Attachment01_StatementOfWork.pdf

PDF 3 MB Posted

Attached to
Backflow Repair and Replacement-Gateway Arch NP Federal contract opportunity
Solicitation number
140P6224Q0007
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This solicitation requests quotes for backflow repair and replacement services at Gateway Arch National Park. The National Park Service requires repairing or replacing three backflows including a 10-inch backflow repaired in place, a 6-inch backflow with a new install, and a 4-inch backflow repaired. Quotes are due by April 3, 2024 with award based on price and prior experience. The small business contractor will have 30 days to complete all repairs and replacements at the park in St. Louis, Missouri in accordance with the detailed statement of work.

View the file

Other files for this federal contract opportunity

Other files attached to Backflow Repair and Replacement-Gateway Arch NP, newest first.
File Type Posted
Sol_140P6224Q0007_Amd_0002.pdf PDF
Sol_140P6224Q0007_Amd_0001.pdf PDF
Attachment02_WageRates.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GATEWAY ARCH NATIONAL PARK BACKFLOW REPAIR AND REPLACEMENT

STATEMENT OF WORK:

Items to be repaired/replaced & locations:

a. 10in Backflow Location: Southwest corner of property

b. 6in Backflow Location: On top of the hill from the chiller tower (B&U entrance)

c. 4in Backflow Location: On top of the hill from the chiller tower (B&U entrance)

(4in and 6in are in the same pit)

Replace or repair 3 backflows one 10in backflow repair in place, one 6in backflow install new, and one 4in backflow repair. Contractor will supply all materials, tools, and labor needed to replace and/or repair. Remove old backflow and/or components. Install new and/or repair kit for backflow and all components. Due to shut off valve locations 10in backflow will need to be repaired in place not replaced with new allowing for the shutoffs valves on the backflow to be the point of water shutoff.

Current Backflow setup for 10in:

2 Wilkins 10in Gate valves Model MD48.

1 Zurn Wilkins 10in backflow 375 DN250.

Current backflow setup for 6in:

2 Watts 6in 200CWP Gate Valves 1 Backflow 6in Model 957

Current Backflow setup for 4in:

2 Watts 4in 200CWP Gates Valves 1 Backflow 4in Model 957

LOCATION:

Gateway Arch National Park 201 Poplar Street, St Louis, MO 63102

SAFETY:

Both backflows are in confined spaces with built in ladder access.

HOURS OF OPERATION:

On site work will need to be done during the operating hours of Monday – Friday 7am – 2pm. Any work done outside this time frame will need to be preapproved by the appropriate personnel.

The following Federal holidays are observed by the National Park Service:

New Year’s Day Birthday of Martin Luther King, Jr.

Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day

Thanksgiving Day Christmas Day

Any of the above holidays falling on a Saturday will be observed on the preceding Friday; holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is observed can be found at https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2024.

SECURITY:

Contractor will be allowed to bring personal and vehicles to location only after being cleared by the Park Law Enforcement Division. After contract award and prior to the start of on-site work, Gateway National Arch will conduct a background investigation on all contractor and subcontractor employees.

For the purposes of the background investigation that will be conducted by Gateway National Arch, after contract award and prior to the start of on-site work:

• All contractor and subcontractor employees shall be required to provide the following for the background investigation: current ID or driver’s license.

• All contractor or subcontractor employee who will be driving a motor vehicle on-site shall be required to provide the vehicle VIN, license plate number, and name of the assigned driver.

APPENDIX A

GATEWAY ARCH NATIONAL PARK

BACKFLOW REPAIR AND REPLACEMENT

Location of work: Red outline is the area where vaults are located. Blue outline is area allowed for vehicles, tools, and materials “construction zone”.

1. Overview map of locations.

2. Overview of 10in backflow location.

3. Overview of 4in and 6in backflow location.

4. Photos of 10in backflow.

5. Photos of 6in backflow.

6. Photos of 4in Backflow.

File details come from the government source that posted it. Updated .