Attch 1_PWS_Aircraft Fire Trainer Repair_11May22.pdf

PDF 8 MB Posted

Attached to
Aircraft Fire Trainer Repair
Solicitation number
FA469022Q0026
Issued by

About this file

This performance work statement and related solicitation describe a firm fixed price contract opportunity to remove, repair, fabricate, and reinstall metal sections of an aircraft mockup used for firefighter training at Ellsworth Air Force Base in South Dakota. The contractor will remove and replace the large and small wings, repair the tail wing and nose cone sections, and dispose of unrepairable parts. The work must be completed from June 15th to July 14th, 2022. This small business set-aside opportunity issued by the 28th Contracting Squadron will be awarded based on quotes submitted by May 31st to lance.white.6@us.af.mil. Interested small businesses must have a CAGE code and be registered in the System for Award Management.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

REMOVE, REPAIR, FABRICATE, & RE-INSTALL METAL JET-FUEL AIRCRAFT

TRAINING PIT MOCK-UP

ELLSWORTH AFB, SD

11 MAY 2022

SCOPE OF WORK: Provide labor, materials, and equipment to perform removal, repair, custom fabrication, installation, and disposal of metal aircraft mock-up sections used for aircraft firefighter training located in center of fire department jet-fuel training pit, Ellsworth AFB, SD, Bldg. 6907. Contractor will remove old, fabricate new, and install one complete large and one small wing. Contractor will repair repairable parts and fabricate new unrepairable pieces of tail wing and nose cone sections of aircraft mock-up. The repairs and materials used for fabrication need to withstand high heat from jet fuel training and hot/cold metal contraction, metal materials used must be similar in type, size, and thickness used on existing aircraft mock-up. Contractor shall ensure all the welds are cleaned by sandblasting or wire brushing and all cracked welds be ground off and re-welded to restore the structural integrity. Re-establishing the welds may require straightening plates and/or adding shim plates. To reduce the weight on the wings, the Contractor shall add support member(s) under the mock engines. Attachment A provides original dimensions and specifications for the mock aircraft.

Contractor understands that the fire training pit is currently being rehabilitated and is under re-construction by another contractor. The entire mock aircraft currently resides outside the fire training pit on the concrete apron that circumvents the pit as shown in Attachment B. If desired, Contractor can complete fabrication and welding on-site and shall protect the existing concrete from fabrication and welding activities to ensure no damage occurs to the existing concrete. Contractor shall conduct their work so it does not interfere with the ongoing construction activities. Once fabrication and repairs are complete, the work performed will be inspected and accepted prior to moving the firetrainer into place within the training pit. The mock aircraft will be set back in place as part of a separate ongoing construction contract. The contractor selected for this service requirement will not be responsible for moving the mock aircraft into the fire training pit.

VENDOR RESPONSIBILITIES: Custom fabrication or repairs of mock-up sections can be accomplished off-site, vendor responsible for delivery back to job site.

CONTRACTOR QUALIFICATIONS: Contractor shall be experienced and trained in crane operations, welding, custom fabrication, installation, and repair of metal.

COMPLIANCE: Contractor shall comply with OSHA and applicable National Fire Protection Association Codes. Contractor(s) shall comply with the Base Fire Regulations as required under EAFBI 92-1. Contractor(s) shall not utilize explosives or fire in performing work.

Contractor shall comply with Welding, Cutting and Brazing requirements in AFOSH Standard 91-5, 1 May 1997.

Following items will be performed by contractor personnel as part of this scope of work:

1. Large Wing Section Removal, Custom Fabrication, Installation, and Disposal:

Custom fabricate and weld new large wing with:

o I-beam frame o Individual wing plates o I-beam fascia plates o Support legs with mounting plates and mounting holes

Dispose of old large wing section.

2. Small Wing Section Removal, Custom Fabrication, Installation, and Disposal:

Custom fabricate and weld new large wing with:

o I-beam frame o Individual wing plates o I-beam fascia plates o Support legs with mounting plates and mounting holes

Dispose of old small wing section.

3. Tail Wing Section Removal, Repair, Custom Fabrication, and Installation:

Repair tail wing:

o Remove loose or damaged sections o Remove existing skids o Remove vertical stabilizer o Remove damaged horizontal stabilizer o Weld or repair tail wing parts o Custom fabricate and replace tail wing parts and skids

Dispose of old tail wing parts/pieces.

