This document is a Master Specifications table of contents and technical specification sections issued by the Department of Veterans Affairs (DVA) VHA for construction and facility improvement projects, with an effective date of March 1, 2026.

The document establishes comprehensive technical requirements for construction work across all divisions, including general requirements, concrete, masonry, metals, wood and plastics, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, and utilities. Key specifications address materials, workmanship standards, quality control, testing, commissioning, and sustainability requirements including LEED certification options. Notable material standards include ASTM specifications for concrete, reinforcing steel, Portland cement, masonry materials, structural steel, and various finishes. The specifications require shop drawings and product data submissions, field testing and inspection services, and compliance with American Welding Society standards for structural connections. Equipment specifications cover medical and laboratory equipment, food service equipment, and facility systems. Construction tolerances, curing methods, concrete finishing standards, and protective coatings are detailed for exterior improvements. The document references multiple related sections including testing laboratory services, sustainable construction requirements, commissioning of various systems, and shop drawing submission procedures. Sections are regularly updated, with revision dates ranging from 2010 through March 2026, ensuring current industry standards and practices.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

03-01-2026

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-2020

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-2021 01 32 16.01 Architectural and Engineering CPM Schedules 03-2020 01 32 16.13 Network Analysis Schedules – Major Construction

Project Design-Bid-Build 05-2022

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 12-2025 01 32 16.16 Network Analysis Schedules (Design-Build Only) 05-2022 01 32 16.17 Network Analysis Schedules – Major Design/Build

Projects 06-2019

01 33 23 Shop Drawings, Product Data, and Samples 03-2026 01 35 26 Safety Requirements for Major Projects 05-2024 01 42 19 Reference Standards 11-2020 01 45 00 Quality Control 02-2021 01 45 29 Testing Laboratory Services 11-2018 01 45 35 Special Inspections 06-2021 01 57 19 Temporary Environmental Controls 01-2021 01 58 16 Temporary Interior Signage 07-2015 01 74 19 Construction Waste Management 04-2022 01 81 13 Sustainable Construction Requirements 10-2017 01 81 13.02 Sustainability Certification Requirements – LEED V4

BD+C: New Construction and Major Renovation 04-2023

01 81 13.03 Sustainability Certification Requirements – LEED V4 BD+C: Healthcare

04-2023

01 81 13.12 Sustainability Certification Requirements – LEED V4.1 BD+C: New Construction and Major Renovation

04-2023

01 81 13.13 Sustainability Certification Requirements – LEED V4.1: Healthcare

04-2023

01 81 13.14 Sustainability Certification Requirements – LEED V4.1 BD+C: Data Centers

04-2023

01 81 13.15 Sustainability Certification Requirements – LEED V4.1 BD+C: Warehouses and Distribution Centers

04-2023

01 81 13.21 Sustainability Certification Requirements – GREEN

GLOBES

01-2021

01 91 00 General Commissioning Requirements 04-2022 01 91 00.01 DVA/USACE Projects General Commissioning Requirements 08-2019

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 12-2023 02 41 00 Demolition 08-2017

00 01 10-2

SECTION NO DIVISION AND SECTION TITLES DATE

02 65 00 Underground Storage Tank Removal 01-2021 02 82 11 Traditional Asbestos Abatement 01-2021 02 82 13.13 Glovebag Asbestos Abatement 01-2021 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-2021 02 82 13.21 Asbestos Roofing Abatement 01-2021 02 82 13.31 Asbestos Transite Abatement 01-2021 02 82 13.41 Asbestos Abatement for Total Demolition Project 01-2021 02 83 33.13 Lead-Based Paint Removal and Disposal 01-2021

DIVISION 03 – CONCRETE

03 23 00 Stressing Tendons 01-2021 03 30 00 Cast-in-Place Concrete 01-2021 03 30 53 (Short-Form) Cast-in-Place Concrete 01-2021 03 37 13 Shotcrete 01-2021 03 41 13 Precast Concrete Hollow Core Planks 01-2021 03 41 33 Precast Structural Pretensioned Concrete 01-2021 03 45 00 Precast Architectural Concrete 01-2021 03 51 13 Cementitious Wood Fiber Decks 01-2021 03 51 16 Gypsum Concrete Roof Decks 01-2021 03 52 00 Lightweight Concrete Roof Insulation 01-2021 03 55 11 Gypsum Concrete Floor Decks 01-2021

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 01-2021 04 05 13 Masonry Mortaring 10-2017 04 05 16 Masonry Grouting 01-2021 04 20 00 Unit Masonry 08-2017 04 72 00 Cast Stone Masonry 01-2021

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-2018 05 21 00 Steel Joist Framing 11-2018 05 31 00 Steel Decking 01-2021 05 36 00 Composite Metal Decking 01-2021 05 40 00 Cold-Formed Metal Framing 01-2021 05 50 00 Metal Fabrications 08-2018 05 51 00 Metal Stairs 01-2021

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-2017 06 16 63 Cementitious Sheathing 01-2021 06 20 00 Finish Carpentry 01-2021

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19 Preparation for Re-Roofing 01-2021 07 08 00 Facility Exterior Closure Commissioning 01-2021

00 01 10-3

SECTION NO DIVISION AND SECTION TITLES DATE

07 08 00.01 DVA/USACE Projects Facility Exterior Closure Commissioning

08-2019

07 11 13 Bituminous Dampproofing 01-2021 07 12 00 Built-Up Bituminous Waterproofing 01-2021 07 13 00 Sheet Waterproofing 01-2021 07 13 52 Modified Bituminous Sheet Waterproofing 01-2021 07 14 21 Latex Mastic Deck Covering 01-2021 07 18 13 Pedestrian Traffic Coatings 01-2021 07 21 13 Thermal Insulation 01-2021 07 21 23 Loose-Fill Insulation 01-2021 07 22 00 Roof and Deck Insulation 01-2021 07 24 00 Exterior Insulation and Finish Systems 01-2021 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 01-2021 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 01-2021 07 31 13 Asphalt Shingles 02-2021 07 31 26 Slate Shingles 01-2021 07 31 29.13 Wood Shingles 01-2021 07 32 13 Clay Roof Tiles 01-2021 07 40 00 Roofing and Siding Panels 03-2026 07 51 00 Built-Up Bituminous Roofing 12-2021 07 51 13.11 Hot-Applied Built-Up Asphalt Roofing 12-2021 07 51 13.13 Cold-Applied Built-Up Asphalt Roofing 12-2021 07 52 16.11 Cold Adhesive Styrene-Butadiene-Styrene Modified

