Attachments.pdf

PDF 3 MB Posted

Attached to
Partial Replacement of Waterline, North Hartland Lake, Hartland, VT
Solicitation number
W912WJ25Q0052
Issued by

About this file

This file is Appendix A of a Statement of Work containing informational photos and drawings related to a partial water line replacement project at the U.S. Army Corps of Engineers North Hartland Lake facility in Hartland, VT.

The appendix includes five images: a photo showing the North Hartland Lake Project Office garage from the water shut off valve perspective, a photo showing where the water line exits the concrete slab to connect to pressure tanks, and three technical drawings - an overall site drawing showing the water line layout, a detailed drawing of the water line's entry into the Project Office including plumbing/heating details, and an electrical system drawing showing conduit and grounding plans. The drawings provide detailed specifications and measurements that would be relevant for contractors bidding on the water line replacement work.

View the file

Other files

File Type Posted
Amendment W912WJ25Q0052-0001.pdf PDF
Solicitation W912WJ25Q0052.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARTIAL REPLACEMENT OF

WATER LINE

U.S. ARMY CORPS OF ENGINEERS

NORTH HARTLAND LAKE

HARTLAND, VT

STATEMENT OF WORK

APPENDIX A

Informational Photos and

Drawings

Photo 1: North Hartland Lake Project Office garage from the water shut off valve

Photo 2: Water line exiting the concrete slab to pressure tanks

Drawing 1: Overall drawing showing water line

Drawing 2: Water line coming into the Project Office

Drawing 3: Electrical System

Appendicies A + B
Appendix A 1