Attch 7 Experience Form.docx

DOCX document 28 KB Posted

Attached to
Repair HVAC Harmon Arnold Halls
Solicitation number
FA700020R0013
Issued by

About this file

This document contains an experience form and solicitation for repair work at Harmon and Arnold Halls at the United States Air Force Academy. The experience form requests information on two recent HVAC installation or repair projects completed as a prime contractor or subcontractor, where at least 300 tons of aggregate chiller capacity was installed including one chiller of at least 100 tons. Projects must have been performed within the last five years and included installation, demolition, testing, balancing, and controls work. At least one project must demonstrate use of a temporary chiller. The solicitation is for repair of HVAC systems at the specified buildings with a period of performance of 300 calendar days from notice to proceed. The contract type is firm-fixed-price between $1,000,000 to $5,000,000. This opportunity is a 100% set-aside for women-owned small businesses according to FAR 19.15.

View the file

Other files

File Type Posted
Conformed Slctn FA700020R00130001.pdf PDF
Attch 1 - SOW Rev 2.pdf PDF
SF 30 Slctn Am 01 FA700020R00130001.pdf PDF
Solicitation - FA700020R0013.pdf PDF
Attch 6_WD23Jan20.pdf PDF
Attch 05 HAZMAT Report.pdf PDF
Attch 8 Fncl Reference.doc DOC document
Attch 03 Specifications.pdf PDF
Attch 02 Drawings.pdf PDF
Attch 04 USAFA EnviroStnds 2019.pdf PDF
Attch 1 - SOW Rev 01.pdf PDF
Attch 09 Siemens JA Redacted.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA700020R0013

EXPERIENCE FORM

FA7000R0013

Repair HVAC – Harmon and Arnold Halls

OFFEROR INFORMATION:

Company Name: Point of Contact Name/Title: Telephone Number: Email:

INSTRUCTIONS:

The prime offeror must submit verifiable information for two (2) recent completed projects (e.g. task orders, purchase orders, contracts, etc.) performed by the offeror as either a prime contractor or subcontractor for similar work. The first two projects on the Experience form will be evaluated. Any additional projects submitted will not be evaluated. Fill in all blanks in the space provided in typewritten text no smaller than 12-point font. Alternate formats will not be considered, including descriptions that extend beyond the space provided. Each submitted project must include:

a. Work must have been completed within five (5) years of this solicitation's closing date;

b. HVAC installation/repair/replacement work in which at least 300 tons of total aggregate chiller capacity were installed;

c. At least one installed chiller had a capacity of at least 100 tons.

For Example - a project in which FOUR 50-ton chillers and ONE 100-ton chillers were installed (50+50+50+50+100=300) would meet the minimum capacity requirements above. Also, a project in which ONE 300-ton chiller was installed would meet the minimum capacity requirements above. However, a project in which EIGHT 75-ton chillers were installed would NOT meet the minimum capacity requirements above (because none of the chillers met the 100-ton requirement of part c, above).

d. Completion of all of the incidental construction work: System Controls Work, Electrical Work, HVAC Demolition, HVAC Test and Balancing, HVAC Ductwork Installation.

e. In at least one of the submitted Experience projects, offeror will demonstrate installation and utilization of a temporary chiller unit.

PROJECT 1:

Project Title:Requiring Organization:
Place of Performance:Contract Number:Contract Value:

Contract Period or Dates of Performance:

This project was performed by the named offeror as (circle one): Prime Contractor -OR- Subcontractor Number of chillers installed: _________________ Aggregate Chiller Capacity: ______________________________ Was at least one temporary chiller utilized? ___________ In the space provided below, briefly describe the work completed. Include any unusual conditions or unique challenges and how your company addressed them:

Client/Customer to Verify Project 1 Information POC Name:

Telephone Number: Email:

PROJECT 2:

Project Title:Requiring Organization:
Place of Performance:Contract Number:Contract Value:Contract Period or Dates of Performance:This project was performed by the named offeror as (circle one): Prime Contractor -OR- Subcontractor Number of chillers installed: _________________ Aggregate Chiller Capacity: ______________________________

Was at least one temporary chiller utilized? ___________ In the space provided below, briefly describe the work completed. Include any unusual conditions or unique challenges and how your company addressed them:

Client/Customer to Verify Project 2 Information POC Name:

Telephone Number: Email: