Attch 1 PNQS-09-4491 Repair Dining Facility Bldg. 668 - Specifications.pdf
PDF 6 MB Posted
- Attached to
- PNQS 09-4491 Repair Dining Facility Bldg. 668, Maxwell AFB, AL (Solicitation Amendment 0002)
- Solicitation number
- FA330026R0001
About this file
This document is a comprehensive project manual and specification set for the repair and renovation of Dining Facility Building 668 at Maxwell Air Force Base in Montgomery, Alabama. The project, identified as PNQS-09-4491, involves a complete renovation of the existing dining facility, including extensive modifications to kitchen, plumbing, electrical, HVAC, and structural systems. The total project has a duration of 516 calendar days, divided into a procurement phase and a construction phase, with an estimated project value between $5-10 million.
Key components of the renovation include replacing kitchen equipment, installing new bathrooms, creating a communications room and fire sprinkler room, comprehensive building systems upgrades, and site improvements. The project requires full compliance with federal, state, and local building codes, with specific attention to environmental protection, hazardous material abatement, and sustainable construction practices. The work will be executed in phases to minimize disruption, with the contractor required to coordinate closely with base operations and follow strict safety and environmental guidelines throughout the project duration.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A PROJECT MANUAL FOR
REPAIR DINING FACILITY, BLDG 668
MAXWELL AIR FORCE BASE
MONTGOMERY, ALABAMA
PROJECT NUMBER PNQS 09 – 4491
PHJA/2223US
This Sheet Intentionally Left Blank
A & E DESIGN – REPAIR DINING FACILITY, BLDG 668 MAFB-PNQS-09-4491
MAXWELL AFB, ALABAMA PHJA/2223US
ABBRIVIATIONS ABB-1
LIST OF ABBREVIATIONS
REFERENCED STANDARDS AND AGENCIES
AA ALUMINUM ASSOCIATION
AASHTO AMERICAN ASSOCOCIATION STATE HIGHWAY &
TRANSPORTATION OFFICIALS
AABC ASSOCIATED AIR BALANCE COUNCIL
ABC ALABAMA BUILDING COMMISSION
ACI AMERICAN CONCRETE INSTITUTE
ACIL AMERICAN COUNCIL OF INDEPENDENT LABORATORIES
ACPA AMERICAN CONCRETE PIPE ASSOCIATION
ACRMA AIR CONDITIONING AND REFRIG.MACHINERY ASSOC.
ADC AIR DIFFUSION COUNCIL
ADEM ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
AGA AMERICAN GAS ASSSOCIATION
AGC ASSOC. GEN. CONTRACTORS OF AMER.; ALABAMA GAS
CORP.
AHA AMERICAN HARDBOARD ASSOCIATION
AHD ALABAMA HIGHWAY DEPARTMENT
AIA ALABAMA INSTITUTE OF ARCHITECTS
AIA AMERICAN INSURANCE ASSOCIATION
AIA ASBESTOS INFORMATION ASSOCIATION
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION
ALDOT ALABAMA DEPARTMENT OF TRANSPORTATION
AMMA AMERICAN METAL MANUFACTURERS ASSOCIATION
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APA AMERICAN PLYWOOD ASSOCIATION
APC ALABAMA POWER COMPANY
ARI AIR CONDITIONERS AND REFRIGERATION INSTITUTE
ASA AMERICAN STANDARDS ASSOCIATION
ASHRAE AMER. SOC. HEATING, REFRIG. & AC ENGINEERS
ASLA AMERICAN SOCIETY OF LANDSCAPE ARCHITECTS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS
AT&T AMERICAN TELEPHONE & TELEGRAPH COMPANY
AWCI ASSOCIATION OF WALL AND CEILING INDUSTRIES
AWI ARCHITECTURAL WOODWORK INSTITUTE
AWMA ALUMINUM WINDOW MANUFACTURERS ASSOCIATION
AWPA AMERICAN WOOD PROTECTION ASSOCIATION
AWWA AMERICAN WATER WORKS ASSOCIATION
AWS AMERICAN WELDING SOCIETY
BIA BRICK INSTITUTE OF AMERICA
BHMA BUILDERS HARDWARE MANUFACTURERS ASSOCIATION
CABRA COPPER AND BRASS RESEARCH ASSOCIATION
CLFMI CHAIN LINK FENCE MANUFACTURING INSTITUTE
CPA CONSUMER PROTECTION AGENCY
CPSC CONSUMER PROTECTION SAFETY COMMISSION
CRA CALIFORNIA REDWOOD ASSOCIATION
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CS COMMERCIAL STANDARD
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
DFPA DOUGLAS FIR PLYWOOD ASSOCIATION
DHI DOOR & HARDWARE INSTITUTE
EPA ENVIRONMENTAL PROTECTION AGENCY
EIA ELECTRONICS INDUSTRIES ASSOCIATION
FHA FEDERAL HOUSING ADMINISTRATION
FM FACTORY MUTUAL LABORATORIES
FS FEDERAL SPECIFICATION
FGJA FLAT GLASS JOBBERS ASSOCIATION
FTI FACING TILE INSTITUTE
GRDF GYPSUM ROOF DECK FOUNDATION
GSA GENERAL SERVICES ASSOCIATION
IBC INTERNATIONAL BUILDING CODE
ICC INTERNATIONAL CODE COUNCIL
IECC INTERNATIONAL ELECTRICAL CODE COUNCIL
IFC INTERNATIONAL FIRE CODE
IFGC INTERNATIONAL FUEL GAS CODE
IES ILLUMINATING ENGINEERING SOCIETY
ILA INDIANA LIMESTONE INSTITUTE
MBMA METAL BUILDING MANUFACTURERS ASSOC.
MBSA MODULAR BUILDING STANDARDS ASSOCIATION
MFMA MARBLE FLOORING MANUFACTURERS ACCOCIATION
MIA MARBLE INSTITUTE OF AMERICA
MLMA MARBLE LATHE MANUFACTURERS ASSOCIATION
MWI METAL WINDOW INSTITUTE
NAAMM NATIONAL ASSOC. ARCHITECTURAL METAL MANUF.
NBLP NATIONAL BUREAU OF LATHING AND PLASTERING
NACA NATIONAL ACOUSTICAL CONTRACTORS ASSOCIATION
NAEC NATIONAL ASSOCIATION OF ELEVATOR CONTRACTORS
NASFCA NATIONAL AUTOMATIC SPRINKLER AND FIRE CONTROL
NBS NATIONAL BUREAU OF STANDARDS
NCHA NATIONAL CONTRACT HARDWARE ASSOCIATION
NCMA NATIONAL CONCRETE MASONRY ASSOCIATION
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOC.
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIOHS NATIONAL INST.OF OCCUPATIONALHEALTH & SAFETY
NLI NATIONAL LIMESTONE INSTITUTE
NLMA NATIONAL LUMBER MANUFACTURERS ASSOCIATION
NOFMA NATIONAL OAK FLOOR MANUFACTURING ASSOCIATION
NPCA NATIONAL PRECAST CONCRETE ASSOCIATION
NSF NATIONAL SANITATION FOUNDATION
NTMA NATIONAL TERRAZZO AND MOSAIC ASSOCIATION
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMIN.
PATMI POWER ACTUATED TOOL MANUFACTURERS INSTITUTE
PCA PORTLAND CEMENT ASSOCIATION
PCI PRESTRESSED CONCRETE INSTITUTE
PDI PLUMBING AND DRAINAGE INSTITUTE
PEI PORCELAIN ENAMEL INSTITUTE
PI PERLITE INSTITUTE
PSC PUBLIC SERVICE COMMISSION
SAA SURETY ASSOCIATION OF AMERICA
SBI STEEL BOILER INSTITUTE
SBTMA SOUTHERN BRICK AND TILE MANUFACTURERS ASSOC.
