Attch 14 Water Catchment Notes.pdf
PDF 75 KB Posted
- Attached to
- CHUPADERA CATCHMENT & FENCE 2021 Federal contract opportunity
- Solicitation number
- 140L0621Q0035
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L0621Q0035_Amd_0002.pdf | ||
| Attch 19 SOW replaces Attch 1_0001.doc | DOC document | |
| Attch 18 Chupadera Wildlfie Map replaces Attch 2_0001.pdf | ||
| Sol_140L0621Q0035_Amd_0001.pdf | ||
| Attch 15 Water Catchment Side.pdf | ||
| Attch 13 Water Catchment Gussetting.pdf | ||
| Attch 12 Water Catchment Gussets.pdf | ||
| Attch 7 Pipe Fence Corner.pdf | ||
| Attch 5 Water Catchment Top.pdf | ||
| Attch 4 Material List.xlsx | XLSX spreadsheet | |
| Attch 17 Pricing Worksheet.docx | DOCX document | |
| Attch 11 Water Catchment Gussets and Corner.pdf | ||
| Attch 10 Water Catchment End.pdf | ||
| Attch 9 Water Catchment Corner Details.pdf | ||
| Attch 8 Pipe Fence Gate Details.pdf | ||
| Attch 1 SOW.doc | DOC document | |
| Attch 6 Pipe Fence Arroyo Crossing.pdf | ||
| Attch 2 Map.pdf | ||
| Sol_140L0621Q0035.pdf | ||
| Attch 16 Water Catchment Support Spacing.pdf | ||
| Attch 3 Wage Determination.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
SHEET: 1 OF 1
AutoCAD SHX Text
REVIEWED JAF
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DRAWN BY: HFB
AutoCAD SHX Text
DATE: 3-11-19
AutoCAD SHX Text
DESIGNED CM
AutoCAD SHX Text
ALWAYS THINK
AutoCAD SHX Text
SAFETY
AutoCAD SHX Text
STANDARD DETAIL DRAWING NO.
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
WATER CATCHMENT DRAWING CONSTRUCTION NOTES
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text \\ILMNMAB3DS1\abLoc$\Individual Employee Folders\EMPLOYEES\hbuckner\SOCORRO SUPPORT\SFO Wildlife Water Catchment 2019
AutoCAD SHX Text
NONE
AutoCAD SHX Text NOTES 1. The structure is composed of two seperate frames. The structure is composed of two seperate frames. The outer members of each frame shall be constructed of 4 ea 6" receiver channel purlins. All receiver channel purlin-to-pipe and receiver channel purlin-to-pipe and purlin-to-purlin vertical and lateral connections must have a gusset installed. 2. Straps connecting purlins to pipe support frame Straps connecting purlins to pipe support frame are 2-1/2" x ". 14". 3. Pipe to pipe gussets are to be min. 6"x ". Pipe to pipe gussets are to be min. 6"x ". 14". 4. Vertical-pipe-to-purlin gussets are to be min. Vertical-pipe-to-purlin gussets are to be min. 6" x ". Lateral-pipe-to-purlin gussets are to be 14". Lateral-pipe-to-purlin gussets are to be min. 6" x ". All gussets welded to pipe shall be 14". All gussets welded to pipe shall be All gussets welded to pipe shall be saddle-cut for proper welded connection. 5. Pipe-to-pipe connections: vertical pipe shall be Pipe-to-pipe connections: vertical pipe shall be saddle-cut for proper welded connection. 6. Gap between frames should be no less than 6.5" Gap between frames should be no less than 6.5" to accommodate 6" gutter (to reservoir). 7. Frame is level front-to-back. Gutter is sloped Frame is level front-to-back. Gutter is sloped vs sloping frame. Slope gutter 3" toward reservoir. 8. Vertical distance from bottom of gutter fitting to Vertical distance from bottom of gutter fitting to reservoir inlet shall be no less than 24" to accomodate plumbing. Horizontal distance from the catchment frame to the reservoir shall be no less than 3'. 9. Welds shall be continuous along all mating Welds shall be continuous along all mating surfaces, no tack welds. 10. Where c-purlins tie into receiver channel purlins Where c-purlins tie into receiver channel purlins along outer edges of frame, see note 9. 11. There shall be no overhang of tin roofing past There shall be no overhang of tin roofing past edge purlin. Fold sheetmetal over purlin edge. 12. All open pipes shall be capped @ ends. All open pipes shall be capped @ ends. 13. Sheetmetal gutter to be fabricated by others Sheetmetal gutter to be fabricated by others & installed by contractor. 14. Heigth of catchment varies from site to site, Heigth of catchment varies from site to site, due to changes in terrain, etc. Install per due to changes in terrain, etc. Install per Government Instructions.
| Sheets and Views |
| WATER CATCHMENT 3-8-2019-CATCHMENT NOTES |
File details come from the government source that posted it. Updated .