Attch_24_D002_CDRL_Engineering Data for Provisioning (EDFP).pdf

PDF 106 KB Posted

Attached to
10K, 50K & 210K Collapsible Fuel Tanks
Solicitation number
FA8534-21-R-0004
Issued by

View the file

Other files

File Type Posted
FA8534-21-R-0004-0002.pdf PDF
FA8534-21-R-0004-0001.pdf PDF
Attch_03_Past Performance Questionnaire.doc DOC document
Attch_15_EDL_210K_015114293.pdf PDF
Attch_08_Transportation.pdf PDF
Attch_13_EDL_10K_015112125.pdf PDF
Attch_21_B003_CDRL_Test Inspection Report.pdf PDF
Attch_20_B002_CDRL_Test Procedure.pdf PDF
Attch_25_E001_CDRL_Product Base Line Index.pdf PDF
Attch_29_E005_CDRL_Safety Assessment Report.pdf PDF
Attch_17_A002_CDRL_Conference Minutes.pdf PDF
Attch_16_A001_CDRL_Conference Agenda.pdf PDF
Attch_28_E004_CDRL_Request for Variance.pdf PDF
Attch_11_Statement of Work (SOW).pdf PDF
Attch_18_A003_CDRL_Contractors Progress Status and Mgmt Report.pdf PDF
Attch_09_Packaging.pdf PDF
Attch_06_Price Proposal Volume.xlsx XLSX spreadsheet
Attch_12_General Engineering Notes.pdf PDF
Attch_07_Cross Reference Matrix.xlsx XLSX spreadsheet
FA8534-21-R-0004.pdf PDF
Attch_10_MIL-PRF-32233C.pdf PDF
Attch_01_FACTS Sheet.docx DOCX document
Attch_23_D001_CDRL_Logistics Product Data w Attachments.pdf PDF
Attch_05_Client Authorization Letter.docx DOCX document
Attch_22_C001_CDRL_TMCR w Attachment.pdf PDF
Attch_26_E002_CDRL_Engineering Change Proposal (ECP).pdf PDF
Attch_04_Transmittal Letter.docx DOCX document
Attch_02_Consent Form.docx DOCX document
Attch_19_B001_CDRL_Technical Report Study Services.pdf PDF
Attch_14_EDL_50K_015178580.pdf PDF
Attch_27_E003_CDRL_Notice of Revision (NOR).pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page of Pages

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T

(1 Data I tem)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this bur den, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

D. SYSTEM/ITEM

Collapsible Fuel Tank

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

Engineering Data for Provisioning (EDFP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81874

5. CONTRACT REFERENCE

SOW Para 3.3.2

6. REQUIRING OFFICE

406 SCMS/GULAB

7. DD250 REQ

See Block 16

9. DIST

STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

IAW AFMC Form 718

14. DISTRIBUTION

b. COPIES

8. APP CODE

See Block 16

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

A. The Prime Provisioning Activity (PPA) is identified in Block 14 with an asterisk (*).

B. For PPLs/SFPPLs, one set of technical data (electronic copy) will be provided to the PPA with the Logistics Product Data in PLISN sequence, annotated with PLISN, PCCN, SCC, PCC, CAGE and Part Number, with accompanying transmittal correspondence.

C. For PPLs/SFPPLs, one set of technical data (electronic or hardcopy) will be provided to DLIS (** Block 14), annotated with PLISN, PCCN, SCC, PCC, CAGE, and P/N, with accompanying transmittal correspondence (with a courtesy copy provided to the PPA) D. All transmittal correspondence will cite the applicable Contract Number, PCCN, and SCC. DLIS transmittal correspondence should cite 406SCMS/GULABB as the PPA and provide a courtesy copy to the PPA.

E. Block 7: Acceptance/Rejection of the technical data will be furnished within 90 calendar days after receipt by the PPA. Method of acceptance/rejection will be in accordance with contract requirements.

F. Block 8: Approval (written) is not required. However, the data item will be reviewed and accepted/rejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office.

G. Block 9: Distribution statement A applies.

H. Blocks 10, 12, & 13: Date(s) to be reflected on the AFMC Form 718 (Atch 1 to the Initial Provisioning Performance Specification (IPPS)). If complete sets are not provided, identify missing technical data and provide it 30 days prior to the Spares Provisioning Conference or as directed by the PPA. This applies to all non stock-listed items regardless of the type Logistics Product Data and SMR Code (source, maintenance, and recoverability). Technical data is required for each support item appearing on all types of Logistics Product Data, first appearance only on each Logistics Product Data submission, unless directed otherwise by the PPA.

I. The prime contractor and all sub-vendors shall provide required data, translated to the English language, for the express purpose of identifying and cataloging items with a full description regardless of limited rights claims. Letters of refusal must clearly state reason(s) technical data is not being furnished to satisfy the data requirements levied and recommend alternate methods of furnishing required technical data to the PPA.

J. For DCNs, LLTILs, and CBILs, both sets of technical data will be provided to the PPA.

K. The contractor shall not assess developmental costs to the Government to furnish this technical data as EDFP, only cost necessary for reproduction and assemblage.

L. In the event EDFP submittal deliveries are to be made to a secured program specific electronic site (contractor or government), a transmittal notification will be concurrently forwarded to the PPA via email.

IF ROUTINE MAIL:

406SCMS/GULAB *1

235 Byron St.

Suite 19A

Robins AFB, GA

31098-1670

IF PRVT CARRIER:

638 Supply Chain *1 Management Group

406SCMS/GULAB

235 Byron St.

Suite 19A

Robins AFB, GA

31098-1670

IF HARD COPY TO:

DLIS-KPD PSO **1

74 Washington Ave., N, Suite 7

Battle Creek, MI

49037-3084

IF ELECTRONIC:

DLISPSO@dla.mil 1

15. TOTAL

G. PREPARED BY

Dwayne White

H. DATE:

9/3/2020

I. APPROVED BY

J. DATE

1 1

Nhat d Nguyen Dec 1 2020

D002

D mailto:DLISPSO@dla.mil

File details come from the government source that posted it. Updated .