Attch 1 Eielson PWS 2021.10.27.pdf
PDF 464 KB Posted
- Attached to
- Solicitation Eielson AFB, AK ATGHS Federal contract opportunity
- Solicitation number
- HTC711-22-R-C005
About this file
This performance work statement outlines requirements for air terminal and ground handling services at Eielson Air Force Base in Alaska. The contractor shall provide services including air terminal operations, load planning, aircraft services, passenger and baggage handling, fleet services, exercises and deployments, records management, and communications. The government will furnish facilities, equipment, materials, and training. Required equipment includes loaders, forklifts, latrine and fuel trucks. Interested offerors must respond to solicitation number HTC711-22-R-C005 by 2:00pm CST on December 8, 2021. The solicitation is issued by the United States Transportation Command for the Department of Defense.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2021.12.08 Amendment 0003 Eielson RFP - HTC71122RC005.pdf | ||
| Eielson Amended PWS 2021.12.08.pdf | ||
| EIESLON RFP Q and A Master Log 2021.11.30.xlsx | XLSX spreadsheet | |
| Amendment 0002 DFARS Vaccine Clause.pdf | ||
| EIL PP TEAMS Meeting Minutes 2021.11.16 .pdf | ||
| 2021.11.08 Amendment Small Business Set-Aside Correction.pdf | ||
| Attch 3 Eielson DD254 - Certified.pdf | ||
| Attch 2 PP survey cvr ltr - Signed.pdf | ||
| 2021.11.08 RFP HTC711-22-R-C005 Eielson.pdf | ||
| Attch 2 Eielson ATGHS PP Survey.doc | DOC document | |
| Attch 5 - CBA.pdf | ||
| Attch 4 Contract Information Sheet.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No: HTC711-22-R-C005 Attachment 1
CONTRACT NO.:
27 October 2021
PERFORMANCE WORK STATEMENT
FOR
AIR TERMINAL AND GROUND HANDLING SERVICES
FOR THE
AIR MOBILITY COMMAND
AT
EIELSON AFB, ALASKA
1. DESCRIPTION OF SERVICES: The contractor shall provide Air Terminal and Ground Handling Services (ATGHS) on behalf of the Air Mobility Command (AMC) in support of the Defense Transportation System (DTS) to include but not limited to all US Government owned or operated aircraft, US sponsored foreign government or civil aircraft, commercial contract aircraft, commercial tendered aircraft, and allied, coalition, or partner nation aircraft at Eielson AFB, Alaska. The contractor shall facilitate on-time aircraft departures and maintain the ability to provide sustained ATGHS for a Working
Maximum on Ground (WMOG) capability of one wide-body aircraft or any combination of narrow-body which equate to one wide body aircraft, as defined in Appendix A. These services are considered to be operationally critical support as defined in DFARS 252.204-7012.
1.1. Air Terminal Operations Center (ATOC): The contractor shall provide a control function that manages all information and terminal resources required to receive, document, plan, and move passengers, cargo, and mail, ensuring maximum aircraft utilization. The contractor shall:
1.1.1. Gather, process, and disseminate information in accordance with (IAW):
- Air Force Instruction (AFI) 24-605, V2, Chapter 4, Section 4A
- Headquarters (HQ) AMC/A4T policy, messages, memorandums, instructions, and directives
- Global Air Transportation Execution System (GATES)
The contractor shall:
1.1.1.1. Provide the 618 Air Operations Center (AOC), 613 AOC/Air Mobility Division Manager (AMDM), and Base
Command Post, as appropriate, aircraft landing, block-in, block-out, and take-off times; information concerning a potential aircraft delay, actual delay, or abort.
1.1.1.1.1. Contact the Contracting Officer Representative (COR) within 12 hours of an actual aircraft delay or abort.
1.1.1.2. Report all aircraft mishaps and incidents, as well as, unscheduled aircraft remaining overnight (RON) to AOC, 613
AOC/AMDM (as applicable), Base Command Post (except Aircraft RON), and COR.
1.1.1.3. Update, publish, and provide daily mission schedules, which cover the next 72 hour period, to agencies specified by COR.
1.1.1.3.1. Publish and distribute the initial mission schedule no later than (NLT) 0800L and provide updates (mission add-ons, cancellations, delays).
1.1.1.4. Coordinate inbound and outbound clearance for explosives shipments and monitor the terminal’s explosive movement requirements and capability IAW AFI 24-605, V2, Chapter 4, Section 4A, paragraphs 4.6.2. and 4.6.3.
1.1.1.5. Coordinate airlift mission requirements with the mission validator, Installation Deployment Officer (IDO), 353 CTS/ES Logistics Exercise Support (RED FLAG, AK/RF-A), and the deploying/redeploying unit.
1.1.1.5.1. Ensure contractor personnel attending RF-A planning meetings possess a Secret Security Clearance and maintain technical knowledge of mission movement and execution procedures to facilitate mission adaptations and relevant communications.
1.1.1.5.2. Coordinate 168 Air Refueling Wing (ARW) mission requirements with the 168 ARW/LGRRP and provide them periodic feedback concerning operational issues and concerns.
1.1.1.6. Coordinate mission planning, control, and execution. Establish ssequence of events checklists to track performance requirements within established aircraft ground times, facilitating on-time aircraft departures.
1.1.1.7. Prepare billing documents for services to non-Department of Defense (DOD) aircraft IAW AFI 24-605, V2, Chapter 4, Section 4A, paragraph 4.26.
1.1.1.7.1. Preparation of billing documents are not required for services rendered to non-DOD aircraft that are contracted by AMC on a planeload charter and/or aircraft that have a justifiable claim under other authorizations (i.e., joint-use agreement, treaty, cooperative military airlift agreement, non-AMC contract).