SCB SOUTH CENTRAL BELL
SCPI STRUCTURAL CLAY PRODUCTS INSTITUTE
SDI STEEL DOOR INSTITUTE; STEEL DECK INSTITUTE
SIGMA SEALED INSULATING GLASS MANUFACTURERS ASSOC.
SJI STEEL JOIST INSTITUTE
SMACCA SHEET METAL & AIR COND.CONTRACTORS ASSOC.
SPA SOUTHERN PINE ASSOCIATION
SPIB SOUTHERN PINE INSPECTION BUREAU
SPR SIMPLIFIED PRACTICE RECOMMENDATIONS
SPC STRUCTURES PAINTING COUNCIL
SRI STEEL RECYCLING INSTITUTE
SSPC SOCIETY FOR PROCTIVE COATING
SWI STEEL WINDOW INSTITUTE
TAIA THE AMERICAN INSURANCE ASSOCIATION
TCNA TILE COUNCIL OF NORTH AMERICA
TMA TILE MANUFACTURERS ASSOCIATION
UL UNDERWRITERS LABORATORIES
USDA U.S. DEPARTMENT OF AGRICULTURE
VI VERMICULITE INSTITUTION
VWPI VACCUM WOOD PRESERVATIVE INSTITUTE
WCLIB WEST COAST LUMBER INSPECTION BUREAU
WRI WIRE REINFORCEMENT INSTITUTE
ABBRIVIATIONS ABB-2
MISCELLANEOUS REFERENCES
A AMPERES; AREA; ARCHITECTURAL
AB ANCHOR BOLT
ABD ACOUSTICAL BOARD
AC ALTERNATING CURRENT; AIR CONDITIONING
ACOU ACOUSTICAL
ACT ACTIVE
AD AREA DRAIN
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
AL ALUMINUM
ALT ALTERNATE
ALUM ALUMINUM
ASPH ASPHALT
AT ACOUSTICAL TILE
AUTO AUTOMATIC
AVE AVENUE
AVG AVERAGE
AWG AMERICAN WIRE GAUGE
B BATH
BC BACK CHECK
BD BOARD
BEJ BUILDING EXPANSION JOINT
BET BETWEEN
B4E BEVELED 4 EDGES
BKBD BACKBOARD
BL BUILDING LINE
BLDG BUILDING
BM BENCH MARK; BEAM
BRDG BRIDGING
BS BOTH SIDES
B&S BROWN & SHARP
BT BULB TEE
BTB BACK-TO-BACK
BTU BRITISH THERMAL UNIT
BU BUILT UP
C CARPET; CONDUIT; COURSE; CENTIGRADE; CIVIL;
CORRIDOR
CAB CABINET
CAT CATALOG
CB CHALKBOARD; CONCRETE BLOCK
CC CUBIC CENTIMETER
CDC CLOSE DON’T COUNT
CEM CEMENT
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD
CI CAST IRON
CJ CONSTRUCTION JOINT
CL CENTER LINE
C&G CURB & GUTTER
CLG CEILING
CM CONSTRUCTION MGR; CORRUGATED METAL
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT; CHANGE ORDER
COND CONDENSATE
COL COLUMN
CONC CONCRETE
CONN CONNECT
CONT CONTINUOUS
COR CORRIDOR
CR COLD ROLLED; CORROSION RESISTANT
CRS CORROSION RESIS STEEL
CRT CATHODE RAY TUBE
CSK COUNTERSUNK
CST CENTRAL STAN TIME
CSV CRAWL SPACE VENT
CT CERAMIC TILE; EAST THRESHOLD
CTC CENTER TO CENTER
CTR COUNTER
CW COLD WATER
CWR COLD WATER RETURN
CWS COLD WATER SUPPLY
CYL CYLINDER
D PENNY (NAILS, ETC)
DA DOUBLE ACTING
DBL DOUBLE
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM
DIM DIMENSION
DO DITTO
DOZ DOZEN
DN DOWN
DP DAMPPROOF
DR DRAWER; DRAIN; DOOR; DINING ROOM
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
E EAST; ELECTRICAL; ENTRY
EA EACH
EB EXPANSION BOLT
EDF ELEC DRINKING FOUNTAIN
EJF EXPANSION JOINT FILLER
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR; ELEVATION
ELD ELECTRIC LOCKING DEVICE
ENT ENTRANCE
EOS END OF SECTION
EQ EQUAL; EQUIPMENT
EQUIP EQUIPMENT
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXB EXPANSION BOLT
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXP.JT EXPANSION JOINT
EXT EXTERIOR
EXTN EXTENSION
F FAHRENHEIT; FACE
FBP FIRE BARRIER PARTITION
FC FOOT CANDLE
FD FLOOR DRAIN; FIRE DAMPER
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUSHER CABINET
FED FEDERAL
FF FINISH FLOOR
FH FIRE HYDRANT; FLAT HEAD
FHC FIRE HOSE; CABINET
FL FLOW LINE; FLOOR LINE; FLOOR; FUSIBLE LINK
FOW FACE OF WALL
FPM FEET PER MINUTE
FR FIRE RATED
FS FULL SIZE; FEDERAL SPEC
FT FOOT
FTF FACE TO FACE
FVC FOOTING
FVC FIRE VALVE CABINET
FYC FOR YOUR CONSIDERATION
FYI FOR YOUR INFORMATION
G GAS
GA GAUGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR; GYPSUM BOARD
GBR GUINESS BOOK OF RECORDS
GC GENERAL CONTRACTOR; GENERAL CONDTIONS
GG GRAVEL GUARD
GI GALVANIZED IRON
GL GLASS
GLM GOOD LUCK MEN
GND GROUND
GOVT GOVERNMENT
GPF GALLONS PER SQAURE FOOT
GPM GALLONS PER MINUTE
GPY GALLONS PER SQUARE YARD
GR GRADE
GT GLAZED CERAMIC TILE
GV GATE VALVE
GYP GYPSUM
H HEATING (HVAC); HALL
HAC HEATING/AIR CONDITIONING
HB HOUSE BIBB
HC HOLLOW CORE; HANDICAPPED
H/C HANDICAPPED
HD HEAVY DUTY
HDF HANDICAP DRINKING FOUNTAIN
HFS HALF FULL SIZE
HG HEAVY GAUGE
HL HIGH LIMIT
HM HOLLOW METAL
HMR HORIZONTAL MASONRY REINFORCE
HO HOLD OPEN
HORIZ HORIZONTAL
HP HORSEPOWER; HIGH PRESSURE
HPL HIGH PRESSURE LIMIT
ABBRIVIATIONS ABB-3
HR HANDRAIL; HOUR
HT HEIGHT
HW HOT WATER; HARDWARE (SET)
HWD HARDWARE
HVAC HEATING; VENTILATING, & AC
HZ HERTZ
ID INSIDE DIAMETER
