
7.1.4 The maximum allowable markup on Changes in the Work shall be ten percent (10%) which includes overhead, profit, estimating expenses, other office expense, bond and insurance costs.”
ARTICLE 8 - TIME
1. Add subparagraph 8.3.4
8.3.4 Claims for Delay: In the event the contractor is delayed in completing the work by the Owner for any reason, whether intentional or otherwise, and the delay does not preclude the contractor from completing the work within the time period specified in the contract agreement, the contractor shall be entitled to no remedy for such delay.
ARTICLE 9 - PAYMENTS AND COMPLETION
1. Add subparagraph 9.3.1.3
9.3.1.3 Up to time the work is substantially complete, the owner will make monthly payments to the contractor, based on the schedule of values of 90% of the value of labor and materials incorporated in the work and of 90% of all tangible materials stored at the site during that month. The Owner will have retained five percent (5%) of the total contract price for “Closeout Materials” and five (5%) of the total contract price for “Punch List Completion”. The Contractor may request payment of the retained percentages upon completion of that portion of their Work.
2. Add clause .8 to subparagraph 9.5.1
.8 Unsatisfactory clean-up in accordance with subparagraph 3.15.
ARTICLE 11 - INSURANCE AND BONDS
1. Add the following Sections 11.1.2.1 through 11.1.2.4 to Section 11.1.2:
11.1.2.1 The limits for Worker’s Compensation and Employers’ Liability insurance shall meet statutory limits mandated by State and Federal laws. If (1) limits in excess of those required by statute are to be provided, (2) the employer is not statutorily bound to obtain such insurance coverage, or (3) additional coverages are required, additional coverages and limits for such insurance shall be as follows:
WORKER’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE:
Worker’s Compensation: State of Michigan Statutory Limits
Employer’s Liability: $500,000 - each accident
$500,000 - disease (each employee) $500,000 - disease (policy limit)
11.1.2.2 The limits for Commercial General Liability insurance including coverage for Premises-Operations, Independent Contractors’ Protective, Products-Completed Operations, Contractual Liability, Personal Injury and Broad Form Property Damage (including coverage for Explosion, Collapse, and Underground Hazards) shall be as follows:
COMMERCIAL GENERAL LIABILITY INSURANCE:
Bodily Injury $1,000,000 - each occurrence $2,000,000 - aggregate
Property Damage $1,000,000 - each occurrence
Fire Damage (any one fire) $100,000
Medical Expense (any one person) $5,000
Notes:
(1) Products-Completed Operations Insurance shall be maintained for a minimum period of one (1) year after final payment.
(2) The Owner shall be listed as additional insured. The Owner shall be the certificate holder.
11.1.2.3 Automobile Liability insurance (owned, non-owned and hired vehicles) for bodily injury and property damage:
AUTOMOBILE LIABILITY INSURANCE:
Bodily Injury $1,000,000 Property Damage $1,000,000
11.1.2.4 Umbrella or Excess Liability Coverage:
UMBRELLA / EXCESS LIABILITY INSURANCE:
Umbrella/Excess Insurance $2,000,000 - each occurrence
2. Add Subparagraph 11.3.11
11.3.11 The provisions of this paragraph 11.3 shall not operate to relieve the Contractor of responsibility for loss or damage to the Contractor’s own or rented property or property of Contractor’s employees of whatever kind or nature, including but not limited to: tools, equipment, forms, scaffolding and temporary structures, including their contents. The Owner shall in no event be liable for loss or damage to the aforementioned items or other property of the contractor that is not included in the permanent construction.
3. Delete Subparagraph 11.3.7 Waivers of Subrogation
ARTICLE 13 - MISCELLANEOUS PROVISIONS
1. Delete subparagraph 13.6 - Interest in its entirety.
END OF SECTION 00 7300
| 00 0001 - Specification Cover |
| 00 0100 - Project Directory |
| 00 0110 - Table of Contents |
| 00 1000 - Advertisement for Bid |
| 00 2000 - Instructions to Bidders |
| 00 2200 - Bid Category General Notes |
| 00 2400 - Bid Category Descriptions |
| 00 4000 - Bid Form |
| 00 4100 - Familial Disclosure Statement |
| 00 7300 - Supplementary Conditions |
File details come from the government source that posted it. Updated .