Attachment VI - Drawing 2.pdf
PDF 368 KB Posted
- Attached to
- Y1DZ--Replace Grease Duct Canteen 610A4-25-504
- Solicitation number
- 36C25025Q0453
About this file
This document is a second floor plan architectural drawing for a Department of Veterans Affairs (VA) facility located in Fort Wayne, Indiana. The detailed floor plan shows a comprehensive layout of various medical and administrative spaces, including specialized areas such as chemistry (UP 248), hematology (249B), blood bank (249C), microbiology labs (245 and 246), phlebotomy, x-ray rooms, patient therapy, clinics, offices, break rooms, restrooms, mechanical rooms, and circulation spaces like corridors and stairs. The drawing is marked "NOT FOR CONSTRUCTION" and is a record drawing dated 02.21.2020, with the project number 506-17-601 and VA Station No. 610A4. The drawing was prepared by RDC/John Poe Architects and uses a scale of 1/16" = 1'-0", providing a comprehensive overview of the facility's second floor spatial organization and room allocation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25025Q0453 0003.docx | DOCX document | |
| Pre Bid Sign In Sheet.pdf | ||
| 36C25025Q0453 0002.docx | DOCX document | |
| Canteen fan.pdf | ||
| 36C25025Q0453 0001.docx | DOCX document | |
| Attachment IV - VHA Directive 1192-01.pdf | ||
| Attachment II - RFI Template.doc | DOC document | |
| Attachment I - Wage Determination.pdf | ||
| Attachment III - EMR.docx | DOCX document | |
| Attachment VII - Drawing 1.pdf | ||
| Attachment VIII - Specifications.pdf | ||
| 36C25025Q0453_1.docx | DOCX document | |
| Attachment V - VA Notice of Limitations on Subcontracting.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
UPUP UP
UP
UP
UP
UP
CHEMISTRY
OFFICE
249A
HEMATOLOGY
249B
BLOOD BANK
249C
SPECIMEN
PROCESSING
CORRIDOR
C204
TOILET
OFFICES
249D
MECHANICAL
ROOM
250A
MICROBIOLOGY
VENDING
STORAGE
STORAGE
254STAIR #3
OFFICE
255A
OFFICE
OFFICE
255B
OFFICE
257B
H.A.C.
KITCHEN
LOCKER
260 258 257A
STAIR
CAFE
264 263
CAFE
265266
MICROBIOLOGY
GROSSING
HISTOLOGY
PHLEBOTOMY
WAITING
AREA
ADMINISTRATIVE
AREA
CONFERENCE
ROOM
240A
X-RAY
BREAK
BATH
237A
CONSTRUCTION
XRAY
STAIR
BATH
BREAK
237B
WORK RM
SCAN
LAB
SCAN
TOILET
224B
LOCKER
ROOM
TOILET
226A
223B
OFFICE
SUPPLY
221A
TREATMENT
PT THERAPY
OFFICE
OFFICE
TOILET
H.A.C.
218A
OFFICE
EXAM
OFFICE
216A
STAIR
CORRIDOR
C202
EXAM
ULTRASOUND
MECH
214A
CONTROL
OFFICE
211 210C
TOILET
210B
BREAK
OFFICE
MECH
210A
ELEVATOR
ELEVATOR
ELEVATOR
CORRIDOR
C203
MECH
200B
MENS
TOILET
208A
WOMENS
TOILET
OFFICE
207A
CLINIC
CLINIC
MED
OFFICE
CORRIDOR
C200
CLINIC
BREAK
H.A.C.
MECH
LAB
STORAGE
LAB
STORAGE
270A
LAB
STORAGE
X-RAY
NOT FOR CONSTRUCTION
RDC/ JOHN POE ARCHITECTS
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
2/17/2020 10:06:19 AM
BIM Master Record Drawings
02.21.2020
SECOND FLOOR PLAN
01-A.102
506-17-601
Fort Wayne, Indiana (610A4)
VA Station No:
610A4
Jacob Morrical
Record Drawing 18007.00
Scale: 1/16" = 1'-0"
SECOND FLOOR PLAN
KEY PLAN
Revisions Date
| Sheets |
| 01-A.100 - BASEMENT FLOOR PLAN |
| 01-A.101 - FIRST FLOOR PLAN |
| 01-A.102 - SECOND FLOOR PLAN |
| 01-A.103 - THIRD FLOOR PLAN |
| 01-A.104 - FOURTH FLOOR PLAN |
| 01-A.105 - FIFTH FLOOR PLAN |
| 01-A.106 - PENTHOUSE FLOOR PLAN |
| 01-A.120 - RCP - BASEMENT |
| 01-A.121 - RCP - FIRST FLOOR |
| 01-A.122 - RCP - SECOND FLOOR |
| 01-A.123 - RCP - THIRD FLOOR |
| 01-A.124 - RCP - FOURTH FLOOR |
| 01-A.125 - RCP - FIFTH FLOOR |
| 01-A.200 - EAST & WEST ELEVATIONS |
| 01-A.201 - NORTH & SOUTH ELEVATIONS |
| 01-CAI.100 - CAI - BASEMENT |
| 01-CAI.101 - CAI - FIRST FLOOR |
| 01-CAI.102 - CAI - SECOND FLOOR |
| 01-CAI.103 - CAI - THIRD FLOOR |
| 01-CAI.104 - CAI - FOURTH FLOOR |
| 01-CAI.105 - CAI - FIFTH FLOOR |
| 01-CAI.106 - CAI - PENTHOUSE FLOOR |
| 01-SOC.100 - SOC - BASEMENT |
| 01-SOC.101 - SOC - FIRST FLOOR |
| 01-SOC.102 - SOC - SECOND FLOOR |
| 01-SOC.103 - SOC - THIRD FLOOR |
| 01-SOC.104 - SOC - FOURTH FLOOR |
| 01-SOC.105 - SOC - FIFTH FLOOR |
| G.001 - COVER SHEET |
| SOC.000 - DESCRIPTION PAGE |
File details come from the government source that posted it. Updated .