This is a Purchase Statement of Work issued by the Air Force Research Laboratory (AFRL) in Rome, New York for the procurement and delivery of a guard booth.
The vendor must submit a quotation to deliver a relocatable guard booth to the Visitor Control Center at AFRL/RF, located at 304 Brooks Road, Rome, NY 13441, by October 1st, 2026. The booth will shelter security officers at high-traffic installation entrances. The booth specifications include dimensions of 4' wide by 8' long by 8' height (within +/- 6" tolerances), steel frame construction with minimum 4" overhang, and light gray interior and exterior coloring. The booth must feature minimum insulation ratings of R28 for walls and R42 for the roof, anchor brackets for concrete surface attachment, and a non-slip floor. Interior furnishings include a desk with drawer. Access consists of one 32" metal swing door with fixed glass and lever handle with lock on a 4' wide end, one transaction/toll booth style roller window on the left of the 8' length side, and fixed or sliding windows with locks throughout. All windows must be non-ballistic rated and tinted. The booth requires ceiling-mounted interior lighting with wall switch, minimum one quad outlet, 125 Amp 6-space breaker panel, minimum 13,500 BTU roof-mounted AC unit, and minimum 3000-watt wall-mounted heater. Delivery is included with the purchase and shall be tax exempt. The warranty covers material and manufacturing defects plus delivery damage; provides one year coverage for structural defects in framing, floor, and roof; minimum 30 days for electrical devices and HVAC units; and minimum 14 days for glass, doors, windows, and delivery damage.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFRL/RF Purchase Statement of Work ULDF260002 – Install Guard Booth, B103
June 29, 2026
Vendor to submit quotation to AFRL/RF to deliver a guard booth by October 1st, 2026 as described below. Intended use for this guard booth will be to provide shelter for additional security officers during high traffic installation entrances.
Site Address:
Visitor Control Center Air Force Research Laboratory 304 Brooks Road, Rome, NY 13441
1. Specifications and Performance
Basic Physical Attributes:
a) The booth shall have delivery included with the purchase and be tax exempt.
b) The booth shall be 4’ wide by 8’ long by 8’ height within +/- 6” tolerances, relocatable.
c) The booth shall be steel framed with a min. 4” overhang.
d) The booth shall have a min. insulation rating of R28 for the walls and R42 for the roof.
e) The booth shall be light gray in color for both interior and exterior or the relocatable booth.
f) The booth shall have anchor brackets to attach to existing concrete surface.
g) The booth shall have a non-slip floor.
h) The booth shall have a desk with drawer.
i) The booth shall have (1) min. 32” metal swing door with fixed glass and lever handle with lock on one of the 4’ wide ends, (1) transaction/toll booth style roller window on the left of the man door 8’ length side of the booth and all other windows through the booth shall be fixed/non-operational or sliding with a lock depending on standard booth construction.
j) The booth shall have non-ballistic rated tinted windows.
k) The booth shall have ceiling mounted interior lighting with a wall switch.
l) The booth shall have a min. of (1) quad outlet.
m) The booth shall have a 125 Amp 6-space breaker panel.
n) The booth shall have a min. of a 13,500 BTU roof-mounted AC unit.
o) The booth shall have a min. of a 3000-watt wall-mounted heater.
p) The booth shall have a warranty of:
a. Covering any defects in material or manufacturing workmanship and damage during delivery by the Seller or its agent
b. Period of one year from date of delivery for structural defects in the framing, floor and roof
c. Minimum of 30 days for any electrical devices, appliances or HVAC units.
d. Minimum of 14 days for replacement/repair of any glass, doors, windows, delivery damage.