INCL INCLUDE
INSUL INSULATING MATERIAL
INT INTERIOR
INV INVERT
IPS IRON PIPE SIZE
ISF INSIDE FACE
ITC IN THIS CONTRACT
J JANITOR
JAN JANITOR
JB JUNCTION BOX
JR JUNIOR
JS JANITOR SINK
JSV JOINT SPACE VENT
JT JOINT
K KIP (1000 LB); KITCHEN
KA KEY ALIKE
KD KNOCK DOWN; KEY DIFFERENT
KG KILOGRAM
KM KILOMETER
KV KILOVOLT
KVA KILOVOLT AMPS
KW KILOWATT
L ANGLE (METAL SHAPE)
LAM LAMINATE
LAV LAVATORY
LBS POUNDS
LDW LESS DOOR WIDTH
LED LIGHT EMITTING DIODE
LG LIGHT GAUGE
LH LEFT HAND
LIN LINEAR
LL LOW LIMIT
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
LP LOW PRESSURE; LIQUID; PETROLEUM; LIGHT PROOF
LPL LAMINATED PLASTIC
LPT LOCAL PREVAILING TIME
LSG LAMINATED SAFETY GLASS
LT LIGHT
LVR LOUVER
M MEN
MAX MAXIMUM
MBT MARBLE THRESHOLD
MC MEDICINE CABINET
MDO MEDIUM DENSITY OVERLAY
MDS METAL DIVIDER STRIP
MECH MECHANICAL
MED MEDIUM; MEDICAL
MEMB MEMBER
MET METAL
MFG MANUFACTURER
MH MANHOLE
MI MALLEABLE IRON
MM MINIMUM; MINUTE
MISC MISCELLANEOUS
MK MASTER KEY; MARK
MO MASONRY OPENING
MP MEDIUM PRESSURE
MPH MILES PER HOUR
MT METAL THRESHOLD
MTD MOUNTED
MTP METAL TOILET PARTITION
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NL NIGHT LATCH
NO NUMBER; NITROUS OXIDE
NRP NON-REMOVABLE PIN
NTR NO TEMPERATURE RATING
NTS NOT TO SCALE
OA OUTSIDE AIR
OC ON CENTER
OCEW ON CENTER EACH WAY
OLF OUNCE PER LINEAR FOOT
OD OUTSIDE DIAMETER
OH OVERHEAD; OVAL HEAD
OPG OPENING
OPH OPPOSITE HAND
OPN OPENING
OPP OPPOSITE
OSF OUTSIDE FACE
OTO OUT TO OUT
OXY OXYGEN
OZ OUNCE
P PLUMBING
PA PARALLEL ARM; PUBLIC ADDRESS
PAR PARAGRAPH
PAS POWDER ACTUATED STUD
PB PROJECT BOOK
P/C PRESTRESSED CONCRETE; PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCY POUNDS PER CUBIC YARD
PDF POWER DRIVEN FASTENER
PGL PLATE GLASS
PH PHILLIPS HEAD
PL PROPERTY LINE; PLATE
PLB PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYW PLYWOOD
POL POLISH
PP POWER POLE
PPS POUNDS PER SQUARE
PRV PRESSURE REDUCING VALVE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAGE
PSY POUNDS PER SQUARE YARD
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTP PLASTIC(FACED)TP
PVC POLYVINYL CHLORIDE
QT QUARRY TILE
R RADIUS; RUBBER
RA RETURN AIR
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN; ROAD; ROUND
RE REFERENCE
REF REFRIGERATOR
REG REGISTER
REV REVISED
REQD REQUIRED
RH RELATIVE HUMIDITY; RIGHTHAND; ROUND HEAD;
ROBE HOOK
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
R/W RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS&S ROD STOCK & SEALANT
RT RESILIENT TILE
S SOUTH; STAIR; STRUCTURAL
SA SUPPLY AIR SINGLE ACTING
SAN SANITARY
SBP SMOKE BARRIER PARTITION
SC SOLID CORE; SCALE
SCH SCHEDULE
SCHED SCHEDULED
SD SOAP DISPENSER OR DISH; SMOKE DAMPER
SEC SECTION
SF SQUARE FEET
SG SOAP GRAB
SGT STRUCTURAL GLAZED TILE
SH SHEET
SHF SHELF
SHVS SHELVES
SI SQUARE INCH
SIM SIMILAR
SLA SINGLE LEVER ARM
SNB SEX NUTS & BOLTS
SND SANITARY NAPKIN DISPENSER
SOT SEE OTHER TRADES
SP SINGLE PHASE; SINGLE POLE
SPEC SPECIFICATION
SP SPLASH PAN
SQ SQUARE
SR SHOWER ROD
SS STAINLESS STEEL; SANITARY SEWER
SSD SUB-SURFACE DRAIN
SSMH SANITARY SEWER MANHOLE
STL STEEL
STR STRUCTURAL
SW SWITCH
SY SQUARE YARD
SYP SOUTHERN YELLOW PINE
S4S SURFACE 4 SIDES
T TOILET
ABBRIVIATIONS ABB-4
TAB TEST & AIR BALANCE
TB TACKBOARD
T&B TOP &BOTTOM
TC TERRA COTTA
TEL TELEPHONE
TGL TEMPERED GLASS
TLC TENDER LOVING CARE
TOC TOP OF CURB
TOW TOP OF WALL
TP TOILET PARTITION
TPH TOILET PAPER HOLDER
TR TOWEL ROD
TRANS TRANSFORMER
TS TERRAZZO STRIP
TS TUBE (STRUCTURAL SHAPE) TERRAZZO (EXPANSION) STRIP
TSTAT THERMOSTAT
TV TELEVISON
TYP TYPICAL
U URINAL
UC UNERCUT; UNDERCOUNTER
UOS UNLESS OTHERWISE SHOWN
USG UNITED STATE GAGE
V VOLTAGE; VESTIBULE
VAC VACUUM
VB VAPOR BARRIER
VC VITROUS CLAY
VCT VINYL COMPOSITION TILE
VIB VIBRATOR
VDT VIDEO DISPLAY TERMINAL
VP VAPORPROOF
VAT VINYL ASBESTOS TILE
W WOMEN; WATT; WEST
W/ WITH
WC WATER CLOSET
WD WINDOW DIMENSION; WOOD
WDW WINDOW
WF WIDE FLANGE(BEAM)
WG WIRE GLASS
WH WEEP HOLE; WATER HEATER, WALL HYDRANT
WM WASHING MACHINE
WOT WORK OF OTHER TRADES
WP WATER/WEATEHER PROOF
WR WATER RESISTANT
WS WOOD SCREWS
W&V WASTE AND VENT
WWF WOVEN WIRE FABRIC
WWM WOVEN WIRE MESH
YH YARD HYDRANT
*WHERE AN ABBREVIATION HAS MORE THAN ONE MEANING, ASSUME
THE USE APPROPRIATE TO THE TRADE OR ITEM REFERRED TO.
