This is a technical specification and installation diagram for PACT roof duct insulation work, specifically detailing project 610A4-26-509. The document presents detailed architectural drawings and photographic documentation of existing roof duct conditions at multiple building locations, showing the current state of installed ductwork requiring renovation.
The work scope includes four primary tasks: removal and disposal of existing identified insulation, installation of 2-inch FSK fiberglass duct board, rejacketing of the entire duct system with aluminum guard material, and sealing to prevent water intrusion. The drawings indicate specific dimensions including a 30'×30' base unit with a 40'×24' upper section and a 30'×30' rise configuration, with scale references provided (three inches equals one foot, one and one half inches equals one foot, and one inch equals one foot). The technical specifications reference duct identification number 610A4-26-509 and include cross-sectional details of the insulated duct assembly with protective aluminum cladding. Three photographs document the current rooftop conditions showing deteriorated ductwork at different angles and elevations of what appears to be a multi-story institutional or residential building facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
XX
WW
ZZ
A
B
B.5
C
23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37
YY
A.4
"x
30"x30"
HP-1C139
HP-1C154
REFRIG. SET DN
TO FIRST FLOOR
REFRIG. SET DN
TO FIRST FLOOR
RAISE RELOCATED 42"x24" LOUVER
LOCATION INTO EXISTING WINDOW
OPENING AND REWORK DUCTWORK
TO EX. AH-1.
EX. AH-1
INSTALL PTAC UNIT WITH INTERGRAL
HOT WATER COIL IN MODIFIED
WINDOW. EXTEND ELECTRICAL WIRING
AND 3/4" HWR&S PIPING. PROVIDE
PIPING ENCLOSURE BENEATH UNIT
(TYPICAL OF 8).
"x
UP
PTAC-1 PTAC-1 PTAC-1 PTAC-1 PTAC-1 PTAC-1 PTAC-1PTAC-1
28.2 28.324.1 35343332313029282623.8 2524
VV
KEYPLAN
SCALE: 1" = 100'-0"
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
GENERAL NOTES:
A. CONTRACTOR SHALL PROVIDE MANUFACTURER'S
RECOMMENDED ACCESS TO ALL EQUIPMENT, TERMINAL
UNITS, AND VALVES. ACCESS SHALL BE REMOVABLE CEILING
TILES OR CEILING ACCESS PANELS. COORDINATE LOCATION
OF MECHANICAL EQUIPMENT WITH OTHER TRADES TO AVOID
CONFLICT.
B. REFER TO ARCHITECTUAL REFLECTED CEILING PLAN FOR
LOCATION OF GRILLES AND DIFFUSERS.
C. FOR ALL WALLS THAT ARE EXTENDED TO STRUCTURE
PROVIDE SLEEVES FOR PIPING AND DUCTWORK
PENETRATING WALLS (REFERENCE SPECIFICATIONS).
D. DRAWINGS ARE DIAGRAMMATIC. PROVIDE ADDITIONAL
OFFSETS, TRANSITIONS, ETC. AS REQUIRED TO AVOID
INTERFERENCES ENCOUNTERED. FULL COORDINATION
DRAWINGS WITH OTHER TRADES ARE REQUIRED.
E. CEILING CAVITY SPACE IS VERY LIMITED WHERE VAV UNITS,
DUCTWORK AND PIPING IS TO BE INSTALLED. COORDINATE
ALL SPINKLER PIPING, ELECTRICAL CONDUIT, AND OTHER
UTILITIES WHERE REQUIRED FOR INSTALLATION.
F. IF THE CONTRACTOR DOES NOT CLEARLY UNDERSTAND
THESE PLANS OR IS NOT SURE OF THEIR MEANING. THEY
SHOULD OBATIN THE ARCHITECTS WRITTEN EXPLANATION
AND INTERPRETATION PRIOR TO SUBMITTING THEIR BID, SINCE
THE CONTRACTORS WILL BE HELD RIGIDLY TO THE
INTERPRETATION OF THE ARCHITECT.
G. PROVIDE CHEMICAL TREATMENT FOR PROJECT CLOSED LOOP
HEATING HOT WATER (HWR&S) AND COOLING CHILLED WATER
(CHWR&S) SYSTEM INSTALLED. REFER TO SPECIFICATION
232113.
H. ALL TURNING VALVES AND OTHER DUCT MOUNTED
EQUIPMENT SHALL HAVE ACCESS DOORS UPSTREAM OF
DEVICE.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\m ck in ne y\ D oc um en ts
\1
V
A F tW ay ne R
_m ck in ne y.
rv t
CONSTRUCTION DOCUMENTS
MH103
RRMWJH
SECOND FLOOR ROOF MECHANICAL
PLAN
2018/3/30
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: 1/8" = 1'-0"
SECOND FLOOR ROOF MECHANICAL PLAN
W
IL
L IAM J HOSMO
N
P R O F
ESS IONAL ENG
I N E E R
R
EG
I S TERED
I N D I A NA
No.
STATE OF
19447
2018/3/30
• Remove and dispose of existing identified insulation.
• Install 2” FSK fiberglass duct board.
• Rejacket the whole duct with alum guard.
• Seal to prevent water intrusion.
610A4-26-509 Insulate PACT Roof Duct
VHANINVanbuA Polygonal Line
File details come from the government source that posted it. Updated .