This document is a set of architectural and engineering drawings for a project to remodel 770 SF of existing exam rooms at the Boise VA Medical Center to accommodate a second CT scanner. The key details include:
The project involves modifying the existing fire sprinkler and alarm systems, installing lead-lined walls and doors, new lighting, HVAC, plumbing, and telecommunications systems. The work must be completed in a fully operational hospital environment, with strict infection control and safety requirements. The project requires coordination to minimize disruption to ongoing hospital operations. The drawings provide details on the architectural, structural, mechanical, and electrical work, as well as life safety and infection control plans. This appears to be a set of construction documents for the actual renovation work, not a solicitation or performance requirements document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26024R0028 0003.docx | DOCX document | |
| 36C26024R0028 0002.docx | DOCX document | |
| 36C26024R0028 0001.docx | DOCX document | |
| Attachment 01 Site Visit Sign In Sheet 29MAY.pdf | ||
| Attachment II 531 CSI 106 SOW .pdf | ||
| Attachment VI 531 CSI 106 Remodel for 2nd CT Specifications.pdf | ||
| Attachment III Price Breakout 531 CSI 06.xlsx | XLSX spreadsheet | |
| 36C26024R0028.docx | DOCX document | |
| Attachment IV 531 CSI 106 Contractor Past Performance .docx | DOCX document | |
| Attachment I General Decision Number ID20240104.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABANDO
NED
STEAM
VAULT
GI000
JME RJF
COVER SHEET AND SHEET INDEX
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
REMODEL FOR 2ND CT
BOISE VAMC, ID.
531-CSI-106
MARCH 2024REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
100% CONSTRUCTION
DOCUMENTS
DWG. OF
DRAWING TITLE
APPROVED:
CHIEF ENGINEER
SIGNATURE
DIRECTOR
N
TRUE
NORTH
VICINITY MAP
PROJECT WORK AREA
N
TRUE
NORTH
N
TRUE
NORTH
CAMPUS PLAN
VICINITY MAP
PROJECT WORK AREA
N
TRUE
NORTH
PROJECT SITE
BOISE VAMC SPECIFIC NOTES:
1. CONSTRUCTION FOR THIS PROJECT WILL TAKE PLACE IN
BUILDINGS THAT REMAIN OCCUPIED BY HOSPITAL STAFF
AND PATIENTS. DUST CONTROL, NOISE, AND VIBRATION
ARE AREAS OF MAJOR CONCERN. THE CONTRACTOR WILL
BE REQUIRED TO MAINTAIN AIRTIGHT DUST BARRIERS AND
EXHAUST FANS DURING THE DURATION OF DUST
PRODUCING WORK AS SPECIFIED AND DIRECTED BY THE
RESIDENT ENGINEER. SEE SPECIFICATION, SECTION 01 00
00, ARTICLE 1.7, ALTERATIONS, PARAGRAPH PROTECTION,
FOR ADDITIONAL INFORMATION. WORK THAT CREATES
EXCESSIVE NOISE AND/OR VIBRATIONS MUST BE
CAREFULLY SCHEDULED AND COORDINATED WITH THE
HOSPITAL. THERE WILL BE TIMES WHEN NOISE OR
VIBRATION PRODUCING WORK WILL NOT BE ALLOWED AND
IT WILL HAVE TO BE SCHEDULED FOR OTHER NON-CRITICAL
TIMES AT NO ADDITIONAL COST TO THE VA.
2. THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING
AND MAINTAINING ALL REQUIRED BARRIERS. TEMPORARY
FIRE BARRIERS MUST BE CONSTRUCTED FOR ALL
OCCUPANCIES WHEREVER CONSTRUCTION LOWERS THE
FIRE SAFETY FEATURES OF THE AREA BEING REMODELED
(I.E. FIRE SPRINKLERS OR FIRE ALARM SYSTEMS ARE
IMPAIRED OR REMOVED), CORRIDORS ARE CLOSED OFF OR
CORRIDOR WALLS ARE REMOVED, OR WHENEVER FIRE
WALLS ARE IMPACTED. FIRE WALLS ARE ALSO REQUIRED
TO SEPARATE NEW CONSTRUCTION FROM EXISTING
BUILDINGS. TEMPORARY FIRE WALLS THAT SEPARATE
RENOVATION PROJECTS FROM OCCUPIED AREAS MUST BE
OF 1-HOUR CONSTRUCTION WITH ONE (1)-HOUR RATED
DOORS. TEMPORARY FIRE WALLS THAT SEPARATE NEW
CONSTRUCTION FROM OCCUPIED AREAS MUST BE TWO
(2)-HOUR RATED WITH NINETY (90) MINUTE RATED DOORS.
TEMPORARY RATED PARTITIONS MUST RUN FROM SLAB TO
SLAB AND FROM EXTERIOR WALL OR FIRE RATED PARTITION
TO EXTERIOR WALL OR FIRE RATED PARTITION.
3. THE VA REQUIRES THAT ALL PENETRATIONS THROUGH FIRE
RATED BARRIERS BE ACCOMPLISHED BY A QUALIFIED FIRE
STOP CONTRACTOR IN ACCORDANCE WITH SPECIFICATION
078400. WHEN WORK TAKES PLACE WITHIN EXISTING
BUILDING THAT ARE NOT SEPARATED BY A 2-HOUR BARRIER
FROM OCCUPIED AREAS, AND WHERE IT IS NOT FEASIBLE
TO HAVE A QUALIFIED FIRE STOP CONTRACTOR PROVIDING
FIRE SEALING ON A DAILY BASIS, IT SHALL BE THE
RESPONSIBILITY OF THE TRADE PENETRATING THE FIRE
RATED BARRIER TO PROVIDE TEMPORARY FIRE
PROTECTION OF ALL PENETRATIONS AT THE END OF EACH
WORKDAY. TEMPORARY PROTECTION MUST MEET ALL
NFPA CODES RELATED TO FIRE BARRIER PENETRATIONS.
THE TEMPORARY PROTECTION MUST BE MAINTAINED IN
PROPER ORDER UNTIL THE PERMANENT FIRE STOPPING
MATERIAL IS INSTALLED. FIREBRICKS OR FIRE PLUGS MUST
BE USED TO SEAL PENETRATIONS IN TEMPORARY OR
PERMANENT FIRE SEPARATIONS (FLOORS AND WALLS)
UNTIL THEY CAN BE PROPERLY FIRE SEALED (I.E. CORE
DRILLS FOR NEW SEWER LINES PRIOR TO INSTALLATION
AND FIRE STOPPING OF SEWER LINES).
4. THE CONTRACTOR SHALL SEPARATE ALL CONSTRUCTION
AREAS FROM THE REST OF THE BUILDING'S NORMAL
OPERATION. THIS SHALL INCLUDE THE ERECTION OF
CLEARLY MARKED BARRICADES TO LIMIT ACCESS BY
UNAUTHORIZED PERSONNEL, AND TO PREVENT
CONTAMINATION FROM PARTICULATE MATTER. IF A FIRE
BARRIER IS NOT REQUIRED, THEN A SOLID BARRIER
CONSTRUCTED OF METAL STUDS AND SHEETROCK ON ONE
SIDE SHALL BE USED. THE BARRIER MUST PREVENT THE
TRANSMISSION OF DUST BY SEALING THE WALL TO THE
FLOOR AND CEILING AND SEALING ALL JOINTS OR BY SOME
OTHER METHOD. THE EXCEPTION TO A SOLID BARRIER IS IF
A FIRE WALL IS NOT REQUIRED AND THE EXPECTED
DURATION OF THE TEMPORARY BARRIER WILL NOT EXCEED
7 CALENDAR DAYS. IN THIS SITUATION, A PLASTIC
TEMPORARY BARRIER MAY BE USED. IF A PLASTIC BARRIER
IS USED, IT MUST BE INSPECTED DAILY TO ASSURE IT
INTEGRITY. WHEN PLASTIC SHEETING IS USED, FIRE
RESISTANT PLASTIC SHEETING (LIMITED COMBUSTIBILITY)
MUST BE USED. ALL NECESSARY CAUTIONARY SIGNAGE
WILL BE IN ACCORDANCE WITH FEDERAL REGULATION
29CFR 1926.200.
5. CONTRACTOR IS REQUIRED TO FOLLOW ALL OSHA
REGULATIONS CONCERNING CONSTRUCTION. THE
SUPERINTENDENT IS REQUIRED TO HAVE COMPLETED, AS A
MINIMUM, OSHA'S 10-HOUR TRAINING AND BE
KNOWLEDGEABLE OF GENERAL SAFETY REQUIREMENTS
FOR CONFINED SPACES, FALL PROTECTION, PERSONAL
PROTECTIVE EQUIPMENT, TRENCHING, SCAFFOLDING,
CRANES, ELECTRICAL, ETC. APPLICABLE SUBCONTRACTORS
ARE TO HAVE A COMPETENT PERSON ON SITE WHEN
REQUIRED BY OSHA. IF ACCESSING A CONFINED SPACE,
THE CONTRACTOR IS REQUIRED HAVE THEIR OWN
CONFINED SPACE AIR MONITOR AND TO TEST THE AIR
PRIOR TO ENTERING ANY CONFINED SPACE. IF THE
CONTRACTOR MUST ENTER A SANITARY SEWER MANHOLE,
IN ADDITION TO A CONFINED SPACE AIR MONITOR, THEY
MUST HAVE PROPER OSHA RESCUE EQUIPMENT FOR A
PERMIT REQUIRED CONFINED SPACE. WHERE IT IS NOT
POSSIBLE FOR THE VA TO SHUTDOWN AN ELECTRICAL
PANEL OR CIRCUIT, THE CONTRACTOR MUST PROVIDE AND
USE THE APPROPRIATE SAFETY CLOTHING AND EQUIPMENT
AS REQUIRED BY NFPA 70E. THE VA WILL BE MONITORING
THE CONTRACTOR'S COMPLIANCE WITH OSHA
REGULATIONS. FAILURE TO COMPLY IS GROUNDS FOR
STOPPING WORK.
