Attachment03_Technical.pdf

PDF 373 KB Posted

Attached to
REHAB ELEVATED WATER SUPPLY TANK - SUNSET CRATER
Solicitation number
140P1522Q0019
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NPS Request for Quotes #140P1522Q0019 Point of Contact: Dave Raad david_raad@nps.gov

ATTACHMENT 3: TECHNICAL REQUIREMENTS

Technical is the factual documentation of the offeror’s ability to meet the requirements.

1. The offeror has successfully completed installation of Tnemec products in elevated potable water storage facilities of 50,000-gallon capacity or larger and at a height of 100 ft or taller? ☐ Yes ☐ No

a. If yes, provide tank capacity and tank height

b. If yes, provide date(s) of work and location of tank on which work was performed

c. Are details of this work included in offeror’s documentation of past experience? ☐ Yes ☐ No

d. If details of this work are not included in offeror’s documentation of past experience, please explain why.

2. The offeror has reviewed the specified Tnemec products for this contract and will be able to perform all the work specified in this contract to the manufacturer’s specifications. ☐ Yes ☐ No

3. Offeror can complete the sandblasting and full removal of two coating systems to the specifications needed for installation of the Tnemec lining system as specified in this contract. ☐ Yes ☐ No

4. The offeror has received approval from a NACE-certified inspector for lining installation in the last 3 to 4 years? ☐ Yes ☐ No

a. If yes, provide date(s) of work and location of tank on which work was performed

b. Are details of this work included in offeror’s documentation of past experience? ☐ Yes ☐ No

c. If details of this work are not included in offeror’s documentation of past experience, please explain

5. The offeror has performed warrantee or remedial work claims after an 11-month inspection inspected by a NACE level 3 inspector. ☐ Yes ☐ No

a. If yes, provide location of tank on which work was performed

NPS Request for Quotes #140P1522Q0019 Point of Contact: Dave Raad david_raad@nps.gov

b. Are details of this work included in offeror’s documentation of past experience? ☐ Yes ☐ No

c. If details of this work are not included in offeror’s documentation of past experience, please explain

6. The offeror’s coating applicator is qualified to apply the materials specified in the scope of work by having either:

a. Successfully completed training in the use of the coating material on applications similar to those specified in these specifications ☐ Yes ☐ No If yes, provide documentation of training completed.

OR

b. Skill and experience in the application of coating materials similar to materials specified in the statement of work under conditions similar to this project. ☐ Yes ☐ No If yes, provide coating applicator’s qualifications and references.

7. State the work that will be self-performed by the offeror. For key work elements to be completed by subcontractors, state the subcontractor that the offeror proposes and provide past experience for that subcontractor.

File details come from the government source that posted it. Updated .