Repair Dining Facility, Bldg 668 MAFB-PNQS-09-4491 Maxwell AFB, Alabama
PROJECT TABLE OF CONTENTS Page 1
TABLE OF CONTENTS
DIVISION 00 – BIDDING REQUIREMENTS
00 00 05 BID SCHEDULE
00 00 20 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.10 GENERAL REQUIMENTS – MAXWELL AFB
01 00 01A ENVIRONMENTAL PROTECTION GENERAL REQUIREMENTS – MAXWELL AFB
with: CONTRACTOR'S HAZARDOUS MATERIALS QUESTIONNAIRE with: CONTRACTOR'S ENVIRONMENTAL ENTRY FORM with: RECYCLING AND LANDFILL REPORT with: INSTALLATION CERTIFICATION FOR CLEAN CONSTRUCTION DEBRIS
TO BE REMOVED FROM THE CONSTRUCTION PROJECT SITE
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
with: AF FORM 3064 PROGRESS SCHEDULE
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 33 00 SUBMITTAL PROCEDURES
with: AF 3000 – MATERIAL SUBMISSIONS REPORT
01 35 33 ENVIRONMENTAL PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
with: PROJECT BOARD DIAGRAM A-1 with: PROJECT BOARD TEMPLATE A-2
01 57 13 STORMWATER PROTECTION BEST MANAGEMENT PRACTICES
01 67 00.10 RECYCLED / RECOVERED MATERIALS – MAXWELL AFB
01 73 00 ALTERATION WORK
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 SELECTIVE REMOVAL AND DEMOLITION
02 REMOVAL AND SALVAGE OF HISTORIC CONSTRUCTION MATERIALS
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 82 00 ASBESTOS REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE DIVISION
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 – METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
Repair Dining Facility, Bldg 668
MAFB-PNQS-09-4491
PHJA/2223US
PROJECT TABLE OF CONTENTS Page 1
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 20 00 08/16, CHG 2: 11/18 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 00 POLYMER-MODIFIED CEMENT WATERPROOFING
07 21 00 MINERAL FIBER BUILDING INSULATION
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 13 METAL ROOF TILES
07 54 19 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 14 00 08/16, WOOD DOORS
08 31 00 05/17, ACCESS DOORS AND PANELS
08 41 13 08/18, ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 51 13 05/19 ALUMINUM WINDOWS
08 71 00 02/16, DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 24 23 CEMENT STUCCO
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.13 STANDARD RESINOUS FLOORING
09 72 00 WALLCOVERINGS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 10 SOLID PLASTIC LOCKERS
DIVISION 11 - EQUIPMENT
11 05 40 COMMON WORK RESULTS FOR FOODSERVICE EQUIPMENT
11 06 40.13 FOODSERVICE EQUIPMENT SCHEDULE
DIVISION 21 - FIRE SUPPRESSION
21 13 00.00 40 FIRE-SUPPRESSION SPRINKLER SYSTEMS
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
MAFB-PNQS-09-4491
PHJA/2223US
PROJECT TABLE OF CONTENTS Page 2
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
22 13 00 05/23 FACILITY SANITARY SEWERAGE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 01 30.41 HVAC SYSTEM CLEANING
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 13.34 40 CONTROL VALVES, SELF-CONTAINED
23 09 23.02
23 09 53.00
23 09 93
23 11 20
23 21 13.00
23 21 23
23 30 00
23 31 13.00
23 34 23.00
23 36 00.00
23 37 13.00
23 52 00
23 64 26
23 73 13.00
23 81 00
23 82 16.00
23 82 46.00
BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
SPACE TEMPERATURE CONTROL SYSTEMS
SEQUENCES OF OPERATION FOR HVAC
CONTROL FACILITY GAS PIPING
LOW TEMPERATURE WATER (LTW) HEATING
SYSTEM
HYDRONIC PUMPS
HVAC AIR DISTRIBUTION
METAL DUCTS
HVAC POWER VENTILATORS
AIR TERMINAL UNITS
DIFFUSERS, REGISTERS, AND GRILLES
HEATING BOILERS
CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
MODULAR INDOOR CENTRAL-STATION
AIR-HANDLING UNITS
DECENTRALIZED UNITARY HVAC EQUIPMENT
AIR COILS
ELECTRIC UNIT HEATERS
DIVISION 26 - ELECTRICAL
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 05 26.00 40 GROUNDING AND BONDING FOR ELECTRICAL
SYSTEMS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00.00 40 SWITCHBOARDS AND SWITCHGEAR
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 28 21.00 40 AUTOMATIC TRANSFER SWITCHES
26 32 15.00 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
MAFB-PNQS-09-4491
PHJA/2223US
PROJECT TABLE OF CONTENTS Page 3
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/08, CHG 2: 02/21 EARTHWORK
31 31 16.19 08/22 TERMITE CONTROL BARRIERS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 31 13 11/21 CHAIN LINK FENCES AND GATES
32 92 23 04/06, CHG 1: 08/21 SODDING
-- End of Project Table of Contents --
THIS SHEET INTENTIALLY LEFT BLANK.
REPAIR DINING FACILITY
MAXWELL AFB, ALABAMA
LIST OF DRAWINGS
SHEET
SEQ. NUMBER SHEET NAME
1 T1 .0 TITLE SHEET, LOCATION, & VICINITY PLAN
2 T1 .1 INDEX OF DRAWINGS
CIVIL
3 C-1 4 C-2 5 C-3
SITE PLAN DEMOLITION
SITE PLAN
DETAILS
LANDSCAPE
6 LA 1 .0
7 LA 1. 1
8 LA 1 .2
LANDSCAPE PLAN
LANDSCAPE NOTES AND DETAILS
LANDSCAPE DETAILS
ARCHITECTURAL
LIFE SAFETY PLAN
DEMOLITION PLAN
PNQS 09-4491
9 LS 1 . 1
10 D1.1 11 D 1.2
1 2 AO. 1
DEMOLITION NOTES, BASEMENT & ROOF PLANS AND DETAILS
ACCESSIBLE SHEET & TYP. MOUNTING HEIGHTS
1 3 A0.2 14 A0.3 15 A1.0 16 A1.1 1 7 A 1 .2 1 8 A 1 .3 19 A1.4 20 A2. 1 21 A2.2 22 A2.3 23 A2.4 24 A2.5 25 A2.6 26 A2.7 27 A2.8 28 A2.9 29 A2. 1 0 30 A2. 11 31 A2.12 32 A2.13 33 A2.14 34 A2.15 35 A2. 1 6 36 A2. 1 7 37 A3. 1 38 A3.2 39 A3.3
ACCESSIBLE SHEET & TYP. MOUNTING HEIGHTS
ACCESSIBLE SHEET & TYP. MOUNTING HEIGHTS
ARCHITECTURAL SITE DEMOLITION PLAN
ARCHITECTURAL SITE PLAN - NEW WORK
ARCHITECTURAL SITE DETAILS
ARCHITECTURAL SITE DETAILS
ARCHITECTURAL SITE DETAILS
FLOOR PLAN
BASEMENT FLOOR PLAN AND ENLARGED FLOOR PLAN
PARTIAL ENLARGED KITCHEN FLOOR PLAN
