Attch3_NER_GenSetBidScheduleRev_1_2pp.xls
XLS spreadsheet 39 KB Posted
- Attached to
- CO-NATL EAGLE REPSTRY-GENERATOR SET Federal contract opportunity
- Solicitation number
- 140FC124Q0018
About this file
This document is a Summary Cost Breakdown for a federal contract opportunity related to the replacement of a generator set at the National Eagle Repository (NER) located in Commerce City, Colorado. The project has an estimated value between $100,000 and $250,000 and is a Total Small Business set-aside. The required work includes installing a new 150 kW natural gas-fired exterior standby generator, automatic and manual transfer switches, and replacing existing conductors as necessary to provide a complete and operational system. The cost breakdown is organized by general conditions, materials, equipment, and labor, with a total final cost for the project. The document references using the latest annual RS Means Estimating Guide for determining line item costs. This acquisition will be awarded as a single Firm-Fixed-Price contract on a Best Value basis considering price, technical, and past performance factors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attch2_WD_GeneralDecision_CO20240015_AdamsCo_7pp.pdf | ||
| Sol_140FC124Q0018.pdf | ||
| Attch1_SOW_NER_GenSet-Alt-RepairServices-240611_16pp.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BidSheet
| Summary of Cost Breakdown | ||||||||||
| A. General Conditions | ||||||||||
| $ Amount | ||||||||||
| 1 | Mobilization / Demobilization: | |||||||||
| 2 | Bonds | |||||||||
| 3 | Insurance | |||||||||
| 4 | Travel (as applicable) | |||||||||
| 5 | Lodging (as applicable) | |||||||||
| 6 | Design (as applicable) | |||||||||
| Total (A): | $ - 0 | (X4) | ||||||||
| B. Summary of Cost Breakdown for | ||||||||||
| Materials, Equipment, and Labor * | ||||||||||
| 1 | Labor | (X1) | $0 | |||||||
| 2 | Materials | (X2) | $0 | |||||||
| 3 | Equipment | (X3) | $0 | |||||||
| Subtotal: | $0 | |||||||||
| Sub-total | ||||||||||
| X Coefficient (%): | ||||||||||
| Total (B): | 0 | |||||||||
| C. FINAL COST FOR PROJECT (A + B) | $0 | |||||||||
| * The breakdown totals are derived from RS Means Line item numbers and item descriptions as shown in the | ||||||||||
| RS Means Cost Estimating Guide for the individual elements under each division, taken from attached pages | ||||||||||
| of this summary cost breakdown. | ||||||||||
| PLEASE NOTE: | The RS Means Line #s and Descriptions shall be utilized for the latest annual | |||||||||
| RS Means Estimating Guide. | ||||||||||
| PROJECT NAME: | NER Generator Set Replacement | |||||||||
| LOCATION: | National Eagle Repository | |||||||||
| DATE PREPARED: | ||||||||||
| ESTIMATOR: | ||||||||||
| Line Item # | Item Description from Means | Quantity | Bare Labor | Bare Material | Bare Equipment | Total | ||||
| from Means | no. | unit | per | Total | per | Total | per | Total | Cost | |
| units | measure | unit | unit | unit | ||||||
| Div 1 | General Requirements | X4 | ||||||||
| Mobilization and Demobilization | 1 | LS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | ||
| Bond | 1 | LS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | |
| Insurance | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | ||||
| Professional Design Services (as required) | 1 | LS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0 | ||
| Travel and lodging (as required) | 0.00 | 0.00 | 0.00 | 0 | ||||||
| 0.00 | 0.00 | 0.00 | 0 | |||||||
| Div 2 | Site Construction | 0.00 | 0.00 | 0.00 | 0 | |||||
| Div. 2 | Demolition | 1 | LS | 0.00 | 0.00 | 0.00 | 0 | |||
| Div. 32 | Earthwork | 0.00 | 0.00 | 0.00 | 0 | |||||
| 0.00 | 0.00 | 0.00 | 0.00 | 0 | ||||||
| Div 3 | Concrete | 1 | LS | 0.00 | 0.00 | 0.00 | 0 | |||
| 0.00 | 0.00 | 0.00 | 0 | |||||||
| Div 4 | Masonry | 0.00 | 0.00 | 0.00 | 0 | |||||
| 0.00 | 0.00 | 0.00 | 0 | |||||||
| Div 5 | Metals | 0.00 | 0.00 | 0.00 | 0 | |||||
| 0.00 | 0.00 | 0.00 | 0 | |||||||
| Div 6 | Wood & Plastics | 0.00 | 0.00 | 0.00 | 0 | |||||
| 0.00 | 0.00 | 0.00 | 0 | |||||||
| Div 7 | Thermal & Moisture Protection | 0.00 | 0.00 | 0.00 | 0 | |||||
| 0.00 | 0.00 | 0.00 | 0 | |||||||
| Div 8 | Doors & Windows | 0.00 | 0.00 | 0.00 | 0 | |||||
| 0.00 | 0.00 | 0.00 | 0 | |||||||
| Div 9 | Finishes | 0.00 | 0.00 | 0.00 | 0 | |||||
| 0.00 | 0.00 | 0.00 | 0 | |||||||
| Div 10 | Specialties | 0.00 | 0.00 | 0.00 | 0 | |||||
| 0.00 | 0.00 | 0.00 | 0 | |||||||
| Div 11 | Equipment | 0.00 | 0.00 | 0.00 | 0 | |||||
| 0.00 | 0.00 | 0.00 | 0 | |||||||
| Div 12 | Furnishings | 0.00 | 0.00 | 0.00 | 0 | |||||
| 0.00 | 0.00 | 0.00 | 0 | |||||||
| Div 13 | Special Construction | 0.00 | 0.00 | 0.00 | 0 | |||||
| 0.00 | 0.00 | 0.00 | 0 | |||||||
| Div 14 | Conveying Systems | 0.00 | 0.00 | 0.00 | 0 | |||||
| 0.00 | 0.00 | 0.00 | 0 | |||||||
| Div 15 | Mechanical | 0.00 | 0.00 | 0.00 | 0 | |||||
| 0.00 | 0.00 | 0.00 | 0 | |||||||
| Div 16 | Electrical | 0.00 | 0.00 | 0.00 | 0 | |||||
| Sub-Total Divisions 2-16 | $0 | $0 | $0 | |||||||
| Average Coeffient to be applied on Divisions 2-16 | (X1) | (X2) | (X3) | |||||||
| Sub-Total | 0 | |||||||||
| Division 1 General Requirements | (X4) | 0 | ||||||||
| Total Contractors Cost | $0 |
&L&"Arial,Bold"US Fish and Wildlife Service 140FC124Q0018&C&D&RPage &P
ATTACHMENT 3
601818R700
FISH AND WILDLIFE SERVICE
SUMMARY COST BREAKDOWN
FOR PROJECTS
File details come from the government source that posted it. Updated .