Attachment VI - Drawing 2.pdf

PDF 368 KB Posted

Attached to
Y1DZ--Replace Grease Duct Canteen 610A4-25-504
Solicitation number
36C25025Q0453
Issued by

About this file

This document is a second floor plan architectural drawing for a Department of Veterans Affairs (VA) facility located in Fort Wayne, Indiana. The detailed floor plan shows a comprehensive layout of various medical and administrative spaces, including specialized areas such as chemistry (UP 248), hematology (249B), blood bank (249C), microbiology labs (245 and 246), phlebotomy, x-ray rooms, patient therapy, clinics, offices, break rooms, restrooms, mechanical rooms, and circulation spaces like corridors and stairs. The drawing is marked "NOT FOR CONSTRUCTION" and is a record drawing dated 02.21.2020, with the project number 506-17-601 and VA Station No. 610A4. The drawing was prepared by RDC/John Poe Architects and uses a scale of 1/16" = 1'-0", providing a comprehensive overview of the facility's second floor spatial organization and room allocation.

View the file

Other files

File Type Posted
36C25025Q0453 0003.docx DOCX document
Pre Bid Sign In Sheet.pdf PDF
36C25025Q0453 0002.docx DOCX document
Canteen fan.pdf PDF
36C25025Q0453 0001.docx DOCX document
Attachment IV - VHA Directive 1192-01.pdf PDF
Attachment II - RFI Template.doc DOC document
Attachment I - Wage Determination.pdf PDF
Attachment III - EMR.docx DOCX document
Attachment VII - Drawing 1.pdf PDF
Attachment VIII - Specifications.pdf PDF
36C25025Q0453_1.docx DOCX document
Attachment V - VA Notice of Limitations on Subcontracting.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

UPUP UP

UP

UP

UP

UP

CHEMISTRY

OFFICE

249A

HEMATOLOGY

249B

BLOOD BANK

249C

SPECIMEN

PROCESSING

CORRIDOR

C204

TOILET

OFFICES

249D

MECHANICAL

ROOM

250A

MICROBIOLOGY

VENDING

STORAGE

STORAGE

254STAIR #3

OFFICE

255A

OFFICE

OFFICE

255B

OFFICE

257B

H.A.C.

KITCHEN

LOCKER

260 258 257A

STAIR

CAFE

264 263

CAFE

265266

MICROBIOLOGY

GROSSING

HISTOLOGY

PHLEBOTOMY

WAITING

AREA

ADMINISTRATIVE

AREA

CONFERENCE

ROOM

240A

X-RAY

BREAK

BATH

237A

CONSTRUCTION

XRAY

STAIR

BATH

BREAK

237B

WORK RM

SCAN

LAB

SCAN

TOILET

224B

LOCKER

ROOM

TOILET

226A

223B

OFFICE

SUPPLY

221A

TREATMENT

PT THERAPY

OFFICE

OFFICE

TOILET

H.A.C.

218A

OFFICE

EXAM

OFFICE

216A

STAIR

CORRIDOR

C202

EXAM

ULTRASOUND

MECH

214A

CONTROL

OFFICE

211 210C

TOILET

210B

BREAK

OFFICE

MECH

210A

ELEVATOR

ELEVATOR

ELEVATOR

CORRIDOR

C203

MECH

200B

MENS

TOILET

208A

WOMENS

TOILET

OFFICE

207A

CLINIC

CLINIC

MED

OFFICE

CORRIDOR

C200

CLINIC

BREAK

H.A.C.

MECH

LAB

STORAGE

LAB

STORAGE

270A

LAB

STORAGE

X-RAY

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

2/17/2020 10:06:19 AM

BIM Master Record Drawings

02.21.2020

SECOND FLOOR PLAN

01-A.102

506-17-601

Fort Wayne, Indiana (610A4)

VA Station No:

610A4

Jacob Morrical

Record Drawing 18007.00

Scale: 1/16" = 1'-0"

SECOND FLOOR PLAN

KEY PLAN

Revisions Date

Sheets
01-A.100 - BASEMENT FLOOR PLAN
01-A.101 - FIRST FLOOR PLAN
01-A.102 - SECOND FLOOR PLAN
01-A.103 - THIRD FLOOR PLAN
01-A.104 - FOURTH FLOOR PLAN
01-A.105 - FIFTH FLOOR PLAN
01-A.106 - PENTHOUSE FLOOR PLAN
01-A.120 - RCP - BASEMENT
01-A.121 - RCP - FIRST FLOOR
01-A.122 - RCP - SECOND FLOOR
01-A.123 - RCP - THIRD FLOOR
01-A.124 - RCP - FOURTH FLOOR
01-A.125 - RCP - FIFTH FLOOR
01-A.200 - EAST & WEST ELEVATIONS
01-A.201 - NORTH & SOUTH ELEVATIONS
01-CAI.100 - CAI - BASEMENT
01-CAI.101 - CAI - FIRST FLOOR
01-CAI.102 - CAI - SECOND FLOOR
01-CAI.103 - CAI - THIRD FLOOR
01-CAI.104 - CAI - FOURTH FLOOR
01-CAI.105 - CAI - FIFTH FLOOR
01-CAI.106 - CAI - PENTHOUSE FLOOR
01-SOC.100 - SOC - BASEMENT
01-SOC.101 - SOC - FIRST FLOOR
01-SOC.102 - SOC - SECOND FLOOR
01-SOC.103 - SOC - THIRD FLOOR
01-SOC.104 - SOC - FOURTH FLOOR
01-SOC.105 - SOC - FIFTH FLOOR
G.001 - COVER SHEET
SOC.000 - DESCRIPTION PAGE

File details come from the government source that posted it. Updated .