Bituminous Membrane Roofing 12-2021

07 52 16.12 Hot-Mopped Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing

12-2021

07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 01-2021 07 54 16 Ethylene Interpolymer (KEE) Roofing 01-2021 07 54 19 Polyvinyl-Chloride (PVC) Roofing 12-2018 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 11-2025 07 56 00 Fluid-Applied Roofing 01-2021 07 57 13 Sprayed Polyurethane Foam Roofing 12-2021 07 60 00 Flashing and Sheet Metal 01-2021 07 61 16 Batten Seam Copper Roofing 01-2021 07 71 00 Roof Specialties 01-2021 07 72 00 Roof Accessories 01-2021 07 81 00 Applied Fireproofing 07-2023 07 84 00 Firestopping 01-2021 07 92 00 Joint Sealants 04-2022 07 95 13 Expansion Joint Cover Assemblies 01-2021

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-2021 08 11 73 Sliding Metal Fire Doors 01-2021 08 14 00 Interior Wood Doors 01-2021 08 17 10 Integrated Door Assemblies 01-2021 08 31 13 Access Doors and Frames 06-2025 08 32 13 ICU Sliding Glass Doors 01-2021 08 33 00 Coiling Doors and Grilles 01-2021 08 33 13 Coiling Counter Doors 01-2021

00 01 10-4

SECTION NO DIVISION AND SECTION TITLES DATE

08 34 53 Security Doors and Frames 01-2021 08 34 59 Vault Doors and Day Gates 01-2021 08 35 13.13 Accordion Folding Doors 01-2021 08 36 13 Sectional Doors 01-2021 08 38 16 Flexible Traffic Doors 01-2021 08 41 13 Aluminum-Framed Entrances and Storefronts 01-2021 08 42 33 Revolving Door Entrances 01-2021 08 44 13 Glazed Aluminum Curtain Walls 04-2020 08 51 13 Aluminum Windows 01-2021 08 51 13.11 Side-Hinged Aluminum Windows 01-2021 08 51 23 Steel Windows 01-2021 08 51 69.11 Aluminum Storm Windows 01-2021 08 56 19 Pass Windows 01-2021 08 56 53 Blast Resistant Windows 01-2021 08 56 59 Service and Teller Window Units 01-2021 08 56 66 Detention Window Screens 01-2021 08 63 00 Metal-Framed Skylights 01-2021 08 71 00 Door Hardware 03-2024 08 71 13 Automatic Door Operators 01-2021 08 71 13.11 Low Energy Power Assist Door Operators 01-2021 08 80 00 Glazing 01-2021 08 90 00 Louvers and Vents 01-2021

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-2026 09 06 00 Schedule for Finishes 01-2021 09 22 16 Non-Structural Metal Framing 06-2018 09 23 00 Gypsum Plastering 01-2021 09 24 00 Portland Cement Plastering 01-2021 09 26 00 Veneer Plastering 01-2021 09 29 00 Gypsum Board 04-2020 09 30 13 Ceramic/Porcelain Tiling 11-2025 09 51 00 Acoustical Ceilings 12-2018 09 54 23 Linear Metal Ceilings 01-2021 09 63 13 Brick Flooring 01-2021 09 63 40 Stone Flooring 01-2021 09 65 13 Resilient Base and Accessories 01-2021 09 65 16 Resilient Sheet Flooring 06-2022 09 65 19 Resilient Tile Flooring 05-2018 09 66 13 Portland Cement Terrazzo Flooring 01-2021 09 66 16 Terrazzo Floor Tile 10-2025 09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) 12-2021 09 67 23.30 Resinous (Epoxy Resin Composition) Mortar Flooring

(RES-3)

05-2024

09.67.23.40 Resinous Poured In Place Resilient Flooring (RES-4) 01-2021 09 67 23.50 Resinous Terrazzo Flooring (RES-5) 01-2021 09 67 23.60 Resinous Urethane and Epoxy Mortar Flooring (RES-6A and RES 6B) 01-2021

09 68 00 Carpeting 01-2021 09 68 21 Athletic Carpeting 01-2021

00 01 10-5

SECTION NO DIVISION AND SECTION TITLES DATE

09 69 00 Access Flooring 01-2021 09 72 16 Vinyl-Coated Fabric Wall Covering 01-2021 09 72 31 Polypropylene Fabric Wall Covering 01-2021 09 78 23 Phenolic Interior Wall Paneling 01-2021 09 84 33 Sound-Absorbing Wall Units 01-2021 09 91 00 Painting 01-2021 09 94 19 Multicolor Interior Finishing 01-2021 09 96 59 Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2) 01-2021

DIVISION 10 – SPECIALTIES

10 11 13 Chalkboards and Markerboards 01-2021 10 11 23 Tackboards 01-2021 10 11 33 Glassboards (Magnetic & Non-Magnetic) 01-2021 10 13 00 Directories 01-2021 10 14 00 Signage 01-2021 10 21 13 Toilet Compartments 01-2021 10 21 16 Shower and Dressing Compartments 01-2021 10 21 23 Cubicle Curtain Tracks 01-2021 10 22 13 Wire Mesh Partitions 01-2021 10 22 19 Demountable Partitions 01-2021 10 22 26.13 Accordion Folding Partitions 01-2021 10 25 13 Patient Bed Service Walls 05-2023 10 26 00 Wall and Door Protection 01-2021 10 28 00 Toilet, Bath, and Laundry Accessories 01-2021 10 44 13 Fire Extinguisher Cabinets 08-2018 10 75 00 Flagpoles 01-2021

DIVISION 11 – EQUIPMENT

11 05 12 General Motor Requirements for Equipment 01-2021 11 12 00 Parking Control Equipment 01-2021 11 17 36 Package Transfer Units 08-2025 11 26 00 Unit Kitchens 01-2021 11 40 11 Custom Fabricated Food Service Equipment 01-2021 11 40 21 Food Service Equipment-Utility Distribution System 01-2021 11 41 00 Food Storage Equipment 01-2021 11 41 21 Walk-In Coolers and Freezers 01-2021 11 44 00 Food Cooking Equipment 01-2021 11 48 00 Cleaning and Disposal Equipment 01-2021 11 53 13 Laboratory Fume Hoods 01-2021 11 53 23 Laboratory Refrigerators 01-2021 11 53 53 Biological Safety Cabinets Laminar Airflow Stations 01-2021 11 53 61 Custom Fabricated Laboratory Equipment 01-2021 11 53 71 Solution Warming Cabinets 01-2021 11 71 01 Medical Washing and Sterilizing Equipment 01-2021 11 71 02 Laboratory Washing and Sterilizing Equipment 01-2021 11 73 00 Ceiling Mounted Patient Lift System 06-2025 11 78 00 Mortuary Equipment 01-2021 11 78 13 Mortuary Refrigerators 01-2021

00 01 10-6

SECTION NO DIVISION AND SECTION TITLES DATE

11 79 13 Hydrotherapy Equipment 01-2021 11 82 19 Packaged Incinerators 01-2021

DIVISION 12 – FURNISHINGS

12 22 16 Drapery Track and Accessories 01-2021 12 24 00 Window Shades 08-2017 12 24 21 Lightproof Shades 01-2021 12 31 00 Manufactured Metal Casework 01-2021 12 32 00 Manufactured Wood Casework 01-2021 12 34 00 Manufactured Plastic Casework 01-2021 12 35 70.21 Medication Cabinet 01-2021 12 36 00 Countertops 12-2023 12 56 70.11 Suspended Table 01-2021

