This questionnaire relates to a federal contract opportunity for elevator modernization work at Shaw Air Force Base. The scope of work involves upgrading an existing 1,500 pound passenger elevator that services eight or more floors with sustainable controls, electrical, and mechanical systems. Questions focus on experience modernizing a similar Thyssen elevator system, including the site location and scope of any past projects, equipment included, challenges faced and overcome during modernization, and lessons learned. Equivalent experience modernizing other elevator systems is also addressed, with an emphasis on phasing requirements for occupied buildings. Responses will help assess the ability to successfully complete the modernization work while meeting occupancy needs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attch 01 - SOW - Elevator Modernization.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B1990 Control Tower Elevator Moderniza�on Ques�onnaire
This contract ac�on requires the moderniza�on of the elevator system at B1990 Control Tower at Shaw Air Force Base. The purpose of the moderniza�on work is to upgrade the exis�ng trac�on elevator with sustainable controls, electrical, and mechanical systems.
1) Have you modernized a Thyssen 1500 lb. passenger elevator with that supports 8 more floor stops?
a. If so:
i. If so, who what was the site loca�on and scope of the project? Provide a point of contact.
ii. If so, what equipment was included in the bill of materials? Include the equipment manufacturers u�lized. Provide a point of contact.
iii. If so, who was the customer? Provide a point of contact.
iv. What challenges did you face modernizing this elevator system? How did you overcome these challenges?
v. What take aways did you have upon project comple�on?
vi. Would you do anything different when modernizing this type of elevator system.
2) If you have not modernized a Thyssen 1500 lb. passenger elevator that supports 8 or more floor stops, what equivalent elevator have you modernized?
a. If so:
i. What type of elevator was modernized? Provide informa�on regarding the moderniza�on of the system.
ii. Have you modernized an elevator system where phasing was required due to the building being occupied?
iii. What challenges did you face with phasing an elevator moderniza�on project? How did you overcome these challenges?