6. COORDINATE HAZARDOUS MATERIAL ABATEMENT AND
DEMOLITION WORK FOR BOTH EXTERIOR AND INTERIOR
AREAS. PREFERENCE SHALL BE GIVEN TO COMPLETING
THIS WORK IN CONJUNCTION WITH DRYING-IN THE
STRUCTURE AND BEFORE INSTALLATION OF ANY TYPE OF
MAJOR SYSTEMS SUCH AS AIR HANDLERS, CHILLERS,
DUCTING, FINISH WORK IN PROGRESS.
7. MAINTAIN TEMPORARY PARTITIONING AND OTHER
MEASURES AS REQUIRED FOR INFECTION CONTROL IN
ORDER TO SEPARATE DAY-TO-DAY HOSPITAL AND 2ND CT
AREA ACTIVITIES FROM CONSTRUCTION ACTIVITIES.
CONTROL OF CONSTRUCTION TRAFFIC, NOISE, DUST, AND
INCLEMENT WEATHER BETWEEN THE EXISTING FACILITY
AND NEW WORK SHALL INCLUDE SAFETY, PROTECTIVE
BARRIERS, AND APPROPRIATE HOURS OF WORK BASED ON
IMPOSITION OF WORK ACTIVITY TO LIMIT THE IMPACT OF
CONSTRUCTION.
8. UTILITY PENETRATIONS FOR TIE-INS BETWEEN NEW AND
EXISTING SHALL BE PERFORMED WITHOUT AFFECTING
DAY-TO-DAY HOSPITAL AND 2ND CT AREA OPERATIONS TO
THE GREATEST EXTENT POSSIBLE. COORDINATE WITH VA
PROVIDING NOTIFICATION AND LEAD TIME AS REQUIRED BY
DIVISION 01 SPECIFICATIONS.
9. THE CEILING SPACE FROM THE BOTTOM OF THE CEILING
GRID TO A MINIMUM OF 6” ABOVE THE BOTTOM OF THE
CEILING GRID IS RESERVED FOR INSTALLATION OF CEILING
MOUNTED ITEMS (I.E. LIGHT FIXTURES, SPEAKERS,
DIFFUSERS). NO PIPING, DUCTWORK, CONDUITS, ETC.,
EXCEPT DROPS SERVING THE CEILING MOUNTED ITEMS, IS
ALLOWED TO BE INSTALLED IN THIS SPACE, UNLESS
OTHERWISE APPROVED BY THE RESIDENT ENGINEER.
10. COORDINATION IS REQUIRED BETWEEN THE CONTRACTOR
AND THE COR TO ESTABLISH THE MOST EFFICIENT METHOD
FOR BRINGING THE 2ND CT AREA INTO FULL OPERATION.
THE INTERFACE OF SYSTEMS AND INFRASTRUCTURE FOR
MECHANICAL, FIRE PROTECTION, ELECTRICAL, AND
TELECOMMUNICATIONS BETWEEN THE EXISTING AND NEW
AREAS SHALL BE IDENTIFIED AND COORDINATED PRIOR TO
CONSTRUCTION IN ORDER TO DEVELOP A SPECIFIC
APPROACH TO ALLEVIATE DOWN TIME FOR HOSPITAL AND
2ND CT AREA OPERATIONS AND TEMPORARY RELOCATION
OF HOSPITAL AND 2ND CT AREA PERSONNEL.
REMODEL FOR 2ND CT
BOISE VA MEDICAL CENTER
BOISE, ID
DEPARTMENT OF
VETERANS AFFAIRS
PROJECT NO. 531-CSI-106
SHEET LIST
Sheet Number Sheet Title
GENERAL
GI000 COVER SHEET AND SHEET INDEX
GS101 LIFE SAFETY PLAN
GI002 PRECONSTRUCTION INFECTION CONTROL & RISK ASSEMENT MATRIX
STRUCTURAL
SI000 STRUCTURAL GENERAL INFORMATION
SI501 STRUCTURAL DETAILS
ARCHITECTURAL
AE001 ARCHITECTURAL ABBREVIATIONS AND LEGENDS
AE100 OVERALL BASEMENT FLOOR PLAN
AD101 DEMOLITION BASEMENT PLANS
AE101 BASEMENT FLOOR PLAN AND REFLECTED CEILING PLAN
AE102 FINISH, SIGNAGE, AND FURNITURE & EQUIPMENT FLOOR PLANS
AE301 WALL TYPES, DOOR AND WINDOW SCHEDULE DETAILS
AE601 INTERIOR ELEVATIONS, DETAILS, AND ROOM FINISH SCHEDULES
AE602 SCHEDULE FOR INTERIOR FINISHES
FIRE PROTECTION
FX101 GROUND FLOOR – FIRE SUPPRESSION PLAN
FA101 GROUND FLOOR - FIRE ALARM PLAN
MECHANICAL
MI001 MECHANICAL ABBREVIATIONS AND NOTES
MD101 ENLARGED BASEMENT MECHANICAL DEMOLITION PLAN
MH101 ENLARGED BASEMENT MECHANICAL HVAC DUCTWORK PLAN
MH501 MECHANICAL DETAILS
MH502 MECHANICAL DETAILS
MH601 MECHANICAL SCHEDULES
MC701 MECHANICAL CONTROLS
PLUMBING
PI001 PLUMBING SHEET COVER SHEET
PG101 ENLARGED BASEMENT MEDICAL GAS PIPING PLANS
PL101 ENLARGED BASEMENT SANITARY SEWER WASTE AND VENT PIPING PLAN
PP101 ENLARGED BASEMENT DOMESTIC WATER PIPING PLAN
PP501 PLUMBING DETAILS
ELECTRICAL
EI001 ELECTRICAL GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
EL101 ELECTRICAL LIGHTING PLAN
EP101 ELECTRICAL FLOOR PLAN
EP601 POWER DIAGRAM
EP610 PANEL SCHEDULES
EP611 PANEL SCHEDULES
TELECOMMUNICATIONS
TI001 TELECOM ABBREVIATIONS, GENERAL NOTES AND SYMBOLS
TN101 TELECOMMUNICATIONS PLAN
03/15/2024
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T112
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NORTH VA LOOP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T111
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AutoCAD SHX Text
SOUTH VA LOOP
AutoCAD SHX Text 85A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ACCESS ROAD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EAST VA LOOP(ONE WAY)<
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T118
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T112
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T110
AutoCAD SHX Text
AutoCAD SHX Text
VBA REGIONAL OFFICE
AutoCAD SHX Text
FORT STREET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T119
AutoCAD SHX Text
AutoCAD SHX Text
UP
RAMP
UP
UP
G15
G14
CG5
G13
CT EXAM ROOM
G13A
CT CONTROL
ROOM
G13B
CT SCANNER
EQUIPMENT
ROOM
MEDICAL IMAGING ROOM
G15A
EXISTINGEXISTING
CORRIDOR
G10
COMMON PATH TRAVEL
DISTANCE =59'-0"
TRAVEL DISTANCE =140'-0"
TR
A
VE
L
D
IS
TA
N
C E
=7 3'
-0
FEC
FEC
PRIMARY PATH OF TRAVEL
COMMON PATH OF TRAVEL
EXISTING 2 HOUR FIRE BARRIER
EXISTING SMOKE BARRIER PARTITION
FIRE EXTINGUISHER CABINET,
SEE DETAIL 18/AE501
FEC
LIMIT OF CONSTRUCTION
EXIT SIGNAGE
E F G HE1 JDCBA
3.8
2.8
1B
GS101
JME RJF
LIFE SAFETY PLAN
0'
SCALE: 1/8" = 1'-0"SCALE: 1/8" = 1'-0"
16'8'4'
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
REMODEL FOR 2ND CT
BOISE VAMC, ID.
531-CSI-106
MARCH 2024REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
100% CONSTRUCTION
DOCUMENTS
DWG. OF
PROJECT AREA
BUILDING 85
BASEMENT
KEYPLAN
DRAWING TITLE
APPROVED:
CHIEF ENGINEER
SIGNATURE
DIRECTOR
N
TRUE N
LIFE SAFETY LEGEND:
PROJECT DESCRIPTION
THIS PROJECT AT THE VA MEDICAL CENTER, BOISE, IDAHO IS FOR
THE REMODEL OF 770 SF OF EXISTING EXAM ROOMS TO ALLOW
FOR THE 2ND COMPUTER TOMOGRAPHY (CT) SCANNER.
THE BUILDING HAS AN EXISTING FIRE SPRINKLER AND ALARM
SYSTEM WHICH WILL REQUIRE LIMITED MODIFICATION AND
RELOCATION IN ORDER TO ACCOMMODATE THE REVISED SPACE.