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components 01-2021

13 17 23 Therapeutic Pools 01-2021 13 17 23.11 Therapeutic Pool Accessories 01-2021 13 19 13 Kennel Enclosures and Gates 01-2021 13 21 29 Constant Temperature Rooms 01-2021 13 21 49 Audiology Booth 01-2021 13 34 19 Metal Building Systems 01-2021 13 49 00 Radiation Protection 01-2021

DIVISION 14– CONVEYING EQUIPEMENT

14 12 11 Traction and Winding Drum Dumbwaiter 04-2024 14 21 00 Traction Elevator – New 04-2024 14 21 10 Traction Elevator – Modernization 04-2024 14 21 11 Traction Cartlift 04-2024 14 24 00 Hydraulic Elevator – New 04-2024 14 24 10 Hydraulic Elevator – Modernization 04-2024 14 24 11 Hydraulic Cartlift 04-2024 14 91 33 Gravity Soiled Linen Chutes 09-2023 14 91 82 Gravity Trash Chutes 09-2023 14 92 00 Pneumatic Tube System 09-2023

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-2016 21 08 00.01 DVA/USACE Projects Commissioning of Fire Suppression

Systems 08-2019

21 12 00 Manual Dry Standpipe Systems 06-2015 21 13 13 Wet-Pipe Sprinkler Systems 06-2015 21 13 16 Dry-Pipe Sprinkler Systems 01-2015 21-22-00 Clean Agent Fire Suppression Systems 05-2015 21-30-13 Electric-Driven, Fire Pumps 05-2015 21-30-16 Diesel-Driven, Fire Pumps 05-2015

00 01 10-7

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 01-2023 22 05 12 General Motor Requirements for Plumbing Equipment 09-2020 22 05 19 Meters and Gages for Plumbing Piping 09-2020 22 05 23 General-Duty Valves for Plumbing Piping 09-2020 22 05 33 Heat Tracing for Plumbing Piping 09-2020 22 07 11 Plumbing Insulation 09-2019 22 08 00 Commissioning of Plumbing Systems 11-2016 22 08 00.01 DVA/USACE Projects Commissioning of Plumbing Systems 08-2019 22 11 00 Facility Water Distribution 03-2026 22 11 23 Domestic Water Pumps 09-2015 22 12 16 Facility Elevated, Potable-Water Storage Tanks 09-2015 22 13 00 Facility Sanitary and Vent Piping 09-2020 22 13 23 Sanitary Waste Interceptors 09-2020 22 13 29 Sanitary Sewerage Pumps 09-2020 22 13 29.13 Wet-Pit Mounted, Vertical Sewerage Pumps 09-2020 22 13 33 Packaged, Submersible Sewerage Pump Units 09-2020 22 14 00 Facility Storm Drainage 09-2015 22 14 29 Sump Pumps 09-2015 22 14 33 Packaged, Pedestal Drainage Pump Units 09-2015 22 14 36 Packaged, Submersible, Drainage Pump Units 09-2015 22 15 00 General Service Compressed-Air Systems 03-2026 22 31 11 Water Softeners 09-2015 22 33 00 Electric Domestic Water Heaters 09-2020 22 34 00 Fuel-Fired Domestic Water Heaters 09-2020 22 35 00 Domestic Water Heat Exchangers 09-2020 22 40 00 Plumbing Fixtures 05-2024 22 42 26 Commercial Disposers 09-2015 22 61 13.74 Dental Compressed-Air Piping 05-2023 22 61 19.74 Dental Compressed-Air Equipment 09-2020 22 62 00 Vacuum Systems for Laboratory and Healthcare

Facilities 05-2023

22 62 19.74 Dental Vacuum and Evacuation Equipment 09-2015 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 05-2023 22 66 00 Chemical-Waste Systems for Laboratory and Healthcare

Facilities 09-2020

22 67 19.16 Reverse-Osmosis Water Equipment 03-2026 22 67 21 Water Dealkalizing System 09-2015

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 10 Common Work Results for Boiler Plant and Steam

Generation 06-2024

23 05 11 Common Work Results for HVAC 03-2023 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment 03-2023

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

03-2023

00 01 10-8

SECTION NO DIVISION AND SECTION TITLES DATE

23 05 51 Noise and Vibration Control for Boiler Plant 03-2022 23 05 93 Testing, Adjusting, and Balancing for HVAC 03-2023 23 05 93.01 DVA/USACE Projects Testing, Adjusting, and Balancing for HVAC 11-2021

23 07 11 HVAC and Boiler Plant Insulation 02-2020 23 08 00 Commissioning of HVAC Systems 03-2023 23 08 00.01 DVA/USACE Projects Commissioning of HVAC Systems 08-2019 23 08 11 Demonstrations and Tests for Boiler Plant 04-2020 23 09 11 Instrumentation and Control for Boiler Plant 04-2024 23 09 23 Direct-Digital Control System for HVAC 03-2023 23 10 00 Facility Fuel Systems 04-2020 23 11 23 Facility Natural-Gas Piping 04-2020 23 21 11 Boiler Plant Piping Systems 12-2025 23 21 13 Hydronic Piping 06-2025 23 21 23 Hydronic Pumps 03-2023 23 22 13 Steam and Condensate Heating Piping 12-2025 23 22 23 Steam Condensate Pumps 04-2020 23 23 00 Refrigerant Piping 03-2024 23 25 00 HVAC Water Treatment 03-2023 23 31 00 HVAC Ducts and Casings 03-2023 23 34 00 HVAC Fans 03-2023 23 36 00 Air Terminal Units 03-2023 23 37 00 Air Outlets and Inlets 03-2023 23 38 13 Commercial-Kitchen Hoods 03-2023 23 40 00 HVAC Air Cleaning Devices 03-2023 23 50 11 Boiler Plant Mechanical Equipment 12-2025 23 51 00 Breechings, Chimneys, and Stacks 04-2020 23 52 25 Low-Pressure Water Heating Boilers 12-2025 23 52 28 Low-Pressure Steam Boilers 12-2025 23 52 33 Water Tube Boilers 06-2025 23 52 39 Fire Tube Boilers 01-2026 23 56 00 Solar Energy Heating System 03-2023 23 57 33 Geothermal Energy – Direct Use 03-2023 23 64 00 Packaged Water Chillers 03-2024 23 65 00 Cooling Towers 03-2023 23 72 00 Air-to-Air Energy Recovery Equipment 03-2024 23 73 00 Indoor Central-Station Air-Handling Units 03-2023 23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 03-2023 23 81 00 Decentralized Unitary HVAC Equipment 03-2024 23 81 23 Computer-Room Air-Conditioners 03-2024 23 81 43 Air-Source Unitary Heat Pumps 03-2023 23 81 46 Water-Source Unitary Heat Pumps 03-2023 23 81 49 Ground-Source Heat Pump 03-2023 23 82 00 Convection Heating and Cooling Units 03-2023 23 82 16 Air Coils 03-2024 23 84 00 Humidity Control Equipment 03-2024