4. Nose Cone Section Removal, Repair, Custom Fabrication, and Installation:

Repair nose cone:

o Remove loose or damaged sections o Remove existing skids o Remove damaged cone belly pan and front plate o Remove damaged horizontal stabilizer o Weld or repair nose cone parts o Custom fabricate and replace damaged nose cone parts and skids

Dispose of old nose cone parts/pieces.

GOVERNMENT RESPONSIBILITIES:

Provide site and facility access for Vendor personnel performing installation and repair work.

Vendor personnel will be allowed on site and be able to work without specific clearances or special access needs.

If escorts are required to controlled areas then they shall be provided by the base.

Provide the Vendor Project Manager with a single point of contact for the duration of the contract.

Obtain and provide all necessary approvals, permits, and lease agreements for affected facilities.

5. WORKING HOURS: Normal duty hours at Ellsworth AFB are Monday through Friday, except on Government holidays, 7:00 a.m. to 5:30 p.m. Inform Contracting Officer in writing 72 hours prior to working at times other than normal duty hours.

Facilities will be occupied and in full operation when the work is performed.

Federal Holidays include:

i. New Year’s Day – 1 January

ii. Martin Luther King Day - 3rd Monday in January

iii. Washington’s Birthday - 3rd Monday in February

iv. Memorial Day - last Monday in May

v. Juneteenth Day – 19 Jun

vi. Independence Day - 4 July

vii. Labor Day - 1st Monday in September

viii. Columbus Day - 2nd Monday in October

ix. Veteran’s Day - 11 November

x. Thanksgiving Day - 4th Thursday in November

xi. Christmas Day - 25 December

6. BASE CLOSURE: Work scheduled but not accomplished because of base closure due to weather, exercises, or actual alert, will be accomplished as soon as possible after reopening the base.

7. CLEAN UP: After successful completion of all work and tests, and at the end of each workday, Contractor shall clean the area and dispose of debris and trash outside the limits of Government property. Work area and affected areas shall be left in a clean and orderly manner, acceptable to Contracting Officer's Representative. Any damages caused by the contractor to surfaces or structures due to accomplishment of the project shall be repaired to match existing at no cost to the Government. Any damages caused by the contractor to trees, shrubs or surrounding vegetation will be repaired / replaced at no cost to the Government.

8. COMPLIANCE WITH ENVIRONMENTAL LAWS: The contractor shall comply with all applicable federal, state, and local laws, regulations, ordinances, policies, codes and standards related to environmental matters. The contractor shall also comply, and assure that all subcontractors comply, with all applicable specific instructions, policies, or references contained herein. Copies of local policies and procedures can be reviewed at the Base

Environmental office, 605-385-2674. Contractor shall comply with

EAFB WATER SYSTEM O&M RELEASE MANAGEMENT PLAN.

9. ACCESS TO BASE: Contractor shall attain Contractor/Employee Base Passes to perform these services on Ellsworth AFB. The contractor shall coordinate with Contracting to complete this task.

TRAFFIC LAWS: The Contractor and its employees shall comply with base traffic regulations. Weapons, Firearms, and Ammunition.

Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their Contractor-owned or privately owned vehicle while on EAFB.

10. SECURITY, FIRE, AND MEDICAL SERVICES: The government will provide police protection while contract personnel are on base.

ATTACHMENTS:

Attachment A - Fire Training Aircraft plans and specifications (CUI) Attachment B – Photos of fire training pit and mock aircraft

Pandemic Response. All personnel present on Ellsworth AFB are required to follow any and all pandemic response policies established by the base leadership. Personal protective measures (face masks, gloves, hand sanitization, etc.) may be increased or decreased related to the current pandemic conditions on Ellsworth AFB. Contractors performing on Ellsworth AFB will follow the guidance provided by the local work center where contract performance will occur or other government representatives on the base.

Contractors that refuse to comply with any and all pandemic response policies may be denied access to the installation which can result in corrective contract actions.

1289328404C Text Box

ATTACHMENT - A

ATTACHMENT B

Overhead view of Fire Training Pit – Fire Pit in Center Nose and Tail Sections of Mock Aircraft

Wing of Mock Aircraft

Polygon

1289328404C Typewritten Text Approximate location of mock aircraft.

Line

Attachment A.pdf
af179-81-01cover
af179-81-01cover s-1
af179-81-01cover s-2
af179-81-01cover s-3
af179-81-01cover s-4
af179-81-01cover s-5

File details come from the government source that posted it. Updated .