1.2. Load Planning: The contractor shall plan, select, sequence, and monitor each aircraft passenger, cargo and mail load
IAW AFI 24-605, V2, Chapter 4, Section 4A, paragraphs 4.7. through 4.32., and HQ AMC/A4T policy, messages, memorandums, instructions, and directives, and GATES. The contractor shall:
1.2.1. Obtain passenger deviations when moving hazardous material IAW AFI 24-605, V2, Chapter 4, Section 4A, paragraph 4.10.
1.3. Aircraft Services: The contractor shall control and record movement of cargo and mail, provide cargo processing, special handling, and aircraft loading and unloading IAW:
- AFI 24-605, V2, Chapter 3;
- Department Transportation Regulation (DTR) Regulation 4500.9-R, Part II, Chapter 203, Section C, paragraphs 5, 6, 7, and 8;
- DODI 4515.13, Section 6
- Air Force Manual (AFMAN) 24-604
- HQ AMC/A4T policy, messages, memorandums, instructions, and directives
- GATES
1.3.1. The contractor shall load and unload cargo on and off surface conveyances.
1.3.2. The contractor shall provide technical assistance for preparation of hazardous materials marking, labeling, and documentation IAW AFMAN 24-604, and applicable intermediate changes and supplements. Inspect all hazardous material IAW AFMAN 24-604 before acceptance into the DTS. Use the International Air Transportation Association
(IATA) Dangerous Goods Regulations as applicable.
1.3.3. The contractor shall coordinate installation entry/provide escort services for conveyances and drivers to/from the base entry point and AMC Air Terminal, as required IAW installation entry policies.
1.4. Passenger and Baggage Services: The contractor shall provide a complete range of passenger and baggage services
IAW:
- AFI 24-605, V2, Chapter 2, Section 2A;
- Electronic Foreign Clearance Guide
- DODI 4515.13, Sections 3, 4, 10, and 12
- USPACOMINST 0201.2
- HQ AMC/A4T policy, messages, memorandums, instructions, and directives
- GATES
1.4.1. The contractor shall ensure contractor personnel are knowledgeable of hazardous materials/dangerous goods that are acceptable/unacceptable to be carried by passengers for personal use in carry-on baggage and in checked baggage.
1.4.2. The contractor shall maintain a Social Media website IAW AFI 24-605, V2, Chapter 2, Section 2A, paragraph 2.8.4.
1.4.3. The contractor shall advertise the Interactive Customer Evaluation (ICE) program and distribute ICE cards provided by the COR.
1.5. Commercial Aircraft Aircrew Baggage.
1.5.1. The contractor shall coordinate commercial aircraft aircrew baggage upload/download requirements with the
Commercial Carrier Representative.
1.5.2. The contractor shall upload commercial aircraft aircrew baggage prior to aircraft scheduled departure and download loose commercial aircraft aircrew baggage when other loose loaded DV/passenger baggage is downloaded.
1.6. Funds Handling. The contractor shall provide funds handling services IAW AFI 24-605, V2, Chapter 2, Section 2A, paragraphs 2.81. through 2.106., and HQ AMC/A4T policy, messages, memorandums, instructions, and directives.
1.7. Fleet Service: The contractor shall provide fleet service to include, but not limited to, picking up, loading, and unloading fleet service equipment and supplies, in-flight meal delivery, aircraft latrine servicing, and aircraft interior sanitation and cleaning IAW AFI 24-605, V2, Chapter 2, Section 2B. The contractor shall:
1.7.1. Account for equipment loaded and unloaded aboard aircraft.
1.7.2. Maintain adequate stock level for expendable items listed in Appendix C-1.
1.7.3. Establish adequate storage location for two 275 Gallon Totes containing BlueJuice Arctic Lavatory Fluid for protection from the environment and enables safe transfer to lavatory servicing truck.
1.7.3.1. Coordinate shipping/receiving activities with 354 FW/LRS and COR to obtain 275 Gallon Totes of BlueJuice
Artic Lavatory Fluid from the 732 AMS/TROF.
1.7.3.1.1. Produce shipping documentation for empty 275 Gallon Totes, confirm with COR the DODAAC, Destination
Points of Contact (POC), and Transportation Account Code (TAC), and coordinate with the 354 FW/LRS for pick-up of empty 275 Gallon Totes and documentation for shipping to the 732 AMS/TROF for refill.
1.7.3.1.2. Coordinate delivery of 275 Gallon Totes of BlueJuice Arctic Lavatory Fluid with the 354 FW/LRS within 48 hours of shipment receipt notification.
1.7.4. Ensure waste from the lavatory service trucks is dumped at designated waste disposal sites.
1.7.5. Remove all trash from aircraft, other than Commercial Aircraft. NOTE: Cleaning and catering of commercial aircraft is the responsibility of the air carrier.
1.7.5.1. Provide trash removal and lavatory services upon arrival and as requested.
1.7.5.1.1. Coordinate and establish a trash pick-up and lavatory services schedule with exercise airlift mission coordinators.
1.7.5.2. Maintain the international trash disposal program IAW local base policy.
1.7.5.2.1. Incinerate international trash utilizing the Government provided incinerator IAW the United States Department of Agriculture (USDA) approved Compliance Agreement and Eielson AFB Regulated Garbage Removal Standard
Operating Procedures provide by the COR.
1.7.5.2.2. Maintain a monthly international trash removal log for USDA Regulated Garbage.
1.7.5.2.2.1. The log shall include the following column headings, Date, Mission Number, Aircraft Type, Aerial Port of
Embarkation (APOE), Total Pax, Number of Bags of Trash, Total Weight of All Bags, Date Trash Incinerated.