OCCUPANCY CLASSIFICATION
EXISTING AMBULATORY HEALTH CARE (NFPA 101 CHAPTER 21)
OCCUPANT LOAD (NFPA 101 SECTION 7.3.1.2)
AMBULATORY HEALTH CARE = 150 SF/ OCCUPANT
TOTAL SQUARE FOOTAGE = (770 / 150) = 6
INTERIOR FINISH (NFPA 101, SECTION 21.3.3)
INTERIOR FINISH SHALL BE IN ACCORDANCE WITH NFPA 101
SECTION 10.2, AND CONTENTS WITH NFPA 101, SECTION 10.3
FIRE SPRINKLER SYSTEM (NFPA 101 SECTION 9.7)
EXISTING AUTOMATIC SPRINKLER SYSTEM
FIRE ALARM SYSTEM (NFPA 101 SECTION 9.7.2.1)
EXISTING ALARM SYSTEM.
SEPARATION FROM HAZARDS
THE EAST WALL IS AN EXISTING SMOKE BARRIER WALL THAT WILL
NOT BE MODIFIED.
THE ADJOINING WALL BETWEEN ROOMS G13 AND G14 SHALL BE
LEAD-LINED ON BOTH SIDES TO EXISTING CONCRETE FLOOR
ABOVE.
MEANS OF EGRESS (NFPA 101 SECTIONS 7.1 AND 21.2)
THE CURRENT PLAN HAS A TOTAL OF 2 EXITS.
NUMBER OF EXITS (NFPA 101 SECTION 7.4.1)
TOTAL EXITS REQUIRED = 2 (NFPA 101 SECTION 7.4.1)
TOTAL EXITS PROVIDED = 2
TRAVEL EXIT DISTANCE (NFPA 101 SECTION 21.2.6)
MAXIMUM ALLOWABLE TRAVEL DISTANCE = 200'-0"
ACTUAL TRAVEL DISTANCE = 149'-0"
MAXIMUM ALLOWABLE COMMON PATH OF TRAVEL = 100'
ACTUAL TRAVEL PATH = 59'-0"
EXIT WIDTH (NFPA 101 SECTION 7.2.1.2.3.2)
MINIMUM DOOR LEAF WIDTH REQUIREMENT OF 32"
PORTABLE FIRE EXTINGUISHERS (NFPA 10)
75'-0" MAXIMUM TRAVEL DISTANCE
BUILDING CODE SUMMARY:
2018 NFPA 10 STANDARD FOR PORTABLE FIRE
EXTINGUISHERS
2019 NFPA 13 STANDARD FOR THE INSTALLATION OF
SPRINKLER SYSTEMS
2020 NFPA 70 NATIONAL ELECTRICAL CODE
2019 NFPA 72 NATIONAL FIRE ALARM CODE
2021 NFPA 101 LIFE SAFETY CODE
2019 NFPA 110 STANDARD FOR EMERGENCY AND STANDBY
POWER SYSTEMS
2015 ABAAS ARCHITECTURAL BARRIERS ACT
ACCESSIBILITY STANDARDS
2021 PG 18-10 VA DESIGN CRITERIA, FIRE PROTECTION,
(8TH ED. JUNE 1)
2022 PG 18-13 VA BARRIER FREE DESIGN STANDARD,
(REV. NOV.1). A SUPPLEMENT TO ABAAS
SCALE:1 LIFE SAFETY PLAN
1/8" = 1'-0"
03/15/2024
AutoCAD SHX Text
FND
BC
GI002
JME RJF
PRECONSTRUCTION INFECTION
CONTROL & RISK ASSEMENT
MATRIX
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
REMODEL FOR 2ND CT
BOISE VAMC, ID.
531-CSI-106
MARCH 2024REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
100% CONSTRUCTION
DOCUMENTS
DWG. OF
DRAWING TITLE
APPROVED:
CHIEF ENGINEER
SIGNATURE
DIRECTOR
VHA-ICRA-2023-1.0
Infection Prevention and Control Construction/Renovation/Maintenance Permit This page must be posted at the entrance to the project area for Level III and Level IV activities.
Unique permit number:
Location of construction/renovation/maintenance Project manager Project start date Contact phone number Completion date Contractor Permit expiration date
Activity Category (A, B, C, or D)
Overall Patient Risk Category (Low, Medium, High, or Highest)
Level of Infection Prevention and Control Precautions (I, II, III, or IV)
Level of Precautions
Control measures to be in place for the duration of the activity (Check the box for the activity’s Level of Precautions to indicate the Control Measures)
Level I
1. Perform work activity in a manner that does not create dust.
2. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.
3. Any materials and equipment being brought into the facility must be free of contaminants and loose material.
Level II
All control measures in Level I and the following:
1. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system).
2. Ensure worker clothing is clean and free of visible dust before leaving the work area.
3. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation.
4. When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system
5. Seal doors, to prevent dust migration.
6. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.
7. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area.
8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
9. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily.
Level III
All control measures in Levels I and II and the following:
1. Ensure availability of equipment for cleaning hands.
2. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
3. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.
4. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
5. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors (unless a work specific waiver is approved by VHA’s Office of Healthcare Engineering); this must be maintained continuously 24/7 for the duration of the project. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows is not required to be HEPA-filtered. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited.
6. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
Level IV
All control measures in Levels I, II and III and the following:
1. Barriers must be hard barriers unless temporary to install final barrier.
2. Containment must include an anteroom to ensure pressure control, Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.
3. Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable.
4. Workers must wear shoe covers or have a method to clean shoes in anteroom Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.
Additional requirements:
Project Manager signature Date
Infection Preventionist signature Date
X
03/15/2024
3D View
SCALE: NONE
*ONLY GANTRY AND PATIENT TABLE ARE SHOWN IN THE 3D VIEW.
DESIGN CRITERIA
A. VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. DO NOT SCALE DRAWINGS.
B. DO NOT REPRODUCE CONTRACT DOCUMENTS OR COPY STANDARD PRINTED INFORMATION AS BASIS
OF SHOP DRAWINGS
C. CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION PRACTICES INCLUDING TECHNIQUES, PROCEDURES, AND THE SEQUENCE OF CONSTRUCTION. CONTRACTOR SHALL NOTIFY COR IF A
CONFLICT ARISES DUE TO VARIATIONS OR OTHER PROBLEMS WITH THE CONSTRUCTION DOCUMENTS
D. OBSERVATIONS OF JOBSITE OTHER THAN REQUIRED INSPECTIONS BY ENGINEER ARE NOT
CONSTRUCTION APPROVALS
E. STRUCTURAL ENGINEER MUST BE NOTIFIED AT LEAST 72 HOURS PRIOR TO ANY REQUIRED
CONSTRUCTION OBSERVATION.
GENERAL NOTES
A. SCOPE: THE FOLLOWING DRAWING SHEETS OUTLINE THE STRUCTURAL DESIGN FOR THE INSTALL OF NEW EQUIPMENT FOR THE RENOVATION OF BUILDING-85 IN THE BOISE VAMC. WHEN A DIFFERENCE
EXISTS BETWEEN THESE DRAWINGS AND ANY OTHER GOVERNING CODE, THE MORE STRINGENT
SHALL CONTROL. ANY OTHER ITEMS NOT COVERED THEREIN SHALL BE COMMENSURATE WITH GOOD ENGINEERING PRACTICE. SEISMIC DESIGN DATA WAS ASSUMED USING INFORMATION FROM OTHER
PROJECTS LOCATED ELSEWHERE ON BOISE VAMC CAMPUS.
B. APPLICABLE CODES AND STANDARDS:
1. INTERNATIONAL BUILDING CODE - 2018 EDITION
2. AMERICAN SOCIETY OF CIVIL ENGINEERS - ASCE 7-16
3. SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS - AISC360-16
4. BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE - ACI318-19
5. H-18-8 SEISMIC DESIGN REQUIREMENTS
6. GE HEALTHCARE PRE-INSTALLATION MANUAL (REVOLUTION CT FAMILY) - REV 21 (2023)
C. BUILDING RISK CATEGORY: III
D. DESIGN LOADS:
1. LOADS RECEIVED FROM MANUFACTURER'S DESIGN DRAWINGS
a. WEIGHT OF PARTS Refer to Report
2. SEISMIC DESIGN CRITERIA:
a. SEISMIC DESIGN CATEGORY C
b. RISK CATEGORY III
c. SOIL CLASSIFICATION D - DEFAULT
d. COMPONENT IMPORTANCE FACTOR Ip = 1.5
e. COMPONENT AMPLIFICATION FACTOR ap = 1.0
f. COMPONENT RESPONSE MODIFICATION FACTOR Rp = 1.5
g. COMPONENT OVER-STRENGTH FACTOR Ω0 = 2.0
h. MAPPED SEISMIC RESPONSE ACCELERATIONS SS = 0.312
S1 = 0.111
i. SPECTRAL RESPONSE COEFFICIENTS SDS = 0.323
SD1 = 0.176
j. COMPONENT OPERATING WEIGHT Wp : REFER TO REPORT
k. SEISMIC DESIGN FORCE Fp : REFER TO REPORT
l. VERTICAL SEISMIC FORCE Fv : REFER TO REPORT
3. LOAD COMBINATIONS:
a. 1.2 DL + EV + Ω0 Fp
b. 0.9DL - EV + Ω0 Fp
STRUCTURAL STEEL REQUIREMENTS
1. DETAIL, FABRICATE AND ERECT STRUCTURAL STEEL IN ACCORDANCE WITH THE LATEST PROVISIONS OF
AISC MANUAL OF STEEL CONSTRUCTION, CODE OF STANDARD PRACTICE AND CHAPTER 22 OF THE IBC
PER THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION.