DIVISION 25 – INTEGRATED AUTOMATION

25 10 10 Advanced Utility Metering System 02-2010

00 01 10-9

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-2022 26 05 13 Medium-Voltage Cables 06-2025 26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-2022 26 05 26 Grounding and Bonding for Electrical Systems 11-2022 26 05 33 Raceway and Boxes for Electrical Systems 11-2022 26 05 36 Wireways for Radiology Equipment 11-2022 26 05 39 Underfloor Raceways for Electrical Systems 11-2022 26 05 41 Underground Electrical Construction 01-2026 26 05 73 Overcurrent Protective Device Coordination Study 11-2022 26 08 00 Commissioning of Electrical Systems 11-2022 26 08 00.01 DVA/USACE Projects Commissioning of Electrical

Systems 08-2019

26 09 23 Lighting Controls 11-2022 26 11 16 Secondary Unit Substations 11-2022 26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage

Transformers 11-2025

26 13 13 Medium-Voltage Circuit Breaker Switchgear 06-2025 26 13 16 Medium-Voltage Fusible Interrupter Switches 11-2022 26 20 11 Isolated Power Systems 11-2022 26 22 00 Low-Voltage Transformers 11-2022 26 23 00 Low-Voltage Switchgear 11-2022 26 23 13 Generator Paralleling Controls 11-2022 26 24 13 Distribution Switchboards 11-2022 26 24 16 Panelboards 11-2022 26 24 19 Motor Control Centers 11-2022 26 25 11 Busways 11-2022 26 26 00 Power Distribution Units for Static Uninterruptible

Power Systems 11-2022

26 27 26 Wiring Devices 11-2022 26 29 11 Motor Controllers 11-2022 26 29 21 Enclosed Switches and Circuit Breakers 11-2022 26 32 13 Engine Generators 11-2022 26 33 53 Static Uninterruptible Power Supply 11-2022 26 33 53.10 Static UPS for Telecommunications Spaces 08-2025 26 35 26 Harmonic Filters 11-2022 26 36 23 Automatic Transfer Switches 11-2022 26 41 00 Facility Lightning Protection 11-2022 26 42 00 Cathodic Protection 11-2022 26 43 13 Surge Protective Devices 11-2022 26 51 00 Interior Lighting 03-2024 26 55 71 Medical and Surgical Lighting Fixtures 11-2022 26 56 00 Exterior Lighting 11-2022

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-2019 27 05 26 Grounding and Bonding for Communications Systems 06-2015 27 05 33 Raceways and Boxes for Communications Systems 10-2018 27 05 61 Leased Space, Communication Equipment and Systems 06-2015

00 01 10-10

SECTION NO DIVISION AND SECTION TITLES DATE

27 08 00 Commissioning of Communications Systems 11-2016 27 08 00.01 DVA/USACE Projects Commissioning of Communications

Systems 08-2019

27 10 00 Control, Communication and Signal Wiring 06-2015 27 11 00 Telecommunications Room Fittings 06-2015 27 15 00 Communications Structured Cabling 01-2016 27 31 00 Voice Communications Switching and Routing Equipment 06-2015 27 31 31 Voice Communications Switching and Routing Equipment

- Extension 06-2015

27 32 41 Two-Way Radio Equipment and Systems 10-2018 27 41 31 Master Antenna Television Equipment and Systems 06-2015 27 51 16 Public Address and Mass Notification Systems 11-2022 27 51 23 Intercommunications and Program Systems 06-2015 27 52 23 Nurse Call and Code Blue Systems 10-2018 27 52 41 Miscellaneous Medical Systems 06-2015 27 53 19 Distributed Radio Antenna (Within Building) Equipment and System 10-2018

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and

Security 04-2018

28 05 13 Conductors and Cables for Electronic Safety and Security

10-2018

28 05 26 Grounding and Bonding for Electronic Safety and Security

09-2011

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security

09-2011

28 08 00 Commissioning of Electronic Safety and Security Systems

11-2016

28 08 00.01 DVA/USACE Projects Commissioning of Electronic Safety and Security Systems

08-2019

28 13 00 Physical Access Control System 10-2011 28 13 16 Physical Access Control System and Database

Management 09-2011

28 13 53 Security Access Detection 09-2011 28 16 00 Intrusion Detection System 10-2011 28 23 00 Video Surveillance 09-2011 28 26 00 Electronic Personal Protection System 09-2011 28 31 00 Fire Detection and Alarm 10-2011 28 52 31 Emergency Call System 06-2015

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 08-2023 31 20 11 Earthwork (Short Form) 10-2012 31 23 19 Dewatering 10-2012 31 23 23.33 Flowable Fill 10-2012 31 32 23 Pressure Grouting Soil Stabilization 10-2012 31 62 00 Driven Piles 10-2012 31 63 16 Auger Cast Grout Piles 10-2012 31 63 26 Drilled Caissons 10-2012

00 01 10-11

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-2016 32 12 16 Asphalt Paving 09-2015 32 14 16 Brick Unit Paving 08-2016 32 17 23 Pavement Markings 08-2016 32 31 13 Chain Link Fences and Gates 06-2018 32 31 40 High Security Fences and Gates 08-2016 32 84 00 Planting Irrigation 08-2016 32 90 00 Planting 08-2016

DIVISION 33 – UTILITIES

33 08 00 Commissioning of Site Utility Systems 11-2016 33 08 00.01 DVA/USACE Projects Commissioning of Site Utility

Systems 08-2019

33 10 00 Water Utilities 03-2017 33 30 00 Sanitary Sewer Utilities 06-2013 33 40 00 Storm Sewer Utilities 12-2017 33 46 13 Foundation Drainage 10-2011 33 51 00 Natural-Gas Distribution 10-2011 33 63 00 Steam Energy Distribution 02-2024

DIVISION 34 – TRANSPORTATION

34 71 13 Passive Vehicle Barriers 04-2018 34 75 13.13 Active Vehicle Barriers 08-2016

DIVISION 48 – Electrical Power Generation

48 14 00 Solar Energy Electrical Power Generation System 07-2023 48 15 00 Wind Energy Electrical Power Generation System 07-2023

01-01-21

03 30 53 - 1

SECTION 03 30 53

(SHORT FORM) CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Equipment pads.

1.2 RELATED WORK

A. Section 01 45 29, TESTING LABORATORY SERVICES: Materials Testing and

Inspection During Construction.

B. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS

C. Section 32 05 23, CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS:

Concrete Roads, Walks, and Similar Exterior Site Work.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this Section.