1.7.5.2.2.1.1. Send the monthly log to the COR via email within three business days from the end of the reporting month.
1.7.5.2.2.2. Monthly international trash removal logs shall be destroyed after one year.
1.7.5.2.3. Maintain a sufficient amount of diesel fuel from the base fuel station in the Government provided container for use in the Oil Away Unit when incinerating wet trash.
1.8. Exercises, Inspections and Deployments/Redeployments. The contractor shall provide services up to twenty-four
(24) hours per day on an extended basis IAW DTR 4500.9-R, Part III, Chapter 303, Section B, paragraphs 2e(1), Section C, paragraphs 2d(3)(a), paragraphs 3b (3) and (4), 5d(1)(c) except 2, and Figure 303-3 except 13 and 15;
- Appendix J, Section B;
- Appendix K;
- Appendix M, paragraphs C.3. and Section D;
- Appendix O;
- Appendix P;
- Appendix S, Section D;
- Appendix U, Section D and E;
- Appendix V, Section A and G-I;
- Appendix X;
1.8.1. Accomplish Joint Inspection (JI) IAW DTR 4500.9R Part III for all unit moves.
1.8.2. Provide load teams to meet all aircraft services requirements unless the applicable Government unit/service has stated Government load teams will be provided during mission coordination with the contractor.
1.8.2.1. Provide a Load Team Chief when Government load teams are provided.
1.8.3. Notify the deployed activity as applicable of frustrated cargo/equipment.
1.8.4 Provide technical assistance to deploying/redeploying units when requested.
1.8.5. Develop a JI program to ensure a sufficient number of contractor personnel are JI certified to fulfill the requirements of this Performance Work Statement (PWS). Accomplish JI IAW DTR 4500.9R Part III, Chapter 303 and Appendix O.
1.8.5.1. Validate load plans IAW DTR 4500.9-R, Part III, Chapter 303.
1.9. Reports, Records, and Electronic Data Interchange.
1.9.1. The contractor shall prepare and submit the following reports within the periods stated IAW the specified publication, policy, message, or memorandum. A copy of reports identified with an * shall be provided to COR Manager and COR.
1.9.1.1. * Monthly Station Traffic Handling Report, HQ AMC-A4T(M) WRS (AMC Form 82) IAW AFI 24-605, V2, Chapter 4, Section 4B, paragraphs 4.36. through 4.36.2.
1.9.1.2. * Global Asset Reporting Tool (GART) AMC RCS: Monthly/Weekly Report, IAW AFI 24-605, V5, Chapter 4, Section 4B, paragraphs 4.14. through 4.14.3.
1.9.1.3. Mishandled Baggage Summary, (AMC Form 134a) IAW AFI 24-605, V2, Chapter 2, Section 2A , paragraphs
2.119. through 2.119.2.7.
1.9.1.4. *732 AMS Weekly Recap Report. Complete and forward to 732 AMS Data Records, IAW current 732 AMS policy, messages, memorandums and instructions.
1.9.2. The contractor shall create, maintain, and dispose of Government-Required Records IAW AFI 24-605, V2, Chapter
4, Section 4B, GATES, and AMC/A4T policy messages, memorandums, instructions, and directives. The contractor shall provide the original record or a reproducible copy of any such record within three (3) working days of receipt of the request. The contractor shall:
1.9.2.1. Perform post flight procedures within 24 hours of aircraft departure.
1.9.2.2. Complete and file all flight transactions and related documentation within 48 hours of aircraft departure.
1.9.2.3. Research documentation retained by the contractor and prepare reports within 48 hours of request. Maintain a copy of all research requests for a period of 90 calendar days.
1.9.2.4. Audit and correct all errors and discrepancies within 24 hours of discovery or notification.
1.10. Communications Management and Information Systems. The contractor shall interface with the Government communications representative(s) as required to manage the air terminal computer systems and ensure continued functionality.
1. 10.1. Provide a GATES Work Area Security Officer (WASO) IAW GATES Manual.
1. 10.1.1. Provide a letter with the name of the GATES WASO and alternate(s) to the Contracting Officer (CO), COR, and
AMC/A6 15 calendar days before the start of the contract. Submit an updated appointment letter as required.
1. 10.1.2. Immediately request assistance from HQ AMC/A4TI for software and hardware related problems, notify the
COR of software and hardware related problems within 48 hours of the request for assistance, and ensure GATES trouble tickets are submitted to the GATES HELPDESK as required to ensure unresolved problems identified and tracked until resolution is provided.
1. 10.1.3. Establish manual-processing procedures and provide uninterrupted service to the customer when GATES functionality is lost.
1. 10.1.3.1. Notify the COR when a loss of GATES functionality occurs and cannot be restored within 30 minutes.
1.11. Materials Handling Equipment (MHE) and Vehicle Operations/Maintenance. The contractor shall operate, maintain, and provide preventive maintenance for all MHE and vehicles listed in the PWS to ensure maximum availability and utilization IAW:
- AFI 24-302, Chapter 7, Section 7B, paragraphs 7.12 through 7.17
- Technical Orders, Instructions, and Operational Orders
- Installation Vehicle/MHE programs and policies
1.12. Mechanized Material Handling Systems (MMHS). The Contractor shall inspect, maintain, and provide preventive/routine maintenance for all MMHS listed in the PWS to ensure maximum availability and utilization IAW AFI
24-605, V5, Chapter 4, Section 4F.
1.13. Custodial Services. The contractor shall ensure all Government-Furnished Equipment and Facilities are clean.
1.13.1. The contractor shall clean joint use Cargo Deployment and Ammunition Processing Facilities when utilized by the contractor.