2. MATERIALS SHALL BE AS FOLLOWS UNO:
• PLATES ASTM A36
• UNISTRUT TELESPAR ASTM A1011
• HIGH−STRENGTH BOLTS ASTM A325, U.N.O.
• PLAIN WASHERS ANSI B18.22.1−65 (R2008)
• WELDING ELECTRODES SHALL BE E60XX RODS CONFORMING TO AWS A5.20 (FCAW PROCESS), AWS
A5.18 (GMAW PROCESS) OR AWS A5.1 (SMAW PROCESS)
3. WELDING SHALL BE PERFORMED BY AN AWS CERTIFIED WELDER.
4. WELDING PROCEDURES ARE THE RESPONSIBILITY OF THE STRUCTURAL STEEL CONTRACTOR.
5. ALL WELDS SHALL BE CONTINUOUS WHERE NO LENGTH IS PROVIDED.
6. ALL GROOVE AND BUTT WELDS SHALL BE FULL PENETRATION WELDS AND SHALL DEVELOP THE FULL
STRENGTH OF THE WEAKER MEMBER.
7. ALL WELDS EXPOSED TO VIEW SHALL BE CLEANED, GROUND SMOOTH AND PAINTED. PAINTING DONE ON
STEEL MEMBERS SHOULD BE AT LEAST 3" FROM FIELD WELDS UNLESS WELDS ARE COMPLETED. SHOP
PRIME AND PAINT STEEL PER THE OWNER'S SPECIFICATIONS.
8. CONNECTIONS MADE WITH HIGH STRENGTH STEEL BOLTS SHALL CONFORM IN ALL RESPECTS TO THE
CURRENT SPECIFICATIONS FOR STRUCTURAL JOINTS AS ENDORSED BY AISC.
9. FOR BEARING TYPE CONNECTIONS, BOLTS SHALL BE INSTALLED TO A SNUG TIGHT CONDITION. THE SNUG TIGHT CONDITION IS DEFINED AS THE TIGHTNESS THAT EXISTS WHEN ALL PLIES OF A JOINT ARE IN FIRM CONTACT. THIS CONDITION MAY NORMALLY BE ATTAINED BY A FEW IMPACTS OF AN IMPACT
WRENCH OR THE FULL EFFORT OF A PERSON USING AN ORDINARY SPUD WRENCH.
STRUCTURAL CONCRETE REQUIREMENTS
1. THE THICKNESS OF GROUND FLOOR SLAB IS AT LEAST 5".
2. THE THICKNESS OF 1ST CONCRETE FLOOR IS 8".
3. THE THICKNESS OF CONCRETE WALL IS AT LEAST 4".
4. THE STRENGTH OF CONCRETE MATERIAL OF SLAB AND WALL IS AT LEAST 2500 PSI.
STRUCTURAL FASTENERS REQUIREMENTS
1. THE FASTENERS ARE PRODUCTS OF SIMPSON STRONG-TIE.
2. THE CEILING TUBES ARE UNISTRUT TELESPAR AS SPECIFIED IN THE DRAWINGS.
SI000
MA MS
STRUCTURAL GENERAL
INFORMATION
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
REMODEL FOR 2ND CT
BOISE VAMC, ID.
531-CSI-106
MARCH 2024REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
100% CONSTRUCTION
DOCUMENTS
DWG. 4 OF
DRAWING TITLE
APPROVED:
CHIEF ENGINEER
SIGNATURE
DIRECTOR3/15/2024
G15
G14
G13
CT EXAM ROOM
G13A
CT CONTROL
ROOM
G13B
CT SCANNER
EQUIPMENT
ROOM
MEDICAL IMAGING ROOM
G15A
EXISTINGEXISTING
G10
CG
(Part 1)
CG
(Part 2)
29"29" 32 15/16" 37 1/2"
32 15/16" 37 1/2"
/8
/1 6"
/1 6"
/1 6"
/1 6"
5 3/4"
8 3/4" 8 3/4"
PART NO. DESCRIPTION REQUIRED FASTENERS
TABLE 1; EQUIPMENT LIST & REQUIRED FASTENERS
1 GANTRY
PATIENT TABLE
POWER DISTRIBUTION UNIT
SYSTEM CABINET IV
OPERATOR CONSOLE
MAIN DISCONNECT PANEL
UNINTERRUPTIBLE POWER SUPPLY
SERVICE CABINET
(8) 1/2"ɸ CS STRONG-BOLT2 (HNOM=2 3/4", HEF = 2 1/4")
(12) 1/2"ɸ CS STRONG-BOLT2 (HNOM=2 3/4", HEF = 2 1/4")
(4) 3/8"ɸ CS STRONG-BOLT2 (HNOM=1 7/8", HEF = 1 1/2")
(4) 3/8"ɸ CS STRONG-BOLT2 (HNOM=1 7/8", HEF = 1 1/2")
(4) 3/8"ɸ CS STRONG-BOLT2 (HNOM=1 7/8", HEF = 1 1/2")
(4) 3/8"ɸ CS STRONG-BOLT2 (HNOM=1 7/8", HEF = 1 1/2")
(12) 1/2"ɸ CS STRONG-BOLT2 (HNOM=2 3/4", HEF = 2 1/4")
(4) 3/8"ɸ CS STRONG-BOLT2 (HNOM=1 7/8", HEF = 1 1/2")
REMARK
REFER TO DET.1
REFER TO DET.1
WEIGHT, LB
* IT IS THE DESIGN WEIGHT. THE ACTUAL WEIGHT IS ONE SIXTH OF THIS VALUE.
BASE MATERIAL
CONCRETE FLOOR
CONCRETE WALL
CONCRETE FLOOR
CONCRETE FLOOR
CONCRETE FLOOR
CONCRETE FLOOR
CONCRETE FLOOR
CONCRETE FLOOR
8 THICKNESS, MM (IN)
M5
TABLE 2; WELDING NUT
3.7-4.0 (0.15-0.16)
11000PLEDGE LOAD (N)
M6 4.7-5.0 (0.19-0.20)
15500
* WELDING NUTS SHALL MEET GB-T 13681-1992 REQUIREMENT OR EQUIVALENT.
EQUIPMENT LAYOUT
SCALE: NONE1 DET. 1; ANCHOR LAYOUT (PART 1 & 2)
SCALE: 3/8" = 1'-0"2
SI501
MA MS
STRUCTURAL DETAILS
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
REMODEL FOR 2ND CT
BOISE VAMC, ID.
531-CSI-106
MARCH 2024REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
100% CONSTRUCTION
DOCUMENTS
DWG. 5 OF
DRAWING TITLE
APPROVED:
CHIEF ENGINEER
SIGNATURE
DIRECTOR3/15/2024
AE001
JME LMF
ARCHITECTURAL ABBREVIATIONS
AND LEGENDS
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
REMODEL FOR 2ND CT
BOISE VAMC, ID.
