Attch 1_SOW_Pest Control Netting_Building 952_dated 18 Nov 24.pdf
PDF 501 KB Posted
- Attached to
- Pest Control Netting Federal contract opportunity
- Solicitation number
- FA301625Q0031
About this file
This Statement of Work (SOW) details requirements for pest control netting installation at Building 952, the Combat Arms Training and Maintenance (CATM) Weapons Main Cleaning Area at JBSA Chapman Annex, TX. The contractor must install three sheets of 50' x 70' heavy-duty bird netting with ¾" grid openings to mitigate bird, rodent, and reptile issues in the facility's rafters. The single-story facility measures approximately 70'W x 140'L x 23'H at its highest point.
The required materials include 19-gauge polyethylene netting that is flame resistant and weatherproof up to 250°F, along with 15 bird net zippers for accessing light fixtures and fans, 11 500' galvanized bird net cables, mounting brackets, hog rings, ferrules, anchor rivets, split pins, and turnbuckles. Work hours are 7:00 AM to 4:00 PM CDT Monday through Friday, with optional weekend and holiday work permitted at no additional cost. The contractor must provide all equipment and materials, maintain site cleanliness, and coordinate with facility POCs Mr. Michael Sherburne and Mr. Detra Whitfield for installation at 900 Patrol Road, JBSA-Lackland AFB, TX 78227.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers_FA301625Q0031.pdf | ||
| Solicitation_FA301625Q0031_Pest Control Netting.pdf.pdf | ||
| Attch 2_Building 952 Layout.pdf.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
502 CONS/JBKAE F2MTRD4292A003
JBSA Lackland, TX Pest Control Netting for Building 952
Statement of Work Pest Control Netting for Building 952
JBSA Chapman Annex, TX 18 November 2024
1. DESCRIPTION OF WORK.
1.1. General Requirements.
The contractor shall provide all personnel, equipment, supplies, tools, materials, and non-personal services necessary to install 19-gauge heavy duty bird netting with ¾” grid openings in a manner that mitigates current bird, rodent, and reptile issues as defined in this Statement of Work (SOW). The work shall be conducted at the Combat Arms Training and Maintenance (CATM) Weapons Main Cleaning Area of Building 952, which is located on Joint Base San Antonio (JBSA) Chapman Annex, TX, within the CATM Complex. The Government shall be responsible for moving tables and other equipment that are in the way prior to the arrival of the contactor. The contractor shall contact Mr.
Michael Sherburne at 210-671-8005 or Mr. Detra Whitfield at 210-671-6177 with any questions.
1.2. Building Layout.
This facility is a single-story facility that is open on all sides allowing for easy access of necessary equipment, such as lifts, ladders, etc. The dimensions for this structure are approximately 70’ W x 140’ L x 23’ H to the highest point and approximately 10’10”H from the ground to the lowest point of the ceiling of the structure. The facility can be driven up to from the east or west end of the structure for unloading of equipment. The Government will ensure both parking areas, on the east and west side of the structure, are clear of any vehicles to allow the contractor access to the area without blocking fire lanes. See Attachment 5 for an image of the ceiling composition.
1.3. Installation.
Offerors shall inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable.
All work shall be completed at building 952, CATM Weapons Main Cleaning Area. Installation of three sheets of approximately 50’ x 70’ bird netting shall be trimmed to size and installed at an angle of the pitch to follow the ceiling rafters. After installation, this system shall deny access to all species of birds to the rafters, which in turn shall mitigate rodents and reptiles. Zippers shall be utilized to mitigate current obstacles, such as the 12 light fixtures, 2 ceiling fans, and speakers. \
3 (EA) 50’ x 75’ of ¾” Heavy Duty Bird Netting
Made of polyethylene material Flame resistant Stops all birds from entering rafter area 40+ lbs. break strength Rot proof Weatherproof; withstand temperatures of over 250℉
15 (EA) 10’ Bird Net Zippers
Fast, easy access to netted areas Attaches directly to bird netting Allows for maintenance of light fixtures, vents, fans, etc.