PARTIAL ENLARGED KITCHEN FLOOR PLAN
FINISH SCHEDULE AND NOTES
DOOR AND WINDOW SCHEDULES
DOOR DETAILS
DOOR DETAILS
DOOR DETAILS
DOOR DETAILS
DOOR DETAILS
WINDOW AND LOUVER SCHEDULE
WINDOW DETAILS
WINDOW DETAILS
WINDOW DETAILS
WINDOW DETAILS
LOUVER DETAILS
REFLECTED CEILING PLAN
CEILING DETAILS
ATTIC PLAN
SECTION 00 00 1 0 PAGE 1 OF 5
PNQS 09-4491
SHEET
SEQ. NUMBER
84 QF502
85 QF503
86 QF504
87 QF505
88 QF506
89 QF507
90 QF508
91 QF509
92 QF600
93 QF601
94 QF602
95 QF603
96 QF604
97 QF605
98 QF700
99 QF701
1 00 QF702
101 QF703
1 02 QF704
1 03 QF705
104 QF706
1 05 QF707
1 06 QF708
1 07 QF709
1 08 QF800
109 QF801
SHEET NAME
FOODSERVICE EXHAUST HOOD DETAILS - ITEM 49
FOODSERVICE EXHAUST HOOD DETAILS - ITEM 58
FOODSERVICE EXHAUST HOOD DETAILS - ITEM 91 & 91.1
FOODSERVICE EXHAUST HOOD DETAILS - FIRE SUPPRESSION
FOODSERVICE UTILITY DISTRIBUTION SYSTEM DETAILS SHEET 1 - ITEM 48
FOODSERVICE UTILITY DISTRIBUTION SYSTEM DETAILS SHEET 2 - ITEM 48
FOODSERVICE UTILITY DISTRIBUTION SYSTEM DETAILS SHEET 1 - ITEM 57
FOODSERVICE UTILITY DISTRIBUTION SYSTEM DETAILS SHEET 2 - ITEM 57
FOODSERVICE SPECIAL CONDITIONS NOTES & DETAILS
FOODSERVICE SPECIAL CONDITIONS PLAN - MAIN KITCHEN & SERVERY
FOODSERVICE SPECIAL CONDITIONS PLAN - DISH AREA & ROTC SERVERY
FOODSERVICE ENLARGED WALK-IN COOLER/FREEZER DETAILS
FOODSERVICE WALK-IN COOLER/FREEZER DETAILS
FOODSERVICE DISHROOM CONVEYOR SYSTEM DETAILS
FOODSERVICE CUSTOM FABRICATION PLAN - MAIN KITCHEN & SERVERY
FOODSERVICE CUSTOM FABRICATION PLAN - DISH AREA & ROTC SERVERY
FOODSERVICE EQUIPMENT ELEVATIONS
FOODSERVICE EQUIPMENT ELEVATIONS
FOODSERVICE EQUIPMENT ELEVATIONS
FOODSERVICE EQUIPMENT ELEVATIONS
FOODSERVICE EQUIPMENT ELEVATIONS
FOODSERVICE EQUIPMENT ELEVATIONS
FOODSERVICE EQUIPMENT ELEVATIONS
FOODSERVICE EQUIPMENT ELEVATIONS
FOODSERVICE STANDARD DETAILS
FOODSERVICE STANDARD DETAILS
STRUCTURE
11 0 so. 1 111 S1.1 112 S1.2 11 3 S2. 1 11 4 S2.2
GENERAL NOTES AND TYPICAL DETAILS
FOUNDATION PLANS
FRAMING PLANS
SECTIONS AND DETAILS
SECTIONS AND DETAILS
FIRE PROTECTION
1151FP0.1
116 FP1 .1 I
FIRE PROTECTION DETAILS
FIRST FLOOR PLAN - FIRE PROTECTION
PLUMBING
11 7 PO. 1
11 8 P0.2 119 P0.3 1 20 P0.4 1 21 P0.5 122 P0.6
PLUMBING LEGEND AND SCHEDULES
PLUMBING DETAILS
KITCHEN EQUIPMENT SCHEDULE
RISER DIAGRAM - WASTE AND VENT PIPING
RISER DIAGRAM - DOMESTIC WATER PIPING
RISER DIAGRAM - NATURAL GAS PIPING
SECTION 00 00 1 0 PAGE 3 OF 5
PNQS 09-4491
SHEET
SEQ. NUMBER SHEET NAME
123 P 1 . 1 FIRST FLOOR PLAN PLUMBING - DEMOLITION
124 P2. 1 FIRST FLOOR PLAN - PLUMBING - NON-PRESSURE PIPING
125 P2.2 ROOF PLAN - PLUMBING
126 P3. 1 FIRST FLOOR PLAN - PLUMBING - PRESSURE PIPING
MECHANICAL
127 M0.1 128 M0.2 129 M0.3 130 M0.4 131 M1.1 132 M1.2 133 M1.3 134 M1.4 135 M1.5 136 M1.6 137 M2.1 138 M2.2
MECHANICAL SCHEDULES
MECHANICAL DETAILS
MECHANICAL HYDRONIC DETAILS
MECHANICAL CONTROLS
FIRST FLOOR PLAN - HVAC DUCTWORK - DEMOLITION
FIRST FLOOR PLAN - HVAC DUCTWORK - NEW WORK
ATTIC PLAN - HVAC DUCTWORK - NEW WORK
ROOF PLAN - HVAC NEW WORK
FIRST FLOOR PLAN - HVAC PIPING NEW WORK
ATTIC PLAN - HVAC PIPING NEW WORK
MECHANICAL ROOM - HVAC DUCTWORK DEMOLITION AND NEW WORK
MECHANICAL ROOM - HVAC PIPING DEMOLITION AND NEW WORK
ELECTRICAL
1 39 EO. 1
1 40 E0.2 141 E0.3 1 42 E0.4 1 43 E 1 . 1 1 44 E2. 1 1 45 E2.2 1 46 E2.3 147 E2.4 148 E3.1 1 49 E3.2 1 50 E3.3 151 E3.4 1 52 E3.5 153 E3.6 154 E3.7 1 55 E4. 1 156 E5.1 157 E5.2 1 58 E5.3 1 59 E5.4 1 60 E5.5 1 61 E6. 1 1 62 E6.2 1 63 E6.3 1 64 E6.4 1 65 E6.5
ELECTRICAL LEGEND & NOTES
ELECTRICAL LEGEND & NOTES
SITE PLAN - ELECTRICAL DEMOLITION
SITE PLAN - ELECTRICAL NEW WORK
DEMOLITION FLOOR PLAN - ELECTRICAL
NEW FLOOR PLAN - LIGHTING
ATTIC PLAN LIGHTING
LIGHTING CONTROL DETAILS
LIGHTING CONTROL DETAILS
NEW FLOOR PLAN - POWER
NEW FLOOR PLAN - MECHANICAL POWER
NEW ROOF PLAN - MECHANICAL POWER
MECHANICAL GENERAL EQUIPMENT SCHEDULE
KITCHEN PLAN - ELECTRICAL REQUIREMENTS
KITCHEN EQUIPMENT SCHEDULE AND ELECTRICAL REQUIREMENTS
KITCHEN EQUIPMENT SCHEDULE AND ELECTRICAL REQUIREMENTS
NEW FLOOR PLAN - AUXILIARY
LUMINAIRE SCHEDULE, DETAILS & NOTES
PANEL BOARD SCHEDULES, DETAILS & NOTES
PANEL BOARD SCHEDULES
PANEL BOARD SCHEDULES
PANEL BOARD SCHEDULES
FIRE ALARM RISER, DETAILS & NOTES
COMMUNICATIONS RISER DIAGRAM, DETAILS & NOTES
COMMUNICATIONS DETAILS & NOTES
BUILDING 668 COMMUNICATIONS REQUIREMENTS & NOTES
BUILDING 668 COMMUNICATIONS REQUIREMENTS & NOTES (CONT'D)
SECTION 00 00 1 0 PAGE 4 OF 5
THIS SHEET INTENTIONALLY LEFT BLANK.
Section 00005
SECTION 00005
SCHEDULE OF BID ITEMS
Furnish all plant, labor, materials and equipment necessary to perform all work in connection with Project
Number PNQS 09-4491 Repair Dining Facility, Bldg 668 at Maxwell AFB, Alabama, in accordance with the attached specifications and drawings.
Item No. Description Unit of
Issue
Unit
Price Total Amount
0001 Repair Dining Facility, Building 668 EA N/A $
0002 Food Service Equipment EA N/A $
Total Bid Item 0001-0002 $_______________
Company: ___________________________
Signature: ________________________________________
Section 01 00 00.10 Page 1 of 5
SECTION 01 00 00.10
GENERAL REQUIREMENTS – MAXWELL AFB
05/24
PART 1 - GENERAL
1.1 PROJECT SUMMARY
The work covered by these specifications consists of furnishing all plant, labor, equipment and materials and performing all operations in connection with the REPAIR DINING FACILITY, BUILDING 668 to include all areas as indicated on drawings and in strict accordance with these specifications and applicable drawings and subject to terms and conditions of the contract.