1.14. Ground Maintenance. The contractor shall maintain a safe and neat environment. At a minimum: cut, rake, edge and pick-up grass; pull weeds and maintain flower beds; trim trees, bushes, hedges and shrubs; provide ice control measures from facility entrance and exit ramps as well as steps; and remove snow from all sidewalks, steps, drives and parking areas within 150 feet of all Government-Furnished Facilities. The contractor shall also remove ice and snow from sidewalks leading to and from the Passenger Terminal short term parking lot as required to maintain a safe walking surface;
and, plow snow in this parking lot to allow for customer parking.
1.14.1. The contractor shall remove snow from the access road, facility access points, and walkways within 50 feet of joint use Cargo Deployment and Ammunition Processing Facilities when facility is utilized by the contractor.
1.15. Customer Service. The contractor shall conduct tours for individuals and groups as coordinated by COR.
2. SERVICE DELIVERY SUMMARY. The Service Delivery Summary (SDS) represents the most important contract objectives and includes safety and security requirements, which are interwoven critical aspects of these objectives. The contractor is fully expected to comply with all PWS requirements; however, the Government’s assessment of contractor performance will focus mainly on these objectives.
2.1. A critical nonconformance cannot be corrected 1) without negative mission impact; and/or 2) adversely affects another
Government agency’s ability to accomplish their mission; and/or 3) adversely affects the safety/security of personnel or resources.
2.2. A minor nonconformance is unlikely to materially reduce the usability of the services for their intended purpose and cannot be corrected.
Performance Objective PWS
Paragraph
Performance Threshold
1. Provide ATGHS to facilitate on-time aircraft departure.
1. No critical nonconformance (a delay which exceeds 60 minutes) and no more than 1 delayed mission caused by the contractor each month.
2. Gather, process and disseminate information.
1.1. thru 1.1.1.7. No critical nonconformance and less than 3 minor nonconformances each month.
3. Provide load planning services. 1.2. thru 1.2.1. No critical nonconformance and less than 4 minor nonconformances each month.
4. Provide aircraft services. 1.3. thru 1.3.3. No critical nonconformance and less than 4 minor nonconformances each month.
5. Inspection, processing, and movement of hazardous materials.
1.3 and 1.3.2. Inspected, processed, and moved with 100% accuracy.
6. Provide passenger and baggage services.
1.4. thru 1.4.3. No critical nonconformance and less than 4 minor nonconformances each month.
7. Perform funds handling. 1.6. Funds were accounted for properly and deposited on-time.
8. Provide exercises, inspections and deployments/redeployments services.
1.8. thru 1.8.5.1. No critical nonconformance and less than 3 minor nonconformances each month.
9. Manage reports, records and electronic data interchange.
1.9. thru 1.9.2.4. No critical nonconformance and less than 8 minor nonconformances each month.
10. Cyber Incident Reporting 4.6.23. thru 4.6.26. No more than one late cyber incident report or unreported cyber incident in a 12 month period.
3. GOVERNMENT-FURNISHED MATERIALS, EQUIPMENT, FACILITIES, SERVICES AND TRAINING
3.1. Government-Furnished Materials. Government-Furnished Materials (GFM), Appendix C-1, will be provided to the contractor for the duration of the performance period of this contract. The contractor and COR shall jointly inventory the initial stock of GFM not later than five working days prior to the contract performance start date. Any missing items shall be annotated on the inventory and the CO notified in writing. The contractor shall sign a receipt for all materials provided by the Government.
3.1.1. The contractor shall request additional materials by providing a written (email or memorandum) request to the COR at least 90 calendar days before the required delivery date of the materials, if additional materials are authorized by the contract. At the conclusion of the contract, the contractor shall return all residual inventories to the Government.
3.1.2. The contractor shall pack and move GFM as coordinated with the COR during facility renovations, improvements, or relocation efforts.
3.2. Government-Furnished Equipment. Government-Furnished Equipment (GFE), Appendix C-2, will be provided to the contractor for the duration of the performance period of this contract. The contractor and COR shall jointly inventory
GFE NLT five working days before the performance start date; and annually thereafter NLT 10 calendar days before completion of the contract period, including any option periods. The contractor and the COR shall jointly determine the working order and condition of all equipment and document their findings on the inventory. The CO shall be provided a copy of the inventory signed and dated by the COR and contractor's representative receipting for all equipment provided by the Government; and, notified in writing when equipment is missing or not in working order. In the event of disagreement between the contractor and the COR on the working order and condition of equipment, the disagreement shall be elevated to the CO.
3.2.1. The contractor shall submit requests either email or memorandum for additional or replacement GFE to the COR.
Such requests shall specify the reason for the request. The contractor shall prepare and turn in GFE approved for replacement or repair.
3.2.2. The contractor shall pack and move GFE as coordinated with the COR during facility renovations, improvements, or relocation efforts.
3.3. Government-Furnished Facilities. Government-Furnished Facilities (GFF), Appendix C-3, have been inspected by the Government. The Government will correct hazards according to approved plans of abatement taking into account safety and health priorities should a hazard within a GFF be identified. The Government will provide dedicated Defense
Switching Network (DSN) telephone lines and appropriate computer network connections. The contractor shall ensure that telephones and computers are only used for “Official Government Business”.
3.3.1. The contractor shall furnish the CO and COR documentation describing, in detail, any modification requested before any modification of the GFF is performed by the contractor at their expense. No alterations to the facilities shall be made without specific written permission from the CO. The contractor shall return the GFF to the Government in the same condition as received, fair wear and tear and approved modifications excepted. GFF shall only be used in performance of this contract.
3.3.2. The contractor shall make sure contractor personnel practice utilities conservation to include water, electricity, and resources in all facilities as well as ensure that telephones are only used for “Official Government Business”.
