This document contains a project experience questionnaire for a federal solicitation to construct a visitor contact station. The National Park Service Midwest Region is seeking proposals for a project at Ozark National Scenic Riverways in Eminence, Missouri to build a prefabricated or manufactured D log profiled timber structure or comparable facility between $250,000 to $500,000. Offerors must submit responses addressing relevant experience per the evaluation criteria, including up to seven past projects describing work performed, schedule and cost variances, challenges encountered and resolved, and means and methods implemented or proposed. A pre-proposal site visit is also required per the solicitation instructions. The NAICS code is 236220 for commercial and institutional building construction, and it is a total small business set aside with a size standard of $45 million.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Visitor Contact Station at Ozark NSR, newest first.
File Type Posted
Sol_140P6223R0001_Amd_0003.pdf PDF
Attachment10-NPSCablingStandard_0003.pdf PDF
Sol_140P6223R0001_Amd_0002.pdf PDF
Attachment09-RevisedSheet_A1_0002.pdf PDF
Attachment08-DuctlessSplitSystem_0002.pdf PDF
Sol_140P6223R0001_Amd_0001.pdf PDF
Attachment04-WageDetermination-MO20220023.pdf PDF
Sol_140P6223R0001.pdf PDF
Attachment05-LimitationsOnSubcontracting.xlsx XLSX spreadsheet
Construction_Contract_Administration.docx DOCX document
Attachment02-Specifications.pdf PDF
Attachment03-Drawings.pdf PDF
Attachment07-PastPerformance.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Experience Questionnaire Solicitation: 140P6223R0001

Submit responses to the questions below that address experience relative to the elements noted under the Project Experience evaluation subfactor in solicitation section L. Limit submittals to the quantity of projects and timeframes required in the solicitation. Expand the response sections shown below as needed to adequately address each question (this questionnaire may be expanded to multiple pages if needed).

Offeror

REFERENCED PROJECT INFORMATION

Project Title

Project Location

Brief Project Description

Project Owner

POC:

Phone:

CONTRACTOR LIST

List the contractor(s) whose experience on the referenced project is being submitted for evaluation on this proposed project

Contractor Name
Role on Referenced Project

(Prime or Sub)

Trade
Price

(list for each contractor’s specific work) Performance Period (calendar days) (list for each contractor’s specific work)

Original
Final
Original
Final

Subcontractor

PROJECT EXPERIENCE QUESTIONS

1. Describe the project work performed by the contractor listed above.

2. Identify the Project Experience relative to construction of a prefabricated and/or manufactured D log profiled timber structure or comparable structure on-time and within budget that are similar in scope, magnitude, and complexity to this solicitation that this contractor’s work addresses.

3. Describe & provide reasons for any changes to the original price for the work described in question 2 above.

4. Describe and provide reasons for any changes to the original schedule for the work described in question 2 above.

5. Describe problems, associated with the work described in question 2 above, which were encountered and how they were resolved. Describe how the offeror’s proposal accounts for similar issues.

6. Describe the means and methods, associated with the work described in question 2 above, which were successful. Would you implement the same means and methods on the proposed project? Why or why not?

7. Provide any other additional project information you believe should be presented.

File details come from the government source that posted it. Updated .