531-CSI-106
MARCH 2024REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
100% CONSTRUCTION
DOCUMENTS
DWG. OF
DRAWING TITLE
APPROVED:
CHIEF ENGINEER
SIGNATURE
DIRECTOR
PPL PEOPLE
PR PAIR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT CONC POST-TENSIONED CONCRETE
PVC POLYVINYL CHLORIDE
PVDF POLYVINYLIDENE DIFLUORIDE
RAD RADIUS
RB RUBBER BASE
RCP REINFORCED CONCRETE PIPE,
REFLECTED CEILING PLAN
RD ROOF DRAIN
RE REFER TO, REFERENCE
REIN REINFORCE(D)(ING)
RECP RECEPTACLE
RCYL RECYCLE AREA
REFR REFRIGERATOR
RO ROUGH OPENING
ROW RIGHT OF WAY
S
SOUTH
SAFB SOUND ATTENUATION FIRE BATTS
SAN SANITARY
SB SPLASH BLOCK
SC SOLID CORE - SEALED CONCRETE
SCH SCHEDULE
SD STORM DRAIN
SECT SECTION
SEW SEWER
SHT SHEET
SIM SIMILAR
SPF SPRAY APPLIED POLYURETHANE FOAM
INSULATION
SPEC SPECIFICATION
SQ SQUARE
SS SERVICE SINK, STORM SEWER,
STAINLESS STEEL
STM STORM
STD STANDARD
STL STEEL
STRUCT STRUCTURAL
SWBD SWITCHBOARD
T&G TONGUE AND GROOVE
TCU THIN CLAD UNIT
TEL TELEPHONE
THK THICK(NESS)
THRU THROUGH
TJI TRUSJOIST INCORPORATED
T.O. TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL/TOP OF SLAB
TOW TOP OF WALL
TYP TYPICAL
ABV ABOVE
ACI AMERICAN CONCRETE INSTITUTE
ACT ACOUSTICAL CEILING TILE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLER UNIT
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
AISI AMERICAN IRON & STEEL INSTITUTE
ALUM ALUMINUM
ALM ALARM
ALT ALTERNATE
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATING & AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
AWG AMERICAN WIRE GAGE
AWS AMERICAN WELDING SOCIETY
AWWA AMERICAN WATER WORKS
ASSOCIATION
BL BUILDING LINE
BLDG BUILDING
B.O. BOTTOM OF
BRK BRICK
BR BROCHURE RACK
BUR BUILT UP ROOFING
CAB CABINET
CF CUBIC FOOT
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CJ CONTROL JOINT
CKT CIRCUIT
CL CENTERLINE
CLOS CLOSET
CLG CEILING
CLR CLEAR(ANCE)
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
CRS COURSE(S)
CTR CENTER
CNTR COUNTER
CU IN CUBIC INCH
CU YD CUBIC YARD
CW CLEAR WIDTH
DEMO DEMOLITION
DET DETAIL
DIAM,Ø DIAMETER
DC DISPLAY CASE
DP DAMP PROOFING
DPR DAMPER
DR DOOR
DS DOWNSPOUT
DSP DRY STANDPIPE
DWG DRAWING
DWS DOMESTIC WATER SUPPLY
E EAST
EA EACH
ELEV ELEVATION
EJ EXPANSION JOINT
ELEC ELECTRIC(AL)
EMER EMERGENCY
EP ELECTRICAL PANEL
EPDM ETHYLENE-PROPYLENE-DIENE-
MONOMER
EF EXHAUST FAN
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXH EXHAUST
EXP EXPOSED
EXT EXTERIOR
FLUOR FLUORESCENT
FMS FACILITY MANAGEMENT SERVICES
FND FEMININE NAPKIN DISPENSER
FO FACE OF
FOC FACE OF CONCRETE / CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUDS
FT FOOT / FEET
FTG FOOTING
FURR FURRED(ING)
GA GAGE, GAUGE
GALV GALVANIZE(D)
GFCI GOVERNMENT FURNISHED,
CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED,
GOVERNMENT INSTALLED
GFI GROUND FAULT CIRCUIT INTERRUPTER
GL GLASS, GLAZING
GWB GYPSUM WALL BOARD
GRND GROUND
GRT GROUT
HAC HOUSEKEEPING AIDS CLOSET
HB HOSE BIB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HJT HEAD JOINT
HM HOLLOW METAL
HORZ HORIZONTAL
HP HORSE POWER / HIGH PRESSURE
HSKP HOUSEKEEPING
HT HEIGHT
HVAC HEATING, VENTILATION, AIR
CONDITIONING
HWS HOT WATER SUPPLY
ID INSIDE DIAMETER
IGU INSULATED GLASS UNIT
IN INCH (“)
INC INCORPORATED
INFO INFORMATION
INSUL INSULATION/INSULATE(D)(ING)
INT INTERIOR
INV INVERT
JT JOINT
LDR LADDER
LAM LAMINATE
LAV LAVATORY
LB POUND
LAG LAG SCREW
LG LENGTH / LONG
LTG LIGHTING
LVL LAMINATED VENEER LUMBER
LW CONC LIGHTWEIGHT CONCRETE
M METER(S)
MAX MAXIMUM
MECH MECHANIC(AL)
MED MEDIUM
MTL METAL
MFR MANUFACTURE(R)
MH MANHOLE
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MM MILLIMETER
MO MASONRY OPENING
UD UNIT DOSE
UL UNDERWRITERS'
LABORATORIES, INC.
UNO UNLESS NOTED OTHERWISE
V
VOLT
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VENT VENTILATE
VERT VERTICAL
VIF VERIFY IN FIELD
VIT VITREOUS
VS VERSUS
VC VERTICAL CURVE
VOL VOLUME
W WEST / WIDTH / WIDE /
W/ WITH
WC WATER CLOSET
WD WOOD
WG WIRE GLASS
WH WATER HEATER
WDW WINDOW
W/O WITHOUT
WT WEIGHT
WTR WATER
WWF WELDED WIRE FABRIC
XFMR TRANSFORMER
ABBREVIATIONS
FA FIRE ALARM
FB FACE BRICK
FC FOOT-CANDLE
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEB FIRE EXTINGUISHER BRACKET
FEC FIRE EXTINGUISHER CABINET
FFE FURNITURE, FIXTURES AND EQUIPMENT
FG FIXED GLASS
FIN FL FINISHED FLOOR
FIN FL EL FINISHED FLOOR ELEVATION
N/A NOT APPLICABLE
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFF OFFICE
OFD OVERFLOW DRAIN
OH OVERHEAD
OPNG OPENING
OPOI OWNER PROVIDED, OWNER INSTALLED
OPP OPPOSITE
ORIG ORIGINAL
OVHD OVERHEAD
PA PUBLIC ADDRESS
PCF POUNDS PER CUBIC FOOT
PLF POUNDS PER LINEAL FOOT
PFN PRE-FINISHED
PH PHASE
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
AE501
FRP FIBER GLASS REINFORCED PLASTIC
MPI MASTER PAINTERS
INSTITUTE
HVLS HIGH VOLUME LOW
SPEED
EPS EXPANDED POLYSTYRENE
XPS EXTRUDED POLYSTYRENE
LOC LOCAL OPERATOR CONSOLE
FDC FIRE DEPARTMENT CONNECTION
UCF UNIFIED FACILITIES CRITERIA
REM REMOTE EQUIPMENT MODULE
GSF GROSS SQUARE FEET
IBC INTERNATIONAL BUILDING CODE
STC SOUND TRANSMISSION SYSTEM
AFFF AQUEOUS FILM FORMING FOAM
PVMT PAVEMENT
DWGS DRAWINGS
SLDG SLIDING
BC BABY CHANGING TABLE
HNDCP HANDICAP
IV INTRAVENOUS
UC UNDERCUT
AE501
AE502
AE405
AE501
AE502
AE501
AE502
X
SIM
REVISION CLOUD
SECTION
NUMBER
SHEET
NUMBER
ELEVATION
NUMBER
SHEET
NUMBER
DRAWING TITLE
DRAWING SCALE
VIEW TITLE NUMBER
DETAIL NUMBER
SHEET NUMBER
ROOM NUMBER
GRAPHIC SCALE
0' 16'8'4'
SCALE: 1/8" = 1'-0"
MATCH LINE
SEE XX/X-XXX
LEVEL 1/8"=1'-0"
ELEVATION
ELEVATION HEIGHTS
COLUMN GRID LINE
INTERIOR
ELEVATION MARKER
SECTIONS
EXTERIOR
ELEVATION
REFERENCED VIEW TITLES
DETAIL OR
ENLARGED PLAN
NORTH ARROW
ROOM NAME AND
NUMBER
KEY NOTE
WINDOW OPENING
PARTITION TYPE
TAG
DOOR TAG
REVISION NUMBER
MATCHLINE
SYMBOLS LEGEND
AE501
AE502
LOBBY
XXX
A
AE4019
XXX
N
TRUE N
SCALE:
FLOOR PLAN
1/8"=1'-0"1
GENERAL NOTES
1. NOTIFY VETERANS AFFAIRS COR OF ANY DISCREPANCIES
BEFORE PROCEEDING WITH ANY WORK.
2. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS
PRIOR TO ORDERING OR INSTALLING ANY MATERIALS OR
EQUIPMENT.
3. DAMAGED AREAS CAUSED DURING CONSTRUCTION SHALL
BE REPAIRED TO NEW CONDITION OR REPLACED AT THE
CONTRACTOR'S EXPENSE .
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
REMOVAL AND DISPOSAL OF DEMOLITION AND/OR
CONSTRUCTION DEBRIS ASSOCIATED WITH THE WORK.
DISPOSAL SHALL BE IN COMPLIANCE WITH FEDERAL,
STATE, AND LOCAL REGULATIONS. THE PROJECT SITE
SHALL BE KEPT CLEAN AND FREE FROM WASTE
MATERIALS.
5. THE OWNER SHALL RESERVE THE RIGHT TO SALVAGE ANY
REMOVED MATERIALS.
6. COORDINATE AND INSTALL WOOD BLOCKING OR SHEET
METAL BACKING FOR ANCHORAGE OF WALL-MOUNTED
ITEMS.
7. PENETRATIONS THROUGH WALL CONSTRUCTION SHALL
BE FULLY SEALED AT ALL SIDES AND FIRE-STOPPED
WHERE REQUIRED.
8. INSTALL CONTROL JOINTS IN GYPSUM BOARD SURFACES. .
ISOLATE GYPSUM BOARD SURFACES WITH CONTROL
JOINTS FOR RUNS THAT EXCEED 30 FEET IN LENGTH.
9. GYPSUM BOARD PARTITIONS SHALL EXTEND A MINIMUM
OF 6 INCHES ABOVE FINISHED CEILING PLANE UNLESS
NOTED OTHERWISE.
10. NO WORK SHALL BE COVERED OR CONCEALED UNTIL IT
HAS BEEN INSPECTED, TESTED, AND/OR APPROVED BY
THE VETERANS AFFAIRS COR.
11. COORDINATE INFECTION CONTROL RISK ASSESSMENT
(ICRA) REQUIREMENTS WITH COR BEFORE DEMOLITION
AND CONSTRUCTION START WHICH SHALL ALSO BE USED
IN CONJUNCTION WITH PRE-CONSTRUCTION RISK
ASSESSMENT (PCRA) FOR ALL CONSTRUCTION ACTIVITY.
BECOME FAMILIAR WITH THE CONSTRUCTION DOCUMENTS
AND NOTIFY THE VETERANS AFFAIRS(VA) CONTRACTING
OFFICER'S REPRESENTATIVE (COR) OF DISCREPANCIES
BEFORE PROCEEDING WITH WORK.
12. ANY EQUIPMENT REMAINING IN THE WORK AREA (AFTER
THE INITIAL VA EQUIPMENT MOVE AND RELOCATION)
SHALL BE DEMOLISHED.