3.3.3. The contractor shall coordinate and provide assistance with the relocation of functional areas of operation as required within their existing capabilities. The Government will de-conflict coordinated relocation efforts with contractor performance requirements, and arrange for sufficient time to accomplish relocation efforts.
3.4. Government-Furnished Services.
3.4.1. Mail Service. Includes collecting, accepting, sorting, routing, and delivery of official mail.
3.4.2. Refuse Collection and Disposal. Includes collection and disposal of trash and waste materials.
3.4.3. Entomology Services. Includes abatement and control measures directed against insects, rodents, weeds, fungi, and other animals or plants that are determined to be undesirable in buildings, equipment, supplies, and on grounds.
3.4.4. Grounds Maintenance. Except where the PWS designates maintenance to the contractor.
3.4.5. Police Services. Includes maintaining law and order, traffic management, vehicle decals, and parking pass services, as well as Force Protection inspections.
3.4.6. Safety Services. Includes operation of safety programs, educational support, and promotional efforts.
3.4.7. Fire Protection. Includes all normal services related to fire protection and fighting operations, alert service, and rescue operations. Also includes inspections for fire hazards, servicing of portable extinguishers, and related training programs.
3.4.8. Facility Maintenance and Minor Repair. Includes routine and cyclical preventive maintenance and minor repairs required to preserve or restore real property so it may be used for its designated purpose.
3.4.9. Disaster Preparedness. Includes operation of disaster preparedness programs and related services, equipment, and facility support for emergencies and contingency operations.
3.4.10. Environmental Compliance. Includes recycling and resource recovery programs, pollution prevention, environmental compliance, and programs aimed at management and control of hazardous materials. This service does not include clean up and disposal of hazardous materials.
3.4.11. Test Control Officer. Includes final examination administration for ATGHS correspondence courses.
3.5. Government-Provided Training.
3.5.1. Government personnel will provide initial familiarization training at Eielson AFB to contractor personnel for the first 15 calendar days of the contract performance period. During this period, the contractor is fully responsible for providing adequate personnel, supervision, and any items and services necessary to perform ATGHS as defined in this
PWS. Training will include, but not be limited to, AMC operating procedures; documentation requirements; cargo/mail/ in-check, processing, preparation for airlift; passenger/baggage processing; JI processes; Load Team Chief requirements;
aircraft loading/unloading; records and reports requirements; GATES; and maintenance/operation of vehicles and equipment.
3.5.1.1. The Station Manager shall attend a weekly meeting with the COR to review training progress. Training may be terminated in less than 15 days if agreed to in writing by the contractor and Government.
3.5.2. Within 30 calendar days after the Post Award conference, the contractor shall designate in writing to the CO and
COR contractor personnel performing as JI, hazardous materials inspectors, and capability forecasters and shall provide the
CO and COR a current certificate of completion of the Transportation of Hazardous Materials Preparer’s Course or the Air
Transportation of Hazardous Materials Inspector Course. For those contractor personnel designated but not qualified or current, the Government will make available, throughout the term of the contract, required Hazardous Materials Inspector
Course training to enable proper certification of contractor personnel identified as JI and hazardous materials inspectors.
The course duration is five academic days and is currently held at Ft Lee, VA and may be held at other locations world-wide.
3.5.2.1. Contractor personnel shall complete via Web-based Training (WBT) the Air Transportation Hazardous Inspectors
Course to maintain required certification to fulfill the requirements of the PWS for the duration of the contract.
Certification requirements include a final exam to be administered by a certified Test Control Officer. The exam date/time shall be coordinated with the COR. The prerequisite for this course is successful completion of the in-residence
Transportation of Hazardous Materials Preparer’s Course or the Air Transportation of Hazardous Materials Inspector
Course.
3.5.3. Contractor personnel shall satisfactorily complete hazardous material handler training IAW AFMAN 24-604 prior to the start of the first contract period. The contractor shall designate hazardous materials handlers in writing to the CO and
COR.
3.5.4. Within seven calendar days prior to performance start, the contractor shall designate in writing to the CO and COR personnel performing as Aircraft Load Planners. The Government will provide AMC unique aircraft load planning training during initial familiarization training, IAW AFI 24-605, V5, Chapter 2, Section 2I, paragraphs 2.18.1.3. through 2.18.2.4.
3.5.5. The contractor shall designate JI personnel in writing to the CO and COR no later than the first day of familiarization training. JI personnel will be provided Government training during the initial familiarization training period and annual training thereafter shall be conducted by the contractor's qualified JI Instructor, reference requirements
Appendix C-4, Government Joint Inspector Training Requirements. The prerequisite for this training is successful completion of the in-residence Transportation of Hazardous Materials Preparer’s Course or the Air Transportation of
Hazardous Materials Inspector Course.
3.5.5.1. Within 30 calendar days after the Post Award conference, the contractor shall designate in writing to the CO and
COR personnel performing as Instructor(s). The Government will make available, throughout the term of the contract, the
Air Transportation Instructors Course (ATIC) to facilitate on-sight management of the program requirements. The course duration is five academic days and is currently held at the Expeditionary Center, JB McGuire-Dix-Lakehurst, NJ or may be provided through a Mobile Training Team at a location within the Pacific Theater.
3.5.6. The contractor shall designate MHE and Vehicle drivers in writing to the CO and COR no later than the first day of familiarization training. MHE and Vehicle drivers will be provided Government training during the initial familiarization training period and training thereafter shall be conducted by the contractor's instructors.
3.5.7. The contractor shall designate in writing to the CO and COR records management and publications library management personnel, who will be provided Government training during the initial familiarization training period and training thereafter shall be conducted by the contractor.