The work generally consists of, but is not limited to, the renovating the entire building, to include the kitchen, with the addition to the building for new bathrooms, communications room and fire sprinkler room. Demolition includes the demolition for interior alterations, removal of windows and door systems at exterior openings, removal of the existing roof, demolition of building systems, and site demolition. New work includes new partitions and finishes throughout, windows systems, doors and door frames at exterior openings, a new roof assembly, new building systems, and sitework.
This project includes abatement of hazardous materials.
See Section 01 11 00 – Summary of Work for a more detailed summary.
1.2 BUILDING OCCUPANCY
Buildings will be unoccupied during the construction phase of this project, but the building and the site will be unavailable to commence the work until the ROTC season is complete. Contractor shall perform the majority of work during normal working hours.
See Section 01 11 00 – Summary of Work.
1.3 SCHEDULE OF WORK
The Contractor shall be responsible for establishing a schedule to meet construction time. Contractor shall prepare a work schedule on forms provided for schedule of work. Contractor shall have 640 calendar days to complete the work, but within the constraints of the directed phasing of the project.
PHASING OF WORK: The work herein will be completed in two phases.
1.3.1 PROCURMENT PHASE: This phase will begin after NTP. During this phase, the Contractor shall procure all the materials to execute the work. The Contractor shall process submittals for Government review and coordination, and the Contractor will order and stage materials as required. Building 668 and the site will not be available except for verification of existing conditions, survey and documents. The dining facility in Building 668 will remain operational during this phase.
1.3.2 CONSTRUCTION PHASE: This phase begins after the ROTC season is complete (1 September). The Contractor will receive the facility and site of Building 668 after ROTC season is complete (1 September). The contractor will enable full operations to the government during the next period of ROTC operations, beginning 1 May.
1.4 CONTRACT DRAWINGS AND SPECIFICATIONS
The Contractor must comply with the contract clause entitled "Specifications and Drawings for Construction" (FAR 52.246-21). See Section 01 11 00 para 1.6 for "CONTRACT DRAWINGS
AND SPECIFICATIONS DRAWINGS".
Section 01 00 00.10 Page 2 of 5
1.5 REMOVAL PROCEDURES:
No removed items will be reused in this contract unless specifically listed in these specifications and/or on the drawings. All removed equipment becomes the property of the Contractor unless noted otherwise.
See Section 01 74 19 – Construction Waste and Disposal.
REFER TO SPECIFICATION SECTION 01 00 01.10 – GENERAL REQUIREMENTS ENVIRONMENTAL PROTECTION
1.6 REFERENCED PUBLICATIONS
All publications referenced in these specifications, but may not be shown in each part under paragraph entitled "APPLICABLE PUBLICATIONS", also form a part of these specifications to the extent referenced.
1.7 ENVIRONMENTAL RELEASE REPORTING
An Environmental Release Report shall be completed for all environmental releases that are caused by an Air Force activity or which occur on an Air Force installation or facility. Examples of environmental releases are listed as follows but not limited to: oil releases to navigable waters, hazardous substance release above the reportable quantity, vinyl chloride releases, excessive emissions over amount allowed in permits, hazardous material incidents occurring during transportation, underground storage tank spills and releases, and any emergency incidents of environmental contamination. The Contractor shall immediately notify the TM/Contract Administrator in the event of any environmental release. The following information shall be documented: the time, type, amount, and cause of release.
1.8 PROTECTION OF EXISTING LANDSCAPE DURING CONSTRUCTION:
REFER TO SPECIFICATION SECTION 01 00 01.10 – GENERAL REQUIREMENTS ENVIRONMENTAL PROTECTION
1.8.1 Repair Or Replacement Of Damaged Landscape
If any failure to comply with these General Requirements Section or any other Contract Specification or provision or term of this contract occurs during installation, maintenance, or warranty, the Contractor shall be held responsible. Any damage occurring to Government property during the execution of this contract shall be repaired to the Government standards as defined in "The Maxwell Landscape Management Operational Instruction Manual" by the Contractor at no additional cost to the Government. The repair work shall be inspected and accepted by the Government.
Any discrepancies shall be fixed before acceptance.
1.8.2 Requirements
The following requirements shall be observed by the Contractor in order to protect existing landscape (to include trees, shrubs, flowers, turf, flower beds, sidewalks, patios, fences, etc.) during construction operations.
No vehicle parking is all allowed under canopies or within the drip-line root zone of protected trees. All trees are to be protected unless they are shown to be removed on the plans.
No storage of materials will be allowed under protected tree canopies or beside existing shrub plantings.
1.8.2.1 No storage of materials on turf areas shall be allowed unless the Government has given Contracting Officer approval. If any lawn damage occurs (even with special permission), the Contractor shall restore the lawn per par. 25.02.2.4.05 below.
1.8.2.2 No driving across, parking, or other equipment operations on existing turf shall be permitted unless prior approval has been obtained from the Contracting Officer. If any lawn damage occurs (even with special permission), the Contractor shall restore the lawn
Section 01 00 00.10 Page 3 of 5
1.8.2.3 No pruning or breaking off existing trees or shrubs shall be permitted unless prior approval has been obtained from the Contracting Officer and Base Landscape Architect. If prior approval is not obtained, the Contractor is liable for the repair/replacement of any damaged landscape items.
1.8.2.4 No work shall damage the health of any tree whose roots extend into the construction area. No fences, ropes, cables, signs, or devices of any kind shall be attached to any tree.
1.8.2.5 The TM shall be notified immediately of any damage occurring to a tree in the construction site, or any tree damaged by Contractor personnel. The TM/Contract Administrator shall direct measures, if any, to treat the injury. The Government shall incur no cost for any corrective measures, including, but not limited to, removal and replacement of the tree.
1.8.2.6 If the Contractor causes the death or 60% decline to any protected tree(s) within a 24 month period, the Contractor shall remove and replace the damaged tree(s) with size and species of tree(s) directed by the TM. The size of the new tree(s) shall equal caliper size of removed tree(s).
1.8.2.7 Damaged turf areas shall be replaced with sod per “The Maxwell Landscape Management Operational Instruction Manual.” The use of grass seed to repair turf damage at Maxwell AFB or Gunter Annex is not permitted.
1.9 STAGING AREA
During the Procurement Phase, the Contractor will be assigned a stage area in vicinity of Building 841 to begin stock piling equipment and supplies for the Construction Phase.
During the Construction Phase, the Contractor’s staging area will include the Procurement Area’s staging area and the staging area indicated in the drawings.
An damages to the staging areas, construction sites and transportation routes due to the Contractor’s activities on base will be repaired by the Contractor at no expense to the Government.
1.10 SECURITY REQUIREMENTS FOR UNCLASSIFIED CONTRACTS
See Section 01 11 00 – Summary of Work.
10.1 Traffic Laws
All Contractor personnel shall comply with Base traffic regulations.
10.2 Suitability Investigations
See Section 01 50 00 – Temporary Construction Facilities and Controls.
1.11 REQUIRED INSURANCE
See Section 01 30 00 – Administrative Requirements.
1.12 INSPECTION AND ACCEPTANCE
42 CES/CEN is designated as the office responsible for inspecting the work while the Contracting Officer is responsible for final acceptance of the work.
1.13 WARRANTIES
All workmanship, materials, and equipment shall be under warranty for at least one year as set forth in the contract clause entitled "Warranty of Construction" (FAR 52.246-21). See specs for warranties extending beyond the one-year period.