13. PROVIDE A NON-DISRUPTIVE AND ENVIRONMENTALLY
PROTECTED PROCESS FOR THE EXISTING FUNCTIONING
FACILITY OPERATIONS IMMEDIATELY ADJACENT TO AND IN
THE SURROUNDING AREAS WITH RESPECT TO THE AREAS
OF CONSTRUCTION ACTIVITY.
SIM
SECTION
NUMBER
SHEET
NUMBER
ELEVATION
NUMBER
SHEET
NUMBER
LEVEL 1/8"=1'-0"
ELEVATION
ELEVATION HEIGHTS
COLUMN GRID LINE
INTERIOR
ELEVATION MARKER
SECTIONS
EXTERIOR
ELEVATION
NORTH ARROW
AE501
AE502
AE4019
N
TRUE N
RAMP
UP
UP
G15
G14
CG5
G13
CT EXAM ROOM
G13A
CT CONTROL
ROOM
G13B
CT SCANNER
EQUIPMENT
ROOM
MEDICAL IMAGING ROOM
G15A
EXISTINGEXISTING
CORRIDOR
G10
E F G HE1 JDCBA
3.8
2.8
1B
AE100
RJF
OVERALL BASEMENT FLOOR PLAN
0'
SCALE: 1/8" = 1'-0"SCALE: 1/8" = 1'-0"
16'8'4'
SCALE:1 OVERALL BASEMENT FLOOR PLAN
1/8" = 1'-0"
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
REMODEL FOR 2ND CT
BOISE VAMC, ID.
531-CSI-106
MARCH 2024REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
100% CONSTRUCTION
DOCUMENTS
DWG. OF
PROJECT AREA
BUILDING 85
BASEMENT
KEYPLAN
DRAWING TITLE
APPROVED:
CHIEF ENGINEER
SIGNATURE
DIRECTOR
N
TRUE N
AE102
JME
LEGEND
EXISTING INTERIOR PARTITION TO REMAIN
NEW INTERIOR PARTITION, SEE SHEET AE301
AREA OF CONSTRUCTION
SHEET NOTES:
1, WORK TO BE COMPLETED IN COMPLIANCE WITH APPLICABLE
CODES (SEE SHEET GS101) AND TO THE SATISFACTION OF THE
COR.
2. PROTECT EXISTING CONSTRUCTION FROM DEMOLITION
ACTIVITIES AND PATCH AND REPAIR ALL AREAS AFFECTED TO
NEW CONDITION.
3. EXAMINE AND VERIFY DIMENSIONS AND EXISTING CONDITIONS
BOTH ON PLAN AND IN THE FIELD PRIOR TO COMMENCEMENT OF
CONSTRUCTION. VERIFY WHETHER FIELD DIMENSIONS WILL
TAKE PRECEDENCE OVER DRAWING DIMENSIONS. DO NOT
SCALE FROM DRAWINGS.
4. COORDINATE THE REMOVAL AND/OR RELOCATION OF FIXTURES,
EQUIPMENT, AND OTHER APPURTENANCES WITH COR.
CONTRACTOR IS NOT REQUIRED TO PROVIDE MOVING OR
RELOCATION OF VA FURNITURE OR EQUIPMENT.
5. PATCH, REPAIR, REPLACE, AND REPAINT AREAS OF EXISTING
BUILDING AFFECTED BY DEMOLITION TO NEW CONDITION.
MATCH THE EXISTING ADJACENT BUILDING AND MATERIAL TO
GREATEST EXTENT POSSIBLE, INCLUDING BUT NOT LIMITED TO:
FLOORS, WALLS, AND CEILINGS.
6. GE'S MINIMUM OPENING FOR EQUIPMENT DELIVERY IS 46 IN X 78
IN, CONTINGENT ON A 96 IN CORRIDOR WIDTH.
03/15/2024
AutoCAD SHX Text
FND
BC
G15 G15A
G13A
G14
CG5
G13 G13B
G13C
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING EXISTING
EXISTING
7D
2D
1D
5D
5D
5D
3D6D
6D
6D 3D
6D
7D
7D
5D
5D
6D
10D
10D
10D
TYP.
TYP.
TYP. TYP.
3D 7D
NOTE:
CAREFULLY PROTECT NUCLEAR MEDICINE EQUIPMENT
DURING CONSTRUCTION. TIGHTLY SEAL AGAINST ANY DUST
4' -0
2D2D2D
11D
11D
5D
4' -6
12D
'-4
G13 G13B G13C
G13A
G15AG15
CG5
G14
8D 9D
8D 9D
8D 9D
8D 9D
4D
8D 9D
8D 9D
4D
5D
13D 13D
H J
1.9
1.B
H J
1.9
1.B
AD101
JME LMF
DEMOLITION BASEMENT PLANS
0'
SCALE: 1/4" = 1'-0"
8'4'2'
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
REMODEL FOR 2ND CT
BOISE VAMC, ID.
531-CSI-106
MARCH 2024REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
100% CONSTRUCTION
DOCUMENTS
DWG. OF
PROJECT AREA
BUILDING 85
BASEMENT
KEYPLAN
DRAWING TITLE
APPROVED:
CHIEF ENGINEER
SIGNATURE
DIRECTOR
N
TRUE N
SCALE:2 REFLECTED CEILING PLAN - DEMOLITION
1/4" = 1'-0"SCALE:1 FLOOR PLAN - DEMOLITION
1/4" = 1'-0"
KEY NOTES - DEMOLITION:
FURNITURE SELECTED FOR SALVAGE TO BE REMOVED BY VA
PRIOR TO CONSTRUCTION.
REMOVE ELECTRICAL RACEWAY AND ATTACHED WHITE BOARD.
REMOVE EXISTING UPPER CABINETS, BASE CABINET,
COUNTERS, AND ASSOCIATED HARDWARE.
REMOVE EXISTING BULKHEAD WALL.
REMOVE EXISTING WALL
REMOVE DOOR, DOOR FRAME, AND ASSOCIATED DOOR
HARDWARE.
REMOVE EXISTING FLOOR FINISH AND ADHESIVE TO CONCRETE
SLAB AND MAKE SMOOTH.
REMOVE EXISTING SUSPENDED CEILING GRID SYSTEM AND
ACOUSTICAL TILES.
REMOVE ELECTRICAL AND MECHANICAL CEILING FIXTURES.
DOOR TO REMAIN, PROTECT IN PLACE.
EXISTING EQUIPMENT TO REMAIN. COVER AND KEEP DUST FREE
WHEN IMAGING ROOM IS NO LONGER OPERATIONAL DURING
CONSTRUCTION.
REMOVE WALL FOR NEW OPENINGS AND LEAVE AS MUCH AS
POSSIBLE OF THE EXISTING UPPER FRAMING INTACT WHERE IT
IS ATTACHED TO THE BOTTOM OF STRUCTURE.
SAWCUT 14"X14" THRU-WALL OPENINGS IN CAST-IN-PLACE WALL
AT 9'-0" AFF TO BOTTOM EDGE. SEE MH101 FOR LOCATIONS.
#D
1D.
2D.
3D.
4D.
5D.
6D.
7D.
8D.
9D.
10D.
11D.
12D.
13D.
SHEET NOTES:
1. WORK TO BE COMPLETED IN COMPLIANCE WITH THE
APPLICABLE CODES (SEE SHEET GS101) AND TO THE
SATISFACTION OF THE COR.
2. PROTECT EXISTING CONSTRUCTION FROM CONSTRUCTION
ACTIVITIES AND PATCH AND REPAIR TO NEW CONDITION ALL
AFFECTED AREAS..
3. EXAMINE AND VERIFY DIMENSIONS AND EXISTING CONDITIONS
BOTH ON PLAN AND IN THE FIELD PRIOR TO COMMENCEMENT OF
CONSTRUCTION. VERIFY WHETHER FIELD DIMENSIONS WILL
TAKE PRECEDENCE OVER DRAWING DIMENSIONS. DO NOT
SCALE FROM DRAWINGS.
4. COORDINATE THE REMOVAL AND/OR RELOCATION OF FIXTURES,
EQUIPMENT, AND OTHER APPURTENANCES WITH COR.
CONTRACTOR IS NOT REQUIRED TO PROVIDE MOVING OR
RELOCATION OF VA FURNITURE OR EQUIPMENT.
5. ALL INTERIOR SURFACES, WALLS, FRAMES, ETC., REQUIRED TO
HAVE NEW FINISHES APPLIED, SHALL HAVE ALL EXISTING AND
CONTRACTOR CAUSED HOLES, CRACKS, AND OTHER
IMPERFECTIONS FILLED WITH APPROVED PATCHING MATERIAL.
PATCH TO BE FINISHED FLUSH WITH ADJACENT SURFACE, WITH
TEXTURE TO MATCH TEXTURE OF ADJACENT SURFACE. SEE
SPECIFICATIONS FOR PATCHING REQUIREMENTS.
6. REMOVE MECHANICAL, PLUMBING, ELECTRICAL EQUIPMENT AND
ASSOCIATED DEVICES PER DISCIPLINE DEMOLITION SHEETS.