3.5.8. The contractor shall designate in writing Load Team Chief personnel to the CO and COR no later than the first day of familiarization training. Load Team Chief personnel will be provided Government training during the initial familiarization training period and annual training thereafter shall be conducted by the contractor's qualified Load Team
Chief Instructor, reference requirements Appendix C-5, Government Load Team Chief Training Requirements.
3.5.9. Training requirements shall be coordinated with the COR.
3.5.10. The Government will not charge an attendance fee for the Air Transportation of Hazardous Materials Inspector
Course or the ATIC Course.
4. GENERAL INFORMATION: The contractor shall provide all technical support, personnel, supervision, equipment, tools, materials and other items and services, (except as specified within the contract as GFM, GFE, GFF, Government-
Furnished Services, and Government-Furnished Training), as required, to perform ATGHS as defined in this PWS, in support of the DTS.
4.1. Contractor Personnel. The contractor shall provide a Station Manager and Alternate Station Manager(s) who shall be responsible for the performance of the work. The Station Manager and Alternate Station Manager (s) shall be U.S.
Citizens each with a Secret Security Clearance. The name of these persons shall be designated in writing to the CO 10 workdays prior to the contract performance start date.
4.1.1. The Station Manager/Alternate Station Manager(s) shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract.
4.1.1.1. The Station Manager/Alternate Station Manager(s) shall be either present on the work site or able to respond to the work site within one hour of notification by the Government; and, shall read, write, speak, and understand English in order to use technical manuals and references, as well as, communicate effectively.
4.1.1.2. The Station Manager/Alternate Station Manager(s) shall at a minimum attend base logistics, transportation, deployment, exercise, safety, and force protection meetings.
4.1.2. The contractor shall meet with the CO, COR, and other Government personnel as required by the CO.
4.1.3. The contractor shall ensure all personnel are qualified for their positions, provide verifying documentation to the CO upon request; and, are able to read, write, speak, and understand English in order to use technical manuals/references and communicate effectively. The contractor shall notify the CO and COR of the departure of any manager or supervisor and identify their substitution or replacement within seven working days.
4.1.3.1. The contractor shall ensure a sufficient number of contractor personnel retain, as applicable, current and valid certificates, identification cards, licenses, badges, and clearances prior to commencing performance and to fulfill the requirements of the PWS for the duration of the contract.
4.1.3.1.1. The contractor shall ensure government-furnished vehicle operators have a valid license IAW AFMAN 24-306, paragraph 3.10.
4.1.3.2. The contractor shall provide the CO, PM, COR, and Trusted Agent (TA) an initial list (excel spreadsheet) approved in writing/e-signature by the Station Manager, of contractor personnel not later than the contract performance start date and provide an updated list within 24 hours of the employment and/or termination of contractor personnel. This list shall include, at a minimum, the following information:
- Name, (last, first, middle initial)
- Primary position title
- On-site employment date and termination date
- Social Security Number
- Level of investigation/security clearance (as well as date of approval
- Qualification(s), certification/training date, certification/training expiration date, and required refresher training date;
personnel fulfilling the following PWS requirements: JI Instructors/Inspectors, Load Team Chief Instructors/Load Team
Chiefs, Aircraft Load Planner Instructors/Aircraft Load Planners (Designated Aircraft), Hazardous Materials
Inspectors/Handlers, MHE Tunner and Vehicle Instructors/Drivers.
4.1.4. Contractor personnel shall present a neat appearance. Contractor personnel shall wear a commercial airline equivalent uniform (appropriate for the specific functions performed) bearing the name of the company.
4.1.4.1. All contractor personnel shall wear a name tag. The Station Manager/Alternate Station Manager(s) nametag shall identify their position.
4.2. Hours of Operation. The contractor shall staff the ATOC function 24 hours a day, seven days a week. All other functions shall be staffed and services provided 0730-1630 local time Monday through Friday and outside of these established operating hours to meet specific mission requirements. Approximately 40% of the monthly workload will fall outside established hours of operation, 0730-1630 local time Monday through Friday.
4.2.1. The contractor shall provide the COR, CO, Eielson Base Operations/Command Post, and AOC with the means and information needed to contact the Station Manager/Alternate Station Manager(s) around the clock. The contractor may provide stand-by personnel when coordination with the AOC, COR, and local customers indicates performance of service is not required during U.S. Federal holidays and 354 FW down-days.
4.2.2. Force Augmentation. AMC reserves the right to insert personnel to augment contractor operations. The senior
AMC Force Augmentation representative, in coordination with the Station Manager or Alternate Station Manager, has overall management responsibility for prioritizing workload and resources. The contractor shall cooperate with augmentees and render any assistance necessary (as directed by the CO) to ensure there is no degradation of services, to include but not limited to the use of Government-Furnished Materials, Government-Furnished Equipment, and Government-Furnished
Facilities.
4.3. Training. The contractor shall be responsible for all contractor personnel training, certification, licensing, and proficiency, unless otherwise specified in the contract; and, pay all costs incurred for training required by this PWS for the duration of the contract. The contractor shall:
4.3.1. Develop an aircraft load planners program to ensure a sufficient number of contractor personnel complete required training, IAW AFI 24-605, V5, Chapter 2, Section 2I, paragraphs 2.18.1.3. through 2.18.2.4.
4.3.2. Prior to performance under the contract, develop a JI program to ensure a sufficient number of contractor personnel complete required JI certifications IAW PWS Appendix C-4, Government JI Training Requirements, to fulfill the requirements of this PWS for the duration of this contract.