B. American Concrete Institute (ACI):

117-10(R2015)...........Specification for Tolerances for Concrete

Construction and Materials and Commentary

211.1-91(R2009).........Standard Practice for Selecting Proportions for

Normal, Heavyweight, and Mass Concrete.

211.2-98(R2004).........Standard Practice for Selecting Proportions for

Structural Lightweight Concrete.

301/301M-16.............Specifications for Structural Concrete.

305.1-14 - .............Hot Weather Concreting.

306.1-90(R2002).........Cold Weather Concreting.

318/318M-19.............Building Code Requirements for Structural

Concrete and Commentary

347R-14 - ..............Guide to Formwork for Concrete.

SP-66-04-...............ACI Detailing Manual.

C. ASTM International(ASTM):

A615/A615M-20...........Standard Specification for Deformed and Plain

Carbon Steel Bars for Concrete Reinforcement

A996/A996M-16...........Standard Specification for Rail Steel and Axle

Steel Deformed Bars for Concrete Reinforcement

A1064/A1064M-18a........Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and

Deformed, for Concrete

C33/C33M-18.............Standard Specification for Concrete Aggregates.

03 30 53 - 2

C39/C39M-20.............Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens.

C94/C94M-20.............Standard Specification for Ready-Mixed

Concrete.

C143/C143M-20...........Standard Test Method for Slump of Hydraulic

Cement Concrete.

C150/C150M-20...........Standard Specification for Portland Cement.

C171-16.................Standard Specification for Sheet Materials for

Curing Concrete.

C192/C192M-19...........Standard practice for Making and Curing

Concrete Test Specimens in the Laboratory.

C219-20a................Standard Terminology Relating to Hydraulic and

Other Inorganic Cements.

C260/C260M-10a(2016)....Standard Specification for Air-Entraining

Admixtures for Concrete.

C330/C330M-17a..........Standard Specification for Lightweight

Aggregates for Structural Concrete.

C494/C494M-19...........Standard Specification for Chemical Admixtures for Concrete.

C618-19 ................Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in

Concrete.

C881/C881M-20 ..........Standard Specification for Epoxy-Resin-Base

Bonding Systems for Concrete.

C989/C989M-18a .........Standard Specification for Slag Cement for Use in Concrete and Mortars.

C1240-20 ..............Standard Specification for Silica Fume Used in

Cementitious Mixtures.

D1751-18 ...............Standard Specification for Preformed Expansion

Joint Fillers for Concrete Paving and

Structural Construction (Non-extruding and

Resilient Bituminous Types).

E1155-20................Determining FF Floor Flatness and FL Floor

Levelness Numbers.

E1745-17 ...............Standard Specification for Water Vapor

Retarders Used in Contact with Soil or Granular

Fill under Concrete Slabs.

03 30 53 - 3

1.4 SUBMITTALS

A. Submittal Procedures: Refer to Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES. All items indicated below are required submittals requiring Contracting Officer’s Representative (COR) review and approval.

B. Manufacturer's Literature and Data:

1. Concrete Mix Design.

2. Air-entraining admixture, chemical admixtures, and curing compounds.

3. Indicate manufacturer's recommendation for each application.

C. Sustainable Construction Submittals:

1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.

D. Certificates: Certify products comply with specifications.

1. Each ready mix concrete batch delivered to site.

1.5 DELIVERY

A. Deliver each ready-mixed concrete batch with mix certification in duplicate according to ASTM International(ASTM) C94/C94M.

1.6 WARRANTY

SPEC WRITER NOTE: Always retain construction warranty. FAR includes Contractor's one year labor and material warranty.

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

PART 2 - PRODUCTS

2.1 MATERIALS

A. Portland Cement: ASTM C150/C150M, Type I or II.

B. Pozzolans:

1. Fly Ash: ASTM International(ASTM) C618, Class C or F including supplementary optional physical requirements. Pozzolans shall not exceed 25 percent of total cementitious materials by weight.

2. Slag: ASTM International(ASTM) C989/C989M; Grade 100.

3. Silica Fume: ASTM International(ASTM) C1240.

SPEC WRITER NOTE: Edit the aggregates below to meet the Project specific needs.

C. Coarse Aggregate: ASTM International(ASTM) C33/C33M.

1. Size 467 for footings and walls over 300 mm (12 inches) thick.

03 30 53 - 4

2. Size 7 for coarse aggregate for applied topping and metal pan stair fill.

3. Size 67 for other applications.

D. Fine Aggregate: ASTM International(ASTM) C33/C33M.

E. Lightweight Aggregate for Structural Concrete:

ASTM International(ASTM) C330/C330M, Table 1.

F. Mixing Water: Fresh, clean, and potable.

G. Air-Entraining Admixture: ASTM International(ASTM) C260/C260M.

H. Chemical Admixtures: ASTM International(ASTM) C494/C494M.

I. Reinforcing Steel: ASTM International(ASTM) A996/A996M, deformed. Use rebar (no WWF) per SOW.

J. Forms: Wood, plywood, metal, or other materials, approved by

Contracting Officer, of grade or type suitable to obtain type of finish specified.

1. Plywood: Exterior grade, free of defects and patches on contact surface.

2. Lumber: Sound, grade-marked, S4S stress graded softwood.

3. Form coating: As recommended by Contractor.

K. Expansion Joint Filler: ASTM International(ASTM) D1751.

L. Sheet Materials for Curing Concrete: ASTM International(ASTM) C171.

M. Abrasive Aggregates: Aluminum oxide grains or emery grits.

N. Liquid Densifier/Sealer: 100 percent active colorless aqueous siliconate solution.

O. Grout, Non-Shrinking: Premixed ferrous or non-ferrous. Grout to show no settlement or vertical drying shrinkage at 3 days. Compressive strength for grout, at least 18 MPa (2500 psi) at 3 days and 35 MPa (5000 psi) at 28 days.

2.2 ACCESSORIES

A. Bonding Agent: ASTM International (ASTM) C 1059/C 1059M, Type II.

B. Structural Adhesive: ASTM International (ASTM) C881, 2-component material suitable for use on dry or damp surfaces. Provide material

Type, Grade, and Class to suit Project requirements.

2.3 CONCRETE MIXES

A. Design concrete mixes according to ASTM International (ASTM) C94/C94M, Option C.

B. Compressive strength at 28 days: minimum 30 MPa (4,000 psi).

03 30 53 - 5

C. Submit mix design and results of compression tests to the Contracting

Officer for his evaluation. Identify all materials, including admixtures, making-up the concrete.

D. Maximum Slump for Vibrated Concrete: 100 mm (4 inches) tested according to ASTM International (ASTM) C143.

E. Cement and Water Factor (See Table I):

TABLE I - CEMENT AND WATER FACTORS FOR CONCRETE

Concrete: Strength Non-Air-Entrained Air-Entrained

Min. 28 Day Comp.