7. REFER TO DETAIL 1/FX101 FOR FIRE PROTECTION DEMOLITION.
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE DEMOLISHED
NEW PARTITION, REFER TO AE301
AREA OF EXISTING FLOOR FINISH REMOVAL,
SEE FLOOR PLAN - DEMOLITION
WALL LEGEND
8' -4
27'-7"
5'-11"
5' -9
G13
G14
G13C
AE601
AE6021
A1B1
A A
A
(71 NSF)(450 NSF)
(78 NSF)
10'-0"
C
C1
4' -1
4'
-5
5' -4
1'
-8
5' -4
4'
-1 1"
'-1
6'-9"
B1
9'-6" 5'-0"
5'-5"
2' -6
"7
5' -0
B1
B
A
G15
G14
CG5
G13
CT EXAM ROOM
G13A
CT CONTROL
ROOM
G13B
CT SCANNER
EQUIPMENT
ROOM
MEDICAL IMAGING ROOM
G15A
EXISTINGEXISTING
CORRIDOR
1.9
1.B
1.9
1.B
H J
G15 G15A
G14CG5
G13
CT ROOM
G13A
CT
CONTROL
ROOM
G13B
CT SCANNER
EQUIPMENT ROOM
CONTROL ROOM
11 11
S
CM
24 24
XXX
X
A
H J
GULDMANN
SIDE MOUNT
RAIL SYSTEM
WOOD BLOCKING
WITH STEEL
CHANNEL SUPPORT
TO FLOOR SHOWN FOR
ILLUSTRATION ONLY,
REFER TO MANUFACTURER
FOR INSTALLATION
CEILING, REFER
TO SCHEDULE
EXISTING
STRUCTURE
EXISTING WALL
NOTE:
DETAIL SHOWN FOR
ILLUSTRATION ONLY.
CONFIRM APPROPRIATE
SUPPORT SYSTEM WITH
MANUFACTURER
AE101
JME LMF
0'
SCALE: 1/4" = 1'-0"
8'4'2'
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
REMODEL FOR 2ND CT
BOISE VAMC, ID.
531-CSI-106
MARCH 2024REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
100% CONSTRUCTION
DOCUMENTS
DWG. OF
PROJECT AREA
BUILDING 85
BASEMENT
KEYPLAN
DRAWING TITLE
APPROVED:
CHIEF ENGINEER
SIGNATURE
DIRECTOR
N
TRUE N 0'
SCALE: 1/4" = 1'-0"
8'4'2'
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE DEMOLISHED
NEW PARTITION, REFER TO AE301
AREA OF EXISTING FLOOR FINISH REMOVAL,
SEE FLOOR PLAN - DEMOLITION
WINDOW TYPE, SEE SHEET AE301
DOOR TYPE, SEE SHEET AE301
PARTITION TYPE, SEE SHEET AE301
WALL LEGEND
SHEET NOTES:
1. WORK TO BE COMPLETED IN COMPLIANCE WITH APPLICABLE
CODES (SEE SHEET GS101) AND TO THE SATISFACTION OF THE
COR.
2. PROTECT EXISTING CONSTRUCTION FROM DEMOLITION
ACTIVITIES AND PATCH AND REPAIR TO NEW CONDITION ALL
AFFECTED AREAS.
3. EXAMINE AND VERIFY DIMENSIONS AND EXISTING CONDITIONS
BOTH ON PLAN AND IN THE FIELD PRIOR TO COMMENCEMENT OF
CONSTRUCTION. VERIFY WHETHER FIELD DIMENSIONS WILL
TAKE PRECEDENCE OVER DRAWING DIMENSIONS. DO NOT
SCALE FROM DRAWINGS.
4. COORDINATE THE REMOVAL AND/OR RELOCATION OF FIXTURES,
EQUIPMENT, AND OTHER APPURTENANCES WITH COR.
CONTRACTOR IS NOT REQUIRED TO PROVIDE MOVING OR
RELOCATION OF VA FURNITURE OR EQUIPMENT.
5. ALL INTERIOR SURFACES, WALLS, FRAMES, ETC., REQUIRED TO
HAVE NEW FINISHES APPLIED, SHALL HAVE ALL EXISTING AND
CONTRACTOR CAUSED HOLES, CRACKS, AND OTHER
IMPERFECTIONS FILLED WITH APPROVED PATCHING MATERIAL.
PATCH TO BE FINISHED FLUSH WITH ADJACENT SURFACE, WITH
6. TEXTURE TO MATCH TEXTURE OF ADJACENT SURFACE. SEE
SPECIFICATIONS FOR PATCHING REQUIREMENTS.
7. REMOVE MECHANICAL, PLUMBING, ELECTRICAL EQUIPMENT AND
ASSOCIATED DEVICES PER DISCIPLINE DEMOLITION SHEETS.
8. EXISTING STRUCTURAL FRAMING, CAST-IN-PLACE WALLS AND
FLOOR SLABS ARE TO REMAIN AS IS UNLESS NOTED IN OTHER
DESIGN DOCUMENTS FOR THIS PROJECT.
KEY NOTES - CONSTRUCTION:
INFILL WALL OPENINGS FLUSH TO EXISTING WALL WITH 5/8" TYPE
X GYPSUM BOARD ON BOTH SIDES OF 4" METAL STUDS AT 16"
O.C. - FILL STUD CAVITY WITH ACOUSTIC INSULATION (STC 45
MINIMUM) AND MATCH EXISTING WALL FINISH.
IMAGING EQUIPMENT PROVIDED AND INSTALLED BY OTHERS.
EXISTING IMAGING EQUIPMENT TO REMAIN.
ALIGN NEW WALL WITH EXISTING FINISH FACE OF COLUMN.
INSTALL LEAD WINDOW, SEE WINDOW SCHEDULE AE301.
PROVIDE AND INSTALL BUILT-IN CASEWORK, SEE 9/AE601 AND
10/AE601.
INSTALL COUNTERTOP WITH BRACING, SEE 11/AE601.
INSTALL SUSPENDED CEILING SYSTEM WITH 2' X 4' ACOUSTICAL
TILE AT 8'-0" AFF.
INSTALL STAINLESS SINK, SEE PLUMBING DRAWINGS SHEET
PP101.
INSTALL LIGHTING FIXTURES AS SCHEDULED, SEE ELECTRICAL
DRAWINGS SHEET EL101.
INSTALL HVAC FIXTURES AS SCHEDULED, SEE MECHANICAL
DRAWINGS SHEET MH101.
WALL MOUNTED PATIENT LIFT (GULDMANN) NOT IN CONTRACT,
SHOWN FOR FUTURE REFERENCE. VA PROVIDED WITH
INSTALLATION BY OTHERS. ADD REINFORCED WALL BLOCKING
PER MANUFACTURER'S REQUIREMENTS AS CLOSE TO THE
BOTTOM OF THE CEILING AS POSSIBLE TO A MINIMUM OF 16"
DEPTH AND CAPABLE OF SUPPORTING 1.5 TIMES THE SAFE
WORKING LOAD (SWL) OF THE HOIST LIMIT OF 770 lbs = 1155 lbs.
ALTERNATE BLOCKING METHODS ARE ACCEPTABLE TO
TRANSFER HOIST LOADS AND INCLUDE EITHER WOOD OR STEEL.
LEAD-LINED DOUBLE DOOR WITH INACTIVE LEAF, SEE DOOR
SCHEDULE AE301.
LEAD-LINED DOOR, SEE DOOR SCHEDULE AE301.
CEILING MEDICAL GAS OUTLETS FOR MV, MA, AND O2. SEE
MECHANICAL DRAWINGS SHEET PG101. NOTE: THE PLACEMENT
OF THE MEDGAS OUTLETS CANNOT IMPEDE THE MOVEMENT OF
THE PATIENT LIFT.
WALL MEDICAL GAS OUTLETS FOR MV, MA, AND O2. SEE
MECHANICAL DRAWINGS SHEET PG101
ALIGN WALL TO EDGE OF LEAD LINED DOOR TO FORM A
CONTINUOUS LEAD SHIELDING BARRIER AT ENTRY.
CEILING MOUNTED INJECTOR SUPPORT SYSTEM. PROVIDED BY
THE VA AND INSTALLED BY OTHERS.
MILLWORK LOCKABLE STORAGE CABINET, SEE SHEET 8/AE601.
EXISTING WALLS AND DOORS TO REMAIN.
UPPER CABINET, SEE 6/AE601.
DOUBLE DOOR TO MATCH EXISTING ROOM SHIELDING
REQUIREMENTS. COORDINATE WITH VA.
WALL TO MATCH EXISTING INCLUDING EXISTING ROOM
SHIELDING REQUIREMENTS. COORDINATE WITH VA.
FCU DUCT WALL PENETRATIONS FROM MECHANICAL ROOM, SEE
MH101.
SCALE:1 FLOOR PLAN
1/4" = 1'-0" SCALE:2 REFLECTED CEILING PLAN
1/4" = 1'-0"
RCP LEGEND
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
2 X 4 SUSPENDED CEILING SYSTEM
LED 2 X 4 TROFFER
SUPPLY - CEILING DIFFUSER (CD)
RETURN GRILLE (RG)
RELOCATED CEILING DIFFUSER - R(CD)
RELOCATED RETURN GRILLE - R(RG)
RELOCATED CEILING DIFFUSER - R(CD)
RECESSED SPRINKLER PENDENT HEAD
DOWNLIGHTS OVER BED
BASEMENT PLANS
FLOOR PLAN/ REFLECTED
CEILING PLAN
AE301
MEDICAL GAS OUTLETS
SNG-1
SNG-1
SNG-1
SNG-1
3 3
4 4
G15AG15
G14
G13A
CT ROOM
G13
CT EXAM ROOM
G13B
CT SCANNER
EQUIPMENT ROOM
CONTROL ROOM
SNG-2
SNG-2
G15 G15A
G15
G13
CT EXAM ROOM
G13A
CT ROOM
G13B
CT SCANNER
EQUIPMENT ROOM
G14
2 2
MEDICAL
IMAGING RN
A
A
B B
1 1
H J
2.8
H J
2.8
E-5
E-7
E-8
E-9
E-1 E-4
E-6
7' -4
G13A
CT ROOM
G13B
CT SCANNER
EQUIPMENT ROOM
CONTROL ROOM
E-10
G14
G13
CT EXAM ROOM
5'-4"
E-2
8'-2"
E-3
E-11
H J
2.8
A
B
AE102
JME LMF
FINISH, SIGNAGE, AND FURNITURE
& EQUIPMENT FLOOR PLANS
0'
SCALE: 1/4" = 1'-0"
8'4'2'
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
REMODEL FOR 2ND CT
BOISE VAMC, ID.
