S205--Spoils removal for Fort Gibson National Cemetery Base plus 4 one year options
Solicitation number
36C78621Q0020
Issued by

View the file

Other files

File Type Posted
Ft Gibson Spoils Schedule.xlsx XLSX spreadsheet
36C78621Q0020.docx DOCX document
2015-5319 11 Muskogee 063020.pdf PDF
SOW - Fort Gibson -Spoils 30Sep20.pdf PDF
Instructions Combined Solicitation Gibson Spoils.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS

Attachments 1 through 3

Attachment 1 Haul Route

Attachment 2 Work Summary & Progress Report

Attachment 3 Contract Discrepancy Report (CDR)

ATTACHMENT 2

WORK SUMMARY & PROGRESS REPORT Period

Covered:

From:

To:

Cemetery Location: Contractor Information:

Fort Gibson National Cemetery

Project Title:

Removal of Excess Spoils Services

Contract No:

Inspection / Acceptance: The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test some or all of the services that have been tendered for acceptance. The Government may require re-performance of nonconforming services at no increase in contract price.

The Government shall exercise its post-acceptance rights:

1. Within a reasonable time after the defect was discovered or should have been discovered; and

2. Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

WORK COMPLETED & SUBMITTED FOR ACCEPTANCE

(This form is not to be used as an Invoice)

1 Removal and Disposal of Spoils Quantity / Unit CY

Date Completed:

Report below any circumstances which may have adversely affected work progress such as weather, strikes, delays by the Government, etc.

Signature of Contractor: Date Signed Signature of Cemetery Director /

COR Date Signed

Note: Contractor shall sign confirming that services indicated have been completed. Government shall also sign in acknowledgment of receipt of the Progress Report.

Duplicate Form as Necessary

ATTACHMENT 3

Contract Discrepancy Report

Contract Number:

Report No. for this Discrepancy:

To: (Contractor/Manager’s Name)

From: (Name of COR)

5. Dates 5a. Prepared:

5b. Returned by Contractor:

5c. Action Complete:

Discrepancy or Problem: (Describe in detail. Include reference to PWS Directive; attach additional sheet if necessary.)

Signature of Contracting Officer or COR:

8a. To: (Contracting Officer and/or COR)

8b. From: (Contractor)

9. Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence:

(attach additional sheet if necessary.)

10a. Signature of Contractor Representative:

10b. Date:

11. Government Evaluation: (Acceptance, partial acceptance, reflection; attach additional sheet if necessary.)

12. Government Actions: (Reduced payment, cure notice, show cause, other)

13. Close Out Name Title Signature Date