Attachment VI - Drawings.pdf

PDF 2 MB Posted

Attached to
Insulate PACT Roof Duct 610A4-26-509
Solicitation number
36C25026Q0508
Issued by

About this file

This is a technical specification and installation diagram for PACT roof duct insulation work, specifically detailing project 610A4-26-509. The document presents detailed architectural drawings and photographic documentation of existing roof duct conditions at multiple building locations, showing the current state of installed ductwork requiring renovation.

The work scope includes four primary tasks: removal and disposal of existing identified insulation, installation of 2-inch FSK fiberglass duct board, rejacketing of the entire duct system with aluminum guard material, and sealing to prevent water intrusion. The drawings indicate specific dimensions including a 30'×30' base unit with a 40'×24' upper section and a 30'×30' rise configuration, with scale references provided (three inches equals one foot, one and one half inches equals one foot, and one inch equals one foot). The technical specifications reference duct identification number 610A4-26-509 and include cross-sectional details of the insulated duct assembly with protective aluminum cladding. Three photographs document the current rooftop conditions showing deteriorated ductwork at different angles and elevations of what appears to be a multi-story institutional or residential building facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

XX

WW

ZZ

A

B

B.5

C

23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37

YY

A.4

"x

30"x30"

HP-1C139

HP-1C154

REFRIG. SET DN

TO FIRST FLOOR

REFRIG. SET DN

TO FIRST FLOOR

RAISE RELOCATED 42"x24" LOUVER

LOCATION INTO EXISTING WINDOW

OPENING AND REWORK DUCTWORK

TO EX. AH-1.

EX. AH-1

INSTALL PTAC UNIT WITH INTERGRAL

HOT WATER COIL IN MODIFIED

WINDOW. EXTEND ELECTRICAL WIRING

AND 3/4" HWR&S PIPING. PROVIDE

PIPING ENCLOSURE BENEATH UNIT

(TYPICAL OF 8).

"x

UP

PTAC-1 PTAC-1 PTAC-1 PTAC-1 PTAC-1 PTAC-1 PTAC-1PTAC-1

28.2 28.324.1 35343332313029282623.8 2524

VV

KEYPLAN

SCALE: 1" = 100'-0"

AREA OF 1ST FLOOR

PRIMARY CARE

EXPANSION

GENERATOR BUILDING 16

HOSPITAL BUILDING 1

1 EAST WING

N

EXISTING PRIMARY CARE

MAIN

ENTRANCE

GENERAL NOTES:

A. CONTRACTOR SHALL PROVIDE MANUFACTURER'S

RECOMMENDED ACCESS TO ALL EQUIPMENT, TERMINAL

UNITS, AND VALVES. ACCESS SHALL BE REMOVABLE CEILING

TILES OR CEILING ACCESS PANELS. COORDINATE LOCATION

OF MECHANICAL EQUIPMENT WITH OTHER TRADES TO AVOID

CONFLICT.

B. REFER TO ARCHITECTUAL REFLECTED CEILING PLAN FOR

LOCATION OF GRILLES AND DIFFUSERS.

C. FOR ALL WALLS THAT ARE EXTENDED TO STRUCTURE

PROVIDE SLEEVES FOR PIPING AND DUCTWORK

PENETRATING WALLS (REFERENCE SPECIFICATIONS).

D. DRAWINGS ARE DIAGRAMMATIC. PROVIDE ADDITIONAL

OFFSETS, TRANSITIONS, ETC. AS REQUIRED TO AVOID

INTERFERENCES ENCOUNTERED. FULL COORDINATION

DRAWINGS WITH OTHER TRADES ARE REQUIRED.

E. CEILING CAVITY SPACE IS VERY LIMITED WHERE VAV UNITS,

DUCTWORK AND PIPING IS TO BE INSTALLED. COORDINATE

ALL SPINKLER PIPING, ELECTRICAL CONDUIT, AND OTHER

UTILITIES WHERE REQUIRED FOR INSTALLATION.

F. IF THE CONTRACTOR DOES NOT CLEARLY UNDERSTAND

THESE PLANS OR IS NOT SURE OF THEIR MEANING. THEY

SHOULD OBATIN THE ARCHITECTS WRITTEN EXPLANATION

AND INTERPRETATION PRIOR TO SUBMITTING THEIR BID, SINCE

THE CONTRACTORS WILL BE HELD RIGIDLY TO THE

INTERPRETATION OF THE ARCHITECT.

G. PROVIDE CHEMICAL TREATMENT FOR PROJECT CLOSED LOOP

HEATING HOT WATER (HWR&S) AND COOLING CHILLED WATER

(CHWR&S) SYSTEM INSTALLED. REFER TO SPECIFICATION

232113.

H. ALL TURNING VALVES AND OTHER DUCT MOUNTED

EQUIPMENT SHALL HAVE ACCESS DOORS UPSTREAM OF

DEVICE.

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\m ck in ne y\ D oc um en ts

\1

V

A F tW ay ne R

_m ck in ne y.

rv t

CONSTRUCTION DOCUMENTS

MH103

RRMWJH

SECOND FLOOR ROOF MECHANICAL

PLAN

2018/3/30

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

SCALE: 1/8" = 1'-0"

SECOND FLOOR ROOF MECHANICAL PLAN

W

IL

L IAM J HOSMO

N

P R O F

ESS IONAL ENG

I N E E R

R

EG

I S TERED

I N D I A NA

No.

STATE OF

19447

2018/3/30

• Remove and dispose of existing identified insulation.

• Install 2” FSK fiberglass duct board.

• Rejacket the whole duct with alum guard.

• Seal to prevent water intrusion.

610A4-26-509 Insulate PACT Roof Duct