531-CSI-106
MARCH 2024REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
100% CONSTRUCTION
DOCUMENTS
DWG. OF
PROJECT AREA
BUILDING 85
BASEMENT
KEYPLAN
DRAWING TITLE
APPROVED:
CHIEF ENGINEER
SIGNATURE
DIRECTOR
N
TRUE N
SCALE:1 BASEMENT FLOORING PLAN
1/4" = 1'-0"
KEY NOTES:
1. FLOOR TRANSITION DETAILS AND TRANSITION TYPE SEE
SHEET AE602.
2. EXISTING FLOORING TO REMAIN.
3. EXISTING INTERIOR SIGNAGE TO REMAIN.
4. INSTALL CORNER GUARD, SEE SHEET AE602 FOR TYPE AND
DETAIL.
5. PROVIDE AND INSTALL BUILT-IN CASEWORK, SEE 9/AE601
AND 10/AE601.
6. EXISTING EQUIPMENT TO REMAIN.
7. COUNTERTOP WITH BRACING FOR EQUIPMENT, SEE SHEET
AE601.
8. INSTALL LEAD WINDOW, SEE SHEET AE301.
9. WALL MOUNTED PATIENT LIFT (GULDMANN) NOT IN
CONTRACT, SHOWN FOR FUTURE REFERENCE. REFER TO
KEYNOTE 12, SHEET AE101.
10. UPPER CABINET, SEE 6/AE601.
11. CEILING MEDICAL GAS OUTLETS FOR MV, MA, AND O2. SEE
MECHANICAL DRAWINGS SHEET PG101.
12. WALL MOUNTED MEDICAL GAS OUTLETS FOR MV, MA, AND
O2. SEE MECHANICAL DRAWINGS SHEET PG101.
13. MILLWORK LOCKABLE STORAGE CABINET, SEE DETAIL
8/AE601.
14. PROVIDE SUPPORT BACKING FOR CT SCANNER MAIN
DISCONNECT PANEL.
SHEET NOTES
1. SEE SHEET AE100 FOR A OVERALL BASEMENT PLAN, AE601
FOR ROOM FINISH SCHEDULE, AND AE602 SCHEDULE FOR
INTERIOR FINISHES.
2. PREPARE EXISTING SUB-FLOOR TO MEET
MANUFACTURER'S REQUIREMENTS FOR INSTALLATION OF
FLOORING MATERIAL..
3. ALL FLOOR TRANSITIONS BETWEEN DIFFERENT FLOORING
MATERIALS SHALL BE SMOOTH AND FLUSH WITH NO MORE
THAN 1/8" VARIATION IN HEIGHT.
4. FURNITURE AND EQUIPMENT SHOWN FOR
REPRESENTATION ONLY.
5. THE VA COR, VA INTERIOR DESIGNER, AND USERS TO
COORDINATE THE FINAL PURCHASING AND SELECTION OF
THE FURNITURE AND EQUIPMENT.
6. CONTRACTOR IS TO REMOVE ALL WALL MOUNTED
SIGNAGE, BULLETIN BOARDS, CHART HOLDERS, ETC.
PRIOR TO PAINTING UNLESS DIRECTED OTHERWISE.
TURN ALL REMOVED ITEMS OVER TO THE VA. THE VA WILL
BE RESPONSIBLE FOR REINSTALLATION OF ITEMS.
7. ASSURE THAT ALL REQUIRED BACKING IS INSTALLED IN
WALLS PRIOR TO INSTALLING DRYWALL. THIS INCLUDES
BACKING FOR WALL-MOUNTED DOORSTOPS.
8. REPLACE ANY FLOOR-MOUNTED DOORSTOPS REMOVED
AS PART OF FLOORING DEMOLITION WITH NEW FLOOR
MOUNTED DOORSTOPS.
SCALE:2 BASEMENT SIGNAGE PLAN
1/4" = 1'-0"
SCALE:3 BASEMENT FURNITURE AND EQUIPMENT PLAN
1/4" = 1'-0"
LEGEND
(HSF-1) HOMOGENEOUS SHEET FLOORING
WITH WELDED WALL BASE TO CREATE A
SANITARY TRANSITION (FIELD COLOR)
EXISTING FINISH FLOORING TO REMAIN
(FT-1) FLOOR TRANSITION BETWEEN
HOMOGENEOUS (HSF-1) AND EXISTING
CORRIDOR FLOORING
(FT-2) FLUSH FLOOR TRANSITION BETWEEN
HOMOGENEOUS (HSF-1) AND EXISTING G15
AND G15A FLOORING
CFCI: CONTRACTOR FURNISHED, CONTRACTOR INSTALLED
OFCI: OWNER FURNISHED, CONTRACTOR INSTALLED
OFOI: OWNER FURNISHED, OWNER INSTALLED.
EQUIPMENT AND FURNITURE SCHEDULE
MARK DESCRIPTION QUANTITY CFCI OFCI OFOI
E-1 OPEN CONSOLE 1 X
E-2 OPERATOR'S CHAIR 1 X
E-3 GANTRY 1 X
E-4
MAIN DISCONNECT
PANEL (MDP) 1 X
E-5 NG-2000V TABLE 1 X
E-6 PARTIAL UPS 14.4 KVA 1 X
E-7
POWER DISTRIBUTION
UNIT (NGPDU-92) 1 X
E-8 SYSTEM CABINET 1 X
E-9 GE STORAGE CABINET 1 X
E-10 INJECTOR ON CEILING 1 X
E-11 INJECTOR CONTROL 1 X
A B
7' -0
WOOD
VENEER ON
SOLID CORE,
LEAD LINED
WOOD (PAIR) VENEER
ON SOLID CORE, LEAD
LINED WITH INACTIVE
LEAF
HOLLOW METAL
LEAD LINED
DOOR FRAME
HOLLOW METAL
LEAD LINED
DOOR FRAME
3'-6" 5'-0"
1 2
7' -0
7' -0
7' -0
5'-0"3'-6"
2"
2"
2"
2"
2" HOLLOW METAL FRAME
WITH LEAD SHIELDING
LEADED SAFETY GLASS
CONTROL
ROOM
IMAGING ROOM
BOX HEADER
LEAD-LINED 5/8" TYPE
X GYPSUM BOARD PANELS -
EXTEND LEAD INTO FRAME
DOUBLE STUDS WELDED ON
EACH SIDE OFJAMB
OPENING
REMOVABLE GLAZING
STOP
CONTROL ROOM
IMAGING ROOM
STUD RUNNER - ATTACH
TO DOUBLE STUDS EACH
SIDE OF OPENING
LEAD LINED GYPSUM
BOARD PANELS
LEAD LINED HOLLOW
METAL FRAME ON FIRE
RETARDANT TREATED
WOOD BLOCKING
LEADED SAFETY GLASS
WITH GLAZING BLOCKS
AND TAPE
CONTROL ROOM IMAGING ROOM
STAINLESS STEEL
COUNTERTOP
STAINLESS STEEL
1/32" LEAD-LINED TYPE X
5/8"GYPSUM BOARD ON IMAGING
ROOM SIDE
CEILING AS SCHEDULED
TYPE PART
WIDTH
STUD
SIZE
STUD
SPACE
FIRE
RATE UL STC NOTE
A 5 1/4" 4" 16" NA - 45 MIN. TO B.O. STRUC.
A1 5 1/4" 4" 16" NA - TO 6" ABOVE
CEILING
TYPE PART
WIDTH
STUD
SIZE
STUD
SPACE
FIRE
RATE UL STC NOTE
B 5 1/4" 4" 16" NA - 45 MIN. TO B.O. STRUC.
B1 5 1/4" 4" 16" NA - TO 6" ABOVE
CEILING
CONTINUOUS STEELTRACK
WITH STEEL STUDS AS
NOTED BELOW
WALL BASE AS SCHEDULED
CONTINUOUS ACOUSTICAL
SEALANT
FLOOR FINISH AS SCHEDULED
CONTROL ROOM/
CORRIDOR/
EQUIPMENT ROOM
EXISTING STRUCTURE
CEILING AS SCHEDULED
CONTINUOUS STEELTRACK
WITH STEEL STUDS AS NOTED
BELOW
WALL BASE AS SCHEDULED
CONTINUOUS ACOUSTICAL
SELANT
FLOOR FINISH AS SCHEDULED
INSULATED WITH ACOUSTIC
SOUND BATTS
IMAGING
ROOM SIDE
G14
IMAGING ROOM G13 IMAGING ROOM G13
EXISTING…