Section 01 00 00.10 Page 4 of 5
PART 2 – PRODUCTS
2.1 Building Entrance Signage.
Provide three building entrance signs in accordance with UFC 3-120-01, Change 4, Section 3-3.2 – Building Entrance Signs. Building entrance signs will include the building number and the facility name. Message to be approved by base architect.
Confirm locations onsite with the base architect. Size of the sign, placement of the sign at the entrances to be selected, and the mounting height will be in accordance with Figure 3-14 – Building Mounted Entry Sign Placement in UFC 3-120-01.
PART 3 – EXECUTION
3.1 REPAIR OR REPLACEMENT OF DAMAGED PROPERTY
In the event of damages of any nature caused by this work (including maintenance and warranty operations) due to improper protection, precaution, or safety measures, such damages shall be repaired or such property shall be replaced by the Contractor at no expense, cost, or charge to the Government. In the event the Contractor does not satisfactorily repair or replace such damage caused by the work of the contract, the Government reserves the right to make the necessary corrections and deduct from the contract price the cost to the Government for inconveniences, labor material, etc.
involved. Reference contract clause "Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements" (FAR 52.246-9).
1.12.1 Contractor shall protect all communications cabling while working and if damage is caused by the contractor, then the contractor shall replace the damaged communications cabling with same, or for internal cable, base standard CAT 6 cable. All CAT 6 cable must be home run to the communications room. Copper tie cables must be replaced with same. Fiber optic cables must be a continuous strand with no splices. All communication cabling must be wired to T568B standard.
3.2 FINAL CLEANING
1.13.1 Cleaning Schedule
Execute final cleaning prior to the final inspection.
1.13.2 Procedures
1.13.2.1 Clean surfaces exposed to view.
1.13.2.2 Remove temporary labels, stains, and foreign substances; polish transparent and glossy surfaces; wet mop tile or sealed concrete floors, vacuum carpeted floors, broom clean other floors.
1.13.2.3 Clean equipment and fixtures to a sanitary condition.
1.13.2.4 Clean or replace filters of mechanical equipment.
1.13.2.5 Any additional cleaning as specified in other sections.
1.13.2.6 Clean sites of all construction related and project related debris.
1.13.2.7 Remove waste and surplus materials, rubbish, and construction facilities from the work areas and the site.
3.3 CLOSEOUT PROCEDURES
When the Contractor is ready for final inspection, the Contractor shall notify the Contracting Officer (in writing) within two (2) working days of the desired inspection date. During the inspection, the Contractor and the TM/Contract Administrator shall document all deficiencies on a "punchlist." The Contracting Officer will provide a formal copy of the punchlist to the Contractor. The Contractor shall be responsible for correcting all punchlist items prior to the end of the contract completion date and notify the Contracting Officer (in writing) when
MAFB-PNQS-09-4491
Section 01 00 00.10 Page 5 of 5
Repair Dining Facility, Bldg 668 Maxwell AFB, Alabama the contractor is ready for re-inspection.
- - END OF SECTION - -
THIS SHEET INTENTALLY LEFT BLANK.
ENVIRONMENTAL PROTECTION 01001 Page 1 of 15
SECTION 01001A
EXHIBIT L
ENVIRONMENTAL PROTECTION
PART 1 GENERAL
1.0 DESCRIPTION
The work covered by this section consists of furnishing all labor, materials, and equipment and performing all work required for the prevention of environmental degradation during and as a result of construction operations under this contract. These requirements are in addition to any environmental protection requirements elsewhere in these specifications. For the purpose of this specification, environmental pollution is defined as the presence of chemical, physical, or biological elements or agents, not naturally occurring at the site, which adversely affect human health or welfare; unfavorably alter ecological balances; negatively affect plant or animal species;
or degrade the utility of the environment for aesthetic and recreational purposes. The control of environmental pollution by the contractor requires consideration of air, water, and land, and involves noise control, solid waste management and management of radiant energy and radioactive materials, as well as other pollutants. This section also requires the protection of natural, cultural and historic resources.
1.1 ACRONYMS AND DEFINITIONS
ADEM – Alabama Department of Environmental Management CAA – Clean Air Act
CO – Contracting Officer
CERCLA – Comprehensive Environmental Response, Compensation and Liability
Act
CWA – Clean Water Act
EPA – Environmental Protection Agency
MAFB – Maxwell Air Force Base and Gunter Annex. Throughout this environmental protection section, MAFB (including Gunter Annex) may commonly be referred to as the base or installation.
Media – Any soil, water, or air that is moved, disturbed, or released from a site
OSHA – Occupational Safety and Health Administration
TM – Technical Manager
RCRA – Resource Conservation and Recovery Act
SDWA – Safe Drinking Water Act TSCA – Toxic Substances Control Act
42 CES/CEIE – Maxwell Air Force Base Civil Engineering Squadron, Environmental Section.
Throughout this environmental protection section, this office will commonly be referred to as the
“installation environmental office.”
The terms hazardous, waste, pollutant, contaminant, and substance have the same meanings and usage here as they commonly do in the CAA, CERCLA, RCRA, SDWA, and TSCA.
1.2 CONTRACTOR’S GENERAL ENVIRONMENTAL COMPLIANCE OBLIGATIONS
1.2.1. Work under this contract is to be performed on a government facility. All environmental
ENVIRONMENTAL PROTECTION 01001 Page 2 of 15 rules applying to contractor operations elsewhere shall also apply on the government facility. Contractor (and any of their additional contractors, agents or representatives) shall comply with all applicable Federal, State, and local laws and regulations providing for environmental protection and pollution control and abatement. These include but are not limited to: the Clean Air Act, Clean Water Act, Resource Conservation and Recovery
Act, Comprehensive Environmental Response, Compensation and Liability Act, Toxic
Substances Control Act, Federal Insecticide Fungicide and Rodenticide Act, Coastal
Zone Management Act, Endangered Species Act, Migratory Bird Treaty Act, National
Historic Preservation Act, Archeological Resources Protection Act, Safe Drinking Water
Act, Emergency Planning and Community Right-to-Know Act, Oil Pollution Act, and
Pollution Prevention Act. Contractor has the duty to determine where such laws and regulations apply. Although the contractor may request assistance from the TM/Contract
Administrator or the installation environmental office in delineating applicable environmental laws and regulations, contractor has an independent responsibility to make its own determination and to do so in a timely fashion. Environmental Management
System (EMS) significant aspect is Hazardous Waste Compliance. Please ensure all personnel are aware of applicable RCRA requirements and have reviewed the
Commander’s Policy at the end of this section.
1.2.2. Contractors are responsible to implement their own environmental compliance programs, to ensure that individuals working at the site are properly trained and aware of potential hazards and proper operating procedures, and to ensure that all personnel follow the guidelines of OSHA, EPA, ADEM, and the Air Force’s policies, in addition to any guidelines of the jurisdiction(s) in which the operations will be performed. Compliance with the provisions of this section by lower tier contractors will be the responsibility of the contractor.
1.2.3 Notification: The Contract Administrator will notify the Contractor in writing of any non-compliance with environmental provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately take corrective action. If the Contractor fails or refuses to comply promptly, the Contract Administrator may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor unless it was later determined that the
Contractor was in compliance.
1.2.4 Maintenance of Pollution Control Facilities During Construction: During the life of this contract, the Contractor shall maintain all facilities constructed for pollution control under this contract as long as the operations creating the particular pollutant are being carried out or until the material concerned has become stabilized to the extent that pollution is no longer being created.
