This is a Submittal Register template for a federal construction contract related to Post Wide Exterior Paint Requirements. The document provides a comprehensive tracking system for all required submittals throughout the project lifecycle, organized by CSI specification sections and submittal categories.

The register covers preconstruction submittals (SD-01), shop drawings (SD-02), product data (SD-03), samples (SD-04), design data (SD-05), test reports (SD-06), certificates (SD-07), manufacturer's instructions (SD-08), manufacturer's field reports (SD-09), and operation/maintenance data (SD-10), as well as closeout submittals (SD-11). Key construction areas tracked include demolition and deconstruction (02 41 00), lead-based paint abatement (02 82 33.13 20), masonry restoration (04 03 00), structural lumber (06 10 00), exterior trim and siding (06 20 00), fiberglass reinforced polymer components (06 82 14), roofing (07 60 00), sealants and caulking (07 92 00), hardware (08 71 00), glazing (08 81 00), and exterior coatings (09 90 00). The register requires documentation of contractor qualifications, quality control plans, testing certifications, material samples, structural upgrades, sustainability certifications, safety programs, environmental compliance documentation (including lead waste management and hazardous waste disposal), and manufacturer warranties. Submittals are classified as either Government (G) or Sustainability (S) requirements, with tracking columns for submission dates, approval dates, and distribution to reviewing authorities.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 10 PAGES

Post Wide Exterior Paint Requirements

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 GPreliminary High Performance

and Sustainable Building Checklist

1.4.1 GSustainability Action Plan

1.5.3.1 GPreliminary Sustainability

eNotebook SD-11 Closeout Submittals

1.5.3.1 GFinal High Performance and

Sustainable Building Checklist

1.5.3.1 GFinal Sustainability eNotebook

1.5.3.1 GAmended Final Sustainability

eNotebook

1.5.3.1 GAmended Final High

Performance and Sustainable Building Checklist

01 45 00.10 20 SD-01 Preconstruction Submittals

1.6 GQC Plan

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.2.1 GDeconstruction Plan

1.10Existing Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) jeffrey.shugart Typewritten Text

ATTACHMENT NO. 4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 10 PAGES

02 41 00 Receipts 02 82 33.13 20 SD-03 Product Data

1.6.4 GVacuum Filters

1.6.1 GRespirators

SD-06 Test Reports

1.5.2.3 GSampling Results

1.5.2.3 GOccupational and Environmental

Assessment Data Report SD-07 Certificates

1.5.1.1 GQualifications of CP

1.5.1.3 GTesting Laboratory

3.1.1.1 GOccupant Notification

1.5.1.2 GTraining Certification

3.1.1.1 GNotification of the

Commencement of LBP Hazard Abatement

1.5.3 Glead-based paint/paint with lead

removal/control plan

1.6.3 GRental equipment notification

1.5.2.6 GRespiratory Protection Program

1.5.2.7 GHazard Communication Program

3.5.2 GEPA or State approved

hazardous waste treatment, storage, or disposal facility

1.5.2.8 GLead Waste Management Plan

1.6.4 GVacuum filters

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 10 PAGES

02 82 33.13 20 3.5.1.1 GClearance Certification SD-11 Closeout Submittals

3.5.2.1 GHazardous Waste Manifest

1.5.2.4 GMedical Examinations

1.5.1.2 GTraining Certification

3.5.2.1 GTurn-In Documents or Weight

Tickets 03 33 00 SD-02 Shop Drawings

1.4.1Detail Drawings SD-04 Samples

2.1Materials 1.4.2Panels

04 03 00 SD-01 Preconstruction Submittals GQuality Control Plan

1.5.1 GProject Training Program

1.5.2 GQualifications

SD-03 Product Data 1.5.2Qualifications

1.5.6 GCleaning and Restoration

Methods

2.1 GCleaning Materials

2.1.4Biocides

GReplacement Mortar

2.4 GMortar Mix

3.4.8.3 GWater Repellents Infiltration

3.4.8.4 GStone Consolidants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 10 PAGES

04 03 00 SD-04 Samples

1.5.7.1 GMock-ups

SD-05 Design Data

3.5.1 GStructural Upgrades

SD-06 Test Reports 2.2.2.1Testing and Matching 3.5.2Existing Sealants for Asbestos and PCBs SD-07 Certificates

2.2Repair Materials 06 10 00 SD-03 Product Data

2.1.3Plastic Lumber 1.8Fire-retardant Treatment 2.4.2Adhesives

2.1.3 SRecycled Content for Plastic

Lumber SD-05 Design Data

1.9.1 GModifications of Structural

Members

SD-06 Test Reports 1.4.3Preservative-treated

SD-07 Certificates 1.10.1Certificates of Grade

2.1.1 SCertified Sustainably Harvested

Virgin Lumber

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 10 PAGES

06 10 00 2.1.2 SCertified Sustainably Harvested Natural-decay and Insect-resistant Wood

SCertified Sustainably Harvested Framing Lumber

SCertified Sustainably Harvested Structural Glued Laminated Timber

SCertified Sustainably Harvested Plywood Subflooring

SCertified Sustainably Harvested Structural-use and OSB Panel Subfloor Sheathing

SCertified Sustainably Harvested Plywood Combination Subfloor Underlayment

SCertified Sustainably Harvested Plywood Wall Sheathing

SCertified Sustainably Harvested Structural-use and OSB Panel Wall Sheathing

SCertified Sustainably Harvested Structural-use and OSB Panel Diaphragm

SCertified Sustainably Harvested Plywood Shear Wall

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 10 PAGES

06 10 00 SCertified Sustainably Harvested Structural-use and OSB Panel Shear Wall

SCertified Sustainably Harvested Plywood for Other Uses

SCertified Sustainably Harvested Structural-use and OSB Panels for Other Uses

1.7Preservative Treatment SD-10 Operation and Maintenance Data

3.5Take-back Program 06 20 00 SD-03 Product Data

2.1 GWood Products

2.1.13.7 GEngineered

1.3 GTreated Wood Products

2.2 GSoffits

2.3 GFascias and Trim

SD-04 Samples GSamples

SD-07 Certificates

1.5.1.1 GCertificates of Grade

SCertified Sustainably Harvested Wood for Trim and Frames

2.1.5 SCertified Sustainably Harvested

Softwood Plywood

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 10 PAGES

06 20 00 2.1.6 SCertified Sustainably Harvested Hardwood Plywood

SCertified Sustainably Harvested Hardboard

2.1.13 SCertified Sustainably Harvested

Siding

06 82 14 SD-01 Preconstruction Submittals

1.3.1 GQualifications of Manufacturer

GQualifications of Engineer of Record

SD-03 Product Data

2.1.2 GFRP Pipe and Tube

2.1.2 GRailings/Guards

2.1.2 GAnchorage Materials

2.1.2 GAdhesives

2.1.2 GResins

2.1.2 GHardeners

1.3.1Manufacturer's Sample Warranty

SD-06 Test Reports 2.1.3Ultraviolet Test Reports 2.1.3Thermal Expansion Test Reports 2.1.3Flame Spread Test Reports

SD-07 Certificates Manufacturer's Certification by the State of Kansas Product Approval

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 10 PAGES

06 82 14 1.3.1Proof of Certification from a minimum of two quality assurance programs for its facilities or products (UL, DNV, ABS, USCG, AARR)

SD-08 Manufacturer’s Instructions 3.2.2Manufacturer's Instructions

SD-09 Manufacturer’s Field Reports

3.1Manufacturer's Certification of Installation

SD-11 Closeout Submittals 3.2.1Manufacturer's Warranty

07 60 00 SD-04 Samples

1.4.2 GFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

SD-10 Operation and Maintenance Data

1.4.3 GCleaning and Maintenance

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

3.1 GField Adhesion

08 71 00 SD-03 Product Data GHardware Items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 10 PAGES

08 71 00 SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

GHardware Schedule 08 81 00 SD-03 Product Data

2.2Plastic Glazing 1.3Glazing Accessories

SD-04 Samples 3.2.4Plastic Sheet 2.3.2Glazing Compound 2.3.3.1Sealant

SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials 3.2Glass Setting

09 90 00 SD-03 Product Data

2.1 GCoating

3.3.5Sealant

SD-04 Samples

1.9 GColor

SD-07 Certificates 1.3Applicator's Qualifications

1.4.1.2 GQualification Testing

SD-08 Manufacturer’s Instructions 3.4.1Application Instructions 3.8.2Mixing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 10 PAGES

09 90 00 1.7.2Manufacturer's Safety Data Sheets

SD-10 Operation and Maintenance Data

2.1 GCoatings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .