Attch 14 Water Catchment Notes.pdf

PDF 75 KB Posted

Attached to
CHUPADERA CATCHMENT & FENCE 2021 Federal contract opportunity
Solicitation number
140L0621Q0035
Issued by
Department of the Interior Bureau of Land Management National Office

View the file

Other files for this federal contract opportunity

Other files attached to CHUPADERA CATCHMENT & FENCE 2021, newest first.
File Type Posted
Sol_140L0621Q0035_Amd_0002.pdf PDF
Attch 19 SOW replaces Attch 1_0001.doc DOC document
Attch 18 Chupadera Wildlfie Map replaces Attch 2_0001.pdf PDF
Sol_140L0621Q0035_Amd_0001.pdf PDF
Attch 15 Water Catchment Side.pdf PDF
Attch 13 Water Catchment Gussetting.pdf PDF
Attch 12 Water Catchment Gussets.pdf PDF
Attch 7 Pipe Fence Corner.pdf PDF
Attch 5 Water Catchment Top.pdf PDF
Attch 4 Material List.xlsx XLSX spreadsheet
Attch 17 Pricing Worksheet.docx DOCX document
Attch 11 Water Catchment Gussets and Corner.pdf PDF
Attch 10 Water Catchment End.pdf PDF
Attch 9 Water Catchment Corner Details.pdf PDF
Attch 8 Pipe Fence Gate Details.pdf PDF
Attch 1 SOW.doc DOC document
Attch 6 Pipe Fence Arroyo Crossing.pdf PDF
Attch 2 Map.pdf PDF
Sol_140L0621Q0035.pdf PDF
Attch 16 Water Catchment Support Spacing.pdf PDF
Attch 3 Wage Determination.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

SHEET: 1 OF 1

AutoCAD SHX Text

REVIEWED JAF

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DRAWN BY: HFB

AutoCAD SHX Text

DATE: 3-11-19

AutoCAD SHX Text

DESIGNED CM

AutoCAD SHX Text

ALWAYS THINK

AutoCAD SHX Text

SAFETY

AutoCAD SHX Text

STANDARD DETAIL DRAWING NO.

AutoCAD SHX Text

UNITED STATES DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text

WATER CATCHMENT DRAWING CONSTRUCTION NOTES

AutoCAD SHX Text

REV. NO.

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text \\ILMNMAB3DS1\abLoc$\Individual Employee Folders\EMPLOYEES\hbuckner\SOCORRO SUPPORT\SFO Wildlife Water Catchment 2019

AutoCAD SHX Text

NONE

AutoCAD SHX Text NOTES 1. The structure is composed of two seperate frames. The structure is composed of two seperate frames. The outer members of each frame shall be constructed of 4 ea 6" receiver channel purlins. All receiver channel purlin-to-pipe and receiver channel purlin-to-pipe and purlin-to-purlin vertical and lateral connections must have a gusset installed. 2. Straps connecting purlins to pipe support frame Straps connecting purlins to pipe support frame are 2-1/2" x ". 14". 3. Pipe to pipe gussets are to be min. 6"x ". Pipe to pipe gussets are to be min. 6"x ". 14". 4. Vertical-pipe-to-purlin gussets are to be min. Vertical-pipe-to-purlin gussets are to be min. 6" x ". Lateral-pipe-to-purlin gussets are to be 14". Lateral-pipe-to-purlin gussets are to be min. 6" x ". All gussets welded to pipe shall be 14". All gussets welded to pipe shall be All gussets welded to pipe shall be saddle-cut for proper welded connection. 5. Pipe-to-pipe connections: vertical pipe shall be Pipe-to-pipe connections: vertical pipe shall be saddle-cut for proper welded connection. 6. Gap between frames should be no less than 6.5" Gap between frames should be no less than 6.5" to accommodate 6" gutter (to reservoir). 7. Frame is level front-to-back. Gutter is sloped Frame is level front-to-back. Gutter is sloped vs sloping frame. Slope gutter 3" toward reservoir. 8. Vertical distance from bottom of gutter fitting to Vertical distance from bottom of gutter fitting to reservoir inlet shall be no less than 24" to accomodate plumbing. Horizontal distance from the catchment frame to the reservoir shall be no less than 3'. 9. Welds shall be continuous along all mating Welds shall be continuous along all mating surfaces, no tack welds. 10. Where c-purlins tie into receiver channel purlins Where c-purlins tie into receiver channel purlins along outer edges of frame, see note 9. 11. There shall be no overhang of tin roofing past There shall be no overhang of tin roofing past edge purlin. Fold sheetmetal over purlin edge. 12. All open pipes shall be capped @ ends. All open pipes shall be capped @ ends. 13. Sheetmetal gutter to be fabricated by others Sheetmetal gutter to be fabricated by others & installed by contractor. 14. Heigth of catchment varies from site to site, Heigth of catchment varies from site to site, due to changes in terrain, etc. Install per due to changes in terrain, etc. Install per Government Instructions.

Sheets and Views
WATER CATCHMENT 3-8-2019-CATCHMENT NOTES