Attch_07_Cross Reference Matrix.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- 10K, 50K & 210K Collapsible Fuel Tanks
- Solicitation number
- FA8534-21-R-0004
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cross Reference Matrix
| Attachment 7 Cross Reference Matrix | |||||
| Request for Proposal (RFP) Requirement | Proposal Response Location | ||||
| Section L Number | Section M Number | Title | Section Number | Title | Page Number |
| Technical Factor | |||||
| Para II.C.2 | Para II.C.1 | Subfactor One: Design & Manufacturing Approach | |||
| Para II.C.2 | Para II.C.1 | a: Safey Factor of 4 with supporting information, MIL-PRF-32233C Para 3.5.1 | |||
| Para II.C.2 | Para II.C.1 | b: Service Life with supporting emperical data, MIL-PRF-32233C Para 3.5.4 | |||
| Para II.C.2 | Para II.C.1 | c: Storage Life requirements with supporting emperical data, MIL-PRF-32233C Para 3.5.5 | |||
| Para II.C.2 | Para II.C.1 | d: Deployability with supporting data/information, MIL-PRF-32233C Para 3.11 | |||
| Para II.C.2 | Para II.C.1 | e: Joining of Materials with supporting information, MIL-PRF-32233C Para 3.4.1 | |||
| Para II.C.2 | Para II.C.1 | Subfactor Two: Verification Testing Approach | |||
| Para II.C.2 | Para II.C.1 | a: Tank Assembly Fabric, MIL-PRF-32233C Para 4.3.4 Test Results Reporting at Critical Design Review, SOW Para 3.2.2.1 | |||
| Para II.C.2 | Para II.C.1 | b: Production Tank Tests, MIL-PRF-32233C Para 4.3.3 |
File details come from the government source that posted it. Updated .