Str.

MPa (psi)

Min. Cement kg/cu. m

(lbs./cu.

yd.)

Max. Water

Cement Ratio

Min. Cement kg/cu. m

(lbs./cu.

yd.)

Max. Water

Cement Ratio

35 (5000)1,3 375 (630) 0.45 385 (650) 0.40

30 (4000)1,3 325 (550) 0.55 340 (570) 0.50

25 (3000)1,3 280 (470) 0.65 290 (490) 0.55

25 (3000)1,2 300 (500) See 4 Below 310 (520) See 4 Below

Notes:

1. If trial mixes are used, achieve a compressive strength 8.3 MPa (1 200 psi) in excess of f'c. For concrete strengths greater than 35 MPa (5,000 psi), achieve a compressive strength 9.7 MPa (1,400 psi) in excess of f’c.

2. Lightweight Structural Concrete: Pump mixes may require higher cement values as specified in ACI 318/318M.

3. For Concrete Exposed to High Sulfate Content Soils: Maximum water cement ratio is 0.44.

4. Laboratory Determined according to ACI 211.1 for normal weight concrete or ACI 211.2 for lightweight structural concrete.

F. Air-entrainment as specified, and conform with the following for air content table:

TABLE II - TOTAL AIR CONTENT FOR VARIOUS SIZES OF COARSE AGGREGATES

Nominal Maximum Size of

Coarse Aggregate

Total Air Content, percent

10 mm (3/8 inches) 6 Moderate exposure; 7.5 severe exposure

13 mm (1/2 inches) 5.5 Moderate exposure; 7 severe exposure

19 mm (3/4 inches) 5 Moderate exposure; 6 severe exposure

25 mm (1 inches) 4.5 Moderate exposure; 6 severe exposure

40 mm (1 1/2 inches) 4.5 Moderate exposure; 5.5 severe exposure

03 30 53 - 6

2.4 BATCHING AND MIXING

A. Store, batch, and mix materials according to ASTM C94/C94M.

1. Job-Mixed: Batch mix concrete in stationary mixers as specified in

ASTM International(ASTM) C94/C94M.

2. Ready-Mixed Concrete: Comply with

ASTM International(ASTM) C94/C94M, except use of non-agitating equipment for transporting concrete to Site is not acceptable.

3. EXECUTION Mixing Structural Lightweight Concrete: Charge mixer with

2/3 of total mixing water and total aggregate for each batch. Mix ingredients minimum 30 seconds in stationary mixer or minimum 10 revolutions at mixing speed in truck mixer. Add remaining mixing water and other ingredients and continue mixing. Above procedure may be modified as recommended by aggregate producer.

4. When aggregate producer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

PART 3 - EXECUTION

3.1 FORMWORK

A. Installation: Conform to ACI 347. Construct forms to obtain concrete of the shapes, dimensions and profiles indicated, with tight joints.

B. Design and construct forms to prevent bowing-out of forms between supports and to be removable without prying against or otherwise damaging fresh concrete.

C. When patching formed concrete, seal form edges against existing surface to prevent leakage; set forms so that patch is flush with adjacent surfaces.

D. Treating and Wetting: Treat or wet concrete contact surfaces:

1. Coat plywood and lumber forms with non-staining form sealer.

2. Prevent water from accumulating and remaining within forms.

3. Clean and coat removable metal forms with light form oil before reinforcement is placed.

4. In hot weather, cool metal forms by thoroughly wetting with water just before placing concrete.

5. Prevent water from accumulating and remaining within forms.

E. Inserts, Sleeves, and Similar Items: Install flashing reglets, masonry ties, anchors, inserts, wires, hangers, sleeves, boxes for floor

03 30 53 - 7 hinges, and other cast-in items specified in other Sections. Place where indicated, square, flush and secured to formwork.

F. Construction Tolerances - General: Install and maintain concrete formwork to assure completion of work within specified tolerances.

G. Adjust or replace completed work exceeding specified tolerances before placing concrete.

3.2 REINFORCEMENT

A. Install concrete reinforcement according to ACI 318 and ACI SP-66.

B. Support and securely tie reinforcing steel to prevent displacement during placing of concrete.

C. Drilling for Dowels in Existing Concrete: Use sharp bits, drill hole slightly oversize, fill with epoxy grout, inset the dowel, and remove excess epoxy.

3.3 VAPOR BARRIER

A. Except where membrane waterproofing is required, place interior concrete slabs on a continuous vapor barrier.

B. Lap joints 150 mm (6 inches) and seal with a compatible pressure-sensitive tape.

C. Patch punctures and tears.

3.4 PLACING CONCRETE

A. Remove water from excavations before concrete is placed. Remove hardened concrete, debris and other foreign materials from interior of forms, and from inside of mixing and conveying equipment. Obtain approval from Contracting Officer's Representative before placing concrete.

B. Install screeds at required elevations for concrete slabs.

C. Roughen and clean free from laitance, foreign matter, and loose particles before placing new concrete on existing concrete.

1. Blow-out areas with compressed air and immediately coat contact areas with adhesive in compliance with manufacturer's instructions.

D. Place structural concrete according to ACI 301 and ACI 318.

E. Convey concrete from mixer to final place of deposit by method that will prevent segregation or loss of ingredients. Do not deposit, in

Work, concrete that has attained its initial set or has contained its water or cement more than 1 1/2 hours. Do not allow concrete to drop freely more than 1500 mm (5 feet) in unexposed work nor more than

900 mm (3 feet) in exposed work.

03 30 53 - 8

F. Place and consolidate concrete in horizontal layers not exceeding

300 mm (12 inches) in thickness. Consolidate concrete by spading, rodding, and mechanical vibrator. Do not secure vibrator to forms or reinforcement. Continuously vibrate during placement of concrete.

G. Hot Weather Concrete Placement: As recommended by ACI 305.1 to prevent adversely affecting properties and serviceability of hardened concrete.

H. Cold Weather Concrete Placement: As recommended by ACI 306.1, to prevent freezing of thin sections less than 300 mm (12 inches) and to permit concrete to gain strength properly.

1. Do not use calcium chloride without written approval from

Contracting Officer's Representative.

3.5 TOLERANCES

A. Slab on Grade Finish Tolerance: Comply with ACI 117, FF-number and

FL-number method.

1. Paragraph 4.8.3, Class A 3 mm (1/8 inches) for offset in form-work.

2. Table R4.8.4, "Flat" 6 mm (1/4 inch) in 3 m (10 feet) for slabs.

3.6 PROTECTION AND CURING

A. Protect exposed surfaces of concrete from premature drying, wash by rain or running water, wind, mechanical damage, and excessive hot or cold temperatures.

B. Curing Methods: Cure concrete with curing compound per ASTM C309.

C. Formed Concrete Curing: Wet the tops and exposed portions of formed concrete and keep moist until forms are removed.

1. If forms are removed before 14 days after concrete is cast, install sheet curing materials as specified above.

D. Concrete Flatwork Curing:

1. Install sheet materials according to the manufacturer's instructions.

a. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's

Representative consideration.

