This Performance Work Statement (PWS) details snow removal and sanding services for the U.S. Army Corps of Engineers at the Barre Falls Dam, located across Hubbardston, Barre, and Oakham, Massachusetts. The document includes three detailed geographical maps (Figures 1-3) depicting specific snow management areas within two distinct compartments. Compartment 1 covers multiple parking lots, the project office area, and various access points around the dam, including the Stone Road Parking Lot, Overlook Parking Lot, Cemetery Parking Lot, and Picnic Area Parking Lot. Compartment 2 is situated off Route 122 in Oakham and includes a parking lot with specific access considerations.
The PWS provides precise instructions for snow removal, including designated plowing, sanding, and shoveling areas, as well as specific snow pile locations. A notable detail in Compartment 2 indicates that the DCR may close the gate at the Route 122 Parking Lot around January 1st, potentially requiring the contractor to have alternative access methods, such as using a key or navigating through the Barre Falls Project Area. The maps are color-coded with legends showing gates, shoveling areas, plowing and sanding areas, snow pile locations, and the U.S. Army Corps of Engineers boundary. The document is part of the Lower Connecticut River Basin project and is marked with the U.S. Army Corps of Engineers "Building Strong" branding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA009-0004.pdf | ||
| Amendment W912WJ26QA009-0003.pdf | ||
| Amendment W912WJ26QA009-0001.pdf | ||
| Solicitation W912WJ26QA009.pdf | ||
| Amendment W912WJ26QA009-0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SNOW REMOVAL AND SANDING SERVICES
U.S. ARMY CORPS OF ENGINEERS
BARRE FALLS DAM
HUBBARDSTON, BARRE, AND OAKHAM, MA
PERFORMANCE WORK STATEMENT
Figure 1: Plowing, Sanding, and Shoveling Areas in Compartment 1.
BARRE FALLS DAM
HUBBARDSTON, BARRE, AND OAKHAM, MA
PERFORMANCE WORK STATEMENT
Figure 2: Zoomed in perspective of Project Office Area in Compartment 1 highlighting the plowing, sanding, shoveling areas, and desired snow pile locations.
BARRE FALLS DAM
HUBBARDSTON, BARRE, AND OAKHAM, MA
PERFORMANCE WORK STATEMENT
Figure 3: Plowing and sanding areas located in Compartment 2, situated off Route 122 in
Oakham, MA. See Note.