This statement of work outlines requirements for a control tower elevator modernization project at Shaw Air Force Base. The project involves replacing the existing elevator control system, drive unit, car top inspection station, hoist machines, hoist ropes, roller guides, wiring, and operating panels. Door operators, detectors, and interlocks will also be replaced to meet all current ANSI A17.1 code requirements. The related federal contract opportunity is a pre-solicitation for control tower elevator modernization through the Department of the Air Force Air Combat Command. The solicitation number is FA480324RO001.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attch 02 - Questionnaire - Elevator Modernization.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR/RENNOVATE
STATEMENT OF WORK
B1990 ELEVATOR MODERNIZATION
12/05/2023 Project: VLSB 24-XXXX
SCOPE OF WORK:
This Statement of Work (SOW) is for the modernization of the Control Tower Elevator at building B1990 at Shaw Air Force Base (AFB).
The existing elevator was installed in 1997. It is a Thyssen passenger elevator rated a 1500 lbs. and has eight floor stops. This elevator is out of service and requires modernization.
Replace existing control system: furnish & install a new NON-PROPRIETARY microprocessor controller. Includes but not limited to the following features:
• New Drive Unit (KEB type or equivalent) o New Insolation Transformer
• New Car Top Tape Reader - ensures elevator stops level with each landing.
o Stationary perforated steel tape for landing accuracy o Include New Terminal Limit Switches.
• New Car Top Inspection Station with all code compliant features.
• Geared hoist machines o Retain Gear Box o Provide New VVVF Motor & Coupling o New Hoist Ropes & shackles o New Rope Gripper
Furnish and install new overspeed governor & governor rope.
Furnish and install new car and counterweight roller guides (ELSCO type or equivalent)
Furnish & install new copper wiring, wire duct, EMT (Electric Metallic Tubing) and fittings as required for new equipment.
• Includes Traveling Cable, Home Run & Hoistway Wiring.
Furnish & install a new Car Operating Panel inside the elevator cab, total one (1) per car, including all current code requirements and Emergency Telephone. Finish will be #4 brushed stainless steel. Features include the following:
• Illuminated heavy-duty pushbuttons
• Emergency light
• Independent service, stop, fan/light, access enable & Firemen’s Service key switches
• Digital position indicator
• New Code compliant Emergency Communication Device
• No Smoking, Capacity signage
• Alarm Bell pushbutton, connected to a new Alarm Bell
Furnish & install new surface-mounted hall pushbutton stations in #4 brushed stainless steel.
• Including new hoistway access switches
• Firemen’s service Phase I & Phase II key switch
• Emergency Communication monitoring device
• All required signage shall be engraved.
Furnish & Install New Door Operator (MOVFR II type or equivalent)
• New car door hanger, track & clutch assembly
• New door detection device (FS Vision Plus type or equivalent)
• New Hoistway Interlock assemblies
• New two-speed ventilation fan
All work will meet current code requirements: ANSI A17.1.
END OF BASE BID PROPOSAL