3.7 FORM REMOVAL

A. Maintain forms in place until concrete is self-supporting, with construction operation loads.

B. Remove fins, laitance and loose material from concrete surfaces when forms are removed. Repair honeycombs, rock pockets, sand runs, spalls, or otherwise damaged surfaces by patching with the same mix as concrete minus the coarse aggregates.

03 30 53 - 9

C. Finish to match adjacent surfaces.

3.8 FINISHES

A. Slab Finishes:

1. Allow bleed water to evaporate before surface is finished. Do not sprinkle dry cement on surface to absorb water.

2. Scratch Finish: Rake or wire broom after partial setting slab surfaces to received bonded applied cementitious application, within

2 hours after placing, to roughen surface and provide permanent bond between base slab and applied cementitious materials.

3. Broom Finish: Finish exterior slabs, ramps, and stair treads with bristle brush moistened with clear water after surfaces have been floated.

4. Finished Slab Flatness (FF) and Levelness (FL):

a. Slab on Grade: Specified overall value FF 25/FL 20. Minimum local value FF 17/FL 15.

b. Test flatness and levelness according to ASTM E1155.

3.9 SURFACE TREATMENTS

A. Mix and apply the following surface treatments according to manufacturer's instructions.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

- - E N D - -

08-01-18

05 50 00- 1

SECTION 05 50 00

METAL FABRICATIONS

SPEC WRITER NOTE:

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies items and assemblies fabricated from structural steel shapes and other materials as shown and specified.

B. Items specified.

1. Support for Wall and Ceiling Mounted Items: (SD055000-01, SD055000-02, SD102113-01, SD102600-01, SD123100-01 &

SD123100-02)

2. Frames:

3. Guards

4. Covers and Frames for Pits and Trenches.

5. Gratings

6. Loose Lintels

7. Shelf Angles

8. Gas Racks

9. Plate Door Sill

10. Safety Nosings

11. Ladders

12. Railings:

13. Catwalks and Platforms

14. Trap Doors with Ceiling Hatch

15. Sidewalk Access Doors

16. Screened Access Doors

17. Steel Counter or Bench Top Frame and Leg

18. Steel Pipe Bollards

1.2 RELATED WORK

A. Railings attached to steel stairs: Section 05 51 00, METAL STAIRS.

B. Colors, finishes, and textures: Section 09 06 00, SCHEDULE FOR

FINISHES.

C. Prime and finish painting: Section 09 91 00, PAINTING.

D. Stainless steel corner guards: Section 10 26 00, WALL AND DOOR

PROTECTION.

05 50 00- 2

1.3 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES.

B. Manufacturer's Literature and Data:

Grating, each type Floor plate

Trap door Wheel guards

Ceiling hatch Sidewalk Access door

Manhole Covers Safety nosing

C. Shop Drawings:

1. Each item specified, showing complete detail, location in the project, material and size of components, method of joining various components and assemblies, finish, and location, size and type of anchors.

2. Mark items requiring field assembly for erection identification and furnish erection drawings and instructions.

3. Provide templates and rough-in measurements as required.

D. Manufacturer's Certificates:

1. Anodized finish as specified.

2. Live load designs as specified.

E. Design Calculations for specified live loads including dead loads.

F. Furnish setting drawings and instructions for installation of anchors to be preset into concrete and masonry work, and for the positioning of items having anchors to be built into concrete or masonry construction.

1.4 QUALITY ASSURANCE

A. Each manufactured product shall meet, as a minimum, the requirements specified, and shall be a standard commercial product of a manufacturer regularly presently manufacturing items of type specified.

B. Each product type shall be the same and be made by the same manufacturer.

C. Assembled product to the greatest extent possible before delivery to the site.

D. Include additional features, which are not specifically prohibited by this specification, but which are a part of the manufacturer's standard commercial product.

05 50 00- 3

1.5 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. American Society of Mechanical Engineers (ASME):

B18.6.1-97..............Wood Screws

B18.2.2-87(R2010).......Square and Hex Nuts

C. American Society for Testing and Materials (ASTM):

A36/A36M-14.............Structural Steel

A47-99(R2014)...........Malleable Iron Castings

A48-03(R2012)...........Gray Iron Castings

A53-12..................Pipe, Steel, Black and Hot-Dipped, Zinc-Coated

Welded and Seamless

A123-15.................Zinc (Hot-Dip Galvanized) Coatings on Iron and

Steel Products

A240/A240M-15...........Standard Specification for Chromium and

Chromium-Nickel Stainless Steel Plate, Sheet and Strip for Pressure Vessels and for General

Applications.

A269-15.................Seamless and Welded Austenitic Stainless Steel

Tubing for General Service

A307-14.................Carbon Steel Bolts and Studs, 60,000 PSI

Tensile Strength

A391/A391M-07(R2015)....Grade 80 Alloy Steel Chain

A786/A786M-15...........Rolled Steel Floor Plate

B221-14.................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes

B456-11.................Electrodeposited Coatings of Copper Plus Nickel

Plus Chromium and Nickel Plus Chromium

B632-08.................Aluminum-Alloy Rolled Tread Plate

C1107-13................Packaged Dry, Hydraulic-Cement Grout

(Nonshrink)

D3656-13................Insect Screening and Louver Cloth Woven from

Vinyl-Coated Glass Yarns

F436-16.................Hardened Steel Washers

F468-06(R2015)..........Nonferrous Bolts, Hex Cap Screws, Socket Head

Cap Screws and Studs for General Use

05 50 00- 4

F593-13.................Stainless Steel Bolts, Hex Cap Screws, and

Studs

F1667-15................Driven Fasteners: Nails, Spikes and Staples

D. American Welding Society (AWS):

D1.1-15.................Structural Welding Code Steel

D1.2-14.................Structural Welding Code Aluminum

D1.3-18.................Structural Welding Code Sheet Steel

E. National Association of Architectural Metal Manufacturers (NAAMM)

AMP 521-01(R2012).......Pipe Railing Manual

AMP 500-06..............Metal Finishes Manual

MBG 531-09(R2017).......Metal Bar Grating Manual

MBG 532-09..............Heavy Duty Metal Bar Grating Manual

F. Structural Steel Painting Council (SSPC)/Society of Protective

Coatings:

SP 1-15.................No. 1, Solvent Cleaning

SP 2-04.................No. 2, Hand Tool Cleaning

SP 3-04.................No. 3, Power Tool Cleaning

G. Federal Specifications (Fed. Spec):

RR-T-650E...............Treads, Metallic and Nonmetallic, Nonskid

PART 2 - PRODUCTS

2.1 DESIGN CRITERIA

A. In addition to the dead loads, design fabrications to support the following live loads unless otherwise specified.

B. Ladders and Rungs: 120 kg (250 pounds) at any point.

C. Railings and Handrails: 900 N (200 pounds) in any direction at any point.

D. Floor Plates, Gratings, Covers, Trap Doors, Catwalks, and Platforms:

500 kg/m2 (100 pounds per square foot). Use ______ kg (pounds) for concentrated loads. Use ____ kg/m2 (pounds per square foot) for vehicle loads in the following areas : ____________________.

