Attachment4_AffirmationOfTechnical.pdf

PDF 122 KB Posted

Attached to
Remove/Replace Lift Stn Pumps - Casa Grande NM
Solicitation number
140P1521Q0070
Issued by

View the file

Other files

File Type Posted
Attachment2_PriorExperience.pdf PDF
Attachment1_DOLWageRate.pdf PDF
Attachment3_Section889Provisions-Clauses.pdf PDF
Sol_140P1521Q0070.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1: AFFIRMATION OF ABILITY TO MEET TECHNICAL REQUIREMENTS

Technical is the factual documentation of the firm’s ability to meet the requirements. Complete this affirmation of ability to meet technical requirements.

REQUIREMENT

QUOTER AFFIRMS

IT CAN MEET

THIS

REQUIREMENT

QUOTER AFFIRMS

IT IS UNABLE TO

MEET THIS

REQUIREMENT

1. Install two (2) new Myers WG50-43 Submersible Grinder Pump 5.0 HP 460V 3PH or approved equal pumps.

2. Any vendor-proposed equal pumps meet the following requirements:

The pumps shall be capable of delivering up to 183 gallons per minute.

The pumps shall be capable of passing ¾-inch solids.

The pumps shall be cast iron construction with stainless steel shaft.

All external nuts and bolts shall be of stainless steel.

3. Any quotes with vendor-proposed equal pumps must include the following submittals:

Submittal(s) that provided complete information on the pumps and discharge connections.

Submittals must include pump capacity, efficiency and power input curves, pump discharge connection design, construction, and materials.

4. Installation of pumps will begin within sixty

(60) days of the date of the contract and will be completed within thirty (30) days.

5. Pumps shall be installed so that they are easily removable for inspection or service. All connections to the existing control panels and piping shall be completed in a workman like manner.

6. Upon completion of pump installation, each pump will be tested for compatibility and interoperability with existing piping and control systems.

File details come from the government source that posted it. Updated .