11 (EA) 500’ Bird Net Cable
3/32” in Diameter Galvanized 7x7 stranded construction cable (7 strands of wire twisted to make 1strand x6 more of this same make up)
20 (PK of 100) Multi-Purpose Cable Bracket w/Hilti Pin for steel
Use with cable diameter of 3/32” Hilti pin made to penetrate steel beams
20 (BX of 500) Hog Rings
Galvanized Utilized to secure netting to cable system and zippers to netting Repair minor tears in netting
20 (PK of 100) Ferrules
Aluminum Must fit 3/32” cable Secures cable wire
20 (PK of 100) Anchor Rivets
1 ½” in length Utilized to secure cable around perimeter Ideal for rafters, stone, or brick surfaces
20 (PK of 100) Split Pins
1 ½” split pin used as male insert in conjunction with anchor rivet
20 (PK of 10) Turnbuckles
Size: Large for cable runs larger than 75’ Galvanized Creates tension for netting
1.4. Delivery.
The contractor shall be responsible for off-loading items from delivery vehicles and shall provide any additional equipment to accomplish the task. The contractor shall also be responsible for ensuring all safety precautions and measurements are established and maintained in the area being worked on.
There is not a loading dock at this structure, however, equipment and materials can be directly unloaded at the structure. See Attachment 5 Layout Install Pest Control Netting for Bldg 952 for setup of parking area. There is not a temporary storage area for materials or equipment at building 952.
1.5. Address.
37 TRSS Combat Arms Training and Maintenance Complex, Bldg. 952:
900 Patrol Road, JBSA-Lackland AFB, TX 78227
1.6. Site Maintenance.
The contractor shall maintain work areas in a neat, clean, and safe condition. The contractor shall be responsible for providing, installing, and the removal of any temporary signage, barriers, barricade tape, etc. which may be required to control pedestrian in the work area. The aforementioned materials shall be removed from the site by appropriate means daily. Contractor shall not work or store materials in a manner that would hinder or otherwise block pedestrian circulation to exit corridors and exit doors in the event of an emergency or fire. Storage of materials shall be coordinated with the customer. The contractor shall be responsible for freight, unpacking, delivery and inside installation.
1.7. Site Clean Up.
The contractor shall also remove packaging materials from JBSA-Lackland AFB, TX and shall be responsible for any refuse containers needed for trash and packing materials. Lastly, the contractor shall be responsible for returning the facility to its original state prior to installation and repairing any damage caused by the contractor’s personnel or equipment.
1.8. Site Program Manager/Point of Contact (POC).
The contractor shall designate an on-site project manager as the Site POC for individual projects. The Site POC or alternate(s) shall be available during normal duty hours until project completion. The Site POC shall be the interface for all work site communications with the Government, including quality, safety, and discrepancy matters.
1.9. Hours of Operation and Special Conditions.
Normal work hours are 7:00 a.m. through 4:00 p.m., central daylight time (CDT), Monday through Friday, exclusive of Federal holidays. At the option of the Government and with approval of the Contracting Officer, work may be permitted on Federal holidays, weekends, or after 4:00 p.m. at no additional cost to the Government.
Holiday Projected Date
New Year’s Day 1 January
Martin Luther King Jr’s Birthday 3rd Monday in January
President’s Day 3rd Monday in February
Memorial Day Last Monday in May
Juneteenth 19 June
Independence Day 4 July
Labor Day 1st Monday in September Columbus Day 2nd Monday in October
Veteran’s Day 11 November
Thanksgiving Day 4th Thursday in November
Christmas Day 25 December
1.10. Warranty.
Manufacturer and Standard Commercial warranties for individual pieces shall be provided along with contact information as well as any operation manuals.
2. Testing.
The contractor shall provide a turnkey product over to the Government which should not require the Government to perform maintenance or repairs.
3. Acceptance.
Upon completion of the work, the structure and surrounding area shall be subject to a final acceptance by Mr.
Detra Whitfield and/or Mr. Michael Sherburne and a Contracting Officer and/or designee.
4. Records Management.
"The Contractor shall manage all data created for Government use or legally controlled by the Government, in support of the functional activity or required by AF publication, IAW with the AF Records Management procedures in Air Force Instruction (AFI) 33-322, Air Force Manual (AFMAN) 33-363 and Air Force Instruction (AFI) 33-364 (or their subsequent replacements)".
5. Contract Management.
No changes in or deviation from the scope of service shall be affected without a modification executed by the Contracting Officer authorizing such changes.
6. Attachment(s). Project Layout for Building 952.
File details come from the government source that posted it. Updated .