Attch_6_Limitations_on_Subcontracting.xlsx
XLSX spreadsheet 93 KB Posted
- Attached to
- Ruby Creek Chip Seal Federal contract opportunity
- Solicitation number
- 140L0622R0041
About this file
This document is a limitations on subcontracting template attachment for the federal contract opportunity solicitation number 140L0622R0041 for Ruby Creek Chip Seal work. The solicitation is from the Department of the Interior Bureau of Land Management National Office and involves road and safety improvements. The template calculates limitations on subcontracting percentages and requires a minimum of 15% of work to be performed by the prime contractor. It includes fields for total contract value, material and labor costs for both the prime contractor and small business subcontractors. The template ensures at least the required percentage of work is performed by the prime contractor and small business subcontractors in compliance with regulations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attch_8_Contractor_Questions_0001.pdf | ||
| Sol_140L0622R0041_Amd_0001.pdf | ||
| Attch_7_Section_K_Reps_and_Certs.docx | DOCX document | |
| Attch_2_Drawings.pdf | ||
| Attch_1_Specifications.pdf | ||
| Attch_4_Price_Breakout.xlsx | XLSX spreadsheet | |
| Attch_3_Wage_Determination.pdf | ||
| Attch_5_SF1442_Instructions.pdf | ||
| Sol_140L0622R0041.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | Ruby Creek Road and Safety Improvements |
| Type of Set Aside | Total Small Business |
| Performance Period | 365 Days After NTP |
| Required Self-Performance | 15% |
(A) Total Amount Proposed*
(B) Total Material Cost
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost $0.00
| (G) Limitation on Subcontracting Percentage* | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) = (B) + (F) |
| *Note 2: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .