Attchment E - General Solictation Instructions.pdf
PDF 135 KB Posted
- Attached to
- Aluminum Tubes, Plates, and Pipping Needs
- Solicitation number
- PR457594
- Issued by
-
Department of Energy
About this file
This document is a General Solicitation Instructions file (BSD-CS-2058, dated January 13, 2026) that establishes the procedural requirements and guidelines for submitting offers in response to a federal contract solicitation.
Key submission requirements include: offerors must examine all solicitation documents and sign their offers with initialed changes; unit prices must include packing and shipping unless otherwise specified; delivery timelines must be stated definitively and include weekends and holidays; exceptions to solicitation requirements must be clearly referenced; and the Company does not reimburse costs incurred in offer preparation. Offerors must acknowledge receipt of any solicitation amendments in writing. Late submissions received before award may be considered at the Company's discretion. Payment will be made via electronic funds transfer (EFT) through Ariba registration, and prompt payment discounts will be evaluated as part of offer assessment. Offerors should visit the work site to ascertain conditions affecting work and cost estimates, with failure to do so not relieving them of responsibility for proper cost estimation.
The document addresses proprietary information protection, technical data rights, brand name or equal products, unbalanced pricing analysis, and compliance with federal statutes including the Buy American Act (construction materials) and Davis-Bacon Act (wage determinations for secondary work sites). Award will be made to the responsible offeror providing best value considering total cost and other evaluation factors. The Company reserves the right to reject any or all offers, waive informalities, and accept individual line items. Government-furnished property will not be provided unless specified in the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
January 13, 2026
BSD-CS-2058
GENERAL SOLICITATION INSTRUCTIONS
1. PREPARATION OF OFFERS. (a) Offerors are expected to examine the drawings, specifications, descriptions, terms and conditions, and all instructions. Failure to do so will be at the Offeror's risk.
(b) Each Offeror shall furnish the information required by the solicitation. The Offeror shall sign the offer. Erasures or other changes must be initialed by the person signing the offer.
(c) Unit price for each unit offered shall be shown and such price shall include packing and shipping materials unless otherwise specified. A total price shall be entered for each item offered. In case of discrepancy between a unit price and total price, the unit price will be presumed to be correct.
(d) Offeror must state a definite time for delivery of supplies or performance of services unless otherwise specified in the solicitation. Time, if stated as a number of days, will include Saturdays, Sundays, and holidays.
(e) Offers in strict accordance with the solicitation are desired. Any exceptions should be referenced to related documents by title, page, and paragraph, and should be set forth in detail.
(f) This solicitation does not commit the Company to pay for any costs incurred in the preparation and submission of an offer or for any other costs incurred prior to the execution of an Agreement.
2. EXPLANATION TO PROSPECTIVE OFFERORS. Any explanation desired by a prospective Offeror regarding the meaning or interpretation of the solicitation, drawings, specification, etc., must be requested with sufficient time allowed for a reply to reach all prospective Offerors before submission of their offers. Any information given to a prospective Offeror will be furnished to all prospective Offerors if such information is necessary in submitting offers or if the lack of such information would be prejudicial to any other prospective Offerors.
3. ACKNOWLEDGMENT OF AMENDMENTS. Receipt of an amendment to a solicitation must be acknowledged in writing by prospective Offerors.
4. LATE SUBMISSIONS OF OFFERS. Any proposal received after the time specified but before award may be considered solely within the Company’s discretion.
5. PAYMENT. Payment shall be made by electronic funds transfer (EFT). EFT enrollment shall be completed during the Ariba registration process.
6. DISCOUNTS. Prompt payment discounts will be included in the evaluation of offers, provided the period of the offered discount is sufficient to permit payments within such period in the regular course of business under the delivery, inspection, and payment provisions of the solicitation.
7. TREATMENT OF OFFER INFORMATION. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Company or the Government except for evaluation purposes, shall—
(a) Mark the title page with the following legend:
This proposal includes information that shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, an Agreement is awarded to this Offeror as a result of—or in connection with—the submission of this information, the Company and the Government shall have the right to duplicate, use, or disclose the information to the extent provided in the resulting Agreement. This restriction does not limit the Company’s and the Government's right to use information contained in this information if it is obtained from another source without restriction. The information subject to this restriction are contained in pages [insert numbers or other identification of pages]; and
(b) Mark each page of information it wishes to restrict with the following legend:
Use or disclosure of information contained on this page is subject to the restriction on the title page of this proposal.
8. RIGHTS TO TECHNICAL DATA IN SUCCESSFUL PROPOSALS. (a) Should an Agreement be awarded based on a proposal, it is policy, in consideration of the award, to obtain unlimited rights for the Government in technical data (but not commercial or financial information) contained in a successful proposal upon which award of an Agreement is based. To exclude technical data contained in a proposal from the Government’s rights, the Offeror must—
(1) advise the Company that the technical data, or portions thereof that are identified by the Offeror, are covered by the restrictive notice regarding the disclosure and use of proposal information in accordance with the provision of this solicitation entitled Treatment of Offer Information and request that such protection be maintained by excluding the data from the Government’s rights; or
BSD-CS-2058
(2) establish to the Company’s satisfaction that identified portions of the technical data do not relate directly to or will not be utilized in the work to be performed under the Agreement, and request that such portions be excluded from the Government’s rights.
(b) If unlimited rights to technical data in successful proposals, as set forth in paragraph (a) of this section are to be acquired, it shall be by use of the clause below titled “Rights to Proposal Data (Technical).” Any excluded technical data will be identified by inserting appropriate proposal page numbers in the clause, which clause enables the identification of data to be excluded from the Government’s rights, as discussed in paragraph (a) of this section. Such exclusion is not dispositive of the protective status of the data, but any excluded technical data, as well as any commercial and financial information contained in the proposal, will be used for evaluation purposes only. If there is a need to have access to any of the excluded technical data during contract performance, their acquisition will be as limited rights data, if they so qualify, in accordance with Federal Acquisition Regulation 27.404(d).
Rights to Proposal Data (Technical)
Except for data contained on pages __________, it is agreed that as a condition of the award of this subcontract and notwithstanding the conditions of any notice appearing thereon, the Government shall have unlimited rights (as defined in the “Rights in Data - General” clause contained in this subcontract in and to the technical data contained in the proposal dated __________ upon which this subcontract is based.
9. GOVERNMENT-FURNISHED PROPERTY. No material, labor, or facilities will be furnished by the Company or the Government unless otherwise provided in the solicitation.
10. AWARD OF SUBCONTRACT. (a) Unless specified otherwise elsewhere in this solicitation, the Agreement will be awarded to the responsible Offeror whose offer represents the best value, total cost and/or price of the acquisition and other factors considered.
(b) The Company reserves the right to reject any or all offers and to waive informalities and minor irregularities in offers received.
(c) Except as may otherwise be provided in the solicitation, the Company may accept any item or group of items of any offer, unless the Offeror qualifies the offer by specific limitations.
(d) The Company may accept within the time specified therein, any offer (or part thereof, as provided in (c) above), whether or not there are negotiations subsequent to its receipt, unless the offer is withdrawn by written notice received by the Company prior to award. If subsequent negotiations are conducted, they shall not constitute a rejection or counteroffer on the part of the Company.
(e) It is the Company’s intent to award based on initial offers. Accordingly, each offer should be submitted on the most favorable terms, from a price and technical standpoint that the Offeror can submit. However, the Company may allow for proposal revisions if the Company deems it necessary.
11. BRAND NAME OR EQUAL. (a) If items called for by this solicitation have been identified by a "brand name or equal" description (including identification of products by make and model), such identification is intended to be descriptive, but not restrictive, and is to indicate the quality and characteristics of products that will be considered satisfactory. Offers offering "equal" products (including products of the brand name manufacturer other than the one described by the brand name) will be considered for award if such products are clearly identified in the offer and are determined by the Company to meet fully the salient characteristics requirements listed in the solicitation.
(b) Unless the Offeror clearly indicates in the offer that it is offering an "equal" product, the offer shall be considered as offering the brand name product referenced in the solicitation.
(c)(1) If the Offeror proposes to furnish an "equal" product, the brand name, if any, of the product to be furnished shall be clearly identified in the offer. The evaluation of offers and the determination as to equality of the product offered shall be the responsibility of the Company and will be based on information furnished by the Offeror. The Offeror must furnish all descriptive material (such as cuts, illustrations, drawings, or other information) necessary for the Company to (i) determine whether the product offered meets the salient characteristics requirements of the solicitation, and (ii) establish exactly what the Company would be binding itself to purchase by making an offer. The Company is not responsible for locating or securing any information that is not furnished with the offer.
(2) If the Offeror proposes to modify a product so as to make it conform to the requirements of the solicitation, it shall
(i) include in the offer a clear description of such proposed modifications and (ii) clearly mark any descriptive material to show the proposed modifications.
12. UNBALANCED PRICING. The Company may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items and option items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. An offer may be rejected if the Company determines that the lack of balance poses an unacceptable risk to the Company.
13. CONDITIONS AFFECTING THE WORK. Offerors should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or
BSD-CS-2058
the cost thereof. Failure to do so will not relieve Offerors from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Company and the Government will assume no responsibility for any understanding or representations concerning conditions made by any of their officers or agents prior to the execution of the Agreement, unless that understanding or representation is expressly stated in the Agreement resulting from this solicitation.
14. NOTICE OF BUY AMERICAN ACT REQUIREMENT - CONSTRUCTION MATERIALS.
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American Act - Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An Offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Company in time to allow a determination before submission of offers. The Offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an Offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer or has not received a response to a previous request, the Offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Company will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at
FAR 52.225-9.
(2) If evaluation results in a tie between an Offeror that requested the substitution of foreign construction material based on unreasonable cost and an Offeror that did not request an exception, the Company will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material not listed by the Company in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the Offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the Offeror shall submit a separate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Company has not yet determined an exception applies.
(3) If the Company determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Company will evaluate only those offers based on use of the equivalent domestic construction material, and the Offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested may be accepted if revised during negotiations.
15. DAVIS-BACON ACT – SECONDARY SITE OF THE WORK
(a)(1) The Offeror shall notify the Company if the Offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the clause entitled FAR 52.222-6, Davis-Bacon Act, of this solicitation.
(2) If the Offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the Offeror shall request a determination from the Company.
(b)(1) If the wage determination provided by the Company for work at the primary site of the work is not applicable to the secondary site of the work, the Offeror shall request a wage determination from the Company.
(2) The due date for receipt of offers will not be extended as a result of an Offeror's request for a wage determination for a secondary site of the work.
File details come from the government source that posted it. Updated .