4.3.2.1. Utilize the HQ AMC/A4TS approved JI course curriculum.
4.3.2.2. Administer an end-of-course test and hands on evaluations. Provide additional instruction to any person not attaining the passing score of 80% or passing the hands on evaluation, and retest these individuals.
4.3.3. Prior to performance under the contract, develop a Government-Furnished MHE and Vehicle Drivers Program using the AMC Lesson Plans and Qualification Training Packages provided by the COR.
4.3.3.1. Ensure all drivers are properly trained and certified before operating any Government-Furnished MHE or Vehicles;
and, complete annual drivers refresher training.
4.3.3.1.1. Personnel who fail initial or annual drivers refresher training will re-accomplish prerequisite ADLS courses, attend the initial training course, and driving competency evaluation.
4.4. Quality Programs.
4.4.1. The contractor shall utilize his or her commercial quality control program and procedures to identify, prevent, and ensure non-recurrence of defective services.
4.4.2. When the contractor is augmented with military personnel, both parties will be working simultaneously toward the same performance objectives. When defects are noted, the cause will be evaluated. Only defects solely the responsibility of contractor personnel will be documented as deficient contractor performance. The contractor shall not be held accountable for any defect if the responsibility cannot be determined to have been caused by contractor personnel.
4.5. Safety. The contractor shall comply with the latest applicable Federal, State, Air Force, AMC, and Installation regulations, instructions, policies, management plans, and requirements regarding personnel health, occupational and operational safety, and airfield operations. The COR shall provide copies of publications not available on the web and updates as they become available. The contractor shall:
4.5.1. Ensure work performed does not expose personnel or property to hazards, risk of injury, or damage. The
Government safety program manager may conduct periodic and no-notice visits to the contractor work site. Anyone may cease operations immediately if an unsafe act is observed, a dangerous situation is believed to exist, or established regulations, instructions, policies, management plans, and requirements are not being met.
4.5.1.1. Develop checklists using relevant safety guidance to brief personnel on hazards associated with air terminal and flight line operations.
4.5.1.2. Ensure Personal Protective Equipment is available and properly used.
4.5.2. Be responsible for the environmental compliance with recycling and resource recovery programs, pollution prevention, environmental compliance, clean-up and disposal of hazardous materials, and programs aimed at management and control of hazardous materials as well as the proper storage of any hazardous material used by the contractor.
4.5.3. Maintain eye wash stations, hazardous clothing kits hazardous spill kits, and fall restraint harnesses; and, inspect each monthly or more frequently, as required.
4.5.4. Maintain a Safety Data Sheet (SDS), OSHA Form 20 for each hazardous or potentially hazardous material or chemical to be utilized by the contractor.
4.5.5. Be responsible for briefing and ensuring the contractor personnel adhere to the traffic rules and regulations.
4.5.6. Report hazardous situations or events which cannot be eliminated immediately to the COR, COR Manager, and
AMC Program Manager.
4.5.6.1. Deliver a written report within 12 hours, which includes, at a minimum, the following: a) date and time, b) situation or event, c) personnel and resources involved or affected, and d) a narrative description.
4.5.7. In the event of an incident/accident involving personnel and/or property, notify the COR telephonically within 30 minutes and provide them a synopsis of the incident.
4.5.7.1. Deliver a written incident/accident report to the COR within 24 hours, which includes the following: a) date and time of occurrence, b) place of occurrence, c) a list of personnel directly involved, d) a narrative description of the incident/accident that includes a chronological order of the circumstances, and e) recommended steps to prevent future incidents of the same nature.
4.6. Security. The contractor shall comply with the applicable DOD, USAF, AMC, PACAF, and Installation Instructions, regarding Operational, Physical, and Communications Security as well as the Antiterrorism/Force Protection Programs.
The majority of daily work associated with this PWS is at the unclassified level, but contractor personnel may be required to access SECRET information and/or classified areas, during performance of this contract.
4.6.1. The contractor shall ensure all contractor personnel employed to perform contract requirements have a successfully completed Tier 1 Investigation or Secret Security Clearance on file and obtain a Common Access Card (CAC).
4.6.2. Upon contract award, the contractor shall submit the full names, Social Security Numbers, dates of births, and places of births of all United States citizen contractor personnel to the USTRANSCOM Trusted Associate Sponsorship System
(TASS) Trusted Agent (TA). The TA will use that information to create the CAC application in TASS and forward information to USTRANSCOM Protection and Response (TCCS/PR) office / (transcom.scott.tccs.mbx.protection-services-center@mail.mil) for vetting through Defense Information System for Security (DISS) to ensure investigative and clearance requirements have been satisfied. An Optional Form 306, Declaration for Federal Employment, may be required for some contractor employees. USTRANSCOM TA will notify the contractor’s FSO when an Optional Forms 306 is required.
Contractor personnel without the required completed background investigation or security clearance shall be denied the ability to work in support of this PWS. The contractor shall follow these procedures whenever hiring new employees to work under this contract.
4.6.2.1. The contractor shall ensure the Station Manager/Alternate Station Manager (s) and contractor personnel attending
RF-A planning meetings are U.S. Citizens each with a Secret Security Clearance.
4.6.2.1.1. Contractor employee background investigations in DISS must reflect either an open, closed, or adjudicated status or a prior favorable adjudication for deferred reinvestigations that are out of scope. Existing eligibility remains valid until the individual is removed from continuous evaluation, no longer has any DOD affiliation, or has their eligibility suspended or revoked. Contractor personnel with an incident report(s) posted in DISS will be not be permitted to work under this contract until either the incident report is removed from DISS or approval from USTRANSCOM is obtained for continuance of performance by the specific contractor employee. Interim security clearances are only accepted if DISS shows an open investigation. No exceptions to these rules will be allowed by TCCS/PR.
