Attch 3 Organizational Conflict of Interest.pdf

PDF 288 KB Posted

Attached to
Design and Build of Continuous Flow Thermal Effluent Decontamination Systems
Solicitation number
W81XWH22R0073
Issued by

About this file

This document outlines organizational conflict of interest (OCI) requirements for a federal contract to design and build two continuous flow thermal effluent decontamination systems for the U.S. Army Medical Research Institute of Infectious Diseases. Contractors must identify potential OCI and propose mitigation plans to avoid unfair competitive advantages or biased judgments. Specific restrictions prevent contractors from later competing for system components or related follow-on work if they perform systems engineering, technical direction, specifications development or technical evaluation on this contract. Contractors must also protect proprietary information of other companies and certify their OCI status. Failure to disclose OCI may result in termination or disqualification from future awards.

View the file

Other files

File Type Posted
W81XWH-22-R-0073 Amendment 0003.pdf PDF
W81XWH22R0073 Amendment 2.pdf PDF
Site Layout for TEDS3.pdf PDF
B08 Site Photo 8 IMG_0358.jpg JPG image
B08 Site Photo 9 IMG_0359.jpg JPG image
B08 Site Photo 1 IMG_0347.jpg JPG image
B08 Site Photo 5 IMG_0353.jpg JPG image
B08 Site Photo 3 IMG_0349.jpg JPG image
B08 Site Photo 2 IMG_0348.jpg JPG image
B08 Site Photo 10 IMG_0360.jpg JPG image
B08 Site Photo 6 IMG_0356.jpg JPG image
W81XWH-22-R-0073 Solicitation Question Govt.pdf PDF
W81XWH22R0073 Amendment 0001.pdf PDF
B08 Site Photo 7 IMG_0357.jpg JPG image
B08 Site Photo 4 IMG_0350.jpg JPG image
Attch 4 Non-disclosure Statement.docx DOCX document
W81XWH-22-R-0073.pdf PDF
Attch 2 Past Performance Assessment Questionnaire.docx DOCX document
Attch 1 Quality Assurance Surveillance Plan.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3- Organizational Conflict of Interest:

The FAR Part 9.5 prescribes responsibilities, general rules, and procedures for identifying, evaluating, and resolving

Organizational Conflict of Interest (OCI), provides examples to assist Contracting Officers in applying these rules and procedures to individual contracting situations; and implements section 8141 of the 1989 Department of

Defense Appropriation Act. The two (2) underlying principles which the FAR seeks to avoid are preventing the existence of conflicting roles that might bias a Contractor's judgment and preventing unfair competitive advantage. An unfair competitive advantage exists where a Contractor competing for award of any Federal contract possesses --

(1) Proprietary information that was obtained from a Government official without proper authorization; or

(2) Source selection information (as defined in FAR 2.101) that is relevant to the contract but is not available to all competitors, and such information would assist that Contractor in obtaining the contract.

The following subsections prescribe certain limitations on contracting as the means of avoiding, neutralizing or mitigating organizational conflicts of interest.

It is the Contractor’s responsibility to notify the Contracting Officer of any potential OCI. In the event that an OCI exists the Contractor shall propose a Mitigation Plan that shall be reviewed and accepted by the Contracting Officer prior to continuance of the work that presents an OCI. Should the proposed Mitigation Plan not be accepted by the

Contracting Officer, the Government may terminate this contract, disqualify the Contractor from subsequent related contractual efforts, and pursue any remedies as may be permitted by the law or this contract.

Contractors shall sign a Non-Disclosure Agreement at the start of their performance on the contract.

If, under this contract, the Contractor will provide systems engineering and technical direction for a system, but does not have overall contractual responsibility for its development, integration, assembly, checkout or production, the

Contractor shall not be awarded a subsequent contract to supply the system or any of its major components, or to act as consultant to a supplier of any system, subsystem, or major component utilized for or in connection with any item or other matter that is (directly or indirectly) the subject of the systems engineering and technical direction. The term of this prohibition shall endure for the entire period of this contract and for two (2) years thereafter.

If, under this contract, the Contractor will prepare and furnish complete specifications covering non-developmental items, to be used in a competitive acquisition, the Contractor shall not be permitted to furnish these items, either as a prime or subcontractor. The term of this prohibition shall endure for the entire period of this contract performance and for either two (2) years thereafter or the duration of the initial production contract whichever is longer. This rule shall not apply to Contractors who furnish specifications or data at Government request or to situations in which

Contractors act as Government representatives to help Government agencies prepare, refine or coordinate specifications, provided this assistance is supervised and controlled by Government representatives.

If, under this contract, the Contractor will prepare or assist in preparing a work statement to be used in competitively acquiring a system or services, the Contractor shall not supply the system, its major components, or the service unless the Contractor is the sole source, the Contractor has participated in the development and design work, or more than one Contractor has been involved in preparing the work statement. The term of this prohibition shall endure for the length of this contract.

If, under this contract, the Contractor will provide technical evaluation of products or advisory and assistance services, the Contractor shall not provide such services if the services relate to the Contractor's own or a competitor's products or services unless proper safeguards are established to ensure objectivity.

If, under this contract, the Contractor gains access to proprietary or source selection information of other companies in performing advisory assistance services for the Government, the Contractor agrees to protect this information from unauthorized use or disclosure and to refrain from using the information for any purpose other than that for which it was furnished. A separate agreement shall be entered into between the Contractor and the company whose http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/02.htm#P10_603 proprietary information is the subject of this restriction. A copy of this agreement shall be provided to the

Contracting Officer.

The Contracting Officer has significant discretion as to the acceptability of any mitigation plan offered.

Contractors are encouraged to present their best strategy for mitigation of any potential OCI under this contract. Contractors shall submit a mitigation plan at the Contract level and update it as often as necessary throughout the life of the Contract.

The Contracting Officer (and when applicable the appropriate program office, acquisition manager, and legal counsel) will review the comparative analysis and, if provided, the Avoidance or Mitigation Plan, in accordance with the requirements of FAR Subpart 9.5 (Organizational Conflict of Interest) to determine whether award to that

Offeror would be consistent with those requirements and review as necessary throughout the life of the contract. If it is unilaterally determined by the Contracting Officer that no OCI would arise or that the OCI Avoidance or

Mitigation Plan adequately protects the interests of the government in the event of award to that Offeror, the Offeror will be determined eligible for award. If the Contracting Officer reasonably determines that a Contractor has not provided either a comparative analysis or avoidance/mitigation plan, or both, or that the analyses or plan provided is inadequate, sanctions including elimination from the award process, or termination of the related contract effort already awarded, as well as other appropriate sanctions will be considered.

If the Offeror/Contractor knows of no OCI in accepting work under this contract, it shall certify its OCI status and submit the certification with its proposal and any later award, if awarded the contract. The Contractor shall also obtain a similar certification of OCI status from all sub-Contractors, teaming partners or consultants prior to tasking any such party under this contract.

For breach of any of the above restrictions or for nondisclosure or misrepresentation of any relevant facts required to be disclosed concerning this contract, the Government may terminate this contract, disqualify the Contractor from subsequent related contractual efforts, and pursue any remedies as may be permitted by law or this contract.

Prior to a contract modification involving a change to the Performance Work Statement, or an increase in the level of effort or extension of the term of the contract, the Contractor shall submit any applicable organizational conflict of interest disclosure or an update of the previously submitted disclosure or representation.

File details come from the government source that posted it. Updated .