Attachments.pdf
PDF 2 MB Posted
- Solicitation number
- W912WJ26QA027
About this file
This Performance Work Statement (PWS) details a spillway vegetation cutting and herbicide treatment project for the U.S. Army Corps of Engineers at the Surry Mountain Dam in Surry, New Hampshire. The project involves vegetation management on the dam's spillway, with informational photos and maps illustrating the work area, which includes the west face of the spillway, upstream and downstream spillway areas, and the spillway bridge. The Limit of Work map indicates the specific zone for vegetation removal, which appears to cover the spillway's rock face and surrounding terrain. The project is part of the Upper Connecticut River Basin dam maintenance efforts, focusing on controlling vegetation growth to maintain the structural integrity and functionality of the spillway infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA027-0002.pdf | ||
| Amendment W912WJ26QA027-0001.pdf | ||
| Solicitation - W912WJ26QA027.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPILLWAY VEGETATION CUTTING AND HERBICIDE TREATMENT
U.S. ARMY CORPS OF ENGINEERS
SURRY MOUNTAIN DAM
SURRY, NH
PERFORMANCE WORK STATEMENT
Informational Photos
Informational Photo 1: West face of the spillway from the spillway bridge looking West
Informational Photo 2: West face of the spillway from the spillway bridge looking North.
Informational Photo 3: Upstream spillway bottom from the spillway bridge looking North.
Informational Photo 4: Downstream spillway from the spillway bridge looking South.
SPILLWAY VEGETATION CUTTING AND HERBICIDE TREATMENT
U.S. ARMY CORPS OF ENGINEERS
SURRY MOUNTAIN DAM
SURRY, NH
PERFORMANCE WORK STATEMENT
Informational Maps
Informational Map 1: LOCUS Map
Informational Map 2: Limit of Work
File details come from the government source that posted it. Updated .