4.6.3. Contractor personnel required to access, handle, or transport classified material or equipment must have a Secret
Clearance posted in DISS, an interim Secret Clearance is not authorized.
4.6.4. CACs for contractor personnel will be approved in TASS with an expiration date for a period not to exceed three years. Once approved by the TA, the contractor employee may go to the nearest Real-Time Automated Personnel
Identification System (RAPIDS) / Defense Enrollment Eligibility Reporting System (DEERS) office for CAC issuance.
4.6.5. Upon completion of this contract or upon termination of personnel, all contractor personnel who possess CAC cards shall return these cards to the COR.
4.6.5.1. The CO may delay final payment under a contract if the contractor fails to comply with these requirements.
mailto:transcom.scott.tccs.mbx.protection-services-center@mail.mil mailto:transcom.scott.tccs.mbx.protection-services-center@mail.mil
4.6.6. Contractor personnel shall be removed and barred from the worksite if the Government notifies the contractor that the employment or the continued employment of the individual is prejudicial to the interests or endangers the security of the United States of America to include but not limited to security deviations/incidents and credible derogatory information obtained on contractor personnel during the course of the contract period.
4.6.7. The Government may supplement the contractor’s work force if Tier 1 Investigations or Secret Security Clearances are not received prior to the contract performance start date. The Government is not obligated to supplement to supplement the contractor’s workforce. The costs required to perform the services listed in the PWS shall be deducted from the contractor’s monthly payment if any delays in receipt of a favorable Tier 1 Investigation are due to the contractor’s late submission of requests or if an investigation reveals the contractor’s designated personnel are determined not eligible for clearance. Failure to provide sufficient personnel may also constitute default, which could permit the Government to default this contract for cause.
4.6.8. Tier 1 Investigations or Secret Security Clearances required because of contractor personnel turnover shall not constitute an excuse for nonperformance of this contract. The costs for Government performance while contractor personnel are awaiting clearances shall be deducted from the contractor’s monthly payment based on actual costs incurred.
4.6.9. Handling and Protection of Non-Public Information. In performance of this contract, the contractor may have access to DOD Transactional Information (DTI), which for the purposes of this section shall mean any information developed or received in the course of planning, ordering, shipping, tracking, and invoicing in support of the requirements of this contract. To adequately protect this DTI, contractor information systems (IS) involved in the performance of this contract shall comply with the security requirements in the current version of the National Institute of Standards and Technology
(NIST) Special Publication (SP) 800-171, “Protecting Controlled Unclassified (CUI) Information in Nonfederal
Information Systems and Organizations. Compliance with NIST SP 800-171 measures is required at the prime contractor level and applies to subcontractors and other entities that the prime contractor engages with in order to meet the requirements of this contract.
4.6.9.1. Additionally, the contractor agrees to use such information only for the purposes of fulfilling the contracted requirements and to protect such information from unauthorized release or disclosure. Protection of the DTI does not abrogate any responsibilities of the contractor to comply with or implement additional cyber security requirements as part of generally accepted system security principles or as required by other categories of information that may be co-resident with the DTI on the contractor’s IS.
4.6.10. The contractor shall not divulge any financial, planning, programming, or budgeting information without the express consent of the Government as outlined in Operational Security (OPSEC) and Information Security regulations.
4.6.11. The contractor shall not transmit CUI or legacy For Official Use Only information on networks not approved for this information or on contractor networks.
4.6.12. The contractor shall ensure that personnel have the appropriate passes, badges, and identification to accomplish all services as specified in the PWS, to include but not limited to security badges/flight-line access badges.
4.6.13. Within 30 calendar days of their employment start date and annually thereafter, all contractor personnel shall complete Force Protection Training and Cyber Awareness Challenge Training, and provide the COR with the computer generated completion certificates. The website for these courses will be provided by the COR.
4.6.14. Contractor personnel shall protect their CAC login Personal Identification Number (PIN); and, not share either their
PIN or access to their GATES account.
4.6.15. Contractor personnel shall comply with antiterrorism Force Protection conditions (FPCONs).
4.6.15.1. The contractor shall participate in Random Antiterrorism Measure (RAM) activities to the best of their ability.
The contractor shall not add additional staff to perform RAMs. The PWS airlift mission performance requirements take precedence over RAM activities. In no case, shall contractor participation in RAMs result in contractor personnel performing security guard functions.
4.6.16. Security requirements are identified in the DD Form 254, DOD Contract Security Classification Specification. A completed/signed DD Form 254 is attached to the contract.
4.6.17. The contractor shall have a valid Facilities Clearance (FCL) of SECRET as recorded in the National Industrial
Security System (NISS). FCLs must be awarded by the Defense Counterintelligence and Security Agency (DCSA).
4.6.18. The contractor shall comply with the Security Agreement (DD Form 441) and the National Industrial Security
Program Operating Manual (DOD 5220.22-M) with all revisions to the manual, notice of which has been furnished to the contractor.
4.6.18.1. Subsequent to the date of this contract, if the security classification or security requirements under this contract are changed by the Government and if the changes cause an increase or decrease in security costs or otherwise affect any other term or condition of this contract, the contract shall be subject to an equitable adjustment as if the changes were directed under the Changes clause of this contract.
4.6.18.2. The contractor agrees to insert terms that conform substantially to the language of paragraphs 4.6.18. and
4.6.18.1., including this paragraph 4.6.18.2. but excluding any reference to the Changes clause of this contract, in all subcontracts under this contract that involve access to classified information.
4.6.19. The contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Continued Implementation of Homeland Security
Presidential Directive (HSPD) 12–Policy for a Common Identification Standard for Federal Employees and Contractors;
Office of Management and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .