This Statement of Objectives (SOO) details a contract opportunity for the 99th Civil Engineering Squadron (CES) at Nellis Air Force Base to replace the inoperable SN10 Aeration System pump and motor assembly in Building 10113. The project requires a contractor to furnish all labor, equipment, materials, and services to restore the ground tank's aeration system to 100% operational status, ensuring potable water provision for the base.
Key project specifications include replacing the SN10 cascading pump system and motor assembly, performing all necessary electrical and accessory replacements, and adhering to manufacturer instructions and industry standards. The work will be located in Area II of Nellis AFB, with standard working hours from 06:30 a.m. to 3:30 p.m., Monday through Friday. The contractor must provide a one-year parts and labor warranty, and all work must comply with federal, state, local, and base environmental protection requirements. The solicitation is set aside for small businesses under NAICS code 333996, with quotes due by April 28, 2025, and an anticipated firm-fixed-price contract type.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - BNJ.pdf | ||
| F3G3CE5072A002- Combo.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVES
REPLACE SN10 SYSTEM PUMP AND MOTOR
BLDG. 10113
NELLIS AFB
99 CES
Nellis AFB March 2025
OVERVIEW: The existing SN10 Aeration System supporting the ground tank at Bldg 10113 is currently inoperable. The repair of this system is detrimental to providing potable water for Nellis.
SCOPE: The 99th Civil Engineering Squadron (CES) is seeking a contract to make repairs at Bldg 10113. The Contractor shall accurately replace the SN10 cascading pump system and motor assembly and ensure it is fully functional. The Contractor shall furnish all labor, equipment, material, transportation, administration, supervision, along with all other necessary matters to perform the work required in connection with successfully completing this project and returning the aeration system in Tank 10113 to 100% operation at Nellis AFB, Las Vegas, Nevada. Unless otherwise specified, all work performed including any electrical, accessories replacement, parts, and controls required for unit operation, must comply with the manufacturer's instructions and recognized standard industry practices to ensure that the aeration system meets the necessary requirements and serve the intended purposes.
The Contractor is expected to execute all work in a safe, reliable and efficient manner and is accountable for the successful installation and testing of the requested work.
LOCATION: The project site is located at NAFB. NAFB is approximately nine (9) miles north of downtown Las Vegas on Highway U.S-93 (Las Vegas Blvd). NAFB consists of three (3) main areas: the Main Base, Area II, and Area III. The project location is on Area II at building 10113, 10113 Minot Avenue, NAFB, 89191.
ENVIRONMENTAL PROTECTION: All work and Contractor operations shall comply with the requirements imposed by all applicable Federal, State, local and NAFB laws, regulations, codes and permits (including NAFB Management Plan 12) concerning environmental protection. If required per the task, order test for Asbestos Containing Material (ACM) and Lead Base Paint (LBP) in the project work area.
WORK AND MECHANICS: The workers must conduct themselves in a professional manner. The work for this project must be executed in the best and most workmanlike manner, by qualified, trained and certified efficient mechanics or tradesmen, skilled in their respective trades.
QUALITY ASSURANCE: The Government, through the 99 CES Representative, shall periodically evaluate the Contractor’s performance by the specific contract performance requirements.
WORKING HOURS: Standard working hours are from 06:30 a.m. to 3:30 p.m. Monday through Friday excluding Federal Holidays and the day after Thanksgiving.
DELIVERABLES: The Contractor shall perform preoperational checks on all materials installed with the 99 CES Representative present.
WARRANTIES: The installed material and all workmanship shall be covered by a one (1) year parts and labor warranty. Any defects which may arise during this period shall be promptly repaired by the Contractor, including any damage done to the NAFB property due to such defects. At the completion of the project, the Contractor shall provide a signed written warranty to the 99 CES Representative.
---------------------------------------------END OF SCOPE----------------------------------------