E. Manhole Covers: 1200 kg/m2 (250 pounds per square foot).

2.2 MATERIALS

A. Structural Steel: ASTM A36.

B. Stainless Steel: ASTM A240, Type 302 or 304.

C. Aluminum, Extruded: ASTM B221, Alloy 6063-T5 unless otherwise specified. For structural shapes use alloy 6061-T6 and alloy 6061-

T4511.

D. Floor Plate:

05 50 00- 5

1. Steel ASTM A786.

2. Aluminum: ASTM B632.

E. Steel Pipe (Bollard): ASTM A53.

1. Galvanized for exterior locations.

2. Type S, Grade A unless specified otherwise.

3. NPS (inside diameter) as shown.

F. Cast-Iron: ASTM A48, Class 30, commercial pattern.

G. Malleable Iron Castings: A47.

H. Primer Paint: As specified in Section 09 91 00, PAINTING.

I. Stainless Steel Tubing: ASTM A269, type 302 or 304.

J. Modular Channel Units:

1. Factory fabricated, channel shaped, cold formed sheet steel shapes, complete with fittings bolts and nuts required for assembly.

2. Form channel within turned pyramid shaped clamping ridges on each side.

3. Provide case hardened steel nuts with serrated grooves in the top edges designed to be inserted in the channel at any point and be given a quarter turn so as to engage the channel clamping ridges.

Provide each nut with a spring designed to hold the nut in place.

4. Factory finish channels and parts with oven baked primer when exposed to view. Channels fabricated of ASTM A525, G90 galvanized steel may have primer omitted in concealed locations. Finish screws and nuts with zinc coating.

5. Fabricate snap-in closure plates to fit and close exposed channel openings of not more than 0.3 mm (0.0125 inch) thick stainless steel.

K. Grout: ASTM C1107, pourable type.

L. Insect Screening: ASTM D3656.

2.3 HARDWARE

A. Rough Hardware:

1. Furnish rough hardware with a standard plating, applied after punching, forming and assembly of parts; galvanized, cadmium plated, or zinc-coated by electro-galvanizing process. Galvanized G-90 where specified.

2. Use G90 galvanized coating on ferrous metal for exterior work unless non-ferrous metal or stainless is used.

B. Fasteners:

1. Bolts with Nuts:

05 50 00- 6

a. ASME B18.2.2.

b. ASTM A307 for 415 MPa (60,000 psi) tensile strength bolts.

c. ASTM F468 for nonferrous bolts.

d. ASTM F593 for stainless steel.

2. Screws: ASME B18.6.1.

3. Washers: ASTM F436, type to suit material and anchorage.

4. Nails: ASTM F1667, Type I, style 6 or 14 for finish work.

2.4 FABRICATION GENERAL

A. Material

1. Use material as specified. Use material of commercial quality and suitable for intended purpose for material that is not named or its standard of quality not specified.

2. Use material free of defects which could affect the appearance or service ability of the finished product.

B. Size:

1. Size and thickness of members as shown.

2. When size and thickness is not specified or shown for an individual part, use size and thickness not less than that used for the same component on similar standard commercial items or in accordance with established shop methods.

C. Connections

1. Except as otherwise specified, connections may be made by welding, riveting or bolting.

2. Field riveting will not be approved.

3. Design size, number and placement of fasteners, to develop a joint strength of not less than the design value.

4. Holes, for rivets and bolts: Accurately punched or drilled and burrs removed.

5. Size and shape welds to develop the full design strength of the parts connected by welds and to transmit imposed stresses without permanent deformation or failure when subject to service loadings.

6. Use Rivets and bolts of material selected to prevent corrosion

(electrolysis) at bimetallic contacts. Plated or coated material will not be approved.

7. Use stainless steel connectors for removable members machine screws or bolts.

D. Fasteners and Anchors

05 50 00- 7

1. Use methods for fastening or anchoring metal fabrications to building construction as shown or specified.

2. Where fasteners and anchors are not shown, design the type, size, location and spacing to resist the loads imposed without deformation of the members or causing failure of the anchor or fastener, and suit the sequence of installation.

3. Use material and finish of the fasteners compatible with the kinds of materials which are fastened together and their location in the finished work.

4. Fasteners for securing metal fabrications to new construction only, may be by use of threaded or wedge type inserts or by anchors for welding to the metal fabrication for installation before the concrete is placed or as masonry is laid.

5. Fasteners for securing metal fabrication to existing construction or new construction may be expansion bolts, toggle bolts, power actuated drive pins, welding, self drilling and tapping screws or bolts.

E. Workmanship

1. General:

a. Fabricate items to design shown.

b. Furnish members in longest lengths commercially available within the limits shown and specified.

c. Fabricate straight, true, free from warp and twist, and where applicable square and in same plane.

d. Provide holes, sinkages and reinforcement shown and required for fasteners and anchorage items.

e. Provide openings, cut-outs, and tapped holes for attachment and clearances required for work of other trades.

f. Prepare members for the installation and fitting of hardware.

g. Cut openings in gratings and floor plates for the passage of ducts, sumps, pipes, conduits and similar items. Provide reinforcement to support cut edges.

h. Fabricate surfaces and edges free from sharp edges, burrs and projections which may cause injury.

2. Welding:

a. Weld in accordance with AWS.

b. Welds shall show good fusion, be free from cracks and porosity and accomplish secure and rigid joints in proper alignment.

05 50 00- 8

c. Where exposed in the finished work, continuous weld for the full length of the members joined and have depressed areas filled and protruding welds finished smooth and flush with adjacent surfaces.

d. Finish welded joints to match finish of adjacent surface.

3. Joining:

a. Miter or butt members at corners.

b. Where frames members are butted at corners, cut leg of frame member perpendicular to surface, as required for clearance.

4. Anchors:

a. Where metal fabrications are shown to be preset in concrete, weld

32 x 3 mm (1-1/4 by 1/8 inch) steel strap anchors, 150 mm (6 inches) long with 25 mm (one inch) hooked end, to back of member at 600 mm (2 feet) on center, unless otherwise shown.

b. Where metal fabrications are shown to be built into masonry use

32 x 3 mm (1-1/4 by 1/8 inch) steel strap anchors, 250 mm (10 inches) long with 50 mm (2 inch) hooked end, welded to back of member at 600 mm (2 feet) on center, unless otherwise shown.

5. Cutting and Fitting:

a. Accurately cut, machine and fit joints, corners, copes, and miters.

b. Fit removable members to be easily removed.