1.3 FINES OR PENALTIES FOR ENVIRONMENTAL NON-COMPLIANCE
The contractor shall be responsible for paying any fines or penalties assessed against the
Government for violations of environmental laws or regulations resulting from acts or omissions of the contractor or its employees, contractors, or agents. This obligation is in addition to any fines or penalties that may be assessed against the contractor for the same conduct. Contractor shall either reimburse these fines or penalties through the appropriate
Contract Administrator, or with the consent of the Contracting office and installation environmental office, the Contractor shall pay such fines or penalties directly to the regulatory agency or agencies concerned.
ENVIRONMENTAL PROTECTION 01001 Page 3 of 15
1.03.1 Pollution Reporting: No hazardous material can be released into the environment (ground, water, air) without prior approval of the contractor. In the event of an accidental release of a hazardous material to any of these medias, the contractor will be notified immediately.
The contractor will supply the means to properly prevent/contain and dispose of an accidental release in accordance with all applicable Federal, State, and Local regulations.
All costs incurred by the contractor during the mitigation and disposal from an accidental release shall be the responsibility of the contractor.
1.4 CONTRACTOR’S LIABILITY FOR ENVIRONMENTAL DAMAGES
Contractor agrees to hold harmless and indemnify the Government for any and all damages of any kind resulting from environmentally harmful activities by the contractor, contractor’s employees, agents, or contractors. “Damages” includes personal injury or death, property damages (including diminution of value), environmental restoration and response costs, natural or cultural resource damages or restoration, expert witness and attorney’s fees, and reimbursement of any and all expenses incurred to obtain permits as a result of contractor’s failure to identify or obtain permits for itself, the Government.
1.5 CONTACT WITH ENVIRONMENTAL REGULATORY OFFICIALS
Contractor shall immediately advise the TM/Contract Officer, 42nd Contracting Office, and the installation environmental office of the content of all contacts with Federal, State, or local environmental regulators; before, during, and after the performance of this contract concerning the performance of this contract.
1.6 PERMITS FOR EQUIPMENT USED BY CONTRACTORIN PERFORMING
GOVERNMENT CONTRACTS.
For equipment used in the performance of this contract, contractor shall obtain in contractor’s name and at no additional expense to the Government all permits, coordination, certifications or other regulatory authorization necessary to perform and complete the work required by this contract under applicable environmental laws and regulations. “Applicable environmental laws and regulations” includes but is not limited to: the Clean Air Act, Clean Water Act, Resource
Conservation and Recovery Act, Comprehensive Environmental Response, Compensation and
Liability Act, (CERCLA), Toxic Substances Control Act, Federal Insecticide Fungicide and
Rodenticide Act, Coastal Zone Management Act, Endangered Species Act, National Historic
Preservation Act, Safe Drinking Water Act, Emergency Planning and Community Right-to-Know
Act, Oil Pollution Act, and Pollution Prevention Act, and State, County, and Local laws and regulations on the same subjects.
1.7 PERMITS NEEDED FOR CONSTRUCTION, EXCAVATION, MODIFICTION,
RENOVATION, DEMOLITION, INSTALLATION, OR OTHER ALTERATION OF
BUILDINGS, STRUCTURES, EQUIPMENT, INSTALLATIONS, REAL
PROPERTY OR SYSTEMS
Contractor shall identify all Federal, State, County, or local permits, coordination, certifications or other regulatory authorization requirements under all applicable environmental laws and regulations. Contractor shall then prepare in draft, and submit to the Contracts office for review, all applicable permit applications, coordination, notices, or other required filings, together with all supporting data. Permit applications, notifications or other documents that must be submitted by
ENVIRONMENTAL PROTECTION 01001 Page 4 of 15 the Government shall be submitted by the Government, and any documents that must be submitted by the contractor shall be returned to the contractor for submission after review. No work requiring permit or other written authorization shall proceed before the contractor has the permit or authorization or a copy thereof in its possession. Copies of all required environmental permits shall be submitted to the Contracts office to be forwarded to the installation environmental office to have on file prior to the start of work.
PART 2 MATERIALS
2.1 ASBESTOS
2.1.1. Asbestos shall not be used or included in this project unless specifically approved in writing by the 42nd Contracting Office and installation environmental office.
2.1.2. If workers should encounter any suspect asbestos-containing material such as fibrous insulation, pipe wrap, asbestos-containing plaster, etc., contractor shall cease any activity that may disturb the material and immediately contact the TM/Contract Administrator for coordination with the installation environmental office.
2.1.3. If potential asbestos-containing material has been identified in connection with proposed work, all asbestos abatement activities shall be conducted by a certified Safe-
State contractor, following base asbestos protocol, asbestos specification section, Maxwell AFB
Asbestos Management and Operations Plan. Contractor shall follow all applicable governing regulations, including, but not limited to: 29 CFR 1926.1101 - OSHA Safety and
Health Regulations for Construction, Subpart Z, Toxic and Hazardous Substances, 29 CFR
1910.1001 - OSHA Standards, Subpart Z, Toxic and Hazardous Substances, and CFR Part
61 - EPA National Emission Standards for Hazardous Air Pollutants (NESHAPS)
2.2 POLYCHLORINATED BIPHENYLS (PCBs)
2.2.1. PCBs shall not be used or included in this project.
2.2.2. If contractor encounters any lighting ballasts, electrical transformers, or other equipment that is suspected to contain PCBs, contractor shall contact the TM/Contract Administrator for notification to the installation environmental office. If the equipment is not labeled or does not specify that the unit has “no PCBs,” it is considered to be suspect and shall be handled as if it may contain PCBs. Disposal shall be coordinated through installation environmental office. Contractor shall not remove any hazardous waste from the installation without installation environmental office knowledge prior to scheduling.
2.3 LEAD-BASED PAINT
2.3.1. Lead-based paint shall not be used or included in this project.
2.3.2. In buildings that were constructed prior to 1978, it should be assumed that lead-based paint is present unless sampling results indicate otherwise. Any activities that will potentially disturb lead-based paint shall be coordinated through the installation environmental office.
Contractor is responsible for complying with the Maxwell AFB Lead-Based Paint
Management Plan and all applicable Federal, State, and local regulations, including OSHA
Lead in Construction Standard 29 CFR 1926.62. Contractor shall be properly trained and is responsible for worker training and protection requirements. Documentation of training shall be provided to the 42nd Contracting Office prior to start of work.
ENVIRONMENTAL PROTECTION 01001 Page 5 of 15
2.3.3. If suspect lead-based paint is encountered during performance of work, contractor shall coordinate lead-based paint work plan through TM/Contract Administrator for coordination with installation environmental office before proceeding with any activities such as sanding, scraping, demolition, or other activities that may disturb lead-based paint.
2.4 OZONE-DEPLETING SUBSTANCES
2.4.1. The use of Class I ozone-depleting substances is generally prohibited. Any use of a Class
I ozone-depleting substance shall be approved through the installation environmental office prior to use. All Class I ODSs recovered on site shall be returned to the base Civil
Engineering HVAC shop (42 CES/CEOH). All reasonable efforts shall be made to reduce usage of Class II ozone-depleting substances. All usage shall be reported to 42
CES/CEIE.
2.4.2. Contractors shall follow regulations concerning ODS as specified in 42 USC 7671 (b), (c), and (d) and 40 CFR Part 82, Subpart E. All Class I and Class II ODS shall be labeled IAW these regulations.
2.4.3. The contractor shall comply with the applicable requirements of Sections 608 and 609 of the…